W912BV23Q0034 0001.pdf
PDF 607 KB Posted
- Attached to
- AMENDMENT-DC Equipment (Fort Gibson Powerhouse) Federal contract opportunity
- Solicitation number
- W912BV23Q0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BV23Q0034 0002.pdf | ||
| ATTACHMENT 2.pdf | ||
| Attachment Photos.pdf | ||
| WF_130 VDC Panel.pdf | ||
| 130 VDC One-Line Diagram.pdf | ||
| Solicitation W912BV23Q0034 Webber Falls DC Equipment.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
THE PURPOSE OF THIS AMENDMENT IS TO
1. EXTEND THE SOLICITATION CLOSING DATE FROM: 03 MARCH 2023 TO: 17 MARCH 2023.
2. CHANGE THE DELIVERY PERIOD FROM: 31 MAY 2023 TO: 15 MACH 2024.
3. CHANGE SCOPE OF WORK DELIVERY FROM: 24 CALENDAR DAYS TO: 52 CALENDAR WEEKS
4. ADD ATTACHMENT 1 DRAWING, PHOTOS, AND DIAGRAMS
1. CONTRACT ID CODE PAGE OF PAGES
1 8
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 24-Feb-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV23Q0034
X 9B. DATED (SEE ITEM 11)
17-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
24-Feb-2023
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV23Q0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SCOPE OF WORK
1. Scope of Work
1.1. The contractor shall supply a quantity of 58 flooded cell lead acid batteries, remove and properly dispose of the existing bank of 58 flooded cell lead acid batteries, install and connect the supplied lead acid batteries.
1.1.1. The contractor shall supply a quantity of 58 flooded cell lead acid batteries and auxiliary equipment according to the following specification.
a. Type: Flooded cell, tubular plate, multi-cell (3)
b. Voltage: 2.2 volts
c. Capacity: 800 Amp-hours
d. Length: 8.3 inches
e. Width: 7.5 inches
f. Height: 28 inches
g. Quantity: 58
h. DIN 40736 Standard Type: 8 OPzS 800
i. Post Connectors: Flexible insulated copper cable (quantity 58)
j. Pad Lead Connectors: Insulated rubber boots (quantity 4)
1.1.2. The contractor shall disconnect, disassemble, and remove the existing bank consisting of
58 flooded cell lead acid batteries type 8 OPzS 800.
1.1.3. The contractor shall assemble, install, and connect 58 flooded cell lead acid batteries supplied as described in 1.1.
1.1.4. The contractor shall dispose of the removed batteries in accordance with applicable laws, EPA guidelines, and regulations, and provide a battery disposal certificate.
1.2. The contractor shall supply a quantity of two battery chargers and accessories according to the following specification.
a. Input Voltage: 480 Volts
b. AC Amperes: 33 amperes
c. Phase: 3 Phase
d. Frequency: 60 hertz
e. Power Rating: 15 kilowatts
f. Output Voltage: 130 Volts DC
g. No. Cells Charged: 60
h. Type of Cells Charged: Flooded Cell lead acid
i. Quantity: 2
j. Load Sharing: Yes
k. Load Sharing Cables: 2
1.3. The contractor shall supply a quantity of two panelboards in accordance with NEMA PB 1, UL
67, and UL 50 for the distribution of 125 Vdc power that meet the following specifications. The panelboards will be installed by government personnel. Each panelboard will be installed in a dedicated panel on the back side of the main control board. Main control board panels are 90 inches tall by 28 inches wide. Panels shall be installed such that the highest device to be operated does not exceed 72 inches above the ground plane.
1.3.1. Panel No. 1 Specifications
a. Voltage: 125/250 Vdc
b. Short-Circuit Current Rating: 35 kA
c. Service: Two-Wire, 125 Vdc
d. Bus Rating: 400 Amperes
e. Bus Type: Tinned Copper
f. System Ampacity: 250 Amperes
g. Ground Bar: Solid Aluminum
h. Feed Type: Bottom
i. Feed-Through Lugs: No
j. Circuit Breaker Specifications
1. Circuit Breaker Type: Molded Case
2. Circuit Breaker Connection to Bus: Bolt-on
3. Trip Unit Type: Thermal Magnetic
4. Circuit Breaker Poles: Two
5. Interrupting Rating: 35 kA
6. Branch Summation:
a) Main Breaker: 250 Ampere
b) 30 Ampere, 2-pole (quantity 20)
1.3.2. Panel No. 2 Specifications
a. Voltage: 125/250 Vdc
b. Short-Circuit Current Rating: 35 kA
c. Service: Two Wire, 125 Vdc
d. Bus Rating: 400 Amperes
e. Bus Type: Tinned Copper
f. System Ampacity: 250 Amperes
g. Ground Bar: Solid Aluminum
h. Feed Type: Bottom
i. Feed-Through Lugs: Opposite main breaker
j. Circuit Breaker Specifications
1. Circuit Breaker Type: Molded Case
2. Circuit Breaker Connection to Bus: Bolt-on
3. Trip Unit Type: Thermal Magnetic
4. Circuit Breaker Poles: Two
5. Interrupting Rating: 35 kA
6. Branch Summation:
a) Main Breaker: 250 Ampere
b) 100 Ampere, 2-pole (quantity 2)
c) 70 Ampere, 2-pole (quantity 4)
d) 30 Ampere, 2-pole (quantity 16)
1.4. The contractor shall supply a quantity of 8 flooded cell lead acid batteries, remove and properly dispose of the existing bank of 8 flooded cell lead acid batteries, install and connect the supplied lead acid batteries.
1.4.1. The contractor shall supply a quantity of 8 flooded cell lead acid batteries and auxiliary
a. Type: Flooded cell, tubular plate, multi-cell (3)
b. Voltage: 6 volts
c. Float Voltage: 6.6 Volts +/- 1%
d. Capacity: 200 Amp-hours
e. Length: 10.71 inches
f. Width: 8.07 inches
g. Height: 15.16 inches
h. Quantity: 8
i. DIN 40736 Standard Type: 4 OPzS 200
j. Post Connectors: Flexible insulated copper cable (quantity 8)
k. Pad Lead Connectors: Insulated rubber boots (quantity 4)
1.4.2. The contractor shall disconnect, disassemble, and remove the existing bank consisting of 8 flooded cell lead acid batteries type 4 OPzS 200.
1.4.3. The contractor shall assemble, install, and connect 8 flooded cell lead acid batteries supplied as described in 1.8.
1.4.4. The contractor shall dispose of the removed batteries in accordance with applicable laws,
1.5. The contractor shall supply a quantity of one battery charger and accessories according to the
a. Input Voltage: 120 Volts
b. AC Amperes: 15 amperes
c. Phase: 1 Phase
d. Frequency: 60 hertz
e. Power Rating: 15 kilowatts
f. Output Voltage: 48 Volts DC
g. No. Cells Charged: 24
h. Type of Cells Charged: Flooded Cell lead acid
i. Quantity: 1
j. Load Sharing: Capable for possible future added redundancy.
1.6. The contractor shall supply a battery rack spill containment pan with the following specification:
a. Material: Stainless steel
b. Length: 50 inches
c. Width: 20 inches
d. Height:2 inches
1.6.1. The contractor shall install a battery rack spill containment pan specified in 1.6 beneath the 48VDC battery bank.
1.7. The contractor shall supply a quantity of 12 flooded cell lead acid batteries, remove and properly dispose of the existing bank of 12 flooded cell lead acid batteries, install and connect the supplied lead acid batteries.
1.7.1. The contractor shall supply a quantity of 12 flooded cell lead acid batteries and auxiliary
a. Type: Flooded cell, tubular plate, multi-cell (3)
b. Voltage: 2 volts
c. Float Voltage: 2.23 Volts +/- 1%
d. Capacity: 600 Amp-hours
e. Length: 8.0 inches
f. Width: 5.5 inches
g. Height: 25.5 inches
h. Quantity: 12
i. DIN 40736 Standard Type: 6 OPzS 600
j. Post Connectors: Flexible insulated copper cable (quantity 12)
k. Pad Lead Connectors: Insulated rubber boots (quantity 4)
1.7.2. The contractor shall disconnect, disassemble, and remove the existing bank consisting of
12 flooded cell lead acid batteries type 6 OPzS 600.
1.7.3. The contractor shall assemble, install, and connect 12 flooded cell lead acid batteries supplied as described in 1.8.1.
1.7.4. The contractor shall dispose of the removed batteries in accordance with applicable laws,
1.8. The contractor shall supply a quantity of one battery charger and accessories according to the
a. Input Voltage: 120 Volts
b. AC Amperes: 15 amperes
c. Phase: 1 Phase
d. Frequency: 60 hertz
e. Output Voltage: 24 Volts DC
f. Output Amperes: 30
g. No. Cells Charged: 12
h. Type of Cells Charged: Flooded Cell lead acid
i. Quantity: 1
j. Load Sharing: Capable, for possible future added redundancy.
1.9. Location
The DC battery banks, battery chargers, distribution panels and spill containment are located in the Webbers Falls Powerhouse at 14300 S. Powerhouse Road, Webbers Falls, OK 74470. The batteries are located in the power plant’s battery room. The battery chargers are located in the power plant’s battery charger room. The DC distribution panels are located in the power plant’s control room.
1.10. References
a. NFPA 70 National Electrical Code
b. NFPA 70E Electrical Safety in The Workplace
c. EM 385-1-1 Army Corps of Engineers Safety and Health Requirements Manual, Current
Edition
1.11. Basis for Payment
Payment will be made in a lump sum upon completion and acceptance of work. Offer price shall include all costs, including technical assistance, installation, proper disposal, and shipping. Delivery shall be FOB destination, Webbers Falls Powerhouse, 4.5 miles north of interstate highway 40 and
3.6 miles east of state highway 351 in Webbers Falls, Oklahoma from 7:00 am – 4:30 pm Monday through Thursday, excluding Federal holidays. Contact the powerhouse at (Contact information will be provided at award) for coordination of product delivery.
1.12. Work Hours
Working hours at the Webbers Falls hydroelectric power plant are from 6:00 AM to 4:30 PM, Monday through Thursday. Deliveries are accepted between the hours of 8:00 AM and 4:00 PM, Monday through Thursday.
1.13. Completion Time
All work shall be completed and accepted within 52 calendar weeks of award of the Purchase Order.
1.14. Safety Requirements
The contractor shall comply with the Army Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, current edition in addition to all applicable Federal, State, and Local safety codes and practices.
http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.as px
1.14.1. The contractor shall develop and submit to the GDA an Activity Hazard Analysis (AHA) to identify hazards and controls for the transportation, spill/decontamination, removal/installation, bussing, and testing.
1.15. Equipment
All equipment used to perform work under this contract shall be in good operating and mechanical condition and shall comply with EM 385-1-1.
1.16. Weather Limitations
None.
1.17. Warranty
All material provided will have a full replacement warranty which covers defects in workmanship for a period of twelve months from the date of delivery and acceptance.
2. Part 2 – Products
2.1. Materials
Other than those listed as Government furnished the contractor shall furnish all materials and supplies required to complete this task.
2.2. Delivery and Storage
The Contractor is responsible for proper movement and storage of all Government material. All material will be picked-up and returned to the site undamaged and properly stored to avoid damage at contractor facilities.
Materials that are damaged during the transportation or improper storage shall be replaced at no cost to the Government.
2.3. Government Furnished Property
The contractor shall coordinate use of any government furnished property required to complete this contract with the powerhouse specialist.
3. Part 3 - EXECUTION
3.1. Accomplishment of Work
The contractor shall perform all necessary preparations and work to provide for the proper inspection, installation, and testing of equipment. Contractor will meet the requirements and timelines as identified.
3.2. Testing
The contractor shall provide test reports indicating battery conformance to DIN 40736. Contractor must report all defects of materials, including those deemed to have originated at the manufacturer to the Government immediately. The testing shall be performed in accordance with appropriate IEEE/ANSI standards, the manufacturer's recommendations, and EM 385-1-1.
3.3. Technical Data
The contractor shall provide the pertinent technical data for all material, products, and equipment supplied. Such data shall include product cut sheets, operation and maintenance manuals, and manufacturer drawings.
3.4. Warranty
Contractor will guarantee that all completed work will be free of any defects and poor workmanship for a period of 1 year from date of receipt and acceptance. All defects and poor workmanship found will be corrected with no extra charge to the Government.
SECTION F - DELIVERIES OR PERFORMANCE
The following Delivery Schedule item for CLIN 0001 has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
31-MAY-2023 1 OD, TS, HYDRO, RS KERR, WEBBERS
FALLS
RR 1 BOX 145
WEBBERS FALLS OK 74470-9708
FOB: Destination
967358
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
15-MAR-2024 1 OD, TS, HYDRO, RS KERR, WEBBERS
FALLS
RR 1 BOX 145
WEBBERS FALLS OK 74470-9708
FOB: Destination
967358
SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
The below Table of Contents has been added
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 ATTACHMENT 1 9 24-FEB-2023
(End of Summary of Changes)
File details come from the government source that posted it. Updated .