Attach L-1 MPS wo Cost Example Project dtd 15 Mar 2021v3 40M HZ ERS MEGA.xlsx
XLSX spreadsheet 16 KB Posted
- Solicitation number
- W912BV-21-R-0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attach L-2 MPS wCost Example Project dtd 15 Mar 2021 40M HubZone ERS MEGA.xlsx | XLSX spreadsheet | |
| Rev Final Sect B dtd 15 Mar 2021 40M HZ ERS MEGA .xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT L-1 |
| MILESTONE PAYMENT SCHEDULE WITHOUT COST |
$40M HubZone ERS MEGA MATOC
EXAMPLE PROJECT
EXCAVATION AND DISPOSAL AREA
FORMER FUEL STORAGE AREA
COLLEGE STATION, TEXAS
| Solicitation #W912BV-21-R-0023 |
| Contract #TBD |
2 March 2021
Offeror:
INSTRUCTIONS FOR COMPLETION OF ATTACHMENT L-1:
1) Ensure the Offeror's name is provided in the cell above.
2) DO NOT make any changes to this document.
3) Offerors MAY NOT propose alternate Milestones to the CLINs/sub-CLINs identified below;
4) Enter the Projected Start and Completion Dates for each CLIN/sub-CLIN ONLY (green cells in columns C and D).
5) Manually enter the dates, do not link to other spreadsheets.
**Non-compliance with the above instructions will result in the assignment of a 'Deficiency' and the Offeror's proposal being removed from further consideration for contract award.
IMPORTANT: Offerors MUST submit the Excel version of the Attachment L-1 provided with the RFP. Failure to do so will result in the assignment of a 'Deficiency' and, therefore, the Offeror's proposal being removed from further consideration for contract award.
| CLIN | MILESTONE DESCRIPTION | Projected Start Date | |
| (MM/DD/YY) | Projected Completion Date |
(MM/DD/YY)
TASK 1
PROJECT MANAGEMENT
| 0001 | Kick-Off Meeting via teleconference within 15 calendar days of contract award |
| 0002 | Project Management Plan (PMP) |
| 0002AA | Draft PMP |
| 0002AB | Final PMP |
| 0003 | Quality Assurance/Quality Control (QA/QC) Plan |
| 0003AA | Draft QA/QC Plan |
| 0003AB | Final QA/QC Plan |
| 0004 | Monthly Progress Reports |
| 0005 | Accident Prevention Plan (APP)/Site Safety and Health Plan (SSHP) |
| 0006 | Annual Contractor Manpower Reporting |
-Period ending 30 Sep 2022 -Period ending 30 Sep 2023
TASK 2
OPTIMIZED UFP-QAPP & SWPP
| 0007 | Optimized UFP-QAPP |
| 0007AA | Draft UFP-QAPP |
| 0007AB | Final UFP-QAPP |
| 0008 | Storm Water Pollution Prevention Plan (SWPPP) |
| 0008AA | Draft SWPPP |
| 0008AB | Final SWPPP |
TASK 3
EXCAVATION AND DISPOSAL
0009 Excavation and Disposal of Contaminated Soil
TASK 4
SAMPLING
0010 Sampling
TASK 5
BACKFILL
0011 Backfill
TASK 6
RE-VEGETATION
0012 Re-Vegetation
TASK 7
FINAL RESPONSE ACTION COMPLETE REPORT (RACR)
| 0013 | Response Action Completion Report (RACR) |
| 0013AA | Draft RACR |
| 0013AB | Final RACR |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .