SEE ADDENDUM
(No Collect Calls)
W912BV20Q0066 10-Apr-2020
b. TELEPHONE NUMBER
918.669.7657
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 30 Apr 2020
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
C C THAYER
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
918-669-7436FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$19,500,000
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF85
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments before submitting documents. Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio-visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes must be received in a supported Adobe or Microsoft Office file format. These formats are the only acceptable methods of submitting a quote electronically. Zip Files, Cloud storage providers, google docs, web based drop boxes, OneNote/OneDrive, URLs, web-based format, or any other virtual/web-based memory service are NOT acceptable methods of submitting a quote electronically. All documents must be attached in one file.
Reference the solicitation in the subject line. Send quotes to E-mail address CESWT-CT-SS- Quotes@USACE.Army.mil and copy Douglas.D.Buffington@USACE.Army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas D. Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
Douglas Buffington, CECT-SWT-E 2488 East 81st Street
TULSA, OK 74137
FAX: (918) 669-7436
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand-carried, please provide notification to the Contract Specialist at least one working day in advance, (918-669-7078) or Douglas.D.Buffington@USACE.Army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points located on the 16th floor of the small tower. Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District Office. The address of the Tulsa District Office is below:
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 East 81st Street
TULSA, OK 74137-4290
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the pricing schedule provided in the solicitation.
3) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, and L.
4) Your quote must identify the business size of the prime contractor and the business name and address of any subcontractors, if applicable, based on the NAICS code identified. Offerors must clearly identify whether a subcontractor(s) will be performing work, the percentage of work to be performed by each subcontractor, and the socio-economic category into which each identified subcontractor falls. (FAR 52.219-14 LIMITATIONS ON
SUBCONTRACTING (DEVIATION 2019-O0003) (JAN 2019))
5) Evidence that the contractor has completed a project similar to the size and scope of this project.
NOTICE OF ROADWAY
Offerors are encouraged to review road conditions between the two sites. Geographically the sites are less than two miles apart however the roadway between the two locations may not be available for use for an extended time due to roadwork.
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is not scheduled due to COVID-19 concerns. All requests about site conditions, requests for clarification or questions related this solicitation must be requested on Bidder's Inquiry. See instructions below.
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
In accordance with AFARS 5132.702(a)(ii)(B): “Funds are not presently available for this acquisition. No contract award will be made until appropriated funds are made available.”
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.Beta.SAM.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐ register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV20Q0066 The Bidder Inquiry Key is: K2WMET-5WJJ3V
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 2:00pm (Central) Monday, 27 April 2020 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington Telephone: 918‐669‐7078 E‐MAIL: Douglas.D.Buffington@usace.army.mil
Section B - Supplies or Services and Prices
PRICE SCHEDULE
PRICE SCHEDULE
Eufaula Project Office and Powerhouse Office Janitorial Services
TOTAL COST $
Base Year 1 May 20 – 30 Apr 21
CLIN SERVICES QTY UNIT UNIT COST TOTAL
0001 Janitorial Project Office 12 MO $ $
0002 Janitorial Powerhouse 12 MO $ $
0003 Janitorial Fishing Area 6 EA $ $
SubTotal $
First Option Year 1 May 21 – 30 Apr 22
CLIN SERVICES QTY UNIT UNIT COST TOTAL
1001 Janitorial Project Office 12 MO $ $
1002 Janitorial Powerhouse 12 MO $ $
1003 Janitorial Fishing Area 6 EA $ $
Second Option Year 1 May 22 – 30 Apr 23
CLIN SERVICES QTY UNIT UNIT COST TOTAL
CLIN SERVICES QTY UNIT UNIT COST TOTAL
2001 Janitorial Project Office 12 MO $ $
2002 Janitorial Powerhouse 12 MO $ $
2003 Janitorial Fishing Area 6 EA $ $
Third Option Year 1 May 23 – 30 Apr 24
CLIN SERVICES QTY UNIT UNIT COST TOTAL
3001 Janitorial Project Office 12 MO $ $
3002 Janitorial Powerhouse 12 MO $ $
3003 Janitorial Fishing Area 6 EA $ $
Fourth Option Year 1 May 24 – 30 Apr 25
CLIN SERVICES QTY UNIT UNIT COST TOTAL
4001 Janitorial Project Office 12 MO $ $
4002 Janitorial Powerhouse 12 MO $ $
4003 Janitorial Fishing Area 6 EA $ $
SUBCONTRACTING SCHEDULE
PRIME CONTRACTOR SOCIO-ECONOMIC CATEGORY % OF WORK TO BE
PERFORMED
SUBCONTRACTOR SOCIO-ECONOMIC CATEGORY % OF WORK TO BE
CAGE AND ADDRESS PERFORMED
Section C - Descriptions and Specifications
PERFORMANCE WORK STATEMENT
Eufaula Lake
Oklahoma
Services Contract for
Janitorial Work
Project Office and Powerhouse
1 November 2020
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title
1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Materials and Supplies 8 Performance Requirements 9 Contractor Quality Control (CQC) 10 Deductions for Deficient Work 11 Safety and Security 12 Contractor's Facilities 13 Reporting Defective Facilities 14 Building Security 15 Pre-work Conference 16 Contractor Submittals 17 Work Schedules 18 Billing 19 Required Insurance and Insurance Certificate 20 Antiterrorism And Operations Security Requirements
EXHIBITS
No. TITLE
1 Quality Assurance Report (SWT Form 982) 2 Specifications for Contractor-Furnished Materials and Supplies 3 Performance Requirements Table 4 Invoice Format 5 Quality Control Inspection Log (SWT Form 990)
APPENDICES
Appendix Title A Janitorial Work - Project Office B Janitorial Work – Powerhouse C Janitorial Work – Fishing Area
1. SCOPE OF WORK. The work required under this specification provides for the following:
1.1. Janitorial work at the project office complex.
1.2. Janitorial work at the powerhouse and contiguous exterior
1.3. Janitorial work at the fishing area below the dam areas.
2. DEFINITIONS.
2.1. Bimonthly. Work required to be performed every other month.
2.2. Biweekly. Work required to be performed every other week.
2.3. Contractor Quality Control (CQC). The contractor’s system of controlling the quality of services provided under the provisions of the contract.
2.4. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 3.
2.5. Government. The term "Government" as used herein means the United States of America.
2.6. Performance Requirement (PR). Refers to the Government's requirement for each service provided under the contract. Performance Standard (PSTD) specifies the minimum standard (quality) for each service provided under the contract.
2.7. Project. The term "project" as used herein means all Government property and easements at Eufaula Lake.
2.8. Public Use Area (PUA). Definition of parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.9. Quality. Conformance with the contract specification.
2.10. Quality Assurance (QA). The procedure by which the Government determines if the contractor is in conformance with the contract specification (quality of work).
2.11. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.12. Semimonthly. Work required to be performed two times per month.
2.13. Semiweekly. Work required to be performed two times per week.
2.14. Workday is any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, (EM 385-1-1, current issue) is hereby incorporated into this specification. The Contracting Officer or their designee will furnish EM 385-1-1 to the contractor after contract award.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of janitorial work shall be in accordance with this specification.
4.2. Acceptance of janitorial work. The Government shall accept work unless the Contracting Officer Representative notifies the contractor of deficient services.
4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the Contracting Officer Representative in writing within two (2) workdays.
Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance Report (SWT Form 982, Exhibit 1).
4.2.2. If the Contracting Officer Representative notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 9 for deficient work not re-performed.
4.2.3. The contractor shall notify the Contracting Officer Representative when deficiencies have been corrected by completing Part IV of the QA Report, provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer Representative shall complete Part V of the QA Report and furnish the contractor a copy. A copy will also be provided the Contracting Officer at the Tulsa District Office.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during their absence, shall be designated in writing.
5.2.2. The contractor shall provide the Contracting Officer Representative (COR) a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits.
6.1 Upon request, the contractor shall present equipment to the Contracting Officer or Contracting Officer’s Representative for inspection. Equipment brought to the project shall not be used until it has passed inspection. The Contracting Officer or Contracting Officer’s Representative shall establish the time and location for these inspections.
6.2. All motorized equipment shall be powered by 115 Volts AC.
6.3. All equipment must be in good operating and mechanical condition and shall comply with
EM 385-1-1.
6.4. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer approves use of other areas.
7. MATERIALS AND SUPPLIES.
7.1. Contractor Furnished.
7.1.1. Except for the items listed in subparagraph 7.2., the contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification within specified time limits.
7.1.2. All materials and supplies shall be new and adequate quantities shall be maintained to perform the required services without interruptions. All materials and supplies are subject to review by the Contracting Officer Representative to determine compliance with this specification.
7.1.3. Specifications for selected contractor-furnished materials and supplies are given in Exhibit 4.
7.1.4. In addition to materials and supplies listed in Exhibit 4, the contractor shall furnish the following:
Carpet Shampoo Cleaning compounds Disinfectants Glass Cleaner Mops, brooms, etc.
Wax & stripping agents for tile floors Spot Remover for carpets & upholstered chairs Any equipment for cleaning up to a 10 foot level as per the specifications within this requirement
7.2. Government Furnished. The Government will furnish potable water and trash cans at the fishing areas.
8. PERFORMANCE REQUIREMENTS. Performance Requirements (PRs) for work performed under this specification are given in Exhibit 5. The contractor's performance will be evaluated using these PRs as follows:
8.1. Services provided by the contractor will be inspected for compliance with Performance Standards (PSTDs). Those not meeting PSTDs shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.
8.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance. Deficient services determined in this manner will be used to compute defect rates. These defect rates will be compared to PSTDs to determine whether the contractor’s performance is acceptable.
8.3 When QA inspections indicate the contractor’s performance is marginal or unsatisfactory, the contractor shall furnish the Contract Officer’s representative a written plan for correcting his/her CQC program within (2) workdays. In addition, the contractor shall also furnish weekly written status reports on the implementation of this plan until such time the Contract Officer’s Representative determines that the performance is satisfactory; the contractor shall continue weekly status reports until the Contract Officer’s Representative ceases the requirement.
9. CONTRACTOR QUALITY CONTROL (CQC). The contractor shall establish and execute a CQC Plan to assure that all work required by this contract is completed on schedule and in accordance with the PR’s provided in Exhibit 3.
9.1. Results of quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 5). Furnish a copy of completed inspection logs to the Contract Officer’s Representative weekly.
9.2. Requirements in 9.1. may be waived by the Contract Officer’s Representative if it is determined proper CQC can be achieved without the required submissions. This determination will normally be made on the basis of actual performance by the contractor and shall be made in writing by the Contract Officer’s Representative.
10. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PSTDs in Exhibit 5. Deductions for documented defects will be made in accordance with the following procedures:
10.1. Each service found deficient and re-performed by the contractor: No deduction.
10.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
10.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
10.4. Each service found deficient and not re-performed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
11. SAFETY AND SECURITY.
11.1. Safety Plan. The contractor shall furnish the Contracting Officer a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
11.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
11.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
11.1.3. Procedures for handling, reporting, and correcting unafe conditions, practices, and safety violations.
11.1.4. Procedures for treating and transporting injured persons to medical facilities.
11.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the Contracting Officer Representative.
11.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
11.4. The contractor shall maintain a key register (SWT Form 894) to record the assignment of all keys provided by the Government. Extra keys shall be returned to the COR. Discharged employees shall be required to return all keys. Keys shall not be duplicated. Any occurrence of lost keys shall be reported to the COR immediately. If keys are lost the contractor shall reimburse the Government for the cost of new keys and tumblers/locks. The contractor shall also install the tumblers/locks at no expense to the Government. Upon termination of the contract, all keys shall be returned to the Government.
11.5. ANTITERRORISM AND OPERATIONS SECURITY REQUIREMTS:
The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the Contracting Officer upon written request.
11.6. Accident Reports.
11.6.1. The contractor shall immediately notify the Contracting Officer Representative and the Contracting Officer of all known accidents that occur at the project and result in death or serious injury.
11.6.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer Representative immediately and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
11.7. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
12. CONTRACTOR'S FACILITIES. The contractor shall be responsible for storage of materials, supplies, and equipment to maintain the services required by this contract. A wall locker 4 feet wide by 2 feet deep is available at the project office for storage of janitorial supplies and equipment. A limited amount of storage space is available for storage of janitorial supplies in the powerhouse.
13. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the Contracting Officer each workday.
14. BUILDING SECURITY. The names of contractor personnel authorized to perform work under this contract shall be furnished the Contracting Officer Representative. Only those persons whose name appears on this list shall be allowed access to buildings. When Government personnel are not present while work is being performed, contractor personnel shall keep buildings locked and refuse entrance to anyone who does not have a key to the buildings.
Contractor personnel will be instructed in the operation of intruder alarm systems and will be responsible for correct operation of these devices when work is performed and Government personnel are not present.
15. PREWORK CONFERENCE. The Contracting Officer or their representative shall conduct an on-site Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 16 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting Officer or their representative shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.
16. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer Representative prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer Representative. If the Contracting Officer Representative determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
16.1. Names of supervisor and alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
16.2. Contract Quality Control Plan.
16.3. Safety Plan (subparagraph 11.1.).
16.4. Work schedules (submit prior to initiation of work and prior to changing schedules) (paragraph 17.).
16.5. All exposure reports (submit by 2nd workday of each month) (subparagraph 11.5.) shall be submitted before an invoice will be accepted.
16.6. AT/OPSEC Training Forms (SECTION H).
16.7. eVerify Requirement (SECTION H).
17. WORK SCHEDULES. The contractor shall furnish the Contracting Officer and the Contracting Officer’s Representative a schedule for performing all janitorial work that is required at a weekly frequency or less. A revised schedule shall be furnished the Contracting Officer and the Contracting Officer’s Representative prior to the contractor changing his mode of operation.
18. BILLING.
18.1. The contractor shall submit the original and two copies of invoices at the end of each month for all completed work.
18.2. Invoices shall be prepared in the format shown at Exhibit 6.
18.3. All exposure reports shall be submitted before an invoice will be accepted.
18.4. Invoices and supporting documents shall be delivered or mailed to the Project Manager, Eufaula Project Office, Rt. 4, Box 5500, Stigler, OK 74462.
19. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:
19.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.
19.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.
19.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.
20. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the Contracting Officer upon written request.
EXHIBIT 1
QUALITY ASSURANCE REPORT
See SECTION J, Attachment 1, SWT Form 982
EXHIBIT 2
SPECIFICATIONS FOR CONTRACTOR-FURNISHED MATERIALS AND SUPPLIES
ITEM APPENDIX SPECIFICATION
HAND SOAP A LIQUID, HIGH LATHERING & SUDSING
CHARACTERISTICS, MILDLY PERFUMED
(WOMEN).
HAND SOAP A BAR, LAVA OR EQUIVALENT (MENS).
REFUSE CONTAINER LINER A PLASTIC, 8 TO 32 GALLON.
TISSUE PAPER A 2-PLY BATH TISSUE, NON-BLEACHED,
NATURAL, SEPTIC TANK SAFE, MINIMUM
OF 500 SHEETS PER ROLL, 100% POST
CONSUMER WASTE RECYCLED
MATERIALS, #100, FORT HOWARD CO. OR
EQUAL.
TOWELS A SINGLE PLY, SINGLE-FOLD, NATURAL, 40%
POST CONSUMER WASTER RECYCLED
MATERIALS TO MEET EPA GUIDELINES AS
SPECIFIED IN THE FEDERAL REGISTER
#150, FORT HOWARD OR EQUAL.
URINAL DEODORANT SCREEN A Perfumed, Commercial Quality, Septic Tank Safe, SANI, Enzymatic cleaner block and screen or equal
DISHWASHING LIQUID AND
DISHWASHER LIQUID OR PODS
A DISHWASHING LIQUID (DAWN) OR
EQUAL TYPE, DISHWASHER LIQUID
OR PODS (CASCADE) OR EQUAL
TYPE.
EXHIBIT 3
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENTS PR NO. PERFORMANCE STANDARDS
APPENDIX A
Dust furniture, etc. 1 All surfaces free of dust.
Clean floors 2 Clean. No litter, mop strands, streaks, swirl marks, or detergent residue left on floors. No splash marks on furniture, walls, baseboards, etc.
Buff floors 3 Entire floor has a uniform, glossy appearance. No scuffmarks or visible wax buildup. Baseboards, furniture, etc., shall be free of cleaning and waxing solutions.
Vacuum carpets 4 Clean. Stains and residue from new spills removed.
Clean mirrors & glass (other than windows)
5 Clean, no streaks.
Clean restrooms 6 Odor-free. All fixtures, walls, & floors clean.
Lavatories, urinals, commodes, & floors sanitary.
Soap, towels, & toilet tissue adequate until next cleaning day.
Clean drinking fountains 7 Clean, sanitary.
Grounds keeping 8 Grounds, parking areas, & sidewalks free of refuse & debris.
Refuse collection 9 Containers empty. Liners clean and not torn.
Refuse disposal 10 Refuse deposited in dumpsters. No refuse left outside dumpsters.
Cleaning at heights ten foot and below
11 Remove dust/grime from all flat and dust collecting surfaces at or below ten feet in height including duct work which does not contain asbestos, cabinets, lights, vents, piping, governor tanks, regulators, piping, plant equipment, and tanks. Dust removal shall be accomplished by either vacuum with a HEPA Filter equipped vacuum or wet wiping surfaces. Any cleaning solutions to be used on painted surfaces shall be tested in an inconspicuous area prior to use to ensure they do not negatively impact the surface finish.
Cleaning solutions shall not contact any operating equipment (i.e. touch panel screens) during cleaning activities.
EXHIBIT 4
INVOICE FORMAT
See SECTION J, Attachment 2, Eufaula Janitorial Invoice Format
EXHIBIT 5
QUALITY CONTROL INSPECTION LOG
See SECTION J, Attachment 3, SWT Form 990
APPENDIX A
JANITORIAL WORK - PROJECT OFFICE
1. FACILITIES TO BE SERVICED. The facilities to be serviced under the provisions of this appendix consist of the project office and contiguous exterior areas. An inventory of these areas is given in Table A.
2. FREQUENCIES AND TIMES OF SERVICES. Services required shall be performed Monday thru Friday, excluding Federal holidays.
All work shall be accomplished between 8:00 a.m. and 3:30 p.m.
3. DESCRIPTION OF JANITORIAL WORK. The contractor shall perform the following work:
3.1. Interior Heated Areas (Excluding Restrooms).
3.1.1. Each cleaning day. Empty trash receptacles, check and
fill paper towel dispenser in kitchen area, clean sinks, counter tops, interior of microwave oven (s) and coffee maker, vacuum carpeted floors, and clean tile floors. Spot remover shall be used to remove new spills from carpeted floors. Dust venetian blinds, window frames and sills. Clean exterior surfaces of refrigerator. The glass on entry doors, pictures, and adjacent glass enclosures shall be cleaned. Electronic equipment, computers, typewriters, videocassette recorder, radio, and copy machine shall not be cleaned.
3.1.2. Weekly. Waxed (vinyl and quarry tile) floors shall be
mopped and buffed.
3.1.3. Annually. Waxed floors shall be stripped, sealed and
polished.
3.2. Restrooms. Each cleaning day. Clean mirrors and plumbing fixtures, to include all porcelain bowls, urinals, toilet seats, and supply lines. A disinfectant shall be used to eliminate odor and minimize health hazards. Deodorant cakes shall be maintained in urinals. Empty trash receptacles. Soap, paper towels, and toilet tissue dispensers shall be checked and filled if necessary. Wet mop floors using cleanser and a disinfectant.
Excess water shall be removed from floors. Clean partitions.
Biological formations and resultant stains shall be removed from partitions. Dust venetian blinds, window frames and sills.
3.3. Interior Work and Storage Areas. Each cleaning day.
Empty trash receptacles. Sweep or dust mop floors. Wet mopping shall be performed if necessary to remove dirt. Dust windowsills.
3.4. Exterior Areas. Each cleaning day trash, debris, and
accumulations of small litter shall be picked up (including vegetative material such as sticks and leaves). Sidewalks shall be swept clean.
3.5. Refuse Disposal. The contractor shall dispose of all
refuse collected at the project office in the dumpster provided by others.
4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs in Exhibit 5. The terms clean, sanitary, and odor-free facilities are used in Exhibit 5 and are defined as follows.
4.1. Clean. The contractor shall vacuum, sweep, wash, wipe, or brush facilities to ensure that dirt, dust, rocks, debris, trash, garbage, fecal matter, urine, soap scum, biological formations and resultant stains, insects, insect nests and webs, and residue from cleaning agents are removed.
4.2. Sanitary. The contractor shall disinfect facilities each time they are cleaned.
4.3. Odor-free. The contractor shall use a chemical agent in a manner that will eliminate odor from facilities.
TABLE A
INVENTORY OF PROJECT OFFICE FACILITIES
AREA SIZE
Interior Heated Areas with Carpeted Floors 4,569 SF Interior Heated Areas with Vinyl Tile Floors 826 SF Quarry Tile, Hallway & Men’s Restroom 611 SF Sidewalks 50 LF Exterior Areas (surfaced) 1 AC Lawn Area 1.5 AC
W912BV20Q0066
APPENDIX B
JANITORIAL WORK - POWERHOUSE
under the provisions of this appendix consist of the powerhouse and contiguous exterior areas. An inventory of these areas is given in Table B.
2. FREQUENCIES AND TIMES OF SERVICES. Services required on each workday shall be performed Monday through Friday, excluding Federal holidays. All work shall be accomplished between 7:00 a.m. and 3:00 p.m. Services required on a weekly, monthly, quarterly, or annual basis shall be performed on any of the workdays specified above.
3. DESCRIPTION OF WORK.
3.1. Offices, Lobby, Balcony, Entranceways, Control Room, Electronic Equipment Room, Kitchen, Hallways, Elevator,and Stairways (Excluding Restrooms).
3.1.1. Each cleaning day. Empty all trash receptacles. Clean
sink and counter top; sweep/dust mop tile floors (wet mopping shall be accomplished if necessary to remove dirt). Control switchboards, electronic equipment, computers, radio, and copy machines shall not be cleaned.
3.1.2. Weekly. Wet mop all tile floors; dust office furniture and pictures; vacuum carpeted floors; and clean exterior surfaces of refrigerators, microwaves, and stoves. Clean glass on all doors and windows. Clean interior of microwave ovens.
Waxed floors shall be buffed.
3.1.3. Monthly. Clean chairs, including removal of spots from upholstered chairs.
3.1.4. Quarterly. Spot shampoo carpeted floors to remove
difficult stains. Strip vinyl tile floors(if necessary).
3.1.5 Semi-Annually. Strip vinyl tile floors and rewax. Remove dust/grime from all flat and dust collecting surfaces at or below ten feet in height. Dust removal shall be accomplished by vacuum with a HEPA filter equipped vacuum. This work shall be accomplished in May and November and shall be completed from start to finish in a two-week time frame
3.1.5. Annnually. Strip vinyl tile floors and rewax. This
shall be accomplished in the same scheduled timeframe each contract year.
3.2. Restrooms, Locker Room, and Showers.
3.2.1. Each cleaning day. Sweep and wet mop (disinfect)
floors. Excess water shall be removed from floors after wet mopping. Clean mirrors and plumbing fixtures. A disinfectant shall be used to eliminate odor and minimize health hazards.
Deodorizing urinal screens shall be maintained in all urinals.
Trash receptacles shall be emptied. Soap, paper towels, and toilet tissue dispensers shall be checked and filled if necessary.
3.2.2. Weekly. Clean walls, partitions and shower stalls.
Biological formations and resultant stains shall be removed from shower stalls.
3.2.3. Monthly. Clean ceilings, fans, HVAC vent covers, and
light covers. Ceramic tile floors shall be scrubbed with buffer brush and cleaner.
3.3. Erection Bay, Generator Floor, Turbine Floor, Shop Areas (including office and store rooms), Store Rooms and Storage Areas, Second Floor, First Floor, and all Stairways.
3.3.1. Each cleaning day. Empty trash receptacles. Sweep shop floor (including office and storerooms).
3.3.2. Weekly. Sweep or dust mop floors (wet mopping shall be accomplished if necessary to remove dirt). Wet mop shop floor.
All grease and oil stains shall be removed from the floors.
3.3.3. Quarterly. Wet mop all floors except first floor.
First floor shall be broom scrubbed with cleanser and rinsed with water. (All grease and oil stains shall be removed).
Generator bay floor shall be buffed with high speed commercial buffer.
3.3.4. Semiannually. Remove (by vacuuming or wet wiping) all
dust/grime from all flat and dust collecting surfaces at or below ten feet in height including duct work which does not contain asbestos, cabinets, lights, vents, piping, plant equipment. (This is for all 3.3 areas). Strip and Wax all types of tile floors. Tile floors shall be stripped prior to every time they are waxed and finished. This work shall be accomplished in May and November and shall be completed from start to finish in a two-week time frame.
3.4. Intake Structure, Transitional Area Between Powerhouse and Intake.
3.4.1 Quarterly. Pick up litter, trash and debris. Stairways
and floors shall be swept. Floors in the transitional area and in the intake gate room shall be washed down with water to clean sand and salt from area.
3.5. Exterior Surfaced Areas (inside secured parking lot).
3.5.1 Daily. Pick up litter, trash, debris, and fishing line.
3.5.2 Monthly. Clean fishing line from south parking lot fence.
Sweep phone booth floor and clean spider webs from phone booth and employee entrance area.
3.6. Refuse Disposal. The contractor shall dispose of all
refuse collected at the powerhouse in the dumpster provided by others.
4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs in Exhibit 3. The terms clean, sanitary, and odor-free facilities are used in Exhibit 3 and are defined as follows.
4.1. Clean. The contractor shall vacuum, sweep, wash, wipe, or brush facilities to ensure that dirt, dust, rocks, debris, trash, garbage, fecal matter, urine, soap scum, biological formations and resultant stains, insects, insect nests and webs, and residue from cleaning agents are removed.
4.2. Sanitary. The contractor shall disinfect facilities each time they are cleaned.
4.3. Odor-free. The contractor shall use a chemical agent in a manner that will eliminate odor from facilities.
TABLE B
INVENTORY OF POWERHOUSE FACILITIES
AREA SIZE
Offices, Lobby, Balcony, Entrance Ways, Elevator, Control Room, Electronic Equipment Rooms, Locker Room, Kitchen, Hallways, and Stairways
Areas with Carpeted Floors 1,020 SF Areas with Vinyl Tile Floors 3,414 SF Areas with Ceramic Tile Floors 852 SF
Restrooms & Showers 912 SF
Machine Shop 2,275 SF
Erection Bay, Generator Floor, Turbine Floor, Second Floor, First Floor, and Telephone Booth 38,587 SF
Intake Structure, Area Between Dam and Powerhouse 5,371 SF
Third Floor Storage Area 900 SF
Exterior Surfaced Areas .05 AC
APPENDIX C
JANITORIAL WORK – FISHING AREA
under the provisions of this appendix consist of the fishing areas located on both sides of the Canadian River immediately down-stream of the dam. An inventory of these areas is given in Table A.
2. FREQUENCIES AND TIMES OF SERVICES.
2.1. Trash cans at the fishing area shall be emptied every
Monday, Wednesday and Friday.
2.2. Services required for cleaning of the fishing area shall be ordered no more than six times in a calendar year.
3. DESCRIPTION OF JANITORIAL WORK. The contractor shall perform the following work:
3.4. Fishing_Area_(below_the_dam).
3.4.1. Each cleaning day empty trash receptacles and replace
trash bags. Trash may be disposed of in the dumpsters located in the powerhouse and fishing area parking lots. There are two trash cans located underneath a covered shelter (north side) in the fishing area adjacent to the powerhouse parking lot and two located on the wing wall (south side). A key to each gate will be provided so the contractor can access each receptacle by vehicle. The Government will be responsible for replacing any damaged or stolen trash cans.
3.4.2. The Government will issue a work order to clean the
fishing area. When a work order is issued the contractor shall complete the work within ten calendar days. Work includes but is not limited to the following. All trash such as paper, plastic, fishing line, clothes etc. must be collected and placed in one of the dumpsters located in either fishing area parking lot. A map showing an outline of this trash removal is included.
3.5. Refuse Disposal. The contractor shall dispose of all
refuse collected at the project office in the dumpster provided by others.
TABLE C
INVENTORY OF FISHING AREA FACILITIES
AREA SIZE
Fishing Area 71,354 SF North Side 2 35 GA cans South Side 2 35 GA cans
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-1 Contractor Inspection Requirements APR 1984
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991 252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
Section H - Special Contract Requirements
WAGE DETERMINATION
"REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-5333 Daniel W. Simms Division of | Revision No.: 12 Director Wage Determinations| Date Of Last Revision: 12/23/2019 Note: Under Executive Order (EO) 13658 an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1 2015. If this contract is covered by the EO the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination if it is higher) for all hours spent performing on the contract in calendar year 2020. The EO minimum wage rate will be adjusted annually.