W912BV19R0036 - Cranes MATOC Phase 1.pdf

PDF 2 MB Posted

Attached to
Cranes MATOC Federal contract opportunity
Solicitation number
W912BV19R0036
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

This solicitation requests proposals for multiple award task order contracts to provide crane rehabilitation and replacement services. Work will involve facilities such as overhead bridge cranes up to 600 tons, gantry cranes up to 480 tons, and underhung monorail cranes up to 25 tons. Services are required at locks, dams, and other facilities within the boundaries of the Tulsa District of the U.S. Army Corps of Engineers. The solicitation is set aside for small businesses and will result in awards to up to five contractors for a base period of three years plus two one-year options. The total contract capacity is $49.5 million to be shared among the awardees. Proposals are due by December 10, 2020 and will be evaluated using a two-phase selection process. Phase 1 will evaluate offeror qualifications and performance history, with the top five scorers advancing to Phase 2 to submit technical and pricing proposals for an initial task order.

View the file

Other files for this federal contract opportunity

Other files attached to Cranes MATOC, newest first.
File Type Posted
W912BV19R0036-AM03.pdf PDF
W912BV19R0036 - AM02.pdf PDF
W912BV19R0036 - AM01.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation No. W912BV19R0036

US Army Corps of Engineers Tulsa District Arkansas and Red River Watersheds Kansas, Oklahoma, and Texas

Multiple Award Task Order Contract (MATOC) for SWT Crane Rehabilitation and Replacement - FY21

Review Specifications

June 30, 2020

CRANE MATOC FY20 CRNMATOCFY20

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

INSTRUCTIONS TO OFFERORS (RFP)

PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF

AWARD

00 45 00 REPRESENTATIONS AND CERTIFICATIONS

00 72 00 GENERAL CONDITIONS (CONTRACT CLAUSES - RFP)

SUPPLEMENTARY CONDITIONS (SPECIAL CONTRACT REQUIREMENTS)

WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 SUMMARY OF WORK

01 12 00 CONSTRUCTION GENERAL

01 30 01 ADDITIONAL ADMINISTRATIVE REQUIREMENTS

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

00.15

10 RESIDENT MANGAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

TEMPORARY ENVIRONMENTAL CONTROLS

01 78

39.00 24

AS-BUILT DRAWINGS

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

Crane Rehabilitation and Replacement (MATOC)

100% Small Business Set Aside Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Aw ard Task Order Contracts (MATOCs) for Crane Rehabilitation and Replacement Construction Projects in Support of Various Military and Civil Works Projects Within the USACE Tulsa District's Boundaries.

A pool of up to f ive (5) MATOCs w ill be aw arded through FAR Part 15 Tw o Phase, Best Value “Trade Off” Source Selection procedures. The MATOCs are IDIQ contracts as defined in FAR 16.504. Cranes projects w ill be provided by f irrm-Fixed-Price (FFP) Task Orders (TOs). This is Phase 1 of 2 Phase Solicitation process.

Each MATOC w ill be a f ive (5) year contract w ith a (3) year base plus tw o (1) year options. The Government is under no obligation to issue any TOs against these MATOCs in excess of the minimum guarantee obligation of $3,000.00. No TO w ill be aw arded that exceeds $12M. The shared sum of all TOs among the MATOCs (contract capacity) shall not exceed the estimated amount of $49.5M.

The100% Small Business Set-Aside NAICS code is 333923 - Overhead Traveling Crane, Hoist, and Monorail System Manufacturing

RFP due date 10 December 20 at 2:00 PM CST

SHAWN BRADY 918.669.7670

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

10-Nov-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______ calendar days and complete it w ithin ________ calendar days af ter receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________10 Dec 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

918-669-7436FAX:TEL: TEL: FAX:

W912BV19R0036 65

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 11 00 - SF 1442 and CLIN Schedule

ITEM NO SUPPLIES/SERVICES MAX

QUANTITY

UNIT UNIT PRICE MAX AMOUNT

0001 1 Job Crane Rehab and Replacement

FFP

The Contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with the summary of work, the drawings, the base MATOC and task order specifications, and all other contract documents and requirement during the base period of three years. Any unused capacity may be carried over to the subsequent contract period.

FOB: Destination

PSC CD: 3950

MAX

NET AMT

UNIT UNIT PRICE MAX AMOUNT

0002 1 Job OPTION Crane Rehab and Replacement-Option Pd. 1

FFP

The Contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with the summary of work, the drawings, the base MATOC and task order specifications, and all other contract documents and requirement during the base period of three years. Any unused capacity may be carried over to the subsequent contract period.

UNIT UNIT PRICE MAX AMOUNT

0003 1 Job OPTION Crane Rehab and Replacement-Option Pd. 2

FFP

The Contractor shall provide all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with the summary of work, the drawings, the base MATOC and task order specifications, and all other contract documents and requirement during the base period of three years. Any unused capacity may be carried over to the subsequent contract period.

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

INSTRUCTIONS TO OFFERORS

Section 00 21 00 - Instructions, Conditions & Notices to Offerors

1.0 GENERAL INFORMATION

1.1 GENERAL DESCRIPTION OF WORK

1.2 GOVERNMENT SECURITY REQUIREMENTS

1.3 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

1.4 OFFEROR'S QUESTIONS AND COMMENTS

1.5 SMALL BUSINESS SIZE STANDARD/NAICS CODE

1.6 PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

1.7 SITE VISIT

1.8 ACCURACY IN PROPOSALS

1.9 PROPOSAL SUBMITTALS

1.10 PROPOSAL FORMAT

1.11 JOINT VENTURE PROPOSAL REQUIREMENTS

1.12 DEVIATIONS AND EXCEPTIONS

1.0 GENERAL INFORMATION

1.1. GENERAL DESCRIPTION OF WORK

This is a competitive solicitation set aside for 100% Small Business firms for a total of five (5) firm fixed-price Indefinite-Delivery, Indefinite-Quantity (IDIQ), Multiple-Award Task Order Contracts (MATOC) that will have a 3-year base period and two 1-year options with a shared capacity of $49,000,000. The MATOCs will support a wide range construction projects to meet the requirements and time constraints for Cranes Rehabilitation and Replacement, and Fixed Hoists projects within the Southwestern Division (SWD) Tulsa District boundaries which includes all of Oklahoma, and portions of Texas and Kansas.

1.2. GOVERNMENT SECURITY REQUIREMENTS

The offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either precontract or post-contract award, has a return mailing address on the outside of the envelope, package, box, etc.

ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the U.S. Army Corps of Engineers mail room facility located at 2488 E. 81st Street, Tulsa, OK 74137-4290, if it does not contain a return mailing address. There will be no exceptions.

USACE Tulsa District Point of Contact is Shawn Brady:

Phone: 918-669-7670 Email: shawn.brady@usace.army.mil

1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS

Copies of the solicitation and any amendments will be provided electronically. All solicitation documents will be posted thought the Beta Sam Contract Opportunities (formerly FedBizOpps/FBO) website at:

https://www.beta.sam.gov. It shall be the offeror’s responsibility to check the beta.sam.gov website for any amendments. The offeror shall read the solicitation and all amendments in their entirety and submit all requested information specified in this solicitation and all amendments. There will be no public opening of the proposals received as a result of this solicitation.

Any information given to an Offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.

1.4. OFFEROR'S QUESTIONS AND COMMENTS

All contractual matters, questions and or comments relative to these documents should be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic no later than 7 calendar days prior to the proposal due date, in order that they may be given consideration or actions taken prior to receipt of offers.

The bidder inquiry key for this project: 9JZF73-QM7RYT

Instructions for registering in the ProjNet Bidder Inquiry system are available on the above website.

1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE

The NAICS Code selected for this project is 333923, Overhead Traveling Crane, Hoist, and Monorail System Manufacturing, and the size standard is 1,250. Also see FAR 52.204-8.

1.6. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

W912BV19R0036

This request for proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

1.7. SITE VISIT

All site visits will be held at the Task Order Level.

1.8. ACCURACY IN PROPOSALS

Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.

1.9. PROPOSAL SUBMITTAL

1.9.1. The submittal method for proposals is electronic via DoD SAFE or email ONLY (no mailed proposals).

DoD SAFE web site: https://safe.app.mil/

The following email addresses must be entered for notification of proposal receipt and download availability:

shawn.brady@usace.army.mil julie.s.hill@usace.army.mil

1.9.2. Proposals will be received until the date and time and specified in this Request for Proposal. Mail all bonds to:

U.S. Army Corps of Engineers, Tulsa District ATTN: CESWT-CT-E (Shawn Brady) 2488 E. 81st Street Tulsa, OK 74137-4290

1.9.3. The packaging shall be marked Solicitation Number: W912BV19R0036.

1.10. PROPOSALS

See Section 00 22 00 for proposal requirements and formats.

Offer Closing Date: 10 December 2020

Offer Closing Time: 2:00 pm Central Standard Time (CST)

1.11. JOINT VENTURE PROPOSAL REQUIREMENTS

When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the Offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively.

1.12. DEVIATIONS AND EXCEPTIONS

Deviations and exceptions to the terms and conditions of the solicitation are neither encouraged nor desired.

Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for the award. Should the offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer.

Notwithstanding the above, if deviations and exceptions are included with the offer, the offeror shall list and describe in detail the deviations and/or exceptions.

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

CLAUSES INCORPORATED BY REFERENCE

52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.215-22 Limitations on Pass-Through Charges--Identification of Subcontract Effort

OCT 2009

52.216-27 Single or Multiple Awards OCT 1995 52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-5 Trade Agreements OCT 2019

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.232-28 Invitation to Propose Performance-Based Payments MAR 2000 52.236-28 Preparation of Proposals--Construction OCT 1997 252.215-7010 Requirements for Certified Cost or Pricing Data and Data

Other Than Certified Cost or Pricing Data

JUL 2019

252.236-7006 Cost Limitation JAN 1997 252.236-7008 Contract Prices-Bidding Schedules DEC 1991

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of up to five Indefinite Delivery Indefinite Quantity Multiple Award Task Order contracts resulting from this solicitation.

(End of provision)

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Contracting Officer: Julie S. Hill Email: julie.s.hill@usace.army.mil Contracting Officer, 2488 E. 81st Street, Tulsa, OK. 74137-4290

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

https://www.acquisition.gov/browse/index/far

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (DFARS) (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

252.215-7012 REQUIREMENTS FOR SUBMISSION OF PROPOSALS VIA ELECTRONIC MEDIA (JAN 2018)

The Offeror shall submit the cost portion of the proposal via the following electronic media: DoD SAFE.

https://safe.apps.mil/

Section 00 22 00 - Phase 1 of 2 Phase Design Build Selection Process

EVALUATION CRITERIA PHASE 1

SECTION 00 22 00

PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES

1.0 OVERVIEW OF PHASE 1 AND PHASE 2 SELECTION PROCEDURES

1.1 P hase 1. The first phase consists of a process known in commercial design-build (DB) as the “Request for Qualifications” or the acronym: “RFQ”. This solicitation refers to it as “Phase 1”. In Phase 1 of the 2-phase selection procedure, interested firms or joint venture entities (referred to as “Offerors”) submit specified performance capability proposals, demonstrating their capability to successfully execute design-build construction and design-bid-build construction contracts resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than five (5) of the highest rated Phase 1 Offerors to compete for the MATOC contracts in Phase 2.

1.2 P hase 2. In Phase 2, the selected Offerors will submit proposals in accordance with the Section 00 22

20 PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD.

1.3 Offerors will not be participating in a sealed bid procurement process under this acquisition method.

Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.

1.4 P roposal Submissions and the Trade-Off Process. This process permits tradeoffs among cost or price and non-cost factors and allows the Government to accept other than the lowest-priced proposal.

Offerors submit their performance and capability information for review and consideration by the Government. For those Offerors selected to compete during Phase 2, relative importance among technical factors are provided in Section 00 22 20 PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD. The Source Selection Evaluation Board (SSEB) reviews, evaluates, and rates the proposals against the source selection criteria in the RFP. A competitive range consisting of the most highly qualified technical Offerors will be established prior to discussion (if held). The SSEB will review, evaluate and rate the initial task order project technical proposals against the source selection criteria in the RFP for those Offerors included in the competitive range. Concurrently, the Government analyzes price proposals of Offerors utilizing the initial task order project cost proposal. Price will not be rated, but will be a factor in making the final best-value determination for award. The Source Selection Authority (SSA) compares proposals to one another and determines the best value for the government. The perceived benefits of the higher priced proposal must merit the additional cost, and the rationale for tradeoffs must be documented.

1.5 I nitial Task Order Project. Those Offerors selected to compete during Phase 2 of the solicitation shall submit Technical and Cost (Price) proposals for the initial task order as part of Phase 2 Proposal submittals.

See Section 00 22 20 PHASE 2 DESIGN-BUILD SELECTION PROCEDURES AND BASIS OF AWARD. The scope of work for an initial task order project will be provided to Phase 2 Offerors in Section 01 10 00 TASK ORDER STATEMENT OF WORK. The initial task order project cost proposal will be used to evaluate price for the basic MATOC contracts. The best value initial task order may be awarded to one of the most highly-rated contractors on the MATOC pool if it is in the best interest of the Government.

1.6 T ask Orders. Fixed-price task orders shall normally be issued bilaterally against this MATOC.

Individual task orders will be competed among the contracts awarded under this MATOC pursuant to FAR 16.505. Generally, award will be made to the contractor that provides the best value to the Government, unless otherwise indicated. Source Selection decisions will not be subject to the

Disputes Clause of this MATOC (FAR 52.233-1 or its Alternate).

1.7 P erformance of Work. If the Contractor is awarded a contract, the contractor shall perform work in accordance with Section 00 10 00 DESCRIPTION/SPECS/WORK STATEMENT, with the Scope of Work provided with each Task Order (Section 01 10 00 TASK ORDER STATEMENT OF WORK), and with strict accordance with the terms and conditions specified within the RFP and each Task Order.

2.0 GENERAL INSTRUCTIONS

2.1 W ho May Submit: Any legally organized small business firm, s mall business firms formally associated specifically for this project, consortia of small business firms, or any other interested small business parties may submit proposals. Associations may be a s Joint Ventures (JVs) or “team” arrangements. The size standard for this solicitation is as shown in Section 00 45 00

REPRESENTATIONS AND CERTIFICATIONS.

2.2 W here to Submit: Offerors shall submit their proposal to the Tulsa District at the address shown in Section 00 21 00

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS.

2.2.1 2.2.1 Pro Forma Requirements to be provided for Phase 1: This information should be submitted as a separate .pdf file named “Pro Forma Requirements.pdf”. This information consists of the following:

a. The Offeror will submit a cover letter containing:

1) Solicitation number.

2) Name, address, email, and telephone and fax numbers of the Offeror.

3) Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this RFP.

4) Name, title and signature of the person authorized to sign the proposal.

5) A statement specifying agreement with all terms, conditions and provisions included in the RFP.

6) Commercial and Government Entity (CAGE) Codes for the Offeror, and all teaming partners who participated in the Factor 1 – Specialized Experience.

b. Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30 (amendment form).

c. The completed Section 00 45 00 of the RFP (Representations and Certifications), Printed Entity Record from System for Award Management (SAM)

d. Letter from Surety stating Offeror is capable of providing a Bid Guarantee in Phase 2 as required in FAR 52.228-1.

e. Financial statement and bank letter that verify that sufficient funds will be available to finance the work.

f. For Joint Ventures, the information required by paragraph “Joint Ventures”.

g. Identify if this proposal is being submitted as a HUBZone entity.

2.3 S ubmission Deadline. Proposals shall be received by the Tulsa District no later than the time and date specified in Block 10 of Standard Form 1442 via AMRDEC SAFE or email ONLY (no mailed proposals). AMRDEC SAFE web site:

https://safe.amrdec.army.mil/safe

The following email address(es) must be entered for notification of proposal receipt and download availability:

shawn.brady@usace.army.mil julie.s.hill@usace.army.mil In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section.

2.4 The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).

2.5 Tabs. Proposal shall be organized and tabbed as shown in paragraph 3.0, “Phase I Proposal Submittal Summary”.

2.6 Size of Printed Matter Submissions.

2.6.1 Proposal materials shall be submitted via AMRDEC SAFE website https://safe.armdec.army.mil/safe/, or via email, containing the proposal in PDF file format using Adobe Acrobat software. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission.

Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers. Phase 1 proposals shall not exceed 37 single-sided pages, excluding the cover sheet and Table of Contents. A page is defined as text or information on one side of the paper. Factor 2 – Past Performance will not be counted towards this page limitation, nor will the resumes submitted for key personnel, nor the letters of commitment for individuals or teaming subcontractors. The Government will not evaluate any information beyond the total page limitation noted above and in the individual Factor limitations noted in the paragraphs below. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.

2.6.2 The proposals shall contain a detailed Table of Contents.

2.6.2.1 Proposals shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file, and the “find” function must be usable. The technical proposal will be appropriately organized using the tabs specified in the chart below. The Pro Forma requirements shall be submitted as a separate file as required by paragraph 2.2.1 above.

2.6.2.2 A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration.

2.6.2.3 Sections of the proposal shall be bookmarked (linked to the index) as detailed in this section. The SF 1442 may be scanned and shall be *Optical Character Recognition (OCR) compatible. All text must be legible and easily read. Submit the SF 1442, completed and signed by a person authorized by the Offeror. A page is defined as text or information on one side of the paper.

*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to- speech, key data extraction and text mining.

2.6.2.4 Each Volume of the proposal shall be identified by the Solicitation Number (W912BV19R0036), project title (Crane MATOC), name, address, and telephone number of the Offeror, and the following on the volume in bold letters:

Phase 1 - Volume 1: TECHNICAL PROPOSAL

2.6.3 Proposal revisions shall be submitted as whole page replacements with revised text readily identifiable, e.g., bold face print or underlining. The reason for the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision.

A revised copy of the entire proposal in .pdf format shall be provided.

3.0 PHASE 1 PROPOSAL SUBMITTAL SUMMARY

The Phase 1 proposal shall be tabbed and submitted in the following format. Submission Requirements and Evaluation Criteria for each Tab are included in the following paragraphs. All information shall be provided within these tabbed sections and shall not be included as an appendix or attachment. Cost information will limited to Bonding Capacity as part of the Phase I submittal.

Location F actor/ D escription Relative

Importance

TAB A N/A SF 1442

Proposal Data Sheet Not Rated

TAB B Factor 1 Specialized Experience Most Important Factor

TAB C Factor 2 Past Performance 2nd Most important factor

TAB D Factor 3 Design Support 4th(slightly less important than Factor 4 )

TAB E Factor 4 Management Effectiveness 3rd (slightly less important than Factor 2)

TAB F N/A Financial Capacity Go/No Go

4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET

4.1 Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section).

5.0 TAB B – FACTOR 1 - SPECIALIZED EXPERIENCE

t ypes of crane-related work, including new construction, alterations, renovations and repairs, and design-build construction of c ranes. The following list is indicative of the variety of work that may be performed by task orders under this contract:

• SAFETY - Life safety upgrades, industrial safety, industrial hygiene, fire protection, hazardous materials, protection of work sites and property, a nd protection of workers.

materials to support crane rehabilitation work.

• STRUCTURAL – Ability to perform and provide structural engineering-related repairs and/or modifications to support new and rehabilitated crane work.

• INSTRUMENTATION AND CONTROLS - Instrumentation and control systems for repairs and/or modifications to support new and rehabilitated crane work.

• ELECTRICAL - Ability to perform and provide electrical engineering-related repairs and/or modifications to support new and rehabilitated crane work.

• MECHANICAL – Ability to perform and provide mechanical engineering-related repairs and/or modifications to support new and rehabilitated crane work.

5.1 OFFEROR’S SUBMISSION REQUIREMENTS

5.1.1 The Contractor shall demonstrate recent, relevant experience on similar projects, using the Project Information Worksheet form (Attachment 2), at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements as outlined in Section 00 21 00 para 1.1. General Description of Work in INSTRUCTIONS

Offerors will be evaluated on their experience in two areas: experience with task-order-type contracts and experience in various

• ENVIRONMENTAL – Ability to provide removal and disposal of asbestos, lead-based paint, and other hazardous

TO OFFERORS. If the O fferor is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. Offeror shall provide a copy of the joint venture agreement or letters of commitment for all teaming contractors, agreements and letters of commitment will not count towards the page limitations. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than five (5) years preceding the date of this solicitation. Offerors shall provide project information on a minimum of three (3) but no more than five

(5) completed or substantially complete projects, of which two (2) projects submitted can be currently under construction, that reflect experience in the construction elements referenced in Section 00 10 00 DESCRIPTION/SPECS/WORK STATEMENT, paragraph

1.1. Project examples must include one (1) project with a contract value equal to or greater than $5,000,000; all other projects must have a contract value equal to or greater than $750,000. Provide two (2) crane rehabilitation projects in an occupied facility; one (1) design-build new crane installation project. As a minimum, the Contractor shall provide the data specified in the attached “Project Information” Worksheet. Each project submitted shall be limited to two (2) page per project.

5.1.2 The Offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate e xperience that is not directly related to the specific projects above is applicable to this project and how the Government will b enefit.

5.1.3 The Offeror should describe any previous teaming experience between current team members, if not described in the p roject list. The above information is limited to projects that are well underway or that have been completed and turned over no llonger than the past six (6) years preceding the date of this solicitation.

5.1.4 Total page count for Factor 1 shall not exceed 12 pages.

5.2 EVALUATION CRITERIA

The Government will review the projects provided by the Offeror to evaluate and rate the recent relevant specialized experience of the Offeror with similar projects. Experience with task order contracts may be demonstrated by provision of individual task orders in the experience form that meets the submission requirements as outlined in paragraph 5.1.1. If the Offeror cannot provide suitable relevant experience and the evaluators consider the information provided indicates that the Offeror has no relevant experience, a determination will be made as to the risk this lack of corporate experience presents to the Government; and the proposal will be evaluated accordingly. The experience of individuals will not be evaluated under this factor.

The Government will evaluate the extent of recent, related experience of the Contractor in crane construction and/or design-build projects. Experience on the similar projects identified in Section 01 00 00 SUMMARY OF WORK will receive more consideration than experience provided in the supplemental narrative. The Government will place greater importance on projects performed as a prime contractor than as a subcontractor.

To determine strengths and weaknesses, the agency will give more consideration to the following:

a. Projects designed for and constructed for the Corps of Engineers.

b. Projects with a value of $4 million or greater.

c. Fully completed projects rather than substantially complete projects. Per paragraph 5.1.1 above, "substantially complete" projects represent "...designed and at least 50% construction progress

d. Projects completed after 2017.

e. Projects that demonstrate experience of the prime contractor personnel proposed in Factor 4 in the same role as their proposed role on this MATOC.

f. Project examples demonstrating prior teaming experience of the prime construction contractor and the design firm to include demonstrated experience of the designer’s personnel proposed in Factor 3 in the same role as their proposed role on this project.

To receive credit for items g and h the contractor shall clearly indicate on the Specialized Experience forms that the proposed personnel on this project acted in the same role on the submitted project. Additionally the key personnel resumes shall show the projects submitted under this Factor indicating that they served in the same role as is being proposed for this project. Failure to provide these cross references shall result in no credit being given for items g and h.

5.2.1 The Offeror must submit the requested information to demonstrate a record of recent, related experience which may include similar state or local government or private counterparts, as described in 00 10 00 SUMMARY OF WORK, paragraph 1.1. Recent experience includes projects well underway (see above criteria) or those completed and turned over within six (6) years of the proposal issue date for this RFP. Joint Venture partners or teaming partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project. If any of the information required is not included in the forms, then the Contractor will be considered non-responsive and evaluated as unacceptable.

5.2.2 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), other databases; or interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency or to interview owners or references. The Government may check any or all cited references to verify supplied information.

5.2.3 To receive credit for extent (amount) of experience, the Offeror shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project. If Offeror represents the combining of two or more companies for the purpose of this RFP, the proposal shall clearly identify the contractual responsibilities of each firm and the work to be performed by each; describe the nature of the association; indicate whether the firms have experience working together in construction ventures, including how long and how many projects. In addition, each company, including joint ventures, shall list their Government contract experience. Provide a copy of the commitment letter of the firms (see Attachment 5) or the Joint Venture Agreement.

5.2.4 The Government will consider extent of recent experience, degree of relationship of such experience to the projects as described in 00 10 00 SUMMARY OF WORK, paragraph 1.1, demonstrated familiarity with applicable codes and local conditions.

Some examples of relevancy to this project may include, but not be limited to:

a. Number, size, type work, complexity, location.

b. Dates (well under way or completed no more than 6 years preceding date of this solicitation).

c. Firm's role and extent of work self-performed (brokering out all work and simply “placing the sidewalks” on a cited project are examples of less relevant experience).

5.2.5 Projects submitted have the following characteristics (combined between all projects submitted):

Five (5) or more disciplines/trades;

Included design, manufacturing, and installation experience as defined in this RFP and as described in Section 01 00 00 SUMMARY OF WORK paragraph 1.1;

Included painting (including lead paint) experience;

5.2.6 Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous DB experience a strength. Similarly, the Government may consider previous recent teaming experience among the team members as value added. The more relevant the experience, the more credit will be given.

6.0 TAB C – FACTOR 2 – PAST PERFORMANCE

6.1 SUBMISSION REQUIREMENTS:

6.1.1 There is no page limit for this factor. For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror shall submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e. Contractor’s copy of CCASS or CPARS evaluations.

6.1.2 For each project under Factor 1 that does not have a CPARS evaluation, offerors shall provide a Past Performance Questionnaire form PPQ-0 (Attachment 2) to a representative of the owner that can provide the owner’ s opinion of the offeror’ s past performance for the project. The Past Performance Questionnaire (Form PPQ-0) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’ s opinion with the corresponding Subfactor 1 Project.

6.1.3 Form PPQ-0 at Attachment 2 shall be utilized and offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer will not require the PPQ to be sent directly from the client. The offeror may submit the completed PPQ-0. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’ s point of contact Shawn Brady via email shawn.brady@usace.army.mil prior to proposal closing date. If you have questions regarding the attached questionnaire, or require assistance, please contact the Contract Specialist at 918-669-7670.

6.1.4 Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’s opinion with the corresponding Factor 1 Project. No additional information may be submitted under this factor, unless the Offeror is submitting proposals as a Joint Venture in which case the offeror shall provide the brief narrative as described in paragraph 6.1.15 below. Inclusion of additional information or failure to organize the past performance information in the same order as submitted under Factor 1 will result in the contractor being found unacceptable and may result in the contractor being removed from further consideration.

6.1.5 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.

6.1.6 The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date.

6.1.7 The Government will evaluate the responses from the customers from which Past Performance Questionnaires have been received. The Government may contact and interview points of contact on the Past Performance Questionnaires. The Government reserves the right to interview other individuals acting for the listed references, if the listed reference is not available. In addition to the above, the Government may review any other sources of information for evaluating past performance.

6.1.8 Past performance information may be obtained from any other sources available to the Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases; interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.

6.1.9 To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. key subcontractors, Joint Venture Partners, whose experience is being relied on in Factor 1.

6.1.10 The Government may contact references provided as part of Factor 1 – Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

6.1.11 No additional past performance information shall be submitted under this Factor. Offers that violate this rule unnecessarily delay the evaluation process and will be evaluated as unacceptable and may result in the contractor being removed from further consideration.

6.1.12 Joint Venture Submission Requirements:

6.1.13 Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR as the offering Joint Venture. The Offeror must provide three (3) to five (5) "recent", "relevant" projects performed by the JV that reflect the JV's ability to perform the work required in this solicitation as required under Factor 1.

6.1.14 If the Offeror cannot provide a sufficient number of projects as the JV to meet the minimum requirement, the Offeror must provide those "recent", "relevant" projects that it has performed as the JV, and then supplement the record with additional "recent", "relevant" projects performed by each JV member in their individual capacities. In such instance, each JV member must satisfy a minimum requirement of two (2) projects, to include any performed as the JV.

6.1.15 If the JV has no "recent", "relevant" projects performed by the JV, then each member of the JV must provide two (2) to three (3) "recent", "relevant" projects performed by the JV member that reflect the JV member's experience commensurate with their role on this project or how their experience qualifies them for their role on this project as required under Factor 1. In such instances the combined experience projects, submitted by each member of the JV, shall not exceed the maximum number of projects stated in paragraph 5.1.1.

6.1.16 In addition to the examples of "Company Specialized Experience" and "Past Performance Surveys", the Joint Venture shall provide a brief narrative stating the roles that each partner of the Joint Venture will perform on this project and how the presented projects demonstrate the JV member's experience commensurate with their role on this project or how their experience qualifies them for their role on this project. The attached “Specialized Experience" and "Past Performance Survey" forms shall be used by the Joint Venture or the JV partners. Explain how the JV is structured.

6.1.17 Verification: The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS, or other Government appraisal systems or to interview owner or references. The Government may check any or all cited references to verify supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.

6.2 EVALUATION CRITERIA

The Government will perform a performance confidence assessment of the Offeror’s probability of successfully meeting the contract requirements, considering the degree of success of the recent (well…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .