Released_Solicitation_19R0020-JOC.pdf

PDF 2 MB Posted

Attached to
Job Order Contract (JOC) McAlester Federal contract opportunity
Solicitation number
W912BV19R0020
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

This solicitation is for a Job Order Contract (JOC) to provide construction services at the McAlester Army Ammunition Plant in McAlester, Oklahoma. The contract is set aside for Women-Owned Small Businesses and has an estimated value of $22.5 million for the three-year base period with two optional one-year extension periods valued at $7.5 million each. Pricing will be determined by multiplying RS Means unit prices by the contractor's proposed coefficients for normal and other than normal working hours. Proposals are due by October 3, 2019 and the contract is to be awarded on a best value basis considering technical factors, past performance, and price. The selected contractor must begin work within 10 days of notice to proceed and complete individual task orders valued between $25,000 and $3 million.

Job Order Contract (JOC) McAlester Army Ammunition Plant

View the file

Other files for this federal contract opportunity

Other files attached to Job Order Contract (JOC) McAlester, newest first.
File Type Posted
Released_Amend__0001_JOC.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Indefinite Delivery Contract (IDC) for Job Order Contractr (JOC) at the McAlester Army Ammunition Plant (MCAAP) McAlester, Oklahoma. The contract comprises a three-year (3) base period and one (1) tw o-year option period..

This requirement is a 100% set-aside for Women-Ow ned Small Business WOSB) under NAICS Code: 236220, Size Standard: $36.5M

The estimated value is capped at $22,500 for the base year (3 years) and $7,500 for each option period.

The minimum guarantee is $5,000 for the base year only. Individual task orders w ill be f irm-f ixed priced and w ill range from $25,000 to a maximum of $3,000,000.

DIANE M CIANCI 918-669-7458

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

29-Aug-2019

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________Section 00 73

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________03 Oct 2019 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912BV19R0020 93

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00 10 00 - Solicitation

PRICING SCHEDULE

PROPOSAL COEFFICIENT (PRICE) SCHEDULE

Offeror’s Name: _____________________________________________________

ITEM

NO

ITEM DESCRIPTION COEFFICIENT

(whole number)

0001 BASE Year 1 Normal Working Hours

0002 BASE Year 1 Other Than Normal Working Hours

0003 BASE Year 2 Normal Working Hours

0004 BASE Year 2 Other Than Normal Working Hours

0005 BASE Year 3 Normal Working Hours

0006 BASE Year 3 Other Than Normal Working Hours

PROPOSAL COEFFICIENT (PRICE) SCHEDULE

Contractor’s Name: _____________________________________________

ITEM

NO

ITEM DESCRIPTION COEFFICIENT

(whole number)

1001 OPTION Year 1 Normal Working Hours

1002 OPTION Year 1 Other Than Normal Working Hours

2001 OPTION Year 2 Normal Working Hours

2002 OPTION Year 2 Other Than Normal Working Hours

SECTION 00 11 00 COEFFICIENT/PRICE SCHEDULE

1. OFFERS

a. The R. S. Means (RSM) Facilities Construction Cost Data Book (current edition at the time of bid submission) shall be used when developing coefficients for each year of the base period. RSM and 4Clicks Project Estimator software, E4Clicks Premier Version 2.615 (http://www.4clicks.com), shall be used to develop proposals in response to each task order RFP.

b. The price offer shall be comprised of coefficients. A coefficient, as defined in AFARS 5117.9001, is "a numerical factor that represents costs (generally indirect costs) not considered to be included in RSM unit prices (e.g., general and administrative and other overhead costs, insurance costs, bonding and alternative payment protection costs, protective clothing, equipment rental, and also contractor's profit)."

c. Coefficients proposed and accepted upon award are multiplied by unit prices in RSM to price a job or project on individual task orders. The coefficients proposed are incorporated in the Job Order Contract (JOC). Offerors who submit separate coefficients for separate line items in RSM will be considered unacceptable and the offer will be rejected.

Coefficients are limited to three decimal places and submitted as a whole number. For example: 1.015.

d. When developing proposals, use "Average" rows in RSM if shown. If only "Minimum/Maximum” rows are shown, use the "Minimum" row. Also, use the column entitled "Total Bare Costs" which includes material, labor, and equipment. Do not use the column "Total Incl O & P."

e. The offeror's price coefficient must include but is not limited to the following:

1. Overhead

2. Profit (prime and subcontractors)

3. Insurance

4. Compliance with environmental laws, protection and safety

5. Tax Laws

6. Protection or moving of Government property

7. Administrative work

8. All costs associated with bonding (bond premiums)

9. Submittals

10. Price quotations

11. Contractor adjustments to RSM unit prices

12. Clean-up

13. All waste and excess materials

14. Permits, licenses and fees

15. Mobilization and close-out for total contract and each delivery order

16. Signs and barriers

17. Project management and supervision

18. Quality Control

19. Office management and equipment

20. Interest associated with funding of equipment and payroll

21. Depreciation of site offices

22. Employee payroll taxes, insurance and fringe benefits

23. Risk of lower than expected contract dollar volume

24. Risk of high inflation costs for coefficients bid for future years

25. Risk of poor subcontractor performance and re-performance

26. Other risks of doing business

27. Business taxes, contributions, memberships, corporate headquarters support (legal, financial, etc.)

28. The offeror should consider the cost of final clean-up and removal and hauling of trash, debris and rubbish in the coefficients. The Government will not pay nor accept line items for the final clean-up or rubbish, hauling, etc., on delivery orders, unless it is explicitly excluded by the line items in RSM.

29. Travel

30. Performance and Payment bonds.

31. As-built drawings

32. City cost indexes

The unit prices stated in RSM include labor, materials and equipment. Cost of performance and payment bonds are part of the coefficient, per AFARS 17.9001. All costs shall be included in the proposed coefficients as no allowance will be made after award. The offeror must provide their coefficient formula with their proposal.

2. WORK HOURS

a. Normal work hours are defined as Monday through Thursday, 6:30 through 5:00 p.m. Work performed during other than normal working hours will be as specified in the scope of work for individual task orders, multiplied by the respective coefficient for other than normal working hours. This coefficient shall only be used when the Government requires the contractor to perform work outside the installation’s normal working hours.

3. DELIVERY ORDER LIMITATIONS

a. Individual task orders shall not exceed $3,000,000.00.

b. Individual task orders shall be for at least $ 5,000.00.

c. The order limit per year specified in this contract is $22,500,000.00 for the base year (3 years) and $7,500,000 fior each option year. The total period shall not exceed $37,500,000.00.

4. GUARANTEED MINIMUM:

a. There is a guaranteed minimum of $5,000.00 for the first year of the base period, only.

b. The contract includes a three-year base period and two one-year option periods. The estimated value of each option period is $7,500,000.00.

5. Only one contract will be awarded for this solicitation.

6. All coefficients (prices) must be filled in and supported by applicable documentation of the process used to determine the coefficients, or the offer will be considered unacceptable.

7. The offeror agrees to honor proposed prices for at least 90 days after the solicitation period closes.

VOLUME 2 – PRICE PROPOSAL

Factor/ Subfactor/ Element

LOCATION

DESCRIPTION

RELATIVE IMPORTANCE

N/A Vol 2 Tab 1 Proposal Cover Sheet Not Rated

N/A Vol 2 Tab 2 Signed Letter Responding to RFP, SF1442 and Acknowledgement of Amendments

Not Rated

FACTOR 5 Vol 2 Tab 3 SECTION 00 11 00, PRICING

SCHEDULE

All technical factors, when combined, are significantly more important than price

N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond) Not Rated

N/A Vol 2 Tab 5 Representations & Certifications Not Rated

N/A Vol 2 Tab 6 JV Agreement (if applicable) Not Rated

VOLUME 2 – PRICE PROPOSAL – 5th Most Important Factor

Prices for job orders issued under this contract will be computed using the most current RS Means Building Construction Cost Data with 4Clicks Project Estimator software, E4Clicks Premier Version 2.636 (http://www.4clicks.com). See the statement of work for further information.

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 22,500,000 Job Job Order Contract (JOC) Base

FFP

McAlester Army Ammunition Plant, McAlester, Oklahoma. The contract is for a broad range of maintenance, repair and construction work on real property at McAlester AAP, Oklahoma.

FOB: Destination

NET AMT

0002 7,500 Job OPTION Option Year 1

FFP

McAlester Army Ammunition Plant, McAlester, Oklahoma. The contract is for a broad range of maintenance, repair and construction work on real property at

0003 7,500 Job OPTION Option Year 2

FFP

McAlester Army Ammunition Plant, McAlester, Oklahoma. The contract is for a broad range of maintenance, repair and construction work on real property at

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 N/A N/A N/A N/A

0002 N/A N/A N/A N/A

0003 N/A N/A N/A N/A

Section 00 21 00 - Instructions

BIDDERS INQUIRY FOR RFI'S

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors should submit questions and inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov.

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify the information on the next screen is correct and click continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number is : W912BV19R0020 The Bidder Inquiry Key is: QR9J88-AHPIU2

c. The Bidder Inquiry System will close for new inquiries 5 days prior to proposal due date to ensure adequate time to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Diane Cianci Telephone: 918-669-7458

E-MAIL: diane.cianci@usace.army.mil

SITE VISIT INFO & REGISTRATION

SITE VISIT INFORMATION AND REGISTRATION

The site visit for this solicitation has been set for ____________________ at 1300 hours at the Public Works office, McAlester Army Ammunition Plant, McAlester, Oklahoma.

Only two people per firm will be admitted for the site visit. Visitors must possess a valid picture ID issued by a state government, such as a current driver’s license, or a federally issued picture ID. A visitor’s pass for each person must be obtained from the MCAAP Pass and Tag Office at the main gate, located in the first building, north of C Tree Road, at the exit from U.S. Highway 69, south of McAlester, Oklahoma. You must arrive at the Pass and Tag office early enough to get visitor passes and then drive to the Public Works office on base. It is highly recommended you arrive no later than 1200 to avoid missing the meeting and tour.

Only vehicles with current registration and proof of insurance will be admitted to MCAAP. The vehicle must be driven by a person possessing a valid driver’s license and all passengers must have a visitor’s pass from the Pass and Tag Office.

Participants shall meet at the Public Works office, Building 6, at 1300 hours. A bus tour of selected, completed JOC task order sites will be conducted, with possible viewing of potential project sites.

Firms wishing to send representatives must provide the following information no later than _______ Monday, December 2, 2013 at 1200 hours:

1. Full name of each person attending, business address, email address and telephone number.

2. Name, address and telephone number of the firm(s) each person is representing.

Submit the required information via email to the Contract Specialist and the COR at the following addresses:

Diane.cianci@usace.army.mil Linda.m.terefenko.civ@mail.mil

CLAUSES INCORPORATED BY REFERENCE

52.203-3 Gratuities APR 1984 52.203-13 Contractor Code of Business Ethics and Conduct OCT 2015 52.203-16 Preventing Personal Conflicts of Interest DEC 2011 52.204-3 Taxpayer Identification OCT 1998 52.204-7 System for Award Management OCT 2018 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

CLAUSES INCORPORATED BY FULL TEXT

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a indefinite delivery Job Order Contract (JOC) for construction services contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

6.6 6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Pittsburg County, Oklahoma, under Non-SMSA Counties listed for 110 Fort Smith, AR-OK, page 88 of the Technical Assistance Guide for Federal Construction Contracts: http://www.dol.gov/ofccp/TAguides/consttag.pdf.

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.

The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be 20% of the $37,500,000.00 or $3,000,000 whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

Contracting Officer US Army Corps of Engineers 2488 E. 81st Street Tulsa, OK 74137-4290

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit will be arranged and details published in an amendment to the solicitation.

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):

http://farsite.hill.af.mil

(End of clause)

Section 00 22 00 - Supplementary Instructions

00 22 11 EVALUATION CRITERIA

SECTION 00 22 11

EVALUATION CRITERIA, BASIS OF

AWARD

1. 0 OVERVIEW

This is a competitive best value solicitation for a construction contract for the FY19 Job Order Contract (JOC) at the McAlester Army Ammunition Plant (MCAAP), McAlester, Oklahoma. The Government will evaluate proposals in accordance with the criteria described herein and award a firm fixed-price contract to the responsible firm whose proposal conforms to all the terms and conditions of the solicitation and is determined the overall best value to the Government.

The selected contractor shall construct the project in accordance with the plans and specifications.

1.1 WHO CAN SUBMIT

a. Firms formally organized as construction contractors, firms associated specifically for this project, consortia of firms, or any other interested parties may submit proposals. Associations may be as joint ventures or as key team subcontractors.

b. Organization Conflicts of Interest (OCI) Disclosure: The Offeror shall provide a disclosure statement with its proposal which concisely describes all the relevant facts concerning past or present organizational conflicts of interest relating to work on this project. In the same statement, and if applicable, the Offeror shall provide information to assure the Government that the conflicts of interest have been mitigated and/or neutralized to the maximum extent possible. If a conflict of interest is discovered after award of this contract, the Contracting Office will make a decision whether to terminate the contract.

2.0 BASIS OF AWARD

The Contracting Officer intends to award a firm fixed-price contract to the responsible Offeror whose proposal the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, considering all non-price factors described herein, and price. All evaluation factors, other than price, when combined, are significantly more important than price. The intent of this solicitation is to obtain the best proposal for the required work. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. The Government will not award a contract if the proposal contains a deficiency, as defined in FAR 15.001. The Government reserves the right to reject any offer if the offer is not in the best interest of the Government.

3. 0 PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

3.1 REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

3.1.1 Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents and the identity of the Offeror. Additionally, clearly identify the “original” price proposal and the “original” technical proposal on the outside cover.

3.1.2 The Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

3.1.3 No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

3.1.4 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the

Technical Proposal (Volume 1). Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

3.1.5 Deviations, Exception and Assumptions

Deviations and exceptions to the terms and conditions of the solicitation are not allowed. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the proposal may be deemed

“unacceptable” and thus ineligible for award. Any questions related to specific terms and conditions of the solicitation must be resolved prior to submission of the proposal. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumptions made concerning contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other factors.

3.2 DISCUSSIONS

The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).

3.3 GENERAL INSTRUCTIONS.

3.3.1 Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc. All pages should be numbered.

3.3.2 Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

3.3.3 Use three-ring binders to assemble your proposal. Do not use spring clamps or exceed the recommended capacity of the fastener or binder.

3.3.4 “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Proposals containing information that is not to be disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors— Competitive Acquisition,” paragraph (e), “Restriction on disclosure and use of data.”

3.3.5 For submissions with page limitations, the pages will be counted as follows: one side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

3.3.6 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall: be numbered; be clearly marked “REVISED;” show the date of revision; be submitted in appropriate number of copies (e.g., if two (2) copies of the original page was required, then two (2) copies of the revised page will also be required); and shall be a different color than the original pages they are to replace.

3.4 SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL (VOLUME 1)

3.4.1 Number of Sets of the Technical Proposal. The Offeror shall provide the complete Technical Proposal electronically and the complete Price Proposal in a separate electronic document. The submission shall contain the entire Technical Proposal in .pdf format using Adobe Acrobat software; do NOT scan the document(s) into a .pdf file. The text portion of the complete Technical Proposal shall be contained as a single .pdf file and Sections of the proposal shall be bookmarked (linked to the index) in logical order.

3.4.2 Format and Contents of the Technical Proposal and List of Tabs. The original copy of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the chart below.

3.4.3 Page Limitations. The following page limitations are established for each

Factor/Subfactor: Factor 1 – Management Plan:

Subfactor 1, Interaction between Government and Contractor Staff – Limited to 4 pages.

Subfactor 2, Staffing Levels and Response Times – Limited to 3 pages.

Subfactor 3, Quality Control Plan – Limited to 3 pages.

Factor 2 – Past Performance – No page limitation Factor 3 – Work Execution and Subcontracting Plan – Limited to 8 pages.

Factor 4 – Experience – Limited to 20 pages.

3.5 SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL (VOLUME 2)

3.5.1. Number of Sets of the Price Proposal. Submit one ORIGINAL of the Price Proposal electronically.

3.5.2. Size Restrictions and Page Limits. The following are established for each

Factor/Subfactor: Factor 5 – Section 00 11 00 Pricing Schedule

Use only 8 ½” x 11” pages. There are no page limits set for the Price Proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

3.5.3 Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab (such as a JV Agreement) in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.

4.0 PROPOSAL CONTENTS AND RELATED EVALUATION FACTORS

VOLUME 1 – TECHNICAL PROPOSAL

Subfactor/ Element

LOCATION DESCRIPTION RELATIVE IMPORTANCE

FACTOR 1 Management Plan Most Important Factor

Subfactor 1 Vol 1 Tab A Interaction between Government and Contractor Staff

Most Important Subfactor

Subfactor 2 Vol 1 Tab B Staffing Levels and Response Times

2nd Most Important Subfactor

Subfactor 3 Vol 1 Tab C Quality Control and Safety Plan 3rd Most Important Subfactor

FACTOR 2 Vol 1 Tab D Past Performance 3rd Most Important Factor

FACTOR 3 Vol 1 Tab E Work Execution and Subcontracting Plan

2nd Most Important Factor

FACTOR 4 Vol 1 Tab F Experience 4th Most Important Factor

VOLUME 2 – PRICE PROPOSAL

Subfactor/ Element

LOCATION

DESCRIPTION

RELATIVE IMPORTANCE

N/A Vol 2 Tab 1 Proposal Cover Sheet Not Rated

N/A Vol 2 Tab 2 Signed Letter Responding to RFP, SF1442 and Acknowledgement of Amendments

Not Rated

FACTOR 5 Vol 2 Tab 3 SECTION 00 11 00, PRICING SCHEDULE

All technical factors, when combined, are significantly more important than price

N/A Vol 2 Tab 4 Bid Guarantee (Bid Bond) Not Rated

N/A Vol 2 Tab 5 Representations & Certifications Not Rated

N/A Vol 2 Tab 6 JV Agreement (if applicable) Not Rated

5.0 VOLUME 1 – FACTOR 1 – MANAGEMENT PLAN – Most Important Factor The proposal shall provide a list of management and on-site staff, their backgrounds, and respective positions with regard to this contract, and should address: their ability to coordinate multiple subcontractors on single or multiple projects; their response time to Government needs; their purchasing system; a plan to administer payroll and labor relation functions; and provide Quality Control and Safety Plans.

5.1 VOLUME 1 – TAB A: SUBFACTOR 1 – INTERACTION BETWEEN GOVERNMENT AND CONTRACTOR STAFF Most Important Subfactor

5.1.1 Submission Requirements:

Explain the plan to facilitate interaction between the Government and contractor personnel. Provide an organization chart that clearly delineates the lines of authority and leadership of Key Personnel. Outline proposed home office and on-site staff, their responsibilities and authorities with respect to this contract, how they will interface with each other, and one-page resumes for on-site staff. Address responsibilities, capabilities, and levels of authority in order to assure project accomplishment in a timely and responsive manner.

Outline the quality control staffing to include: experience, training and education requirements for each position; required construction discipline areas of expertise; and responsibilities and authority.

Key personnel identified in this Sub-factor should be senior working-level people who will be directly involved with construction on a day-to-day basis, not higher level managers or executives normally located in the firm’s home office. Key personnel comprise the on-site staff and structure necessary to perform the work, including simultaneous execution of multiple task orders.

By identifying these personnel, the Offeror is making a commitment that, barring unforeseen circumstances, said personnel will be assigned to the project. The offeror shall notify the Contracting Officer of any required substitutions due to personnel reassignments, etc. Any substitutions require updated submission of the information and shall be approved by the Contracting Officer.

All key personnel shall have a minimum of 5 years professional experience. The Construction Superintendent does not require a professional degree but shall have a minimum of 5 years experience on construction projects of similar size and complexity.

All contractor and subcontractor personnel performing work under this contract must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorization to be working in the U.S.

Provide resumes for the following Key Personnel: General Project Manager, Quality Control Manager (CQC System Manager), Construction Superintendent, Task Order Site Superintendent(s), and the Site Safety and Health Officer (SSHO). Resume information shall be limited to no more than one (1) page per person and include the following minimum information:

a. Name and title

b. Project assignment

c. Name of firm with which associated

d. Years of experience in the role identified and any related roles performed

e. Years of experience with this firm and with other firms

f. Education, degree(s) and majors, specialized training, year completed, certifications

g. Active professional registration, year first registered, if applicable

h. Other experience and qualifications relevant to same/similar work required under this contract

5.1.2 Evaluation Criteria:

a. The Government will evaluate the strengths, weaknesses and deficiencies in proposed plans. The Government will evaluate the firm’s understanding of the requirements described in the Solicitation and the capability to execute projects. Some additional specific evaluation considerations are listed below. This list is not all-inclusive.

b. Means and Methods. The Government will evaluate the clarity and strength of the means and methods to be used for managing construction projects.

c. The Government will evaluate the required information to determine how well the Offeror identifies and demonstrates that Key Personnel meet or exceed minimum qualifications necessary to perform construction, which includes previous satisfactory experience in similar types of work. Offerors providing resumes for Key Personnel that have experience in similar key positions on projects submitted under Experience, will be viewed more favorably by the Government. Individual performance of Key Personnel proposed for this project may be taken into account when it comes to the attention of the Government. If alternates are proposed for Key Personnel, the evaluation rating will consider the lesser qualified or experienced person, if there is a difference, as the key person. Key Personnel shall have a minimum of five (5) years of experience relevant to the respective position proposed, with commensurate experience in scope/size, and at least general qualifications commercially recognized as pertinent to the respective position.

d. The requirements for the CQC organization are a CQC System Manager and sufficient number of additional qualified personnel to ensure safety and contract compliance. The Site Safety and Health Officer shall receive direction and authority from the CQC System Manager and shall serve as a member of the CQC staff. The contractor’s proposed CQC staff shall support maintaining a presence at work sites at all times during performance of any work.

e. Organization. The Government will evaluate the clarity and strength of the overall organization and how well it is structured and staffed to execute the entire scope of work, including concurrent multiple task orders. If applicable, joint venture participants’ contribution to the organization should be commensurate with their skills and background.

5.2 VOLUME 1 - TAB B: SUBFACTOR 2 – STAFFING LEVELS AND RESPONSE TIMES

2nd Most Important Subfactor

5.2.1 Submission Requirements:

Outline the minimum and maximum on-site staffing levels and describe how and when staffing levels will be adjusted. Offeror must show capability for onsite work within 14 days of notice to proceed. Discuss the proximity of the firm’s home office to the installation and how this may affect response time. Explain management controls and discuss staffing levels available to negotiate and execute task orders simultaneously and effectively. Offeror must show capability for executing 5 task orders valued at $5M simultaneously.

Discuss how staff will provide sketches, plans, shop drawings and as-built drawings, and a plan for ensuring accuracy of sizing calculations (dimensions, electrical capacity, load limits, HVAC sizing, etc).

Outline how staff will control cost and be responsible for requisition, purchase, delivery, and inspection of materials.

5.2.2 Evaluation Criteria:

a. The Government will evaluate the strengths, weaknesses and any deficiencies in staffing levels and response times.

The Government will evaluate the firm’s understanding of the requirements described in the Solicitation and the capability to execute the project. More consideration will be given to rapid, flexible staffing supplementation, effective home-office support, detailed management controls, efforts to effectively manage simultaneous task orders, providing shop and as-built drawings, controlling staff costs, and materials management..

5.3 VOLUME 1 - TAB C: SUBFACTOR 3 – QUALITY CONTROL AND SAFETY PLAN

3rd Most Important Subfactor

5.3.1 Submission Requirements:

Describe what measures and controls will be taken to insure that quality control and safety requirements will be met. Describe the team’s quality control approach, corporate systems and capabilities to maintain quality control of the construction.

Provide information on how you will handle internal and external requests for information, shop drawings, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. There is no need to submit a comprehensive quality control plan as the successful offeror will provide one after award. Outline what measures will be taken to correct construction deficiencies. Demonstrate the quality control reporting procedure.

Outline a proposed safety plan, explaining how Occupational Safety Health Administration (OSHA) and USACE EM-385-1-1 requirements will be met.

5.3.2 Evaluation Criteria:

a. The Government will evaluate the strengths, weaknesses and any deficiencies in the quality control approach. The

Government will evaluate the firm’s understanding of the requirements described in the Solicitation and the capability to ensure quality control during project execution. Some additional specific evaluation considerations are listed below. This list is not all-inclusive.

b. Organization. The Government will evaluate the clarity and strength of the quality control and safety components of the organization and how well it is structured and staffed to execute the entire scope of work. If applicable, joint venture participants’ contribution to the organization should be commensurate with their skills and background.

c. Quality Control. The Government will evaluate the Offeror’s capabilities and understanding of the contractually required quality control processes for Government construction on a military facility. The Government will evaluate the proposed quality control and safety plans to cover all required tasks and responsibilities.

d. Safety Plan: The Government will evaluate the narrative for realism, logic, and understanding of the contractual requirements in regard to the safety plan, including Occupational Safety Health Administration (OSHA) and USACE EM-385-1-1 requirements.

6.0 VOLUME 1 -TAB D: FACTOR 2 – PAST PERFORMANCE-

2ND Most Important Factor

6.1 Submission Requirements:

a. For the projects listed under Factor 4 – Experience, the Government will query the Contractor Performance

Assessment Reporting System (to include ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.

b. For each project that does not have a PPIRS evaluation, Offerors shall forward a copy of the Past Performance Questionnaire (PPQ) included at Attachment 2 to the points of contact responsible for monitoring performance under such contracts. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 4 – Experience. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires shall be submitted with your proposal. This does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

c. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal. Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in PPIRS for the projects listed under Factor 4 – Experience will count toward this requirement. The offeror is responsible for ensuring that the Contracting Officer (KO) has received a minimum of three (3) questionnaires prior to the proposal due date/time or has provided written notification to the KO that they have current applicable ratings in PPIRS. Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. Do not request past performance questionnaires on projects that have final PPIRS evaluations. If a past performance questionnaire is received on a project where a final PPIRS evaluation exists, the PPIRS evaluation will serve as the official rating of record for evaluation purposes.

d. Additionally, for each of the projects submitted under Factor 4-Experience, the offeror shall provide the final or most recent Individual Subcontracting Report (or SF 294 if report was prior to OCT 2005) prepared for submission through the Electronic Subcontracting Reporting System for government contracts. For non-government contracts, provide planned subcontracting goals and actual subcontracted dollars in terms of total contract dollars for Small Business (SB), Small Disadvantaged Business (SDB), Women-Owned Small Business (WOSB), HUBZone Small Business (HUBZone SB), Veteran-Owned Small Business (VOSB), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Historically Black Colleges and Universities (HBCUs) and Minority Institutions (MI).

e. The Government may contact references provided as part of Factor 4 – Experience for information regarding the

Offeror’s past performance on a project and for the purposes of assessing and verifying the scope of the work performed.

Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

f. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to: past performance information retrieved through the PPIRS and/or System for Award Management (SAM), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal; inquiries of owner representative(s); Federal Awardee Performance and Integrity Information System (FAPIIS); Electronic Subcontract Reporting System (eSRS); and any other official source available to the Government.

g. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

7.1.1 Joint Venture Submission Requirements. Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR and/or SAM as the offering Joint Venture. The Offeror must provide three (3) to five (5) "recent," "relevant" projects performed by the JV that reflect the JV's ability to perform the work required in this solicitation as required by paragraph 5.1 “Experience.”

a. If the JV Offeror cannot provide a sufficient number of projects to meet the minimum requirement, the JV Offeror must provide "recent," "relevant" projects performed by the JV, and then supplement the record with additional "recent," "relevant" projects performed by each JV member in their individual capacities. In such instance, each JV member must satisfy the minimum requirement of three (3) projects, to include any performed as the JV.

b. If the JV Offeror has no "recent," "relevant" projects performed by the JV, then each member of the JV must provide three (3) to five (5) "recent," "relevant" projects that reflect the JV member's ability to perform the work required in this solicitation as required by paragraph 8.1 “Experience.”

c. In addition to submittals of "Experience" and "Past Performance Questionnaires,” the Joint Venture shall provide a brief…