1.8 SUBMITT ALS
The contractor shall be required to furnish the following submittals to the COR. Completion of AT/OPSEC training and E-Verify on all personnel on-site who will be working on this contract.
1.9 PRE-WORK CONFERENCE
A mandatory per-work conference will be held with the Contracting Officer Representative and contractor prior to the commencement of any work. The contractor's responsible person and necessary administrative staff will be required to attend this meeting. Procedures for proper invoicing and payment, schedule, contact information, etc., shall be exchanged at this time.
1.10 ENVIRONMENTAL CLEANUP
The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection of the environment and facilities and will be required to restore all damages back to the original conditions at the contractor's expense. The contractor shall remove and dispose of all debris off Government property and disposed of in a state approved disposal site unless specified otherwise. The contractor shall be required to comply with all Federal and State environmental requirements.
1.11 COORDINATION OF WORK
The Contracting Officer Representative (COR) from the Eastern Area Office will be Pete Theodos. Contact information will be exchanged at the mandatory pre-work meeting.
PART 2 - EXECUTION 2.1 ACCOMPLISHMENT OF WORK
2.2 Playground Equipment. Contractor shall install products as outlined and in according to manufacturer's instructions to conform to dimensions. 1 playground set "see attached example", I-5 Inch Single Post Cantilever Swing", and I "Full Length Parkurb Wheel Chair Ramp" or equal as approved by the COR will be installed. All other products necessary for installation to include, but not limited to "Recycled Rubber Timber" and "Recycled Rubber Mulch" must be scaled and ordered to fit playground dimensions.
2.3 Remove Existing Playground. The contractor shall remove all of the existing playground equipment, which consists of a wooden structure with a slide and swings, small Mary-go-round and a spring toy. The two existing benches will stay. Remove all existing pea gravel within the old playground equipment area and pile within the park. Removed play ground equipment shall be disposed of off Government property.
2.4 Install New Playground The contractor shall prepare the existing area to accommodate the new playground footprint at approximately 60' x 40' .All items must be installed according to manufacturer specifications. The contractor shall install a pores protective layer on top of any sub base to prevent the infiltration of vegetation into the playground area. A recycled rubber material will be placed in an area that covers the entire footprint
Kid-friendly rubber/plastic guard rails shall be used around the entire playground area.