Amendment_W912BV19Q0011_0001.pdf

PDF 138 KB Posted

Attached to
Wister Dam Embankment Mowing
Solicitation number
W912BV19Q0011
Issued by

About this file

Solicitation Amendment, W912BV-19-Q-0011-0001

View the file

Other files

File Type Posted
Conformed_Solicitation,_Wister_Dam_Mowing.pdf PDF
Map_1,_Embankment_Area.jpg JPG image
Map_2,_Semi-Improved_Area.jpg JPG image
W912BV19Q0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Clarify the number and area of required mow ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 31-Jan-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV19Q0011

X 9B. DATED (SEE ITEM 11)

17-Jan-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

31-Jan-2019

CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV19Q0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

The contractor shall mow the dam embankment and semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2019 through 29 February 2020, with 8 mowings taking place during this time period, in accordance with the Specifications.

To:

The contractor shall mow the dam embankment area in accordance with the attached Specifications. The period of performance for this line item is 1 March 2019 through 29 February 2020, with 8 mowings taking place during this time period, in accordance with the

CLIN 0002

This CLIN has been renumbered to CLIN 1001.

The CLIN extended description has changed from:

The contractor shall mow the dam embankment and semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2020 through 28 February 2021, with 8 mowings taking place during this time period, in accordance with the

Specifications. The period of performance for this line item is 1 March 2020 through 28 February 2021, with 8 mowings taking place during this time period, in accordance with the

CLIN 0003

This CLIN has been renumbered to CLIN 2001.

The CLIN extended description has changed from:

The contractor shall mow the dam embankment and semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2021 through 28 February 2022, with 8 mowings taking place during this time period, in accordance with the

Specifications. The period of performance for this line item is 1 March 2021 through 28 February 2022, with 8 mowings taking place during this time period, in accordance with the

CLIN 0004

This CLIN has been renumbered to CLIN 3001.

The CLIN extended description has changed from:

The contractor shall mow the dam embankment and semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2022 through 28 February 2023, with 8 mowings taking place during this time period, in accordance with the

Specifications. The period of performance for this line item is 1 March 2022 through 28 February 2023, with 8 mowings taking place during this time period, in accordance with the

CLIN 0005

This CLIN has been renumbered to CLIN 4001.

The CLIN extended description has changed from:

The contractor shall mow the dam embankment and semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2023 through 29 February 2024, with 8 mowings taking place during this time period, in accordance with the

Specifications. The period of performance for this line item is 1 March 2023 through 29 February 2024, with 8 mowings taking place during this time period, in accordance with the Specifications.

CLIN 0002 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0002 5 Each Semi Improved Area Mowings

FFP

The contractor shall mow the semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2019 through 29 February 2020, with 5 mowings taking place during this time period, in accordance with the Specifications.

FOB: Destination

NET AMT

CLIN 1002 is added as follows:

1002 5 Each OPTION Semi-Improved Area Mowings, Option Yr 1

FFP

The contractor shall mow the semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2020 through 28 February 2021, with 5 mowings taking place during this time period, in

CLIN 2002 is added as follows:

2002 5 Each OPTION Semi Improved Area Mowings, Option Yr 2

FFP

The contractor shall mow the semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2021 through 28 February 2022, with 5 mowings taking place during this time period, in

CLIN 3002 is added as follows:

3002 5 Each OPTION Semi Improved Area Mowings, Option Yr 3

FFP

The contractor shall mow the semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2022 through 28 February 2023, with 5 mowings taking place during this time period, in

CLIN 4002 is added as follows:

4002 5 Each OPTION Semi Improved Area Mowings, Option Yr 4

FFP

The contractor shall mow the semi-improved areas in accordance with the attached Specifications. The period of performance for this line item is 1 March 2023 through 29 February 2024, with 5 mowings taking place during this time period, in

SECTION E - INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0002:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

N/A N/A N/A Government

The following Acceptance/Inspection Schedule was added for CLIN 1002:

The following Acceptance/Inspection Schedule was added for CLIN 2002:

The following Acceptance/Inspection Schedule was added for CLIN 3002:

The following Acceptance/Inspection Schedule was added for CLIN 4002:

SECTION F - DELIVERIES OR PERFORMANCE

The following Delivery Schedule Item has been deleted from CLIN 0002:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-MAR-2020 TO

28-FEB-2021

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

967327

The following Delivery Schedule item has been added to CLIN 0002:

CAGE

POP 01-MAR-2019 TO

29-FEB-2020

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 1001 has been added:

CAGE

POP 01-MAR-2020 TO

28-FEB-2021

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 1002 has been added:

CAGE

POP 01-MAR-2020 TO

28-FEB-2021

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 2001 has been added:

CAGE

POP 01-MAR-2021 TO

28-FEB-2022

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 2002 has been added:

CAGE

POP 01-MAR-2021 TO

28-FEB-2022

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 3001 has been added:

CAGE

POP 01-MAR-2022 TO

28-FEB-2023

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 3002 has been added:

CAGE

POP 01-MAR-2022 TO

28-FEB-2023

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 4001 has been added:

CAGE

POP 01-MAR-2023 TO

29-FEB-2024

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

The following Delivery Schedule for CLIN 4002 has been added:

CAGE

POP 01-MAR-2023 TO

29-FEB-2024

N/A OD, EAO, ELO, WISTER LAKE OFC

25334 U.S. HIGHWAY 270

WISTER OK 74966-9123

(End of Summary of Changes)

File details come from the government source that posted it.