AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of his Amendment, 0001, is to revise some of the language in Section 00 22 11 of the solicitation.
ALL other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 17
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BV18R0058
X 9B. DATED (SEE ITEM 11)
18-Apr-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Apr-2019
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION 00 22 11
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following were previously included by reference and are now included by full text:
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
(End of clause)
SECTION 00 22 11 - PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, BASIS OF
AWARD ONE-STEP-BEST VALUE, DESIGN-BUILD (SINGLE AWARD)
The following have been modified:
EVALUATION CRITERIA
SECTION 00 22 11
PROPOSAL PREPARATION AND EVALUATION CRITERIA
PART I -- PROPOSAL INSTRUCTIONS
1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS
a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.
(1) Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate PDF files. Ensure that each separate file is clearly marked to indicate its contents; and the identity of the Offeror.
(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.
(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.
(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.
(5) Do not include exceptions or deviations to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer. If the Offeror must make any assumptions prior to submitting the proposal, the Offeror shall list and describe in detail the assumptions on the first page of each Tab. All assumptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal Cover Sheet submitted with the Price Proposal any assumption to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. Proposal exceptions/deviations will not be considered a part of the contract after award unless specifically approved by the Contracting Officer in writing at the time of contract award.
b. DISCUSSIONS. The Government does not intend to enter into discussions with offerors prior to making an award. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency in accordance with (IAW) FAR Part 15.306(c)(2).
c. COST OR PRICING DATA. Offerors are not required to submit Cost or Pricing Data with their offers.
However, if deemed necessary, supplemental price breakdown information will be used to assist the Government in performing the price evaluation. This will not be requested until after the initial proposal submission.
d. GENERAL INSTRUCTIONS.
(1) Submit only the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc.
(2) Proposal materials shall be submitted in electronic format as shown below (see paragraph entitled
“Electronic Format”). Electronic proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Font size shall not be less than 10 point. Do not use condensed font. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal; however, if drawings, charts, or other graphics are submitted, sheets no larger than 11 inches x 17 inches shall be used. Eleven-by-seventeen (11 x 17) inch sheets will be counted as two 8-1/2 inch x 11 inch sheets. Technical and Price Proposals shall be provided as separate files. The Price Proposal file shall be named “Price Proposal”. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection.
(3) Electronic Format: The Offeror shall provide the complete proposal to the Contract Specialist via AMRDEC SAFE only in accordance with the instructions contained in the letter issued with this Task Order.
Provide the Price Proposal as a separate file. The electronic proposal file shall contain the entire proposal (excluding the Price Proposal) in .pdf format using Adobe Acrobat software to print to a .pdf file; do not scan or copy the documents into a .pdf file. The text portion of the proposal shall be contained as a single .pdf file. The file must be “searchable”. Sections of the proposal shall be linked to the index in logical order.
(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.
(5) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as two pages. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.
(6) Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision, shall be submitted in appropriate via AMRDEC SAFE with the entire proposal revised and complete.
e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL
(1) Price Proposal. Submit the Price Proposal in electronic format in accordance with paragraph 1.d.(3) above.
(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission.
(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted.
However, do not renumber the subsequent tabs.
TAB
CONTENTS OF THE PRICE PROPOSAL (VOLUME 1)
#1
The Proposal Cover Sheet
#2
Signed Letter Responding to RFP and Acknowledgement of Amendments
#3
CLIN Schedule
#4
Bid Guarantee (Bid Bond)
(4) Detailed Submission Instructions for the Price Proposal
(a) TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:
PROPOSAL COVER SHEET
1. Solicitation Number:
2. The name, address, and telephone and facsimile numbers of the Offeror (and electronic address if available):
3. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:
4. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
5. Tax Identification number of Offeror.
(b) TAB 2: The Letter provided to respond to this Request for Proposal is to be completed by all
Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.
(c) TAB 3: Section 00 11 00, CLIN Schedule is to be completed in its entirety by all Offerors. See Section 00 11 00 with attached notes, for further instructions.
(d) TAB 4: Provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee.
f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL
(1) Number of Sets of the Technical Proposal. Submit the Technical Proposal in accordance with paragraph 1.d.(3) above.
(2) Format and Contents of the Technical Proposal and List of Tabs. The technical proposal will be appropriately labeled as such. Each set shall be organized using the PDF bookmarks specified in the following chart. Bookmarks are to be visible immediately after opening.
CONTENTS OF THE TECHNICAL PROPOSAL (VOLUME 2)
LOCATION FACTOR
NUMBER
DESCRIPTION
TAB 1
Factor #1
RELEVANT SPECIALIZED EXPERIENCE
TAB 2
Factor #2
KEY SUBCONTRACTORS & KEY PERSONNEL
TAB 3
Factor #3
PAST PERFORMANCE
(3) Page Limitations. The following page limitations are established for each factor described above:
(a) Factor #1, Relevant Specialized Experience – Limited to 10 pages (a maximum of 5 forms)
(b) Factor #2, Key Subcontractors & Key Personnel – Limited to two (2) pages for each resume provided
(c) Factor #3, Past Performance – No page limitation
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
(4) Detailed Submission Requirements for the Technical Proposal. The following is a detailed description of the information to be submitted under each TAB.
(a) TAB 1: FACTOR 1, RELEVANT SPECIALIZED EXPERIENCE:
Demonstrate the experience of the offeror and/or proposed team, including sub-contractors, on projects same/similar to that described in the solicitation for same/similar construction services. If using subcontractors as part of the proposed team to demonstrate experience, describe the role they will play in this project and the percentage of work they will perform.
The Offeror shall complete a minimum of three (3), “Experience Information” forms, attached at the end of this section, in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete.
All projects submitted must be at least 50% complete and completed within the last 10 years. At least two (2) of the projects provided must be valued at over $500,000. For evaluation purposes, “similar” is defined as regularly engaged in the manufacturing of hydrolic steel structures.
Project submittal information should clearly illustrate experience in the manufactureing of hydrologic steel structures.
If more than three (3) projects are submitted, only the first three (3) listed in the proposal will be evaluated. Each project cited shall be at least $250, 000 in construction cost and have been completed within ten (10) years from the date that the proposal for this project is due. The government preference is that project examples submitted be of completed projects (i.e. construction complete). Each project summary must include the following for each project: a description of the project; scope; location; firms on the proposed team that constructed the project; construction contract award amount and final construction cost; the original contract finish date and actual finish date (if finished).
Narratives of each project should include a brief overview of each project and its relevance to this project. All summaries should also contain the name, address, telephone, e-mail, and fax number of a representative of the customer and familiar with the proposer’s experience on the project and can verify the experience cited.
If any of the information required is not included in the form then the Offeror will be considered non-responsive and evaluated as unacceptable.
(b) TAB 2: FACTOR 2, KEY SUBCONTRACTORS & KEY PERSONNEL:
By naming these firms and personnel, the Offeror is making a commitment that barring unforeseen circumstances, they are the firms and personnel that will be working on this project. Any substitutions shall be approved by the Contracting Officer. All key personnel and subcontractor personnel working on this project must be U.S. citizens or documented U.S. workers and must be able to provide proof of U.S. citizenship or other authorized documentation.
(1) Key Subcontractors: Identify the potential Key Subcontractors chosen for manufacturing, welding, painting, and fitting, describing the extent of their involvement in the project. Submit no more than five Specialized Experience forms (Attachment 1) for each Key Subcontractor. Subcontractors shall be selected from the list of potential subcontractors.
(2) Key Personnel: The Offeror must provide resume data for the following key construction personnel: Project Manager (if applicable), Project Scheduler, Quality Control Manager, and Site Superintendent, Site Safety and Health Officer (SSHO). Minimum qualifications for the Project Manager, Construction site superintendent and Contractor Quality Control (CQC) System Manager shall be as required by Section 01 45 00.00 00 QUALITY CONTROL. SSHO minimum requirements shall be as shown in Section 01 35 26.00 00
GOVERNMENTAL SAFETY REQUIREMENTS.
Resume information to be provided shall be limited to no more than two (2) pages per person and shall include the following information as a minimum:
(i) Name and title
(ii) Project assignment
(iii) Name of firm with which associated
(iv) Years of experience with this firm and with other firms
(v) Education degree(s), year, specialization, if applicable
(vi) Active professional registration, year first registered, if applicable
(vii) Other experience and qualifications relevant to same/similar work required under this contract
(c) TAB 3: FACTOR 3, PAST PERFORMANCE:
For each project submitted, Offerors shall submit available performance documentation. If no performance documentation is available, state so on the project information worksheet. The Government will review the experience forms submitted as well as query the Contractor Performance Assessment Reporting System (to include ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.
Firms without a history of past performance will be given a neutral rating. For non-Corps of Engineers contracts, provide a copy of the performance rating issued by the contracting agent.
For each project that does not have a final ACASS, CCASS, or CPARS evaluation, Offerors shall provide a questionnaire (See Attachment 2) to the point of contact, clearly identifying the project to be evaluated. A sample Past Performance Evaluation Questionnaire is included at the end of this section. When completed, these forms shall be mailed, faxed or e-mailed to the Tulsa District Contract Specialist identified in the RFP letter prior to proposal closing date. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference.
The information contained in the questionnaires will be used to evaluate the offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal.
Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in ACASS, CCASS, and CPARS for the projects listed under Factor 1 will count toward this requirement. The offeror is responsible for ensuring that the KO has received a minimum of three (3) questionnaires prior to that date/time or has provided written notification to the KO that they have current ratings in ACASS, CCASS, and CPARS. Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form shall be provided to the Contract Specialist directly from the reference. Do not request past performance questionnaires on projects that have final ACASS, CCASS, or CPARS evaluations. If a past performance questionnaire is received on a project where a final ACASS, CCASS, or CPARS evaluation exists, the ACASS, CCASS, or CPARS evaluation will serve as the official rating of record for evaluation purposes.
The Government may contact references provided as part of Factor 1 – Relevant Specialized Experience for Task Orders, for information regarding the offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (ESRS), and any other sources not provided by the offeror.
Part II. EVALUATION OF OFFEROR PROPOSALS
2. SOURCE SELECTION USING THE LOW-PRICED, TECHNICALLY ACCEPTABLE PROCESS. An evaluation for acceptability will be performed on the low price proposal in accordance with FAR 15.101-2(b)(3).
The proposal that provides the lowest overall price and is otherwise technically acceptable in all factors will be selected for award. To be considered technically acceptable, no technical factor in the proposal may be determined to be unacceptable. The failure of a proposal to meet any of the factors will result in a technically unacceptable rating and preclude award.
2.1 BASIS OF AWARD. Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factors of the base proposal. Tradeoffs are not permitted.
Proposals will be evaluated for acceptability but not ranked using non-cost/price factors.
2.2 FACTOR 4 - EVALUATION OF THE PRICE PROPOSALS
a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed, reflect a clear understanding of the requirements, and are consistent with the information provided by the Offeror. Additionally, all offers will be analyzed for unbalanced pricing in accordance with FAR 15.404-1(g) and may be rejected if it is determined that the lack of balance poses an unacceptable risk to the Government.
b. The otherwise technically-acceptable, lowest-priced offeror may be required to confirm its price on either a
CLIN, element, or total price basis, and/or provide additional information in support of their price, prior to contract award at the Government’s request and discretion.
2.3 EVALUATION OF THE TECHNICAL PROPOSAL. Each Technical Proposal will be evaluated based on the following evaluation criteria:
a. FACTOR 1: RELEVANT SPECIALIZED EXPERIENCE: The Government will review the experience of the contractor on projects and key personnel provided in response to Factor 1. Offerors must meet all of the following minimum acceptability standards to receive an “ACCEPTABLE” on this factor:
(1) Proposed team must have at least three (3) projects that are same/similar to that of the work found in this solicitation; AND
(2) At least two (2) of the projects submitted must be valued at over $500,000.00, and they must have been at least 50% complete within the last 10 years.
Failure to demonstrate the minimally acceptability standards under this factor will result in a “Non-Acceptable” rating and possible elimination from further consideration for contract award.
b. FACTOR 2: KEY SUBCONTRACTORS AND KEY PERSONNEL: The Government will review the resumes provided in response to Factor 2. Offerors must demonstrate all of the following minimum acceptability standards to receive an “Acceptable” on this factor.
The offeror must demonstrate in all resumes that the key personnel proposed have:
(1) A minimum experience as required by the specified sections (see Section 01 45 00.00 00 QUALITY CONTROL and Section 01 35 26.00 00 GOVERNMENTAL SAFETY REQUIREMENTS).
If none is specified, all personnel shall have a minimum of 5 year specialized experience in their field;
AND
(2) Experience on projects same/similar to the work in this solicitation working in the position they are assigned to under this contract.
Failure to demonstrate the minimally acceptability standards under this factor will result in a “Non- Acceptable” rating and possible elimination from further consideration for contract award.
c. FACTOR 3: PAST PERFORMANCE:
The Government will review the experience forms submitted as well as all CPARS, ACASS, CCASS evaluations regardless of project and past performance questionnaires for projects submitted under Factor 1. The Government may contact points of contacts listed on the “Experience Information” forms submitted under Factor
1. Offerors must demonstrate the following minimum acceptability standards:
Any identified element or overall rating that is LESS than MARGINAL for past performance in the last 3 years OR for any project submitted under Factor 1, shall result in an 'Unacceptable' rating and elimination from further consideration for contract award.
In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305(a)(2)(iv)).
Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability “Unknown” shall be considered “acceptable”
3. GENERAL TECHNICAL CRITERIA
a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.
b. Proposals which are generic, vague, or lacking in detail may be considered unacceptable. The offeror’s failure to include information that the Government has indicated should be included may result in the proposal being found deficient if inadequate detail is provided.
c. The Government cannot make award based on a deficient offer. Therefore, receipt of a “Non-Acceptable” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal. Note: It is the Government’s intent to award without discussions.
d. If awarded the contract, the Contractor shall construct the project in accordance with the plans and specifications issued with this RFP.
ATTACHMENT 1
RELEVANT EXPERIENCE INFORMATION
(To be completed by Contractor)
1. Contract/Task Order Number:
Include Brief Explanation for Block 4 discussing reasons for time growth as necessary:
2. Contractor Name:
Address:
3. Contract Award Value:
4. Contract/TO /PO Status: Active Complete
Original Contract Completion Date:
Actual Completion Date :
Liquidated Damages Assessed(Y/N) :
(if yes, state $ amount)
5. Project Title:
Location:
6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort and a brief overview of relevance to this project:
7. Project Owner or Project Manager for the Client – provide:
Name:
Address:
Telephone Number and E-mail:
SECTION 00 22 00 - ATTACHMENT 2
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE GOVERNMENT’S CONTRACT SPECIALIST. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT
TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts
E VG S M U
N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U
N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U
N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U
N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
E VG S M U
N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project?
E VG S M U
N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U
N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U
N
d) Overall customer satisfaction
E VG S M U
N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines
E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues?
(Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks.
Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
ATTACHMENT 3
KEY PERSONNEL RESUME
Provide information, listed below, on separate sheets showing qualifications of: On Site Construction Project Manager, Quality Control Manager (CQC System Manager), Site Superintendent, and Site Safety and Health Officer. NOTE:
Match the positions on this page to the list of key personnel in the narrative submission requirements and evaluation criteria.
(o) Name and Title ________________________________________________________________
(p) Project Assignment _____________________________________________________________
(q) Name of Your Firm _____________________________________________________________
(r) Years experience in the role identified ______________________________________________
(s) No. of Years: With this Firm__________ With other Firms____________
(t) Education: Degree(s)/Year/Specialization ____________________________________________
(u) Active Registration, if any: No._______, State(s) ______, First Year/ Current Year ______/______
(v) Other experience and qualifications relevant to same/similar work required under this contract:
ATTACHMENT 4
LETTER OF COMMITMENT FOR KEY PERSONNEL
TO: Contracting Officer
SUBJECT: Letter of Commitment for Proposed Contract for ____________________________________
Dear Sir or Madam:
I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that I will fulfill the duty of (Job Title).
Sincerely, (prospective employee signs)
Date: ____________
W912BV18R0058
ATTACHMENT 5
LETTER OF COMMITMENT FOR KEY SUBCONTRACTORS
(USE COMPANY LETTERHEAD)
TO: Contracting Officer
SUBJECT: Letter of Commitment for Proposed Contract for ____________________________________
Dear Sir or Madam:
I hereby make the unequivocal commitment that, in the event of an award of a contract to (Fill in name of Proposer), that (insert name of key Subcontractors firm) will fulfill the duties of (state role on a project).
Sincerely, (Authorized Official)
Date: ____________
(End of Summary of Changes)
The following items are applicable to this modification:
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
AMENDMENT 0001 SUMMARY
The purpose of his Amendment, 0001, is to revise some of the language in Section 00 22 11 of the solicitation. All changes are highlighted in yellow for ease of finding paragraphs and the revised language.
ALL other terms and conditions remain unchanged.