Solicitation,_W912BV18Q0122_A0002.pdf

PDF 210 KB Posted

Attached to
Invasive Species Mgmt J Redmond/Council Grove, KS
Solicitation number
W912BV18Q0122
Issued by

About this file

Amendment 0002 to Solicitation W912BV18Q0122

View the file

Other files

File Type Posted
Solicitation,_W912BV18Q0122_A0001.pdf PDF
Solicitation,_W912BV18Q0122.pdf PDF
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Invasive Species Control, John Redmond Reservoir and Council Grove Lake, Kansas

1. This Amendment to the Solicitation is to extend the offer date and correct errors in SECTION C.

2. The hour and date specified for receipt of the offer is hereby updated to 2:00 PM CST on 25 September 2018.

3. SECTION C is hereby corrected as per the highlighted changes.

4. POC for this Amendment is Douglas Buffington, Douglas.D.Buffington@USACE.Army.mil, phone 918-669-7078, fax 918-669-7436.

5. ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED AND IN FULL FORCE AND EFFECT

1. CONTRACT ID CODE PAGE OF PAGES

1 12

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Sep-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV18Q0122

X 9B. DATED (SEE ITEM 11)

22-Aug-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

20-Sep-2018

CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BV18Q0122

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Sep-2018 10:00 PM to 25-Sep-2018 02:00 PM.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

PERFORMANCE WORK SCHEDULE

STATEMENT OF WORK

INVASIVE SPECIES CONTROL

JOHN REDMOND RESERVOIR AND

COUNCIL GROVE LAKE, KANSAS

1. GENERAL

1.1 WORK AREA

All activities will be taking place at U.S. Army Corps of Engineers wildland areas. The specific areas are listed below and indicated in the attached maps:

John Redmond Reservoir

Otter Creek – An area bordered by extending 13th Rd. westward on the north, Iris Rd. on the West, Embankment Rd. on the south, and the access road to the Otter Creek Recreation Area on the east.

Approximately 231 Acres.

Embankment – The downstream side of the dam embankment to the government boundary, from the Otter Creek access road northeast to the bend in 14th Rd. Approximately 350 acres.

Newkirk’s Corner – A wooded area on the north east corner of where Lynx Rd. turns and becomes 14th Rd.

Approximately 22 acres.

Riverside West – An area between the original river channel and the outlet channel, bored on the north and west by an access road. A contiguous portion of the area extends southwest from the access road to original river channel boat ramp approximately 1,000 feet. Approximately 140 acres.

Riverside East – An area north east of the outlet channel, bordered by 15th St. on the north and the government boundary on the east. Approximately 200 acres.

Project Compound – An area between 15th Rd and Lake Rd, west from the government boundary to

Embankment Rd. This does not include the dam embankment. Approximately 250 acres.

Dam Site – An area between the reservoir and Lake and Embankment Rds. Approximately 470 acres.

Redmond Cove – A wooded area between the shoreline and the government boundary, extending from where the lake goes under Lake Rd. northwest to 17th Road. This does not include the area described as Hickory Creek South. Approximately 400 acres.

Hickory Creek East North – Two contiguous open fields north of 17th Rd and east of the vacated 17th road.

The northern most field is bordered on the north by trees.

Hickory Creek East South – An open field bordered on the north by 17th Rd. and on all other sides by trees.

Approximately 60 acres.

Hickory Creek - An area south of 18th Rd. to the reservoir, and west of Hickory Creek/John Redmond

Reservoir to the government boundary. Approximately 304 acres.

Council Grove Lake

Area 1 – An area extending from US 177 west to River Road West Rd., between the dam embankment and the government boundary. 66 acres.

Area 2 – An area along Lake Road from S. 975th Rd to the entrance of Santa Fe Trail Park. The area extends fifty feet north and south to the government boundary. 20 acres inclusive of the roadway.

Canning Creek – An area of the Canning Creek Public Use Area bordered by the boundary on the east, the lake on the west, lake road on the south, and the camping area on the north. 237 acres.

Neosho Park – An area between Lake Rd. and the shoreline, extending from the emergency spillway west to the entrance to Marina Cove. 84 acres.

White’s Point – An area that separates two arms of the lake, from the boundary with the Kansas

Department of Wildlife and Parks Wildlife Area to the southernmost point from shoreline to boundary line. 262 acres.

Emergency Spill Way – The area between Lake Road and South 975th Rd, south to the government boundary. 148 acres.

Outlet Channel North–An area north of the outlet channel for the Grand Neosho River to the the government boundary, excluding the mowed portion of Outlet Channel West Park. 68 acres.

Outlet Channel South – An area south of the outlet channel for the Grand Neosho River between the dam embankment and the outlet channel for the Grand Neosho River, bordered on the east River Road West Rd. 122 acres.

1.2 SCOPE OF WORK -

Pesticide Application

Pesticide application will be applied as needed to control target pest in the areas listed below. All application must be done by or under the supervision of a State of Kansas certified applicator under optimal wind conditions to avoid drift. Any application below the top of flood pool must utilize a pesticide approved for use below the mean high water mark. All pesticide application must be done in accordance with the label as well as otherFederal, State, and Local guidelines.

Council Grove

Top of Flood Pool: 1,280 feet above mean sea level

Area 2 – Johnsongrass and sericea lespedeza White’s Point – Serecia lespedeza

John Redmond

Top of Flood Pool: 1068 feet above mean sea level

Dam Site – Johnsongrass and sericea lespedeza Riverside East - Johnsongrass and sericea lespedeza Riverside West – Johnsongrass Downramp – Johnsongrass Hickory Creek West - Sericea lespedeza

2. SUBMITTALS

2.1 CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer and the Contracting Officer’s Representative (COR) two (2) weeks prior to the Pre-work Conference. All submittals, other than copies of licenses and contracts, shall be typed. If the Contracting Officer determines any of the proposed plans do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

2.1.1 Names of on-site project manager and alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 4.2).

2.1.2 Safety Plan (subparagraph 7.1).

2.1.3 Report of Safety meetings (submit within 15 days after the end of each quarter)

(subparagraph 7.3).

2.1.4 Exposure reports (submit by 2nd workday of each month) (subparagraph 7.7).

2.1.5 Job Hazard Analysis (subparagraph 7.2)

2.1.6 Kansas permits and/or certifications for application of herbicides (to be submitted with the offer)

2.1.7 Pesticide Treatment Plans

At least 30 days prior to pesticide application, details shall be supplied regarding the specific pesticides to be used in each area. Safety data sheets shall be included as part of this submittal.

2.1.8. Complete Antiterrorism/Operations Security Training and provide completed acknowledgement within 10 calendar days of contract award. (Paragraph 9)

2.1.9. Complete E-Verify Requirement and provide documentation no later than three business days after contract award. (Paragraph 15)

3. EXECUTION AND ACCEPTANCE OF WORK

3.1 Acceptance of Work. Work shall be accepted unless notified by the COR of deficient

Services.

3.1.1 Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 1).

3.1.2 If the COR directs re-performance of work to correct deficiencies, the contractor shall initiate action to accomplish corrective work within two business days.

3.1.3 Notify the COR when corrective work is completed. Notification shall be made by completing Part IV of the QA Report, provided it has been furnished the contractor.

When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor and the Contracting Officer.

4. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within the time limits specified.

4.1 Experience and skills

4.1.1 Provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.

4.1.2 Valid driver’s license for contractor personnel operating motor vehicles will be available upon request.

4.1.3 Quality control personnel shall be knowledgeable of the work they inspect, inspection procedures, and all portions of this specification that apply to the work they inspect.

4.2 Supervision.

4.2.1 Provide an on-site project manager who shall have full authority to direct any work required. This on-site project manager, and alternates who shall have full authority to execute work during brief absences of the on-site project manager, shall be designated in writing. The on-site project manager or alternate shall be on site at all times work is being performed. Identify, in writing, the name of the appointed on-site project manager and provide this information to the Contracting Officer and COR within 10 calendar days of contract award

4.2.2 Provide the COR a telephone number which the contractor's on-site project manager can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

4.2.3 The on-site project manager shall contact the COR between 8:30 and 9:00 a.m. each workday work is being performed. If this contact is made by telephone, the COR may require the on-site project manager to meet and discuss issues and the planned activities.

The COR shall establish the time and location for such meetings after consulting with the on-site project manager; generally within two (2) hours after requested.

5. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within the specified time limits. Equipment breakdowns do not relieve the contractor of the responsibility to complete work properly and on time.

5.1 Equipment Inspections. Upon request, the contractor shall make any piece of equipment available to the COR for inspection; equipment shall not be used until it has passed inspection. The COR shall establish the time and location for these inspections.

5.2 Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with the current revision of EM 385-1-1.

5.2.1 Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.

5.2.2 Equipped with seat belts. Seat belts shall be worn at all times by personnel operating equipment. Refer to subparagraph 16B.08 of EM 385-1-1.

5.2.3 Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the equipment, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.

6. MATERIALS AND SUPPLIES.

6.1 Contractor furnished. The contractor shall furnish all materials and supplies necessary to accomplish all work required by this specification and subsequent Task Orders within specified time limits.

6.2 The COR will identify locations where potable water can be obtained at each site.

7. SAFETY.

http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.html

7.1 Safety plan / Accident Prevention Plan. The contractor shall furnish the COR a comprehensive safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with the most current version of EM 385-1-1. The contractor's written safety policy shall be given to all employees and posted at a prominent location in the contractor's office throughout the contract period. The safety plan shall include, but not be limited to the following:

7.1.1 Procedures for training employees in responsibilities for safety of others, including the general public.

7.1.2 Requirements for wearing or utilizing personal safety equipment and apparel.

7.1.3 Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

7.1.4 Procedures for treating and transporting injured persons to medical facilities.

7.1.5 Fire prevention plans.

7.2 Job Hazard Analysis. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the COR directs. Job hazard analysis directed by the COR shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 4.

7.2.1 Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).

7.2.2 Equipment operation and maintenance (for each type of equipment).

7.2.3 Vehicle operation and maintenance.

7.2.4 Fire Break operations (if awarded).

7.2.5 Prescribed Fire (if awarded).

7.3 Safety meetings. The contractor shall conduct safety meetings prior to the initiation of any activity on the project. Employees of subcontractors shall attend safety meetings.

The contractor shall provide at least one-day notice of safety meetings to the COR so that Corps of Engineers personnel can attend. A quarterly report of the meetings shall be furnished in writing to the COR by the 15th day following the end of each quarter.

The report shall include the following information on each meeting: Date, and location of meeting, names of persons attending, safety items discussed and persons who conducted the meeting.

7.4 Safety violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently removed from this contract upon the written request of the Contracting Officer. The Contracting Officer may require, in writing, that the Contractor remove from the work any employee the Contracting Officer (or Contracting Officer Representative) deems incompetent, careless, or otherwise objectionable.

7.5 Personal clothing and safety apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts, tank tops, or shorts). Clothing shall be in good repair, i.e., no torn shirts or trousers. Personnel performing mowing/trimming work shall wear eye and ear protection, hardhats, and safety-toe shoes. Personnel, when required by Section 5 of EM 385-1-1, shall wear additional protective apparel.

7.6 Accident reports. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.

7.6.1 The contractor shall investigate all accidents involving contractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

7.7 Exposure reports. Contractor shall maintain an accurate record of exposure data (man hours worked) and submit the figure in writing monthly by the 2nd day of the following month.

8. WORK SCHEDULES.

8.1 WORK SCHEDULES. The contractor is responsible for managing all work performed under this specification, including written work schedules as prescribed below. The COR’s authority in reviewing these schedules is limited to assuring compliance with this specification. If the COR determines the schedules do not comply with this specification, the contractor shall revise his schedules and resubmit them.

8.2 With the exception of prescribed burns, work should be completed Monday through Friday, from 8:00 – 16:30, excluding Federal holidays. Prescribed burns may be conducted at any time the weather conditions are suitable provided the project is given 3 work days advanced notification.

9. ANTITERRORISM AND OPERATIONS SECURITY REQUIREMTS

The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in SECTION H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR and Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the Contracting Officer within two business days of contract award.

10. PRE-WORK CONFERENCE. The Contracting Officer or their designee shall conduct a Pre-Work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 2 above. As a minimum, the officer of the company that signed the contract, the on-site project manager, and the person that will directly supervise the administrative work associated with the contract shall represent the contractor. The Contracting Officer shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor. At the discretion of the Government the conference may be held telephonically.

11. CONTRACT PERIOD

This contract will run for 18 months from the time of award.

12. INVOICES

Invoices for work completed at John Redmond Reservoir and Council Grove Lake shall be submitted to the Council Grove Project Office, Contact provided at time of award and a copy shall also be submitted to the COR.

13. BASIS FOR PAYMENT

Payment will be made on a monthly basis according to the activities conducted during the previous calendar month.

All reports, i.e., Contractor Quality Control (CQC), safety meetings, exposure reports, etc., shall be submitted before an invoice will be accepted.

14. CONTRACT BASE AND OPTIONS

All pesticide applications in the listed areas are part of the base for this contract

14.1 Prescribed burns and fire break construction outlined in Appendix A may be optioned on an area by area basis.

14.2 Cedar removal as outlined in Appendix B may be optioned on an area by area basis.

15. Pre‐screen candidates using E‐Verify Program. The Contractor must pre‐screen Candidates using the E‐verify Program (http://www.dhs.gov/E‐Verify) website to meet the established employment eligibility requirements. The contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR and the Contracting Officer no later than 3 business days after the initial contract award (or NTP for construction contracts).

16. The Contractor is responsible for any damages caused by the Contractor or Contractor Personnel to US Government Property during the course of performing on this Contract to include landscaping and park facilities.

17. ENVIRONMENTAL CONDITIONS. The contractor shall maintain a clean work area at all times. The contractor shall be responsible for the protection of the environment and will be required to restore all damages subject to the approval of the contracting officer. The contractor will be required to comply with all Federal and State environmental requirements. The contractor shall remove all excess materials and clean the entire area in a timely manner.

STATEMENT OF WORK

INVASIVE SPECIES CONTROL

APPENDIX A: FIRE MANAGEMENT

The work area is as defined in the base scope of work.

1.2 APPENDIX A SCOPE OF WORK

1.2.a. Prescribed Burns

This task includes all necessary preparation for a safe burn and removal of cedar skeletons post-burn.

Prescribed burns shall be conducted at the areas indicated below in a manner to setback woody encroachment to a sustainable state of early succession, promote warm-season grasses and hinder serecia lespedeza (decreasing such target species as eastern red cedar, locust trees, dogwoods and sumac stands, etc.). Burns shall only be conducted upon approval of a formal burn plan (see submittals) in accordance with the conditions described in the plan.

Burns will not be allowed under conditions which would severely impact densely populated areas, schools, hospitals or airports or under conditions that fail to provide benefits for the management of the targeted species. Local fire marshals and sheriff’s departments shall be notified prior to any prescribed burn activities.

Any loss or damage due to the burning operation shall be the responsibility of the Contractor. The Contractor is responsible for compliance with all Federal, State and local laws and regulations, and shall notify the COR and appropriate local authorities prior to burning. The Contractor shall obtain burn permits, as required, from the appropriate State and County Officials. All red flag warnings and air quality burn restrictions shall be adhered to.

Council Grove

Area 1 – Cedar trees and other woody encroachments, Johnsongrass, Sericea lespedeza Area 3 – Cedar trees and other woody encroachments, Serecia lespedeza, Caucasian bluestem Outlet Channel – Broam grass, cedar trees and other woody encroachments Emergency Spillway – Locust trees and other woody encroachments, Johnsongrass, Sericea lespedeza Neosho Park – Sericea lespedeza, johnsongrass, locust trees and other woody encroachments Canning Creek – Sericea lespedeza, locust and other woody encroachments

John Redmond

Redmond Cove – Cedar and Locust trees Hickory Creek South – Cedar trees and sericea lespedeza Hickory Creek North – Sericea lespedeza and locus trees Embankment – Sericea lespedeza, Johnson grass, locust trees and other woody encroachments Otter Creek – Sericea lespedeza and cedar trees Newkirk’s Corner – Locust trees Project Compound – Sericea lespedeza, Johnson grass, cedar trees

1.2.b Failure to Burn

If the area to be burned is prepared but not burned, payment will be made according to the following table:

Council Grove Rate of Payment Area 1 75% Canning Creek 25% Neosho Park 25% Emergency Spillway 25% Outlet Channel 50% John Redmond Otter Creek 25% Embankment 25% Newkirk’s Corner 50% Project Compound 50% Redmond Cove 50% Hickory Creek East – North 25% Hickory Creek East – South 25%

1.2.c. Fire Break Construction

Below-grade removal of woody vegetation (not to include the rootball) within 50-feet from the boundary where topography allows. It is the responsibility of the COR to make a final determination as to whether topography is prohibitive to the creation of a firebreak.

Chemical treatment shall be used to prevent resprouting.

Remaining vegetation shall be mowed to between two and four inches and followed by application of a broadleaf pesticide to leave only grasses.

Council Grove

At Outlet Channel - South, along the southern most government boundary from Lake Road west to the Neosho River. Approximately 0.36 miles. Segments along the Outlet Channel management area are excluded, but the boundary along the unnamed area south of Outlet Channel is included.

At White’s point, along the eastern boundary of the west shoreline, from the large lagoons north to “M” Ave. 3.04 miles.

2. SUBMITTALS

2.1.1 Burn Plans

Burn plans shall be submitted for approval at least 30 days prior to the first target date for burning. Plans shall include the range of weather conditions under which burns will be conducted, to include air temperatures, relative humidity, and wind speed and direction. A list of the minimum personnel to be on-site during the burn and all emergency coordination contacts to be made prior to burning will also be included, and the name of the person who took the call supplied prior to the start of the burn.

2.1.2 Pesticide Application

All submittals shall be made in accordance with the requirements of the base pesticide contract.

STATEMENT OF WORK

INVASIVE SPECIES CONTROL

APPENDIX B: CEDAR REMOVAL

The work area is as defined in the base scope of work.

1.2 APPENDIX B SCOPE OF WORK

Cedar Tree Removal

This task includes all necessary preparation and execution for the removal of cedar trees in designated areas.

Method of tree removal must not be ground disturbing.

Cedar skeletons are to be stacked for burning at a later date by the Government.

2. SUBMITTALS

(End of Summary of Changes)

File details come from the government source that posted it.