FBO_Posting.pdf

PDF 625 KB Posted

Attached to
AMENDMENT Federal contract opportunity
Solicitation number
W912BV18Q0030
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

About this file

Solicitation

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT, newest first.
File Type Posted
amended_A7_-_Synopsis.docx DOCX document
AMENDMENT_-18Q0030.pdf PDF
amended_A7_-_Synopsis.docx DOCX document
Price_Schedule_Chou-Newt.xls XLS spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-solicitation Notice

W912BV-18-Q-0030

1. This is a Combined Synopsis solicitation for commercial items prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and additional notice will not be issued.

This Acquisition shall be set aside for Small Business.

2. Solicitation W912BV-18-Q-0030 is being issued as a Request for Proposal (RFQ) for a Firm-Fixed-

Price contract for Refuse Collection Services at Chouteau-Newt Graham, Tulsa District, Oklahoma.

3. This notice and the incorporated provisions and clauses are those in effect through the Federal

Acquisition Circular (FAC) 2005-76.

4. This is a 100% Small Business Set Aside. The North American Industrial Classification System

(NAICS) Code is 562111 and the applicable Small Business Size Standard, as established by the U.S.

Small Business Administration, is $38,500,000.00. (FSC S205, PROG S10, SIC 4212).

5. Price Schedule – See attachment

6. Description of services: The required services provides for Nesting Survey Interior Least Tern below

Denison Dam to Index, AR

7. The contract will consist of a base and four option periods. The period of performance will be as follows:

Contract period Start date End Date Base period 1 FEB 18 31 JAN 19

Option year 1 1 FEB 19 31 JAN 20

Option year 2 1 FEB 20 31 JAN 21

Option year 3 1 FEB 21 31 JAN 22

Option year 4 1 FEB 22 31 JAN 23

8. FAR Clauses 52.212-1, 52.212-3 and 52.212-4 apply to this procurement. For the exact text and wording of clauses and provisions please see http://farsite.hill.af.mil. The following addenda apply to these clauses: 52.212-1 – the NAICS code is listed in paragraph # 4 above.

9. FAR Clause 52.212-5 (deviation) applies to this procurement. A completed copy is attached showing the applicable clauses.

10. Offers are due on 23 February 2018 no later than 10:00 AM CST.

11. Bidders Inquiry: Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet. Please see attachment for additional Information.

12. Performance Work Statement. Please see attached instruction to Offerors for the PWS.

13. Price Schedule: Please see attached instruction to Offerors for the Price Schedule.

14. The solicitation is issued via Internet only on Feb Biz Opps Website at http://www.fbo.gov. It is the contractors’ responsibility to check the above-listed internet address daily for any posted changes to the solicitation. Any amendments issued to the solicitation must be acknowledged by potential offerors. No corrections and/or changes to proposals will be allowed after the proposal submittal due time and date.

16. Quotes will be evaluated as follows: Price evaluation: The government shall review acceptable offers by lowest price. Price Reasonableness and affordability will also be evaluated. Past Performance: The Government will review all CPARS evaluations regardless of project and may contact points of contacts or evaluate any information provided to the Contract Specialist or Contracting Officer to include USACE District Past Performance files. Offerors must demonstrate the following minimum acceptability standards: All past or current performance must have overall ratings of Satisfactory, Acceptable or above. Any derogatory information may be grounds for an Unacceptable rating. Offerors with no past performance information will receive an “Acceptable” rating for this factor. Past experience: The government will evaluate as acceptable/not acceptable at least one project of similar work that has been completed within the past 5 years. Award will be made to the lowest-priced, technically acceptable, responsible offeror, whose quote conforms to the requirement of the solicitation. Responsibility will be determined in accordance with FAR 9.104-1.

Location: Chouteau-Newt Graham, Oklahoma

17. Previous contract information: W912BV-17-P-0004 awarded to Alimarc Enterprises LLC for a total award Capacity of $12,990.00 for the base no options were exercised.

SEE ADDENDUM

(No Collect Calls)

W912BV18Q0030 08-Jan-2018

b. TELEPHONE NUMBER

918.669.4978

8. OFFER DUE DATE/LOCAL TIME

10:00 AM 23 Jan 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

ANGELIA V GUYNN

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

US ARMY CORPS OF ENGINEERS, TULSA DISTRICT

2488 E. 81ST STREET

TULSA OK 74137-4290

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$38,500,000

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF83

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section A - Solicitation/Contract Form

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

Read the solicitation in its entirety and all amendments and complete the checklist before submitting documents.

Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST

MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS

Do not include excess information, to include audio-visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.

EMAIL

Emailed quotes in a file format readible by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E-mail address angelia.v.guynn @usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.

FAX or MAIL

Include a cover sheet that references the Contract Specialist – Angelia Guynn and the solicitation number. When submitting through mail ensure you clearly mark the envelope to:

TULSA DISTRICT CORPS OF ENGINEERS ANGELIA GUYNN, CECT-SWT-E 2488 e. 81 ST TULSA, OK

74128 4609 FAX: (918) 669 7436.

Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold outs (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.

Do not use plastic multi hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.

HAND DELIVER

If your submission will be hand -carried, please provide notification to the Contract Specialist at least one working day in advance (918 669-4978) or angelia.v.guynn@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.

Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District Office is below:

TULSA DISTRICT CORPS OF ENGINEERS

2488 E. 81ST

TULSA, OK 74037

This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.

Submit the following documents:

5. A signed copy of the 1st page of the solicitation and all amendments

6. Complete the past performance references page, if included in solicitation.

7. Complete the Excel pricing schedule provided in the solicitation (all cells except for the unit prices are locked).

8. Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder

Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e- mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Numbers are: W912BV-18-Q-0030 The Bidder Inquiry Key is:

5. Address/enter only one question/issue per entry.

c. The Bidder Inquiry System will be unavailable for new inquiries 2:00pm (Central) Thursday, 1 December 2016 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800 428 HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Angelia Guynn Telephone: 918-669-4978 E MAIL: Angelia.v.guynn@usace.army.mil

ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS

The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.

Section B - Supplies or Services and Prices

BID SCHEDULE

BID SCHEDULE

CHOUTEAU/NEWT GRAHAM LAKES, OKLAHOMA

REFUSE COLLECTION

BASE YEAR: 1 FEB 18– 31 JAN 19

Unit Total Description Quantity Unit Price Amount

SUMMER PERIOD: 1 April-31 October Chouteau 0001 Afton Landing 7 MO $__________ $__________ 0002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 0003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

0004 Afton Landing 9 EA $__________ $__________ 0005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 0006 Afton Landing 5 MO $__________ $__________ 0007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 0008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

0009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL BASE YEAR $__________

CHOUTEAU/NEWT GRAHAM LAKES, OKLAHOMA

1ST OPTION YEAR: 1 FEB 19 – 31 JAN 20

SUMMER PERIOD: 1 April-31 October Chouteau 1001 Afton Landing 7 MO $__________ $__________ 1002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 1003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

1004 Afton Landing 9 EA $__________ $__________ 1005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 1006 Afton Landing 5 MO $__________ $__________ 1007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 1008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

1009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 1ST OPTION YEAR $__________

2ND OPTION YEAR: 1 FEB 20 – 31 JAN 21

SUMMER PERIOD: 1 April-31 October Chouteau 2001 Afton Landing 7 MO $__________ $__________ 2002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 2003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

2004 Afton Landing 9 EA $__________ $__________ 2005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 2006 Afton Landing 5 MO $__________ $__________ 2007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 2008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

2009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 2ND OPTION YEAR $__________

3RD OPTION YEAR: 1 FEB 21– 31 JAN 22

SUMMER PERIOD: 1 April-31 October Chouteau 3001 Afton Landing 7 MO $__________ $__________ 3002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 3003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

3004 Afton Landing 9 EA $__________ $__________ 3005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 3006 Afton Landing 5 MO $__________ $__________ 3007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 3008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

3009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL 3RD OPTION YEAR $__________

REFUSE COLLECTION

4TH OPTION YEAR: 1 FEB 22 – 31 JAN 23

Unit Total Description Quantity Unit Price Amount

SUMMER PERIOD: 1 April-31 October Chouteau 4001 Afton Landing 7 MO $__________ $__________ 4002 Tallahassee Loop 7 MO $__________ $__________ Newt Graham 4003 Bluff Landing 7 MO $__________ $__________ Subtotal Summer $__________

ADDITIONAL COLLECTIONS NTE

4004 Afton Landing 9 EA $__________ $__________ 4005 Bluff Landing 9 EA $__________ $__________ Subtotal Add’l Collections $__________ WINTER PERIOD: 1 November-31 March Chouteau 4006 Afton Landing 5 MO $__________ $__________ 4007 Tallahassee Loop 5 MO $__________ $__________ Newt Graham 4008 Bluff Landing 5 MO $__________ $__________ Subtotal Winter $__________

SUMMER & WINTER PERIOD

4009 Chouteau Lock 17 12 MO $__________ $__________

TOTAL4TH OPTION YEAR $__________

TOTAL BASE AND ALL OPTIONS

Section C - Descriptions and Specifications

STATEMENT OF WORK

S P E C I F I C A T I O N S

CHOUTEAU / NEWT GRAHAM

OKLAHOMA

MAINTENANCE CONTRACT

FOR

REFUSE COLLECTION SERVICES

ORGANIZATION OF SPECIFICATIONS

This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.

The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.

Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.

TABLE OF CONTENTS

Para.

No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Pre-work Conference 12 Contractor Submittals 13 Billing 14 Changes in Amount of Facilities Serviced 15 Work Schedules 16 Required Insurance and Insurance Certificate 17 Antiterrorism and Operations Security Requirements

EXHIBITS

No. Title 1 Quality Assurance Report 2 Performance Requirements 3 Invoice Format

APPENDICES

Appendix Title A Refuse Collection Services A-1 Inventory of Dumpsters

1. SCOPE OF WORK. The work required under this specification provides for labor, supervision, transportation, equipment, and supplies to perform refuse collection at designated areas of Chouteau Lock and Dam Pool 17 and Newt Graham Lock and Dam Pool 18, McClellan Kerr Navigation Channel.

2. DEFINITIONS.

2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.

2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements.

2.3. Government. As used herein means the Army Corps of Engineers.

2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. Performance Standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.

2.5. Project. Herein means all Government property and easements at Chouteau Lock and Dam Pool 17 and Newt Graham Lock and Dam Pool 18, McClellan Kerr Navigation Channel.

2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.

2.7. Quality. Conformance with the contract specification.

2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.

2.9. Regulations. Refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.10. Workday. Any day, Monday through Friday, exclusive of weekends and Federal holidays.

This definition should not be interpreted to mean work is not required by this specification on other days.

3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual, EM 385-1-1, is hereby incorporated into this specification. EM385-1-1 is available on-line at:

http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.

aspx

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. Initiation and Execution of work shall be in accordance with this specification.

4.2. Acceptance of Work. The Government shall accept Work unless the Contracting Officer or the Contracting Officer’s Representative (COR) notifies the contractor of deficient services.

4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the Contracting Officer or the COR in writing within two (2) workdays.

Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance Report (SWT Form 982, Exhibit 2).

4.2.2. If the Contracting Officer or the COR notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 10 for deficient work not re-performed.

4.2.3. The contractor shall notify the Contracting Officer or the COR when deficiencies have been corrected by completing Part IV of the QA Report, provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer or the COR shall complete Part V of the QA Report and submit the document to the file.

4.3. Refuse services would cease to be required during natural emergencies or disasters, such as a major flood event or tornadoes that would render the Parks or PUAs inaccessible or cause public safety to be a concern, or during a period of prolonged disruption of utility services requiring closure of either partial or entire Parks/PUAs, or in the event of a Temporary Government Shutdown which would close entire Parks/PUAs. In any event, the Contracting Officer or the COR will contact the prime contractor and provide detailed guidance as to how the contractor shall proceed, or not proceed, with park refuse collection services, depending upon the specific circumstances at that time. Services not able to be performed or not required to be performed will not be charged.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the work specified.

5.2. Supervision.

5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during their absence, shall be designated in writing.

5.2.2. The contractor shall provide the Contracting Officer and the COR a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits.

6.1. All equipment must be in good operating and mechanical condition and shall comply with

EM 385-1-1.

6.2. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR and the Site Manager approves use of other areas.

6.3. All refuse service vehicles shall be front, rear, or side loading and be equipped with operational back-up alarms (subparagraphs 16.B.01 and 16.B.02, EM 385-1-1).

6.4. All equipment used to perform work under this contract shall have signs indicating ownership by the contractor. Signs may be painted on equipment or magnetic signs may be attached. Magnetic signs shall not be removed at any time equipment is at the project.

6.5. All vehicles shall be properly licensed, insured, and maintained in a safe, clean condition.

All vehicle operators shall maintain a valid state driver’s license.

7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 2. The contractor's performance will be evaluated using these PRs as follows:

7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient.

7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance.

8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246-4 "Inspection of Services" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 2.

9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:

9.1. Each service found deficient and re-performed by the contractor: No deduction.

9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.

9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

9.4. Each service found deficient and not re-performed by anyone, or work not performed at all:

Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.

10. SAFETY.

10.1. Safety Plan. The contractor shall furnish the Contracting Officer and the COR a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:

10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

10.1.4. Procedures for treating and transporting injured persons to medical facilities.

10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently removed from this contract at the written request of the Contracting Officer.

10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.

10.4. Accident Reports.

10.4.1. The contractor shall immediately notify the Contracting Officer and the COR of all known accidents that occur at the project and result in death or serious injury.

10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly. A live fillable form shall be provided for this requirement. It is imperative this form be accompanied with each monthly invoice, provided no later than the 5th of each month.

11. PRE-WORK CONFERENCE. The Contracting Officer or their designee shall conduct a Pre-work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 12 below. As a minimum, the officer of the company that signed the contract and the supervisor shall represent the contractor. The Contracting Officer or their designee shall establish the location, date, and time of the Pre-work Conference.

12. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer and/or the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer and/or the COR. If the Contracting Officer or the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

12.1. Names of supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).

12.2. Safety Plan (subparagraph 10.1.).

12.3. Exposure reports (submit by 5th workday of each month) (subparagraph 10.5.).

12.4. Contractors agreement with approved disposal site. Contractor must provide copies of any updates to this agreement.

12.5. Other submittals may be required by the Government’s Safety Office such as:

AT1 Operation Security Training, E-Verify, I Watch training or other requirements.

12.6. Insurance certificates (subparagraph 15.1, 15.2, and 15.3)

12.7. Work schedules (paragraph 16)

12.8. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 17)

12.9. Background check initiated with the Tulsa District Security Officer (subparagraph 17.2.)

13. BILLING.

13.1. The contractor shall submit an original invoice at the end of each month for all completed work. Invoices must be provided by the 5th of each month

13.2. The invoice should also include any additional refuse collections that have been completed.

Payment will only be made for work actually performed.

13.3. Invoices shall be prepared in the format shown at Exhibit 3.

13.4. All exposure reports shall be submitted before an invoice will be accepted.

13.5. Invoices and supporting documents shall be delivered, mailed, e-mailed or faxed to the Operations Project Manager, Fort Gibson Project Office, 8568 St. Hwy. 251A, Fort Gibson, OK 74434 and the Contracting Officer Representative.

14. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur by the Contracting Officer.

14.1. Services required are deleted for a period of one (1) month or longer in an entire park.

14.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.

15. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of their performance under this contract the following minimum insurance:

15.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.

15.2. General Liability: Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

15.3. Automobile liability: Liability insurance shall be written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage.

The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

16. WORK SCHEDULES. The contractor shall furnish the Contracting Officer and the COR a schedule for performing all janitorial work that is required at a weekly frequency or less. A revised schedule shall be furnished the Contracting Officer and the COR prior to the contractor changing his mode of operation.

17. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and initiation of background check.

17.1. Training materials and verification forms will be provided within two business days of Contract Award.

17.2. Per the ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS, Jun 2015, incorporated in SECTION H, Item 2b:

17.2.1. For contractors who do not require CAC, but require access to a DoD facility or installation. Proposed language: Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (Army Directive 2014‐05 / AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.

17.2.2. Contractor personnel who are intended to access Government Facilities unescorted MUST provide the following to the Tulsa District Security Officer prior to attempting to access Government Facilities:

1. PSIP Form completed (Form will be provided upon request)

2. OF 0306 completed

3. Two copies of FD 258 (finger print cards) completed

4. Copy of birth certificate, passport, or Certificate of Naturalization

5. Copy of State issued drivers license or state ID

6. Resume' covering seven years

7. Employees will need to complete the SF 86 and retain this copy. Employees should retain copies of all the above forms.

EXHIBIT 1

QUALITY ASSURANCE REPORT

The Quality Assurance Report (SWT Form 982) is provided at SECTION J as Attachment 1.

EXHIBIT 2

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARD

APPENDIX A

Dumpster Maintenance 1 Dumpsters shall have functioning plastic lids.

Dumpsters shall have neat and uniform appearance. Free of graffiti.

Clean Dumpsters 2 Dumpsters shall be clean. Odor control applied as necessary to correct visitor complaints.

Refuse Removal 3 Dumpsters shall be totally emptied when serviced.

Items placed outside containers within a 6-foot radius shall be picked up.

Refuse Disposal 4 All refuse disposed in approved sanitary landfill or incinerator. All applicable County, State, and Federal regulations are complied with.

EXHIBIT 3

INVOICE FORMAT

BILLING FOR

MAINTENANCE CONTRACT

PROJECT: ______________________________ SHEET ___ OF ___

CONTRACTOR: ___________________________ DATE: ____________

ADDRESS: ______________________________ CONTRACT NO: W912BV-__-_-____

BILLING PERIOD: _________ THRU ________ INVOICE NO: ________________

PAYMENT TERMS: _________________________

(Payment Discount or N/A)

BID ITEM NO.

AMOUNT

PAYMENT REQUESTED:

CONTRACTOR (Signature/Date)

W912BV18Q0030

APPENDIX A

1. FACILITIES TO BE SERVICED. All park and Lock facilities listed in Table A-1.

2. FREQUENCIES AND TIMES OF SERVICES.

2.1. Seasonal Work Periods. The amount of work required varies with the seasons of the year based on need. The following work periods are established to reflect changes in inventory of facilities and/or frequency of services from season to season:

Summer Period: 1 April thru 31 October Winter Period: 1 November thru 31 March

2.2. The frequency of required service will be in accordance with Tables A-1.

2.3. An additional service may be required during holiday periods as described in paragraph 4 below.

2.4. The contractor shall begin work no earlier than 7:00 a.m. and shall complete work by 5:30 p.m.

3. DESCRIPTION OF WORK.

3.1. Dumpster Requirements.

3.1.1. The contractor shall furnish dumpsters in any combination to meet the total cubic yards listed in Table A-1; however, dumpsters shall not be smaller than 2 CY or larger than 6 CY.

Exact placement and size of dumpsters shall be coordinated with the Contracting Officer's Representative. Maps shall be provided as SECTION J Attachment 3.

3.1.2. Certain dumpster locations may be subject to flooding. The Government shall attempt to notify the contractor when conditions exist, however; flood events occur rapidly and the contractor should stay proactive in monitoring lake levels and weather forecasts. It will be the responsibility of the contractor for relocating dumpsters to higher ground if necessary. When the lake level returns to normal the contractor will return dumpsters to original locations.

3.1.3. All dumpsters shall have functioning plastic lids and shall be maintained in a neat and uniform appearance by the contractor. All dumpsters shall be prominently identified as to ownership and provider of services.

3.1.4. Cleanliness and sanitation of the vendor-owned containers will be the responsibility of the contractor and must comply with all Federal, State, and County regulations.

3.1.5. Refuse shall be emptied from refuse containers with a truck that is equipped with front-, rear-, or side-load dumping capabilities.

3.2. Refuse Collection.

3.2.1. Dumpsters shall be emptied in accordance with frequencies stated in Table A-1.

3.2.2. Household trash that is bagged and placed in or near refuse containers will be considered normal refuse and no additional payment will be made. If the refuse is scattered (more than 6 feet from dumpsters) or consists of larger refuse it shall be considered dumped material and the contractor will not be required to dispose of it. The Contracting Officer or the Contracting Officer Representative will determine what items would be considered dumped material. All camper generated trash shall be included in monthly services.

3.3. Refuse Disposal. All collected refuse, debris, and litter shall be disposed of properly off Government property in compliance with applicable regulations. Location of disposal site(s) shall be furnished the Contracting Officer Representative.

4. ADDITIONAL REFUSE COLLECTIONS.

4.1. Additional services may be required during the holiday periods of Memorial Day, Fourth of July, and Labor Day. When additional services are ordered, all dumpsters within the public use area shall be emptied.

5. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 2.

TABLE A-1

INVENTORY OF DUMPSTERS

CHOUTEAU/NEWT GRAHAM L&Ds

SUMMER PERIOD

Location Quantity of Dumbsters Frequency

CHOUTEAU L&D 17

Afton Landing 2 Monday & Thursday Tallahassee Loop 1 Monday & Thursday Chouteau Lock 17 1 Monday

NEWT GRAHAM L&D 18

Bluff Landing 2 Monday & Thursday Total 6

WINTER PERIOD

CHOUTEAU L&D 17

Afton Landing 2 Monday Tallahassee Loop 1 Monday Chouteau Lock 17 1 Monday

NEWT GRAHAM L&D 18

Bluff Landing 2 Monday

TOTALS 6

Section G - Contract Administration Data

CLAUSES INCORPORATED BY REFERENCE

252.201-7000 Contracting Officer's Representative DEC 1991 252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

JUN 2012

Section H - Special Contract Requirements

WAGE DETERMINATION

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5319 Daniel W. Simms Division of | Revision No.: 4 Director Wage Determinations| Date Of Revision: 12/26/2017 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts State: Oklahoma Area: Oklahoma Counties of Adair, Cherokee, Craig, Delaware, Mayes, McIntosh, Muskogee, Nowata, Okfuskee, Ottawa, Washington **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 12.60 01012 - Accounting Clerk II 15.33 01013 - Accounting Clerk III 17.78 01020 - Administrative Assistant 19.04 01035 - Court Reporter 19.66 01041 - Customer Service Representative I 9.85 01042 - Customer Service Representative II 11.08 01043 - Customer Service Representative III 12.09 01051 - Data Entry Operator I 11.97 01052 - Data Entry Operator II 13.05 01060 - Dispatcher, Motor Vehicle 17.99 01070 - Document Preparation Clerk 12.66 01090 - Duplicating Machine Operator 12.66 01111 - General Clerk I 11.48 01112 - General Clerk II 12.83 01113 - General Clerk III 16.83 01120 - Housing Referral Assistant 15.78 01141 - Messenger Courier 11.72 01191 - Order Clerk I 11.83 01192 - Order Clerk II 13.79 01261 - Personnel Assistant (Employment) I 13.16 01262 - Personnel Assistant (Employment) II 14.43 01263 - Personnel Assistant (Employment) III 17.57 01270 - Production Control Clerk 19.37 01290 - Rental Clerk 13.33 01300 - Scheduler, Maintenance 12.39 01311 - Secretary I 12.39 01312 - Secretary II 13.86 01313 - Secretary III 15.78 01320 - Service Order Dispatcher 14.95 01410 - Supply Technician 19.04 01420 - Survey Worker 13.71 01460 - Switchboard Operator/Receptionist 11.23 01531 - Travel Clerk I 12.32 01532 - Travel Clerk II 13.14 01533 - Travel Clerk III 13.77

01611 - Word Processor I 11.77 01612 - Word Processor II 13.35 01613 - Word Processor III 14.97 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 19.15 05010 - Automotive Electrician 18.19 05040 - Automotive Glass Installer 17.24 05070 - Automotive Worker 17.24 05110 - Mobile Equipment Servicer 15.14 05130 - Motor Equipment Metal Mechanic 19.15 05160 - Motor Equipment Metal Worker 17.24 05190 - Motor Vehicle Mechanic 17.91 https://www.wdol.gov/wdol/scafiles/std/15-5319.txt?v=4[1/6/2018 8:52:55 PM] 05220 - Motor Vehicle Mechanic Helper 13.98 05250 - Motor Vehicle Upholstery Worker 16.08 05280 - Motor Vehicle Wrecker 17.19 05310 - Painter, Automotive 18.22 05340 - Radiator Repair Specialist 17.24 05370 - Tire Repairer 13.29 05400 - Transmission Repair Specialist 19.15 07000 - Food Preparation And Service Occupations 07010 - Baker 11.11 07041 - Cook I 9.79 07042 - Cook II 11.11 07070 - Dishwasher 8.63 07130 - Food Service Worker 8.89 07210 - Meat Cutter 12.17 07260 - Waiter/Waitress 9.19 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 16.54 09040 - Furniture Handler 11.67 09080 - Furniture Refinisher 16.54 09090 - Furniture Refinisher Helper 13.06 09110 - Furniture Repairer, Minor 14.73 09130 - Upholsterer 16.54 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 11.50 11060 - Elevator Operator 9.52 11090 - Gardener 14.82 11122 - Housekeeping Aide 9.52 11150 - Janitor 9.52 11210 - Laborer, Grounds Maintenance 11.25 11240 - Maid or Houseman 8.90 11260 - Pruner 10.07 11270 - Tractor Operator 13.65 11330 - Trail Maintenance Worker 11.25 11360 - Window Cleaner 10.85 12000 - Health Occupations 12010 - Ambulance Driver 13.81 12011 - Breath Alcohol Technician 16.24 12012 - Certified Occupational Therapist Assistant 23.50 12015 - Certified Physical Therapist Assistant 26.28 12020 - Dental Assistant 16.19 12025 - Dental Hygienist 34.54 12030 - EKG Technician 20.70 12035 - Electroneurodiagnostic Technologist 20.70 12040 - Emergency Medical Technician 13.81 12071 - Licensed Practical Nurse I 14.52 12072 - Licensed Practical Nurse II 16.24 12073 - Licensed Practical Nurse III 18.10 12100 - Medical Assistant 13.23 12130 - Medical Laboratory Technician 16.52 12160 - Medical Record Clerk 12.54 12190 - Medical Record Technician 14.03 12195 - Medical Transcriptionist 14.83 12210 - Nuclear Medicine Technologist 35.65 12221 - Nursing Assistant I 10.95 12222 - Nursing Assistant II 12.31 12223 - Nursing Assistant III 13.44 12224 - Nursing Assistant IV 15.09

12235 - Optical Dispenser 14.54 12236 - Optical Technician 14.52 12250 - Pharmacy Technician 14.68 12280 - Phlebotomist 13.60 12305 - Radiologic Technologist 24.10 12311 - Registered Nurse I 23.55 12312 - Registered Nurse II 28.82 12313 - Registered Nurse II, Specialist 28.82 12314 - Registered Nurse III 34.86 12315 - Registered Nurse III, Anesthetist 34.86 12316 - Registered Nurse IV 41.79 12317 - Scheduler (Drug and Alcohol Testing) 20.11 12320 - Substance Abuse Treatment Counselor 19.61 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 18.95 13012 - Exhibits Specialist II 22.25 13013 - Exhibits Specialist III 27.23 13041 - Illustrator I 18.95 13042 - Illustrator II 22.25 13043 - Illustrator III 27.23 13047 - Librarian 20.72 13050 - Library Aide/Clerk 9.36 13054 - Library Information Technology Systems 19.12 Administrator https://www.wdol.gov/wdol/scafiles/std/15-5319.txt?v=4[1/6/2018 8:52:55 PM] 13058 - Library Technician 13.71 13061 - Media Specialist I 13.50 13062 - Media Specialist II 15.11 13063 - Media Specialist III 16.84 13071 - Photographer I 15.06 13072 - Photographer II 17.50 13073 - Photographer III 20.54 13074 - Photographer IV 25.14 13075 - Photographer V 30.42 13090 - Technical Order Library Clerk 15.74 13110 - Video Teleconference Technician 15.24 14000 - Information Technology Occupations 14041 - Computer Operator I 15.21 14042 - Computer Operator II 17.02 14043 - Computer Operator III 21.59 14044 - Computer Operator IV 25.11 14045 - Computer Operator V 27.62 14071 - Computer Programmer I (see 1) 22.27 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 15.21 14160 - Personal Computer Support Technician 28.80 14170 - System Support Specialist 18.94 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 28.14 15020 - Aircrew Training Devices Instructor (Rated) 34.04 15030 -…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.