W912BV-17-R-0054_AM2.pdf
PDF 183 KB Posted
- Attached to
- Altus Air Force Base Dormitory Federal contract opportunity
- Solicitation number
- W912BV17R0054
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.23_W912BV-17-R-0054_Phase_1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See summary of changes
1. CONTRACT ID CODE PAGE OF PAGES
1 25
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Nov-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV17R0054
X 9B. DATED (SEE ITEM 11)
25-Oct-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Nov-2017
CODE
CONTRACTING DIV
US ARMY CORPS OF ENGINEERS, TULSA DISTRICT
2488 E. 81ST STREET
TULSA OK 74137-4290
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV17R0054
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 27-Nov-2017 02:00 PM to 30-Nov-2017 02:00 PM.
SECTION 00 22 00 - PHASE 1 OF 2 PHASE DESIGN BUILD SELECTION PROCESS
The following have been modified:
SECTION 00 22 00
PHASE 1 OF 2 PHASE DESIGN-BUILD SELECTION PROCEDURES
1.0 OVERVIEW
2.0 GENERAL INSTRUCTIONS
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
4.0 TAB A – STANDARD FORM 1442 AND PROPOSAL DATA SHEET
5.0 TAB B – FACTOR 1 – SPECIALIZED EXPERIENCE
5.1 SUBMISSION REQUIREMENTS
5.2 EVALUATION CRITERIA
6.0 TAB C – FACTOR 2 – PAST PERFORMANCE
6.1 SUBMISSION REQUIREMENTS
6.2 EVALUATION CRITERIA
7.0 TAB D – FACTOR 3 – ORGANIZATION AND TECHNICAL APPROACH
7.1 SUBMISSION REQUIREMENTS
7.2 EVALUATION CRITERIA
8.0 PHASE 1 OVERALL RATING
9.0 PHASE 1 EVALUATION PROCEDURES
9.1 SOURCE SELECTION EVALUATION BOARD (SSEB)
9.2 EVALUATION
9.3 DEFINITIONS
9.4 EVALUATION AND RATING SYSTEM
9.5 PAST PERFORMANCE CONFIDENCE ASSESSMENT RATING SYSTEM
PHASE ONE – SECTION 00 22 00 ATTACHMENTS
1 – PROPOSAL DATA SHEETS
2 – COMPANY SPECIALIZED EXPERIENCE CONSTRUCTION OR PRIME CONTRACTOR
3 – COMPANY SPECIALIZED EXPERIENCE DESIGN FIRM OR IN-HOUSE DESIGN
CAPABILITY
4 – PAST PERFORMANCE SURVEY FORM
5 – KEY PERSONNEL RESUME
6 – LETTER OF COMMITMENT FOR KEY PERSONNEL
7 – LETTER OF COMMITMENT FOR DESIGN FIRM
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD
(Phase 1 of 2)
1.0 OVERVIEW OF PHASE 1 SELECTION PROCEDURES
1.1 This is a two-phase competitive solicitation for a firm, fixed-price contract, which will be awarded using the Best Value Trade-Off Process.
1.2 The Preliminary scope of this contract includes, but is not limited to, a new dormitory that shall provide an approximate 42,625 SF, 2-story facility built at Altus AFB that is compatible with applicable DoD, Air Force, and base design standards. The facility shall be sprinkler-equipped with reinforced concrete foundations (pier and grade beam), floor slabs, ICF (insulated concrete forms) & brick veneer exterior walls, and a standing-seam metal roof system. It shall include Dorm-4-Airmen modules, laundries, storage, lounge area, communications support, utilities, interior finishes, roads, parking, site improvements and all necessary supporting facilities for a complete and usable facility while complying with all DoD antiterrorism/force protection requirements. The project will also demolish 2 facilities totaling approximately 47, 470 square feet.
1.3 Phase 1. The first phase consists of a process known in commercial design-build as the “Request for Qualifications” or the acronym: “RFQ”. This solicitation refers to it as “Phase 1”. In Phase 1 of the 2 Phase design-build selection procedure, interested firms or joint venture entities (referred to as “Offerors”) submit specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than five (5) of the highest rated Phase 1 Offerors to compete for the design-build contract in Phase 2.
1.3.1 The Phase 1 proposal must describe the capability of the Offeror to perform the work, describe the Offeror’s understanding of the requirements contained in the Statement of Work and set forth full, accurate, and complete information as required by the RFP. The proposal should be prepared simply and economically and be legible, clear, and coherent.
1.4 Phase 2. In Phase 2, the selected Offerors will submit preliminary technical-design proposals and the remainder of the performance capability proposals, including identification of key subcontractors, the proposed contract duration, a preliminary schedule, plus a price proposal in response to the Phase 2 Request for Proposal. The final evaluation rating used for comparison, selection, and award will reflect both the rating received in Phase 1 and the evaluation rating received in Phase 2.
1.5 Offerors will not be participating in a sealed bid procurement process under this acquisition method.
Issuance of this Request for Proposal does not constitute an award commitment on the part of the Government.
2.0 GENERAL INSTRUCTIONS
2.1 Who May Submit: Any legally organized small business firm may submit a proposal. The size standard for this solicitation is as shown in Section 00 45 00 REPRESENTATIONS AND CERTIFICATIONS. Associations may be as joint ventures, as a partnership in accordance with FAR 9.601, or as key team subcontractors. To qualify for Phase 2, the Offeror or Offeror’s subcontractor shall have professional architects and engineers, registered in the appropriate technical disciplines and the requirements specified in Contract Clause, ”Requirements for Registration of Designers”, must be met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
2.2 Where to Submit: Pro Forma Information will be received until the date and time indicated on Standard Form 1442 at the address shown in Section 00 21 00 INSTRUCTIONS, CONDITIONS, AND NOTICES TO
OFFERORS.
2.2.1 Pro Forma Requirements to be provided for Phase 1: This information should be submitted in an envelope labeled “Pro Forma Requirements”. This information consists of the following:
1) The offeror will submit a cover letter containing:
a. Solicitation number.
b. Name, address, email, and telephone and fax numbers of the offeror.
c. Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this RFP.
d. Name, title and signature of the person authorized to sign the proposal.
e. A statement specifying agreement with all terms, conditions and provisions included in the RFP.
f. CAGE Codes for the offeror, and all teaming partners who participated in the Factor 1 – Corporate Experience Projects
2) Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard
Form 30 (amendment form).
3) The completed Section 00 45 00 of the RFP (Representations and Certifications), Printed Entity Record from System for Award Management (SAM)
4) Letter from Surety stating Offer is capable of providing a Bid Guarantee in Phase 2 as required in FAR 52.228-1.
5) Financial statement and bank letter that verify that sufficient funds will be available to finance the work.
6) For Joint Ventures, the information required by paragraph “Joint Ventures”.
7) Identify if this proposal is being submitted as a HUBZone entity.
2.3 Submission Deadline. Proposals shall be received by the Tulsa District no later than the time and date specified in Block 10 of Standard Form 1442 via AMRDEC SAFE website https://safe.armdec.army.mil/safe/, or via email. The following email addresses must be entered for notification of proposal receipt and download availability, or for direct email:
brian.c.hutchison@usace.army.mil melissa.k.lynn@usace.army.mil bruce.e.hayes@usace.army.mil
2.4 In order to effectively and equitably evaluate all proposals, the Contracting Officer must receive information containing sufficient detail to allow review and evaluation by the Government. Proposal clarity, organization, and cross-referencing are mandatory. Failures to submit and organize proposals as requested may adversely affect an Offeror's evaluation. Offerors should provide sufficient detail and clearly define all items required in this section.
2.5 The Contracting Officer may remove any Offeror from further consideration during any phase of the procurement if the Offeror fails to meet the submittal requirements of the RFP or to reduce the competitive range for purposes of efficiency pursuant to FAR 15.306(c)(2).
mailto:brian.c.hutchison@usace.army.mil mailto:melissa.k.lynn@usace.army.mil mailto:bruce.e.hayes@usace.army.mil
2.6 Tabs. Proposal shall be organized and tabbed as shown in paragraph 3.0, “Phase I Proposal and Related Evaluation Factors”.
2.7 Size of Printed Matter Submissions.
2.7.1 Proposal materials shall be submitted via AMRDEC SAFE website https://safe.armdec.army.mil/safe/, or via email, containing the proposal in PDF file format using Adobe Acrobat software. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents. Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers. Phase 1 proposals shall not exceed 50 single-sided pages, excluding the cover sheet and Table of Contents. A page is defined as text or information on one side of the paper. Factor 2 – Past Performance will not be counted towards this page limitation, nor will the resumes submitted for key personnel. The Government will not evaluate any information beyond the page limitation noted. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal.
Offers that do not meet these requirements may be subject to rejection.
2.7.2 The proposals shall contain a detailed table of contents.
2.7.2.1 Proposals shall contain the entire proposal in .pdf format using Adobe Acrobat software to print to a .pdf file; do NOT scan the document(s) into a .pdf file. The text portion of the complete proposal shall be contained as a single .pdf file. The technical proposal will be appropriately organized using the tabs specified in the chart below.
2.7.2.2 A cover sheet identifying the Offeror (name, address, point of contact), project description, and solicitation number shall be provided. The second sheet shall be a Table of Contents. Offers that violate these rules unnecessarily delay the evaluation process and may be rejected by the Government after the initial evaluation without receiving any further consideration.
2.7.2.3 Sections of the proposal shall be bookmarked (linked to the index) as detailed below. The SF 1442 may be scanned and shall be *Optical Character Recognition (OCR) compatible. All text must be legible and easily read. Submit the SF 1442, completed and signed by a person authorized by the offeror. A page is defined as text or information on one side of the paper. Factor 2 – Past Performance will not be counted towards this page limitation.
*OCR is a common method of digitizing printed texts so that they can be electronically searched, stored more compactly, displayed on-line, and used in machine processes such as machine translation, text-to- speech, key data extraction and text mining.
2.7.2.4 Each Volume of the proposal shall be identified by the Solicitation Number (W912BV- 17-R-0054), project title (Altus Dormitory, Altus AFB), name, address, and telephone number of the Offeror, and the following on the volume in bold letters:
Phase 1 Volume 1: TECHNICAL PROPOSAL
2.7.3 Proposal revisions shall be submitted as page replacements with revised text readily identifiable, e.g., bold face print or underlining. The source of the revision, e.g., Error, Omission, or Clarification, or amendment shall be included and be annotated for each revision. Proposal replacement pages shall be numbered, shall be clearly marked “REVISED”, shall show the date of revision. A revised copy of the entire proposal in .pdf format shall be provided.
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance Tab A SF 1442 and Proposal Data Sheet N/A Tab B Factor 1 Specialized Experience Most Important Factor Tab C Factor 2 Past Performance 2nd Most important factor Tab D Factor 3 Organization and Technical Approach 3rd Most important factor
4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1 Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section).
5.0 TAB B – FACTOR 1 - SPECIALIZED EXPERIENCE
5.1 SUBMISSION REQUIREMENTS
5.1.1 The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects, using Construction – Specialized Experience form – (Attachment 2), and Designer – Specialized Experience Form – (Attachment 3) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements as outlined in Section 01 11 00. If the offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. Submit projects that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer than five (5) years preceding the date of this Solicitation. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member. Design firms may list prime contractors they have worked for or government, private or commercial customers. The offeror shall select the design firm(s). If projects were design-build, so identify them. Prime contractor must submit at least two multistory dormitory or other multistory multifamily facility projects which include acoustics requirements, multi-purposes spaces, fire protection systems, and a formalized commissioning and test and balance (TAB) process for the HVAC systems with a value of $10 million or greater. The design firm(s) must submit design information for at least two multistory dormitory or other multistory multifamily facility projects which include acoustic requirements, sustainability requirements, interior design, landscape architecture, and fire protection systems with a construction cost of $10 million or greater. Both the prime contractor and the design firm(s) shall each submit at least Three (3) projects but no more than Five (5) projects.
5.1.2 The offeror may provide a supplemental narrative (not project lists), not to exceed two pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the Government will benefit.
5.1.3 The offeror should describe any previous teaming experience between current team members, if not described in the project list. Offeror may describe design-build experience on other type projects. The above information is limited to projects that are well underway or that have been completed and turned over no longer than the past five (5) years preceding the date of this solicitation.
5.2 EVALUATION CRITERIA:
5.2.1 The Government will evaluate the extent of recent, related experience of the prime contractor and design firms in design, construction or design-build, as relevant to their role on this project. If the design will be accomplished in-house, rather than by subcontract, then the design element of specialized experience will still be evaluated, realizing that the work is being done in-house. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government will place greater importance on projects performed as a prime contractor than as a subcontractor.
To determine strengths and weaknesses, the agency will give more consideration to the following:
a) A higher number of relevant projects for both the Prime contractor and the Design Firm(s), up to a maximum of five each.
b) Projects showing experience with design-build construction.
c) Projects Designed for and Constructed on Military installations.
d) Projects with a value of $10 million or greater.
e) Fully completed projects, rather than substantially complete projects.
f) Projects completed after 2012.
g) Projects that demonstrate experience managing multiple large activities simultaneously on a secure and confined site.
h) Projects that demonstrate experience of the team members commensurate with their proposed role on this project.
5.2.2 The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the facility types (which may include similar state or local government or private counterparts) included in this contract, as described in *AM1 Section 00 22 00.
Recent experience includes projects well underway (see above criteria) or those completed and turned over within five (5) years of the proposal issue date for this RFP for design or construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.2.3 The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), Contractor Performance Assessment Reporting System (CPARS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
5.2.4 To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.
5.2.5 The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:
(1) Number, size, type work, complexity, location
(2) Dates (well under way or completed no more than *AM2 7 5 years preceding date of Solicitation)
(3) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience)
5.2.6 Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous D-B experience a strength, even if the experience is on different type projects than this project. Similarly, the Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project. The more relevant the experience, the more credit will be given.
6.0 TAB C – FACTOR 2 - PAST PERFORMANCE
6.1 SUBMISSION REQUIREMENTS:
6.1.1 For each of the projects submitted under Factor 1, to ensure the agency has all relevant past performance information, the offeror shall submit copies of Federal/DoD/Navy/Army performance reviews that are likely already in the agency’s databases or likely within the agency’s arm’s reach, i.e. Contractor’s copy of CCASS or CPARS evaluations.
6.1.2 For each project under Factor 1 that does not have a CPARS evaluation, offerors shall provide a
Past Performance Questionnaire form PPQ-0 (Attachment 4) to a representative of the owner that can provide the owner’ s opinion of the offeror’ s past performance for the project. The Past Performance Questionnaire (Form PPQ-0) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 1. Ensure correct phone numbers and email addresses are provided for the client point of contact. Offerors should organize all Past Performance Information based on the Factor 1 Projects, which normally have project titles and are numbered 1-5, so that reviewers can match the owner’ s opinion with the corresponding Factor 1 Project.
There is no page limit for this factor.
6.1.3 Form PPQ-0 shall be utilized and offerors shall submit the PPQ with their proposal submission to the Contracting Office designated proposal submission location. The contract specialist or Contracting Officer will not require the PPQ to be sent directly from the client. The offeror may submit the completed PPQ-0. Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ, which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’ s point of contact, Brian Hutchison via email Brian.C.Hutchison@usace.army.mil prior to proposal closing date.
If you have questions regarding the attached questionnaire, or require assistance, please contact the
Contract Specialist at (918) 669-7426.
6.1.4 While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror.
6.1.5 The offeror is responsible for ensuring that the completed questionnaires are submitted by the closing date. The Government may contact and interview the owner’ s representative on the Past Performance questionnaires, and reserves the right to interview other individuals acting for the owner’ s representative, if the owner’ s representative is not available.
6.1.6 The Government will evaluate the responses from the customers from which Past Performance
Questionnaires have been received. The Government may contact and interview points of contact on the Past Performance Questionnaires. The Government reserves the right to interview other individuals acting for the listed references, if the listed reference is not available. In addition to the above, the Government may review any other sources of information for evaluating past performance.
6.1.7 Past performance information may be obtained from any other sources available to the
Government, to include, but not limited to, the Past Performance Information Retrieval System (PPIRS), Construction Contractor Appraisal Support System (CCASS), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), or other databases;
interviews with Program Managers, Contracting Officers, and Fee Determining Officials; and the Defense Contract Management Agency.
6.1.8 To improve accuracy of database searches, the offeror will also provide the CAGE Codes for the prime contractor and all teaming partners, i.e. design firms, key subcontractors, Joint Venture Partners, whose experience is being relied on in Factor 1.
6.1.9 The Government may contact references provided as part of Factor 1 – Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.
6.1.10 Joint Venture Submission Requirements.
6.1.11 Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR as the offering Joint Venture. The Offeror must provide three (3) to five (5) "recent", "relevant" projects performed by the JV that reflect the JV's ability to perform the work required in this solicitation as required under Factor 1.
6.1.12 If the Offeror cannot provide a sufficient number of projects as the JV to meet the minimum requirement, the Offeror must provide those "recent", "relevant" projects that it has performed as the JV, and then supplement the record with additional "recent", "relevant" projects performed by each JV member in their individual capacities. In such instance, each JV member must satisfy a minimum requirement of two (2) projects, to include any performed as the JV.
6.1.13 If the JV has no "recent", "relevant" projects performed by the JV, then each member of the JV must provide two (2) to three (3) "recent", "relevant" projects performed by the JV member that reflect the JV member's experience commensurate with their role on this project or how their experience qualifies them for their role on this project as required under Factor 1. In such instances the combined experience projects, submitted by each member of the JV, shall not exceed the maximum number of projects stated in paragraph 5.1.1.
6.1.14 In addition to the examples of "Company Specialized Experience" and "Past Performance
Surveys", the Joint Venture shall provide a brief narrative stating the roles that each partner of the Joint Venture will perform on this project and how the presented projects demonstrate the JV member's experience commensurate with their role on this project or how their experience qualifies them for their role on this project. The attached “Specialized Experience" and "Past Performance Survey" forms shall be used by the Joint Venture or the JV partners. Explain how the JV is structured.
6.1.15 Verification: The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS, or other Government appraisal systems or to interview owner or references. The Government may check any or all cited references to verify supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.
6.2 EVALUATION CRITERIA:
6.2.1 The Government will perform a performance confidence assessment of the offeror’s probability of successfully meeting the contract requirements, considering the degree of success of the D-B team’s recent (well under way or turned over no longer than five (5) years preceding the date of this solicitation), relevant experience. See explanation of “well underway” and relevancy under the Factor “Specialized Experience”.
The Government will assess the past performance on projects submitted under the Specialized Experience Factor and reserves the right to conduct telephone interviews with points of contact identified in the proposal and/or to review other recent projects rated in CPARS or other agency performance databases, review and/or contact offeror-furnished references, or to review personal knowledge.
6.2.2 The Government will first assess and rate the relevancy of recent projects accomplished by the offeror to the scope of this contract for overall application to the performance confidence assessment ratings described hereinafter. The projects will include those submitted under the Specialized Experience Factor as well as from other sources described above. This rating is not a separate proposal rating but is only used in developing overall past performance confidence assessment rating assigned to the Past Performance Factor. The past performance relevancy rating are described below:
6.2.2.1 Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
6.2.2.2 Relevant: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
6.2.2.3 Somewhat Relevant: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
6.2.2.4 Not Relevant: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
6.2.3 The Government will next consider how well the offeror performed on the contracts. The
Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. With respect to relevancy, past performance on projects with more relevance will typically be a stronger predictor of future success and have more influence on the past performance confidence assessment rating than past performance on projects of lesser relevance. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or by the team member. Owners/references may be asked to comment on items such as quality of design or construction, timeliness, management of the work, subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and designer or contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting design or construction errors, warranty work, etc. The Government will target areas covered in the requirements of this proposal including records of confirming to quality, schedule, cost control, customer satisfaction, level of support for such things as as-built documentation, O&M Manuals, training, problem resolution for design or construction errors, warranty work, and safety. The Government will not release the Interview Forms to the Offeror at any time, in order for the Government to solicit candid, unbiased interview comments. The Government also places a higher value on projects, which document successful outcomes and are supported by outside source confirmation, for example, but not limited to telephone databases, offeror-furnished references, or personal knowledge. The Government also paces a higher value on projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The rating for this factor will be expressed as a degree of confidence in the offeror’s ability to successfully accomplish the contract requirements. The rating system used for the performance confidence assessment is described below.
6.2.3.1 Substantial Confidence: Based on the offeror’s recent/relevant performance record, the
Government has a high expectation that the offeror will successfully perform the required effort.
6.2.3.2 Satisfactory Confidence: Based on the offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the offeror will successfully perform the required effort
6.2.3.3 Limited Confidence: Based on the offeror’s recent/relevant performance record, the
Government has a low expectation that the offeror will successfully perform the required effort.
6.2.3.4 No Confidence: Based on the offeror’s recent/relevant performance record, the
Government has no expectation that the offeror will be able to successfully perform the required effort.
6.2.3.5 Unknown Confidence (Neutral): No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
6.2.4 Each entity (firm) will be rated on its own performance or that of its predecessor, if relevant. An entity may establish past performance based on the past performance of its proposed key personnel, apart from that of the entity. If the Government does not obtain past performance information for the projects identified by the offeror and cannot establish a past performance record for the offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance confidence assessment will be considered “Unknown Confidence”.
7.0 TAB D – FACTOR 3 - ORGANIZATION AND TECHNICAL APPROACH
7.1 SUBMISSION REQUIREMENTS:
7.1.1 Provide information that describes the offeror’s organization and intended technical approach to executing the design-build contract per the detailed requirements herein. Limit the information to fifteen pages or less clearly but concisely describe the organizational and technical approach to project management and execution. The fifteen (15) page limit does not include resumes submitted for key personnel, below.
7.1.2 Tab D.1 Offeror’s Understanding: *AM1 Describe the Offeror's understanding of the challenges, risks and technical approach with respect to the design and construction of the dormitory and the demolition of the two existing facilities.
7.1.3 Tab D.2 Organization: Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established.
Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project. The Offeror shall document unequivocal teaming arrangements with its design firms(s) (see attachment 7). A copy of the teaming or joint venture agreement(s) may be appended to the plan (not included in the page limitation). Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s). Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including design and construction activities for each major feature (i.e., site work/modification of existing foundation within the existing building, utilities, facility construction within existing building). Identify the design firm(s) chosen for the project, if not to be self-performed. Phase 2 offerors will be required to identify the specific firms chosen for mechanical and electrical installation as well as their Independent TAB agency. Describe the proposed management structure for the team, describing how the design and construction process will be managed and the authorities and the delegations of authority within the team. Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the D-B team firms, and with the list of key personnel to be provided under the Tab, “Key Personnel”. Describe how communication with the government will be accomplished and the approach for resolution of issues related to the contract. Limit three (3) pages.
7.1.4 TAB D.3 Technical Approach for Design and Construction: Describe the technical approach to design and construction for these facilities. Include any considerations of fast-tracking design and construction. Discuss how design and construction is completed. *AM1 Describe your proposed phasing plan for design and construction of the dormitory and the demolition of the two existing facilities.
7.1.5 TAB D.4 Collaborative Approach for Design and Construction: Describe interactions within the team and with the Corps of Engineers during the design and construction. Discuss how the configuration management system will track and control design evolution and changes during design for quality control and to facilitate quicker Government reviews. Describe the role of the construction team members during design. Describe the role and interaction of the design team with the construction team during construction, addressing, as a minimum, maintaining configuration management of the design during construction, including control and approval of revisions to the accepted design; requests for information; shop drawing and submittal reviews and approvals; progress meetings; site visits, if any;
contract completion, closeout, as-built and completion documentation. Limit three (3) pages.
7.1.6 TAB D.5 Subcontractor Approach and Management: Describe how subcontractors are managed by the contractor. Discuss how subcontract relationships are structured to assure proper balance and flow-down of contract requirements, duties, responsibilities, and properly balanced and proportioned risk management. Discuss how non-performance by subcontractors is handled by the general contractor.
The government wants to understand that the general contractor places emphasis on strong business relationships with subcontractors to maximize the number of quotes the general contractor obtains that demonstrates market competition and the best valued prices are being provided to the government. General Contractors that do not maintain solid business practices with subcontractors increase business costs to the government. Limit one (1) page.
7.1.7 TAB D.6 Planning and Scheduling: Describe the time control capabilities and systems to be used to plan, design, and construct the facility and how the schedule will be used to manage the design and construction. Discuss internal procedures for handling delays to minimize time growth or ”schedule creep”. Discuss experience with interfacing scheduling software with Resident Management System (RMS) if applicable. Limit one (1) page.
7.1.8 TAB D.7 Quality Control: Describe the team’s quality control approach, corporate systems and capabilities and how they will be integrated into the required three phase of control to maintain quality control of the design and construction. Describe the proposed quality control organization, including the proposed staffing plan. Provide an organizational chart showing lines of communications and authority.
Provide specific information on how you will manage design quality control, track design evolution and changes during design to meet the schedule and to facilitate quicker Government reviews. Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout (including development of the interim DD Form 1354), as-built, and completion documentation. In addition to the required designer-of-record roles specified within the RFP for maintaining integrity of the design, describe any other DOR involvement in the quality control process, if any. There is no need to submit a quality control plan as the successful offeror will provide that after award. In phase 1, the Government is interested in demonstrable capabilities to assure and control quality and how the offeror can achieve or exceed the contract’s minimum quality control system requirements. Limit one (2) pages.
7.1.9 TAB D.8 Safety: Describe the team’s safety approach, corporate systems and capabilities to maintain safety during construction to include the proposed safety organization and proposed staffing plan.
Provide an organizational chart showing lines of communications and authority. Describe how the relationship of an Activity Hazard Analysis and the preparatory phase of Quality Control. Limit one (1) page.
7.1.10 TAB D.9 Key Project Personnel Capabilities and Experience: (Resumes not included in the fifteen (15) page count limit above.) Provide a consolidated list of key personnel with name, position title and description of project responsibility for each. . Indicate whether each individual has had a significant role in any of the cited project examples.. For each person provide a brief resume, using the Key Personnel Resume forms (attachment 5) at the end of this section. Key personnel should at a minimum include prime contractor’s project manager responsible for design and construction, site safety manager, the on-site QC manager, construction superintendent, TAB Specialist, design manager, *AM2 the designers of record for structural, civil, geotechnical, fire protection, electrical, mechanical/plumbing, fire protection engineer of record, structural engineer of record, and permit preparers. Project Managers with professional certification to include Project Manager Professional (PMP) or equivalent are preferred. Permit preparers must be professionally registered in the state the project is located. Where projects are located in states that require a separate registration for design of structures, the structural designer of record must be registered in that state. All other designers of record must be registered in accordance with contract clause: 52.236-25, Requirements for Registration of Designers. Provide unequivocal letters of commitment from all proposed key personnel not currently employed by the team members. Use the form letter (Attachment 6) at the end of this section. In connection with this contract, any in-house personnel, subcontractors, and outside associates or consultants will be limited to individuals or firms that were specifically identified in the Contractor’s accepted Phase I Proposal for the Phase II Proposal submittal.
7.2 EVALUATION CRITERIA:
7.2.1 The Government will evaluate the strengths, weaknesses and any deficiencies in the organization and technical approach. The Government will evaluate the firm’s understanding of D-B (and the requirements in described in the Division 01 requirements of the Solicitation) and the capability to execute the project. Some additional specific evaluation considerations are listed below. This list is not all-inclusive.
7.2.2 The Government will evaluate clarity and strength of the overall organization, the structure and staffing to execute the entire scope of work. The Offeror is required to select and commit to design firms to achieve an “acceptable” rating. Joint venture participant’s contribution to the organization should be commensurate with their skills and background.
7.2.3 Offeror’s Understanding: The government will evaluate the offeror's understanding for clarity and conciseness of the challenges and risks of the proposed design and construction as well as the ability to synthesize UFCs 1-200-01, 3-600-01, 3-410-01FA, 4-010-01, USAF Unaccompanied Housing Design Guide, and UFGS 23 05 93 as they apply to this design and construction effort.
7.2.4 Organization: The government will evaluate the offeror’s organizational resources and arrangement to ensure that the contractor has identified and organized resources to perform the work with clear lines of authority and defined delegation of authority. The government will also evaluate that the key personnel organizational chart includes all the required information and is consistent with the corporate organizational chart, matrix of responsibilities and list of key personnel.
7.2.5 Technical Approach for Design and Construction: The Government places a higher value on an offer that provides proposed methods to streamline design and construction, manage labor and other resource constraints in an effort to reduce costs and support aggressive schedules. In addition, clear and concise proposed phasing plans for design, construction and demolition.
7.2.6 Collaborative Approach for Design-Build: The Government will evaluate the integration of the design and construction firms and the staff during design and construction. The constructor must be actively involved in the design process, not just leaving it up to the designer (see Special Contract Requirement (SCR: “Constructor’s role during Design”). The offeror must have an effective configuration management system to control and track revisions to the designs. The Government will evaluate the offeror’s understanding of the design process and the roles of the designers of record and the Government reviewers. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction. Additional consideration will be given to a team that includes as many subcontractors as possible (e.g., the key subs for electrical and mechanical, the fire protection subcontractor, fabricators, etc.) during design development, prior to release of the applicable design packages for construction, so that systems and trade coordination can reduce interferences, increase constructability and speed up construction operations. Contractors that include fire protection/mechanical commissioning agents at the design phase of their projects is important to the government and demonstrates the contractors ability to resource and plan early in project stages to prevent costs growth and schedule creep during the later stages of project finishing and close out.
7.2.7 Subcontractor Approach and Management: The government will evaluate the general contractor’s ability to develop and maintain strong subcontractor and small business relationships. The government will evaluate the general contractor’s subcontractor management model and processes.
7.2.8 Planning and Scheduling: The Government will evaluate the offeror’s scheduling capabilities to manage an integrated fast track design-build schedule as it relates to design and construction of laboratories.
7.2.9 Quality Control: The Government will evaluate the offeror’s capabilities and understanding of the contractually required quality control processes for both design and construction. The Government places value upon continued participation by the designers of record during the construction quality control process. The Government will evaluate the adequacy of the staffing plan to cover all required tasks and responsibilities.
7.2.10 Safety: The government will evaluate the offeror’s capabilities and understanding of the contractually required safety processes for construction.
7.2.11 Key Personnel Capabilities and Experience: The Government will evaluate the required information to determine how well the offeror identifies and demonstrates that its key personnel meet or exceed minimum qualifications necessary, which includes previous satisfactory experience in similar type work, to manage, control and perform the design, and to perform construction. Performance of key personnel proposed for this project may be taken into account when it comes to the attention of the Government. Evaluate how well the Offeror demonstrates that it has the necessary structure and experienced, qualified personnel within its organization to effectively manage, control, administer and execute the integrated design and construction operations, quality control program and subcontracts.