W912BV-17-R-0022_PC_Buncombe_Texoma.pdf
PDF 412 KB Posted
- Solicitation number
- W912BV-17-R-0022
About this file
Solicitation W912BV-17-R-0022
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SWT_Form_982.pdf | ||
| Maps_of_Mowing_Areas.pdf | ||
| Example_of_Job_Hazard_Analysis.pdf | ||
| SWT_Form_990.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV-17-R-0022 02-Feb-2017
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
02:00 PM 06 Mar 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DOUGLAS D BUFFINGTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$18,000,000.00
NAICS:
561720
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF108
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments before submitting documents. Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to
Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes in a file format readable by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address CESWT‐CT‐SS‐Quotes@usace.army.mil and copy
Douglas.D.Buffington@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
TULSA DISTRICT CORPS OF ENGINEERS
DOUGLAS BUFFINGTON, CECT‐SWT‐E
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
FAX: (918) 669‐7495
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x
17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7078) or Douglas.D.Buffington@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.
Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District
Office. The address of the Tulsa District Office is below:
TULSA DISTRICT CORPS OF ENGINEERS
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the past performance references page, if included in solicitation.
3) Complete the Excel pricing schedule provided in the solicitation.
4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M
5) Provide Subcontracting Plan if utilizing Subcontractors (See SECTION I 52.219‐14)
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV‐17‐R‐0022
The Bidder Inquiry Key is: 6DQFZJ‐VRNAIC
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 2:00pm (Central) Monday, 27 February 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington
Telephone: 918‐669‐7078
E‐MAIL: Douglas.D.Buffington@usace.army.mil
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 12:30 PM local time on 16 February 2017 at the US Army
Corps of Engineers, 351 Corps Road, Denison, Texas 75020.
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
Section B - Supplies or Services and Prices
OFFER SCHEDULE
BID SCHEDULE
LAKE TEXOMA, OKLAHOMA & TEXAS
PARK CUSTODIAN - BUNCOMBE CREEK & JUNIPER POINT PUAs
BASE YEAR: 1 APR 17 – 31 MAR 18
Description Quantity Unit Unit Price Total
Amount
0001 Buncombe Creek Mowing 183 Days $__________ $__________
0002 Juniper Point East Mowing 183 Days $__________ $__________
0003 Juniper Point West Mowing 183 Days $__________ $__________
0004 Buncombe Creek Cleaning 183 Days $__________ $__________
0005 Juniper Point East Cleaning 183 Days $__________ $__________
0006 Juniper Point West Cleaning 183 Days $__________ $__________
TOTAL BASE YEAR $__________
OPTION YEAR 1: 1 APR 18 – 31 MAR 19
Description Quantity Unit Unit Price Total
Amount
1001 Buncombe Creek Mowing 183 Days $__________ $__________
1002 Juniper Point East Mowing 183 Days $__________ $__________
1003 Juniper Point West Mowing 183 Days $__________ $__________
1004 Buncombe Creek Cleaning 183 Days $__________ $__________
1005 Juniper Point East Cleaning 183 Days $__________ $__________
1006 Juniper Point West Cleaning 183 Days $__________ $__________
TOTAL OPTION YEAR 1 $__________
OPTION YEAR 2: 1 APR 19 – 31 MAR 20
Description Quantity Unit Unit Price Total
Amount
2001 Buncombe Creek Mowing 183 Days $__________ $__________
2002 Juniper Point East Mowing 183 Days $__________ $__________
2003 Juniper Point West Mowing 183 Days $__________ $__________
2004 Buncombe Creek Cleaning 183 Days $__________ $__________
2005 Juniper Point East Cleaning 183 Days $__________ $__________
2006 Juniper Point West Cleaning 183 Days $__________ $__________
TOTAL OPTION YEAR 2 $__________
OPTION YEAR 3: 1 APR 20 – 31 MAR 21
Description Quantity Unit Unit Price Total
Amount
3001 Buncombe Creek Mowing 183 Days $__________ $__________
3002 Juniper Point East Mowing 183 Days $__________ $__________
3003 Juniper Point West Mowing 183 Days $__________ $__________
3004 Buncombe Creek Cleaning 183 Days $__________ $__________
3005 Juniper Point East Cleaning 183 Days $__________ $__________
3006 Juniper Point West Cleaning 183 Days $__________ $__________
TOTAL OPTION YEAR 3 $__________
OPTION YEAR 4: 1 APR 21 – 31 MAR 22
Description Quantity Unit Unit Price Total
Amount
4001 Buncombe Creek Mowing 183 Days $__________ $__________
4002 Juniper Point East Mowing 183 Days $__________ $__________
4003 Juniper Point West Mowing 183 Days $__________ $__________
4004 Buncombe Creek Cleaning 183 Days $__________ $__________
4005 Juniper Point East Cleaning 183 Days $__________ $__________
4006 Juniper Point West Cleaning 183 Days $__________ $__________
TOTAL OPTION YEAR 4 $__________
TOTAL FOR BASE & ALL OPTION YEARS $__________
Contractor Name (printed) Signature
Section C - Descriptions and Specifications
STATEMENT OF WORK
S P E C I F I C A T I O N S
LAKE TEXOMA
OKLAHOMA & TEXAS
MAINTENANCE CONTRACT
FOR
PARK CUSTODIAN - BUNCOMB CREEK & JUNIPER POINT PUAs
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following page.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title
1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel Requirements 6 Equipment 7 Materials & Supplies 8 Contractor Facilities 9 Performance Requirements 10 Contractor Quality Control 11 Deductions for Deficient Work 12 Safety 13 Reporting Defective Facilities 14 Prework Conference 15 Contractor Submittals 16 Billing 17 Changes in Amount of Facilities Serviced 18 Termination of Contract 19 Antiterrorism and Operations Security Requirements
APPENDICES
Appendix Title A Park Cleaning B Mowing
1. SCOPE OF WORK. The work required under this specification provides for park cleaning and mowing services at Buncombe Creek and Juniper Point PUA’s, Lake Texoma Bryan County Oklahoma & Marshall County Texas.
2. DEFINITIONS.
2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 1.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.
2.5. Project. The term "project" as used herein means all Government property and easements at Lake Texoma.
2.6. Quality. Conformance with the contract specification.
2.7. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.8. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.11. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety & Health Requirements Manual (EM 385-1-1, current version) is hereby incorporated into this specification. EM 385-1-1 is available on-line at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual .aspx .
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and execution of work. Work shall be performed in accordance with this specification and the performance standards (Performance Requirements Table, Exhibit 1).
4.1.2. Acceptance of work. The Government shall accept work unless the Contracting Officer Representative (COR) notifies the contractor of deficient services. Work will be accepted based on compliance with performance requirements. Refer to paragraph 11. for inspection criteria and contractor performance evaluation.
4.1.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 2).
4.1.2.2. If the COR notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 10 for deficient work not re-performed.
4.1.2.3. The contractor shall notify the COR when corrective work is completed.
Notification shall be made by completing Part IV of the QA Report provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor. The QA Report shall be filed with the permanent Contract Files at Tulsa District.
5. PERSONNEL REQUIREMENTS.
5.1. The contractor shall provide all labor and supervision necessary to perform all work described in these specifications. All contract services shall be performed by the contractor or sub contractors except as provided in his or her contingency plan required in paragraph 5.3.
5.2. The contractor or sub contractors shall be physically qualified to perform all work as specified in this contract. Such work includes but is not limited to providing services outdoors under varied and sometimes severe weather conditions, repeated bending and stooping, heavy lifting, standing and walking for long periods, reaching, pulling and climbing on step ladder.
The work shall also include providing information and interacting with the public in a calm and courteous manner even under trying circumstances.
5.3. The contractor shall provide a contingency plan for how work will be accomplished in the event of illness and/or emergencies.
5.4. The contractor shall provide the Contracting Officer and the COR a local or toll free telephone number at or through which they can be reached between 6:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cell phone is acceptable.
5.4.1. The contractor shall provide one supervisor on the project who shall-have full authority to direct any work required. This supervisor, and alternates who shall have full authority to execute work during their absence, shall be designated in writing to the Contracting Officer and the COR.
5.4.2. The contractor shall provide the Contracting Officer and the COR a local or toll-free telephone number at or through which the supervisor can be reached between 7:00 a.m. and 5:00 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
5.5. The contractor/sub contractor shall, at all times, promote a positive, professional image of themselves and the Corps of Engineers; cooperate fully and maintain a polite and respectful manner with all members of the public, other contractors, volunteers, and Government employees. At no time shall the contractor, through their personal appearance, actions, or demeanor, discredit the Government.
5.6. The contractor/sub contractor shall be appropriately dressed and well groomed at all times when performing contract duties and/or within public view (reference subparagraph 12.4).
5.7. Surveillance of recreation areas and assisting visitors who encounter problems at any time of the day or night are in important part of the Park Custodian’s job. However, enforcement of Federal Regulations is the responsibility of the Corps of Engineers personnel and NOT PART
OF THE DUTIES OR RESPONSIBILITIES OF THIS CONTRACT.
5.8. Prohibited Conduct and Activities.
5.8.1. Under no circumstance shall the contractor/sub contractor carry or possess firearms in their RV or anywhere on Government property.
5.8.2. The contractor/sub contractor shall not consume nor be under the influence of alcohol, drugs, or medications (except doctor prescribed) during on-duty hours; nor conduct themselves at any time in a manner unbecoming their position.
5.8.3. The contractor/sub contractor shall not engage in any commercial activity on Government property. This shall include childcare, outside employment, or other activities that conflict or interfere with the performance of required work.
5.8.4. The contractor/sub contractor shall not attempt to apprehend violators or enforce regulations; nor argue with or directly accuse a member of the public of wrong doing; nor commit Corps of Engineers employees or any Law Enforcement Officials to any type of action.
6. EQUIPMENT.
6.1. Government Furnished. Use of one storage shed.
6.2. Contractor Furnished. The contractor shall furnish all equipment such as, but not limited to, edger , trimmer, and finish type mower/s not less than 42” cut that is ample to meet contract requirements (including fuel), brooms, mops, buckets, wringer, brushes, water hoses, nozzles, stepladders, lawn and garden rakes, shovel, plunger, dust pan, squeegee, hand tools, and lock for storage shed.
6.2.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR or the Contracting Officer for inspection. Equipment brought to the project shall not be used until it has passed inspection. The COR or the Contracting Officer shall establish the time and location for these inspections.
6.2.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.
6.2.3. Equipment Operation.
6.2.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.
Use of a rear discharge mower is preferred but not required.
6.2.3.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height unless a sleeve protects the base of the shrub or tree.
6.2.3.3. Power washing equipment shall be operated in a manner that will prevent damage to government facilities.
6.2.4. Vehicle Operation and Parking.
6.2.4.1. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.
All vehicles shall be properly licensed and maintained in a safe, clean condition. The contractor/sub contractor shall maintain a valid state driver’s license.
6.2.4.2. The contractor shall comply with all provisions of Title 36 Code of Federal Regulations pertaining to Corps of Engineers areas. The contractor will not be allowed to operate any vehicle (including mopeds, ATVs, and utility vehicles) off road, around gates or barricades, on sidewalks, on trails or driving the wrong way on a one-way street, unless prior written approval is obtained from the Lake Manager.
7. MATERIALS AND SUPPLIES.
7.1. Government Furnished.
7.1.1. The Government will furnish potable water to perform required work. The contractor shall be responsible for transporting any government-furnished materials and supplies to work sites.
7.1.2. All forms for submitting required reports, gate and building keys.
7.1.3. RV Site.
7.1.3.1. The Government will provide a designated RV site/sites at no cost to the contractor. The site will be supplied with 120/240 volt, 30/50 amp electrical service, potable water, sewer hook-up, picnic table, and fire ring.
7.1.3.2. The contractor may not move on to the site more than three days prior to start of performance period. The contractor shall remove the RV along with all personal property no later than three days after end of performance period. The Lake Manager may approve any variation of this requirement.
7.1.3.3. If termination of the contract becomes necessary (see paragraph 18), all contractor belongings shall be removed from Government property within 5 days.
7.1.3.4. The Government shall furnish potable water, electrical and sewage hookups, and off Project trash hauling/disposal. The Government assumes no responsibility or liability for losses resulting from any interruption or outage of utility services, regardless of duration of outage.
7.2. Contractor Furnished. The contractor shall furnish all materials and supplies necessary to perform the duties and services of this contract, except where otherwise stated as Government furnished.
7.2.1. Self-Contained Recreational Vehicle (RV).
7.2.1.1. The RV shall be well-maintained and a fully operable self-contained travel trailer, motor home, or fifth wheel RV to serve as temporary living quarters for the duration of the performance period. The RV must be of sufficient size and contain appropriate facilities to be lived in without external connection to electrical, water, or sewer hookups.
7.2.1.2. Pickup campers, pop-up trailers, buses, tents, and mobile homes will not be acceptable. Other RVs that, upon inspection, don’t meet the self-contained classification or general size and other requirements as described will not be acceptable. The Lake Manager will make the final decision as to acceptance of contractor’s RV.
7.2.1.3. The contractor shall provide a telephone and answering machine or other approved message-recording service/device at their RV site and pay all connection and monthly service charges.
7.2.2. Vehicles. The contractor shall furnish suitable vehicle(s) for personal transportation, work area use, pickup and delivery of supplies, and transport of refuse from trash cans to bulk storage dumpsters.
7.2.3. Supplies. The contractor shall furnish all paper towels, sponges, rags, scratch pads, and/or other wiping, polishing, drying and scraping cloths/materials, toilet paper, deodorants, disinfectants, cleansers, and other cleaning materials as required. Specifications for select materials and supplies are listed in Exhibit 3.
8. CONTRACTOR FACILITIES. Park Custodians (contractors/sub-contractors) are required to live on site, and shall use their RV as a regular domicile for the duration of the work period, unless otherwise approved by the Contracting Officer and the COR.
8.1. Site Appearance. The contractor’s temporary living site shall be maintained in a clean, sanitary, orderly, and uncluttered condition at all times.
8.2. Animals. Cages, pens or similar facilities for housing pets or raising animals will not be allowed. Contractor’s pets shall be confined to the RV or kept on a leash 6 feet or less in length.
8.3. Visitors. The contractor is allowed to have visitors stay with them in the contractors RV.
However, visitors with their own RV will be required to stay at a regular campsite and pay the normal camping fee. At no time will any visitor be allowed to connect to utilities provided by the Government for the exclusive use of the contractor.
9. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:
9.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the COR or Contracting Officer.
9.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re-performance.
10. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 1.
10.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 4). A copy of completed inspection logs shall be furnished the COR weekly.
10.2. The requirements in subparagraph 10.1. may be waived by the Contracting Officer if they determine proper CQC can be achieved without the required submissions. This determination will normally be made on the basis of actual performance by the contractor and shall be made in writing by the Contracting Officer. If submissions are again required after being waived this reinstatement shall not be considered as grounds for a price increase..
11. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:
11.1. Each service found deficient and re-performed by the contractor: No deduction.
11.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
11.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
11.4. Each service found deficient and not re-performed by anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
12. SAFETY.
12.1. Safety Plan. The contractor shall furnish the COR a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
12.1.1. Procedures for insuring safety of others, including the general public.
12.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
12.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
12.1.4. Procedures for treating and transporting injured persons to medical facilities.
12.1.5. Fire prevention plans.
12.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 5.
12.2. Safety Violations. If a contractor’s/sub contractor’s employee persists in not following the safety requirements of this specification or the contractor’s safety plan, the employee shall be permanently discharged upon the written request of the Contracting Officer. If the contractor/sub contractor persists in not following the safety requirements of this specification or the safety plan, it will be considered grounds for termination. (reference paragraph 18).
12.3. Safety Meetings. The contractor/sub contractor shall attend (at minimum) three pre-holiday monthly safety/information meetings at the Lake Texoma project office. The purpose of these meetings will be to present a short safety program and to discuss project policies, procedures, and information relevant to the contractor’s operation. Additional monthly meetings will be optional.
12.4. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt, long trousers, and shoes (shorts, swimwear, and open footwear are not allowed). Clothing shall be in good repair. The contractor will wear additional protective apparel when required by Section 5, EM 385-1-1.
12.5. Accident Reports.
12.5.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.
12.5.2. The contractor shall investigate all accidents that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately and in writing on ENG Form 3394, Accident Investigation Report, within one
(1) workday following the accident.
12.6. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly to the COR by the 2nd workday of the following month.
13. REPORTING DEFECTIVE FACILITIES. While performing work, the contractor shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR or the Site Manager each workday.
14. PREWORK CONFERENCE. The Contracting Officer or their designee shall conduct a Pre-work Conference with the contractor for purposes of training and orientation and to discuss the provisions of this specification and the contractor's submittals listed in paragraph 15 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The contractor will be provided project information, policies and procedures, and Government furnished items will be distributed. The Contracting Officer or their designee shall establish the location, date, and time of the Pre-work Conference after consultation with the contractor.
15. CONTRACTOR SUBMITTALS. All submittals shall be furnished the COR and/or the Contracting Officer at or prior to the pre-work conference. If the COR and/or the Contracting Officer determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
15.1. Contingency Plan (subparagraph 5.3.).
15.2 Site Supervisor and contact information to include phone numbers for Contractor, Supervisor, and Alternate (subparagraph 5.4.).
15.3. Safety Plan. (subparagraph 12.1.).
15.4. Job Hazard Analysis. (subparagraph 12.1.6.)
15. 5. Exposure reports. (submit by 2nd workday of each month) (subparagraph 12.6.).
15.6. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 19.)
15.7. E-Verify completed (subparagraph 19.2.)
16. BILLING.
16.1. The contractor shall submit an original invoice when work is completed at the end of each month.
16.2. Invoices shall be prepared in the format in Exhibit 6.
16.3. All exposure reports shall be submitted before an invoice will be accepted.
16.4. Invoices and supporting documents shall be delivered or mailed to the Contracting Officer Representative (COR) at:
Texoma Lake Office 351 Corps Road Denison, TX 75020.
16.5. Payment will be made from the finance and accounting office for the Tulsa District in accordance with contract provisions and the Prompt Payment Act.
17. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.
17.1. Services required are deleted for a period of one (1) month or longer in an entire park.
Major storm damage, floods, high lake pool levels, other natural causes or major construction activities may result in the partial or total closure of recreation areas.
17.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.
18. TERMINATION OF CONTRACT. Failure of the contractor to conduct him/herself in an appropriate manner or to provide the items and services listed in the contract specifications will be grounds for termination of this contract. Examples of contractor actions which may result in contract termination, include but are not limited to:
18.1. Repeated failure to provide custodial services as required by the contract terms and conditions.
18.2. Consuming alcohol, drugs, or being intoxicated while on duty.
18.3. Theft of private or Government property or supplies.
18.4. Repeated instances of discourtesy, harassment, or giving false information to the public or Corps of Engineers personnel.
18.5. Repeated documented complaints pertaining to contractors’ conduct, actions, or attitudes.
18.6. Lack of cooperation or failure to implement policies and programs as outlined in the contract terms and conditions or site specific guidelines.
18.7. Failure to maintain current drivers license, auto insurance, and general liability insurance as stated in the contract clauses.
19. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and pre-screening via E-Verify Program.
19.1. Training materials and verification forms will be provided to the contractor within two business days of Contract Award.
19.2 The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 10 business days after the initial contract award. When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
APPENDIX A
PARK CLEANING
1. FACILITIES TO BE SERVICED. Buncombe Creek, and Juniper Point PUA’s - see Inventory of Facilities, Table A. A site map is located at the end of Appendix B.
2. FREQUENCIES AND TIMES OF SERVICE.
2.1. Work shall be performed 1 April through 30 September; seven days per week (Sunday thru Saturday) unless otherwise noted below. On weekends and Federal holidays, absences from the contract area shall be limited to a maximum of 3 hours.
2.2. The contractor shall begin work no earlier than 6 a.m. and shall complete work no later than 4 p.m. (or as specified below). EXCEPTION: ALL BUILDINGS AND SHELTERS SHALL BE COMPLETED BY 10 A.M. Note: The public use of areas and facilities will vary greatly from day to day and at different times throughout the performance period. The requirement to clean daily shall not necessarily require the contractor to perform cleaning duties on all parts of facilities each time services are performed. But rather shall require that upon completion of cleaning, all parts of all facilities shall meet the performance standard of clean as defined in paragraph 4.
2.3. Second cleanings of shower buildings and comfort stations shall be performed in accordance with subparagraph 3.1., between 3 and 6 p.m. These second cleanings shall be performed on Fridays, Saturdays, Sundays, and legal Holidays.
2.4. Additional Unscheduled Services. Unsanitary or unsafe conditions reported to the contractor by the public, other contractors, or Corps of Engineer employees between 6 a.m. and 10 p.m. shall be cleaned, disinfected, or corrected to performance standards. Contractor shall attempt to unstop restroom fixtures if reported or found to be plugged. If attempts fail, contractor shall immediately report the condition to the COR, Site Manager, and/or Park Ranger/Corps Personnel. The contractor shall perform these services without additional compensation.
3. DESCRIPTION OF WORK. The contractor shall perform all cleaning services to comply with the PRs in Exhibit 1. All services shall be performed in a complete, thorough, and first class manner. All facilities, fixtures, and surfaces shall be left in a clean condition, as defined in paragraph 4.
3.1. Shower Buildings and Comfort Stations.
3.1.1. The contractor shall clean all sinks, faucets, counters, mirrors, hand dryers, handrails, door handles/plates, toilets, seats, urinals, tissue holders, and shower stalls (all parts). Polish and dry all fixtures daily. All floors shall be cleaned and disinfected. Excess water on floors shall be removed by mop, broom, or squeegee.
3.1.2. The contractor shall restock toilet tissue by filling all tissue holders (tissue holders may require refilling more often than just on scheduled cleanings , see paragraph 2.4. above).
Empty all trashcans upon completion of building cleaning and replace plastic liners. Clean and disinfect trashcans as needed. Replace defective light bulbs.
3.1.3. The contractor shall clean and disinfect a MINIMUM of twice a week (Monday and Friday) all interior tile walls, and all toilet stall partitions and doors. Dry all surfaces upon completion of cleaning. Clean all light fixtures/covers, doors/jams, utility supply rooms’ vents and fan covers, windows, ceilings, exterior walls, eaves, entryways, and sidewalks.
3.2. Picnic/Camping Sites. Daily cleaning shall be performed between 6 a.m. and 12 noon. The contractor shall inspect and clean campsites, picnic sites, tables, grills, or electrical boxes as available (the contractor will normally not be required to service occupied sites). The contractor shall inspect sites as they are vacated to perform needed cleaning. A report of daily arrivals and departures can be obtained from the gate attendant on duty. Picnic tables shall be scrubbed clean and disinfected as needed. Grills shall normally be cleaned without the use of water. Litter and food residue shall be removed. All ashes shall be removed and placed in area dumpsters. The contractor shall take proper care to insure no hot coals or ashes are placed in area dumpsters.
3.3. Picnic Shelters. The contractor shall clean the floor slab, table seats and tops, fireplaces, light fixtures, eaves, ceilings, and columns. All material removed from fireplaces shall be disposed of in accordance with subparagraph 3.7. The contractor shall take proper care to insure no hot coals or ashes are placed in dumpsters.
3.4. Trailer Dump Stations. The contractor shall perform daily cleaning between 6 a.m. and 12 Noon. The contractor shall clean and disinfect the entire concrete slab drain area, drain cover, hoses, faucets, and water towers.
3.5. Litter Pickup for Grounds and Miscellaneous Facilities.
3.5.1. The contractor shall perform daily litter pickup of all grounds and facilities within the contract area between 6 a.m. and 12 Noon. Boundary for litter pickup shall extend 25 feet beyond all mowed edges. Upon completion of service, cleaning area shall be free of refuse, all trash cans will be empty, clean and disinfected as needed, fitted with a new plastic liner as needed, trash can properly placed on holder with lid in place, and lids to bulk storage dumpsters properly closed.
3.5.2. Litter pickup shall consist of the removal of all manmade and natural debris that detracts from the appearance of the area, presents a health or safety hazard, or creates a maintenance problem. Litter shall include but is not limited to all cans, bottles, broken glass, paper, plastic, foil, cigarette butts, discarded food, dead fish and other animals, fecal material, rocks, limbs, leaves and driftwood.
3.6. Refuse Collection. Refuse pickup services shall consist of the collection of all discarded solid waste materials from all trashcans, facilities, or other areas. Refuse shall include all discarded solid waste materials regardless of source or whether disposed of properly or improperly.
3.7. Refuse Disposal. The contractor shall haul all refuse to the area bulk storage dumpsters (provided by others) in such a manner so that no refuse or effluent will be lost. Vehicles used to transport refuse shall be kept clean and odor free. Open end of trash liners shall be tied closed prior to disposal in the area dumpster.
3.8. Special Requirements.
3.8.1. The contractor shall immediately report all emergency situations, accidents, vandalism, public disturbances, and violations of Title 36 CFR to Corps Rangers or local law enforcement personnel, regardless of the time of day or night.
3.8.2. The contractor shall report to the COR all information concerning either lost or found property on forms provided by the Government. Found property shall be safeguarded by the contractor and promptly turned in to an authorized Corps employee.
3.8.3. PROPER AND SAFE USE OF EQUIPMENT AND CHEMICALS. The contractor shall use all equipment, disinfectants, detergents, and other chemical agents in a safe manner and in accordance with all manufacturers’ instructions. Contractor shall take extreme care while performing cleaning services to insure that corrosive or abrasive chemicals do not mar, discolor, remove or harm the finish in any way on any facility or fixture. The contractor may be liable for damages to private or Government property caused by their operations when not consistent with approved practices.
3.8.4. Securing Utility Rooms, Equipment and Supplies. The contractor shall keep all equipment and supplies secure at all times and safeguard the public by ensuring that only the contractor has access to storage areas and utility rooms. Except when in actual use while servicing buildings; utility/storage rooms shall be kept locked.
3.8.5. Reasonable Cleaning Effort. The contractor shall advise the COR of any stains or markings that cannot be removed by reasonable cleaning efforts.
3.8.6. Water, Wood and Electricity. Water shall not be sprayed on nor allowed to run into electrical fixtures such as outlets, lights and hand dryers. Interior wood surfaces such as ceilings, wood portions of sidewalls and windowsills also shall not be hose sprayed. Exterior wood trim, eaves and facing shall be cleaned using the minimum water necessary. High-pressure sprayer/washer shall not be used on these surfaces unless so directed by the COR.
3.8.7. Landfill Restricted Items and Recycling Programs. The contractor shall not place any items, whose disposal in landfills is restricted, in any of the public trashcans or dumpster units.
Disposal of hazardous items such as tires, batteries, and paint cans, etc. shall be coordinated with the Project Environmental Specialist. The contractor shall participate in all recycling programs instituted by the Government during the contract term and shall maintain recycling areas/containers in a safe and clean condition and as directed by the contract.
3.8.8. Moving Picnic Tables. The contractor WILL NOT be required to remove picnic tables from shelters to perform cleaning duties; although it may, at times be necessary for the contractor to move individual tables to perform required services.
4. PERFORMANCE REQUIREMENTS. Work performed under this appendix shall comply with the PRs given in Exhibit 1. The terms clean, sanitary, and odor-free facilities are defined as follows:
4.1. Clean. The contractor shall sweep, mop, wash, wipe, scrub, scrape, rinse, hose, polish, dry, or brush facilities to ensure removal of all sand, mud, dirt, dust, litter, trash, insects, webs, nests, scale, mold, mildew, streaks, spots, stains, graffiti, soap film, mineral deposits, and all other types of debris or foreign particulate matter.
4.2. Sanitary. The contractor shall disinfect facilities by the application of a combination disinfectant, cleaner, mildew stat, and deodorizer solution, to inhibit the growth of mold and mildew, and kill bacterial organisms. Note: The requirement to disinfect daily (or as scheduled) shall require the Contractor to perform that service on all facilities/ fixtures as scheduled regardless of the appearance of clean. The contractor shall at times also be required to perform disinfecting duties on parts of facilities that normally will not require such service, in order to clean and disinfect unsanitary conditions.
4.3. Odor-Free. The contractor shall use a chemical agent in a manner…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .