RFP No. W912BV-17-R-0020
US Army Corps of Engineers
Tulsa District
Repair Building 280 Mechanical System & Finishes FY17 Project: VNVP161109
Sheppard Air Force Base Wichita County, Texas
Design-Build Request for Proposals Phase 1 of 2
100% Set Aside for Small Businesses
January 2017
THIS IS A TWO-PHASE REQUEST FOR PROPOSAL
PROJECT TABLE OF CONTENTS
PHASE 1
SECTION TITLE
Coversheet 00 11 00 Proposal Schedule* 00 21 00 Instructions to Offerors 00 22 10 Phase 1 of 2 Phase Design-Build Selection Procedures 00 22 20 Phase 2 Design Build Selection Procedures and basis of
Award 00 45 00 Representations & Certifications 00 72 00 Contract Clauses 00 73 00 Special Contract Requirements 00 73 46 Wage Determination*
PHASE 2*
DIVISION 01 – PROJECT GENERAL REQUIREMENTS
01 04 00 Coordination, Field Engineering and Meetings*
01 10 00 STATEMENT OF WORK SUMMARY
Statement of Work is Subject to Change During Phase 2 01 30 60 Background Checks for Contractor Personnel – Sheppard
AFB*
01 32 01.00 10 Project Schedule (Full) Weather Log* 01 33 00.10 10 Digital Submittal Procedures and Correspondence* Submittal Distribution List / Example Eng Form 4025* 01 33 16 Design After Award* 01 35 26.10 10 Governmental Safety Requirements Confined Space Permit* 01 45 00.00 10 Quality Control 01 45 00.10 10 Quality Control System (QCS)* 01 50 02.00 10 Construction Facilities and Temporary Controls* Application for Personnel Pass* 01 57 20.10 10 Environmental Protection* 01 58 00.00 10 Bulletin Board, Project Sign and Safety Sign* 01 74 19 Construction and Demolition Waste Management* 01 78 00.10 10 Project Closeout* Example Red Zone Meeting Checklist*
APPENDICES
Appendix A Site Reference Appendix B SAFB Gate Access Reference* Appendix C USACE Office Location Map* Appendix D As-Built Drawings* Appendix E 82 CES OI32-10 – Design Guide* Appendix F ETL 04-3 (Change 1) Design Criteria for Prevention of
Mold in Air Force Facilities* Appendix G SAFB CADD Standard*
*Phase 2 information to be issued by amendment
Renovated Dormitory 280 at Sheppard Air Force Base, Wichita Falls, TX.
Site Visit w ill be held in accordance w ith FAR 52.236-27
The Cost Magnitude of this contract is betw een $5 million to $10 million.
This acqusition is solicitated as a total small business set-aside under NAICS 236220
PUNNIE CHITTCHANG 918.669.7544
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-Feb-2017
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________421 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time _10 March 2017_ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912BV-17-R-0020 160
02:00 PM
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Repair Bldg 280 Mechanical System and Finishes Sheppard AFB, TX
Item No. Description Quantity Unit Unit Price Line Item Amount
BASE BID: Repair Building 280 Mech System and Finishes
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0001 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0002 CONSTRUCTION 1 Job N/A $ ____________________________
0003 General Conditions 1 Job N/A $ ____________________________
0004 FIRM FIXED PRICE TOTAL COST FOR BASE BID:
Subtotal Items 0001 thru 0003
OPTION 1: Repair Site Drainage
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0005 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0006 CONSTRUCTION 1 Job N/A $ ____________________________
0007 FIRM FIXED PRICE TOTAL COST FOR OPTION 1:
Subtotal Items 0005 thru 0006
OPTION 2: Renovate Kitchenette, Bathroom Vanity, and Dayroom
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0008 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0009 CONSTRUCTION 1 Job N/A $ ____________________________
0010 FIRM FIXED PRICE TOTAL COST FOR OPTION 2:
Subtotal Items 0008 thru 0009
OPTION 3: Replace Carpeting
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0011 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0012 CONSTRUCTION 1 Job N/A $ ____________________________
0013 FIRM FIXED PRICE TOTAL COST FOR OPTION 3:
Subtotal Items 0011 thru 0012
Contractor shall submit a 65% and 95% Designs for Review and Approval.
Contractor shall submit a 65% and 95% Designs for Review and Approval.
CONTRACT LINE ITEM NUMBER (CLIN) SCHEDULE
Contractor shall submit a 65% and 95% Designs for Review and Approval.
BASE PROPOSAL
Contractor shall submit a 65% and 95% Designs for Review and Approval.
SEVEN OPTIONS
OPTION 4: Repair Windows
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0014 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0015 CONSTRUCTION 1 Job N/A $ ____________________________
0016 FIRM FIXED PRICE TOTAL COST FOR OPTION 4:
Subtotal Items 0014 thru 0015
OPTION 5: Refurbish Bathubs
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0017 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0018 CONSTRUCTION 1 Job N/A $ ____________________________
0019 FIRM FIXED PRICE TOTAL COST FOR OPTION 5:
Subtotal Items 0017 thru 0018
OPTION 6: Replace Exterior Doors
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0020 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0021 CONSTRUCTION 1 Job N/A $ ____________________________
0022 FIRM FIXED PRICE TOTAL COST FOR OPTION 6:
Subtotal Items 0020 thru 0021
OPTION 7: Replace Facility Chiller
TYPE C WORK PLAN (DESIGN & CONSTRUCTION)
0023 DESIGN & WORKPLANS 1 Job N/A $ ____________________________
0024 CONSTRUCTION 1 Job N/A $ ____________________________
0025 FIRM FIXED PRICE TOTAL COST FOR OPTION 7:
Subtotal Items 0023 thru 0024
TOTAL OPTIONS
Evaluated Cost; Refer Section 00 22 11 Proposal Preparation and Evaluation Criteria
TOTAL PROJECT COST BASE BID AND OPTIONS
Total Items 0004, 0007, 0010, 0013, 0016, 0019, 0022, and 0025:
Contractor shall submit a 65% and 95% Designs for Review and Approval.
Contractor shall submit a 65% and 95% Designs for Review and Approval.
Contractor shall submit a 65% and 95% Designs for Review and Approval.
Total Items 0007, 0010, 0013, 0016, 0019, 0022, and 0025:
Contractor shall submit a 65% and 95% Designs for Review and Approval.
1)
2)
3)
4)
5)
6)
7)
8) CONDITIONS GOVERNING EVALUATION OF OFFERS AND AWARD OF CONTRACTS:
The Government may require the delivery of the numbered line items, identified in the schedule as option items, in the quantity and at the price stated in the schedule. Subject to the availability of funds, the Contracting Officer may exercise the option by written notice to the Contractor within the time indicated from the Notice to Proceed (NTP):
CLIN NOTES
All the extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the offer.
The Offeror shall submit pricing data on the latest Contract Line Item (CLIN) schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
If a modification to a proposal is submitted and provides for a lump-sum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the Contract Line Item schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on a prorated basis to every item in the CLIN schedule.
AVAILABILITY OF FUNDS (APR 1984) (FAR 52.232-18)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
PROPOSAL SCHEDULE NOTES
The Offeror shall submit pricing data on the latest Proposal Schedule as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
Offerors must insert a price on all numbered items of the Pricing Schedule. Failure to do so will disqualify the Offer.
If a modification to a proposal is submitted and provides for a lumpsum adjustment to the total estimated cost, the application of the lump-sum adjustment to each unit price and/or lump-sum price, in the Contract Line Item schedule must be stated or, if it is not stated, the Offeror agrees that the lump-sum adjustment shall be applied on a prorated basis to every item in the Pricing Schedule.
Only one task order for the entire schedule will be awarded under this solicitation in accordance with the Contract.
1. Offeror must bid on all items
2. Costs attributable to Division 01 - General Requirements are assumed to be prorated among proposal items listed unless specifically noted.
3. Responder is advised that this requirement may be delayed, cancelled or revised at any time during the solicitation, selection, evaluation, negotiation and/or final award process
EVALUATION OF OPTIONS
The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the Base Proposal. (Total Base Proposal and Optional Proposal Items.) Evaluation of options will not obligate the Government to exercise the options.
AWARD OF OPTIONAL PROPOSAL ITEMS
Optional Proposal Items, at the option of the Government, be awarded at the time of contract award or may be exercised at any time from the date of contract award until 45 days after award of this Task Order.
The Government may exercise all options or any combination thereof.
Offerors must insert a price on all numbered items of the CLIN Schedule. Failure to do so will disqualify the Offer.
INSTRUCTIONS TO OFFERORS
SECTION 00 21 00
INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
1.0 GENERAL INFORMATION
1.1 GENERAL DESCRIPTION OF WORK
1.2 CONTRACT COST CEILING LIMITATION
1.3 GOVERNMENT SECURITY REQUIREMENTS
1.4 COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
1.5 OFFEROR'S QUESTIONS AND COMMENTS
1.6 SMALL BUSINESS SIZE STANDARD/NAICS CODE
1.7 PROPOSAL EXPENSES AND PRE‐CONTRACT COSTS
1.8 PRE‐PROPOSAL CONFERENCE
1.9 ACCURACY IN PROPOSALS
1.10 PROPOSAL SUBMITTALS
1.11 JOINT VENTURE PROPOSAL REQUIREMENTS
1.12 DEVIATIONS AND EXCEPTIONS
1.0 GENERAL INFORMATION
1.1. GENERAL DESCRIPTION OF WORK
This is a two‐phase total small business set aside solicitation for design‐build construction project to repair Building 280 mechanical system and finishes at Sheppard Air Force Base, TX.
The project location is surrounded by active runways and taxiways.
This project is being developed to upgrade the existing mechanical system and architectural finishes for the student pilot dormitory. The work includes a base bid and 7 options. The base bid included the replacement of all fan coil, forced air units, and exhaust fans, installation of a dedicated outside air system, and repairs associated with HVAC work. Option 1: includes site grading around the building. Option 2: includes re‐finishing wood cabinets, replacement of counter tops, new VCT in dayroom, kitchenettes, bathroom vanities, laundry rooms, increase countertop height at stove. Option 3: Includes replacement of the carpet throughout the facility.
Option 4: includes repair of the windows throughout the facility. Option 5: includes the refurbishment of 25% of the bathtubs throughout the facility. Option 6: consist of the replacement of 25 exterior door and paint to match the existing doors. Option 7: included the replacement of the chiller. CONTRACT COST CEILING LIMITATION (CCL) FOR DESIGN AND
CONSTRUCTION COSTS
The design and construction costs will be subject to the funds available for this project. The total contract award shall not exceed $9,000,000. Offerors are notified that they are under no obligation to approach this ceiling. However, the Government will not be able make an award, if the dollar amount set for this project is exceeded.
1.2. GOVERNMENT SECURITY REQUIREMENTS
The Offeror(s) must ensure that ALL mail sent to the Tulsa District, U.S. Army Corps of Engineers, either pre‐contract or post‐contract award, has a return mailing address on the outside of the envelope, package, box, etc. ANY MAIL addressed to the U.S. Army Corps of Engineers, including but not limited to bids, modifications to bids, proposals, revised proposals, bonds, correspondence, etc., will be REJECTED by the US Army Corps of Engineers mail room facility located at 1645 S. 101 E. Ave, Tulsa, OK 74128, if it does not contain a return mailing address. There will be no exceptions.
USACE Tulsa District Point of Contact is Pun Chittchang:
Phone: 918‐669‐7544 Email: punnie.chittchang@usace.army.mil
1.3. COPIES OF SOLICITATION DOCUMENTS AND AMENDMENTS
Copies of the solicitation and amendments are available by INTERNET ACCESS ONLY. All solicitation documents will be posted to the Federal Business Opportunities (FBO) website at:
http://www.fbo.gov
Solicitation number: W912BV‐17‐R‐0020
It shall be the contractor’s responsibility to check the websites for any amendments. The offeror shall submit in the proposal all requested information specified in this solicitation. There will be no public opening of the proposals received as a result of this solicitation.
1.4. OFFEROR'S QUESTIONS AND COMMENTS
Questions and/or comments relative to the document should be submitted via Bidders Inquiry at:
https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=HomePagePublic
Instructions for registering in the ProjNet Bidder Inquiry system are available on the above web site.
The Bidder Inquiry Key for this project is: DTA4BB-2IPIRI
Any information given to an offeror which impacts the solicitation and/or offer will be given in the form of a written amendment to the solicitation.
Note: All questions and/or comments should be entered in Bidder’s Inquiry no later than 7 calendar days prior to the proposal deadline, so they may be given consideration or action taken prior to receipt of offers.
1.5. SMALL BUSINESS SIZE STANDARD/NAICS CODE
The small business size standard for NAICS Code 236220 is $36.5 Million.
1.6. PROPOSAL EXPENSES AND PRE‐CONTRACT COSTS
This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.
1.7. PRE‐PROPOSAL CONFERENCE
The Government intends to hold the pre‐proposal conference. The date, location, and time will be announced by Amendment. The offeror must submit, via e‐mail, the firm’s name, address, point of contact, telephone number, and number of personnel planning to attend to the following no later than two (2) working days prior to the conference:
U.S. Army Corps of Engineers, Tulsa District ATTN: Pun Chittchang 1645 S. 101 E. Ave.
Tulsa, OK 74128 Phone: 918‐669‐7544 Email: punnie.chittchang@usace.army.mil
During this conference, the requirements set forth in the solicitation will be reviewed and discussed, with part of the conference to include a question and answer period.
1.8. ACCURACY IN PROPOSALS
Proposals must set forth full, accurate, and complete information as required by this RFP, (including attachments). The penalty for making false statements is prescribed in 18 U.S.C. 1001.
1.9. PROPOSAL SUBMITTALS
The submittal method for proposals is electronic via AMRDEC SAFE web site below, or email, in accordance with section 00 22 10-Phase 1 and 00 22 20-Phase 2:
https://safe.amrdec.army.mil/safe/.
The following email addresses must be entered for notification of proposal receipt and download availability:
brian.c.hutchison@usace.army.mil
Punnie.Chittchang@usace.army.mil
Proposals will be received until the time and date shown on Standard Form SF 1442 or as amended on SF30. Mail proposals to:
U.S. Army Corps of Engineers, Tulsa District ATTN: Pun Chittchang, CESWT‐CT 1645 S. 101 E. Ave.
Tulsa, OK 74128
The Packaging Proposals shall be marked:
”Proposal for Solicitation Number: W912BV‐17‐R‐0020
1.10. JOINT VENTURE PROPOSAL REQUIREMENTS
When proposing as a joint venture, all members of the joint venture shall sign the SF 1442 and the bid bond unless a written agreement by the joint venture is furnished with the proposal designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement shall be submitted with the proposal. Failure to comply with the foregoing requirements may eliminate the proposal from further consideration. If this is an 8(a) or HubZone joint venture, the offeror shall ensure that it complies with the applicable requirements of 13 CFR Part 124 and 13 CFR Part 126, respectively
1.12 DEVIATIONS AND EXCEPTIONS
Deviations and exceptions to the terms and conditions of the solicitation in either the technical or price proposal are neither encouraged nor desired. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined
“unacceptable” and thus ineligible for award. Should the Offeror have any questions related to specific terms and conditions, these must be resolved prior to submission of the offer. Notwithstanding the above, if deviations and exceptions are included with the offer, the Offeror shall list and describe in detail the deviations and/or exceptions on the first page of each Tab. All deviations and exceptions shall be fully supported with the Offeror’s rationale and shall fully explain the impact, if any, on the performance and/or specific requirement of the RFP. The Offeror shall clearly describe on the Proposal
Cover Sheet submitted with the Price Proposal any exception to the contractual and/or technical terms and include the monetary impact on the solicitation with the price proposal. This information will not be evaluated separately but may impact the evaluation of other fact
RFP SECTION 00 22 10: PHASE 1 OF 2 PHASE SELECTION PROCEDURES
1.0 OVERVIEW
1.1. The Government is looking for ways to streamline design and construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule in executing contracts to meet the Air Force program and mission goals of faster project execution at lower cost, while taking advantage of industry standards, means and methods.
In Phase 1 of the 2 phase design-build selection procedure, interested firms or joint venture entities (referred to as “offerors”) submit certain specified performance capability proposals, demonstrating their capability to successfully execute the design-build construction contract resulting from this solicitation. The Government will evaluate the performance capability proposals in accordance with the criteria described herein and will select no more than five (5) of the Phase 1 offerors to compete for the design-build contract in Phase 2.
1.2. In Phase 2, the short-listed offerors will submit proposals in accordance with Section 00 22 20 to be provided with the Phase 2 solicitation.
2.0 GENERAL INSTRUCTIONS
2.1. Who May Submit: Any legally organized Small Business firm may submit a proposal that is formally organized as a design-build entity, Small Business design firms and construction contractors that have associated specifically for this project, or consortia of Small Business firms may submit proposals.
Associations may be as joint ventures or as key team subcontractors. To qualify for Phase 2, the Offeror or Offeror’s subcontractor has to have or will have to have professional architects and engineers, registered in the appropriate technical disciplines and the requirements specified in Contract Clause, ”Requirements for Registration of Designers”, must be met. All designs must be under the direct supervision of appropriately licensed professionals for each discipline involved.
2.2. Proposal materials shall be submitted via AMRDEC SAFE website https://safe.armdec.army.mil/safe/, or via email, containing the proposal in PDF file format using Adobe Acrobat software. Proposals shall be tabbed and labeled in a manner to afford easy identification from a Table of Contents.
Each page shall be identified with the appropriate page number centered at the bottom of the page. Sheet size of the proposal contents shall be 8-1/2 inches x 11 inches where sheets are prepared specifically for this proposal, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use alternative paper sizes (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, https://safe.armdec.army.mil/safe/ an unusual font style such as script, or condensed print for any submission.
All page margins must be at least 1 inch wide, but may include headers and footers. Phase 1 proposals shall not exceed 30 single-sided pages, excluding the cover sheet and Table of Contents. A page is defined as text or information on one side of the paper. Factor 2 – Past Performance will not be counted towards this page limitation, nor will the resumes submitted for key personnel. The Government will not evaluate any information beyond the page limitation noted. The Government will not review any information submitted in an appendix or attachment to the proposal. The Offeror shall not submit verbatim sections of this solicitation as part of their proposal. Offers that do not meet these requirements may be subject to rejection. Phase 1 does not involve a pricing submission.”
3.0 PHASE 1 PROPOSAL AND RELATED EVALUATION FACTORS
Location Factor Number Description Relative Importance
Tab A SF 1442 and Proposal Data Sheet N/A
Tab B Factor 1 Specialized Experience 1st Most Important Factor
Tab C Factor 2 Past Performance 2nd (Slightly less important than Factor 1)
Tab D Factor 3 Organization and Technical Approach
3rd (Slightly less than Factor 2)
4.0 TAB A - STANDARD FORM 1442 AND PROPOSAL DATA SHEET
4.1. Submit the SF 1442, completed and signed by a person authorized by the Offeror. Include the completed proposal data sheet (See attachment 1, provided at the end of this Section).
5.0 TAB B – FACTOR 1 - SPECIALIZED EXPERIENCE
5.1. SUBMISSION REQUIREMENTS
5.1.1. The prime contractor and the design firm(s) (or prime contractor if design is to be self-performed) shall each demonstrate recent, relevant experience on similar projects, using the Construction – Specialized Experience Form (Attachment 2), and the Designer – Specialized Experience Form (Attachment 3) at the end of the section. Offerors may identify state and local government and private contracts that are similar to the Government’s requirements. If the offeror is a joint venture, each firm shall provide information, demonstrating experience relevant to their role on this project. Submit projects selected from those discussed in the experience narrative that are currently well underway (designed and at least 50% construction progress completed) or completed and turned over no longer that five (5) years preceding the date of this Solicitation. Both the Prime
Contractor and the design firm(s) shall each submit at least 3 but not more than 5 projects that are relevant/similar to the subject project with a dollar value that equals or exceeds $4 million dollars. If any firm has multiple functions or divisions, limit the project examples to those performed by the division or unit submitting the offer or by the team member.
Design firms may list prime contractors they have worked for or government, private or commercial customers. The offeror shall select the design firm(s).If projects were design-build, so identify them.
5.1.2. The offeror may provide a supplemental narrative (not project lists), not to exceed three pages, explaining how any corporate experience that is not directly related to the specific projects above is applicable to this project and how the Government will benefit. The following information may be considered.
5.1.3. The offeror should describe any previous teaming experience between current team members, if not described in the project list. Describe team members’ experience on construction projects which are inclusive of multi-unit or large facility design and renovation with major impacts to facility systems (mechanical, electrical, plumbing, etc.) and architectural elements, if not included on the project list. Offeror may describe design-build experience on other type projects. The above information is limited to projects that are well underway or that have been completed and turned over no longer than the five years preceding the date of this solicitation. Limit to two pages.
5.2. EVALUATION CRITERIA:
5.2.1. The Government will evaluate the extent of recent, related experience of the prime contractor and design firm(s) in design, construction or design-build, as relevant to their role on this project. If the design will be accomplished in-house, rather than by subcontract, then the design element of specialized experience will still be evaluated, realizing that the work is being done in-house. Experience on the similar projects identified in the project lists will receive more consideration than experience provided in the supplemental narrative. The Government may place greater importance on projects performed as a prime contractor than as a subcontractor, depending upon overall role and relevancy considerations. Federal Government project experience will not be rated inherently more important than non-Federal Government project experience.
5.2.2. The Offeror must submit the requested information to demonstrate a record of recent, related experience in both design and construction, for the project type (which may include similar state or local government or private counterparts) included in this contract, as described in Section 00 22 10. The firm(s) preparing the design must demonstrate qualifications and experience in multi-unit or large facility design and renovation with major impacts to all facility systems. Recent experience includes projects well underway (see above criteria) or those completed and turned over within five
(5) Years of the proposal issue date for this RFP for design or construction experience. Joint Venture partners should each demonstrate experience commensurate with their role on this project or explain in the supplemental narrative how their experience qualifies them for their role on this project.
5.2.3. The Government reserves the right to verify the experience record of cited projects or other recent projects by reviewing the Corps of Engineers Construction Contractor (or Architect-Engineer) Appraisal Support System (CCASS/ACASS), other DOD or Government appraisal systems or to interview owners or references. The Government may check any or all cited references to verify supplied information.
5.2.4. To receive credit for extent (amount) of experience, the Offeror and its proposed design firm(s) shall demonstrate a history of recent, relevant experience. A firm will not receive credit under this factor for the relevant experience of key personnel proposed for this project.
5.2.5. The Government will consider extent of recent experience, degree of relationship of such experience to this project, demonstrated familiarity with applicable codes and local conditions. Some examples of relevancy to this project may include, but not be limited to:
(1) Number, size, type work, complexity, location
(2) Dates (well under way or completed no more than 5 years preceding date of Solicitation)
(3) Firm's role and extent of work self-performed (brokering out all work and simply “pouring the sidewalks” on a cited project are examples of less relevant experience)
5.2.6. Previous design-build experience is not necessary for an acceptable rating. The Government may consider previous D-B experience a strength, even if the experience is on different type projects than this project.
Similarly, the Government may consider previous recent teaming experience among the team members as value added, even if on different type design and/or construction projects than this project. The more relevant the experience, the more credit will be given.
6.0 TAB C – FACTOR 2 - PAST PERFORMANCE
6.1. SUBMISSION REQUIREMENTS:
a. For the projects listed under Factor 1 – Specialized Experience, the Government will query the Contractor Performance Assessment Reporting System (to include ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance.
b. For each project that does not have an ACASS, CCASS, or CPARS evaluation, Offerors shall forward a copy of the Past Performance Questionnaire (PPQ) included at Attachment 4 to the points of contact responsible for monitoring performance under such contracts. The Past Performance Questionnaire included in the solicitation is provided for the Offeror or its team members to submit to the client for each project the offeror includes in its proposal for Factor 2. Ensure correct phone numbers and email addresses are provided for the client point of contact. Completed Past Performance Questionnaires should be submitted to the Contract Specialist as shown in Attachment 4. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should complete and submit with the proposal the first page of the PPQ (Attachment 4) which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Contract Specialist identified in Section 00 21 00, Instructions, Conditions, and Notices to Offerors via email prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.
c. The information contained in the questionnaires will be used to evaluate the Offeror’s past performance. If any negative past performance information is received, the contractor will be given an opportunity to provide rebuttal. Each contractor shall provide at least three (3) past performance ratings. Any rating an offeror has in ACASS, CCASS, and CPARS for the projects listed under Factor 1 will count toward this requirement.
The offeror is responsible for ensuring that the KO has received a minimum of three (3) questionnaires prior to that date/time or has provided written notification to the KO that they have current ratings in ACASS, CCASS, and CPARS. Entities that have no past customers shall notify the KO in writing, prior to the date and time established for the RFP closing, that they have had no previous clients and that the minimum number of questionnaires cannot be provided. It is the contractor’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references.
The evaluation form should be submitted with your proposal or, if the client requests, be provided to the Contract Specialist directly from the reference.
Do not request past performance questionnaires on projects that have final ACASS, CCASS, or CPARS evaluations. If a past performance questionnaire is received on a project where a final ACASS, CCASS, or CPARS evaluation exists, the ACASS, CCASS, or CPARS evaluation will serve as the official rating of record for evaluation purposes.
d. The Government may contact references provided as part of Factor 1 – Specialized Experience, for information regarding the Offeror’s past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.
e. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (ESRS), and any other sources not provided by the offeror.
f. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
6.1.1 Joint Venture Submission Requirements. Offerors submitting proposals as a Joint Venture (JV) shall obtain a DUNS number and be registered in the CCR as the offering Joint Venture. The Offeror must provide three (3) to five
(5) "recent", "relevant" projects performed by the JV that reflect the JV's ability to perform the work required in this solicitation as required by paragraph 5.1 “Specialized Experience”.
a. If the Offeror cannot provide a sufficient number of projects as the JV to meet the minimum requirement, the Offeror must provide those "recent", "relevant" projects that it has performed as the JV, and then supplement the record with additional "recent", "relevant" projects performed by each JV member in their individual capacities.
In such instance, each JV member must satisfy the minimum requirement of three (3) projects, to include any performed as the JV.
b. If the JV has no "recent", "relevant" projects performed by the JV, then each member of the JV must provide two (2) to three (3) "recent", "relevant" projects performed by the JV member that reflect the JC member's experience commensurate with their role on this project or how their experience qualifies them for their role on this project as required under Factor 1. In such instsances the combined experience projects, submitted by each member of the JC, shall not exceed the maximum number of projects stated in paragraph 5.1.1.
c. In addition to the examples of "Company Specialized Experience" and "Past Performance Surveys", the Joint Venture shall provide a brief narrative (not to exceed 1 page) stating the roles that each partner of the Joint Venture will perform on this project. The attached “Specialized Experience" and "Past Performance Survey" forms shall be used by the Joint Venture or the JV partners. Explain how the JV is structured and provide an organization diagram that outlines communications and authorities.
d. Verification: The Government reserves the right to verify the experience record of cited projects or other recent projects not submitted by reviewing the Past Performance Information Retrieval System (PPIRS, or other Government appraisal systems or to interview owner or references.
The Government may check any or all cited references to verify supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse performance information to which the Offeror has not previously had an opportunity to address.
6.2 EVALUATION CRITERIA:
a. Past Performance evaluation includes two aspects that results in the assessment of the offeror’s probability of performing the requirements stated in the RFP based on the offeror’s demonstrated performance on pages or less clearly but concisely describe the organizational and technical approach to project management and execution. The 15 page recent, relevant contracts (well under way or turned over no longer than five (5) years preceding the date of this solicitation). First offeror’s past performance will be evaluated to determine how relevant a recent effort accomplished by the offeror is to the requirements of the RFP. Second the offeror’s past performance shall be given a Performance Confidence Assessment based on how well the contractor performed on recent and relevant past contracts. The Government will consider the currency and relevance of the information, source of the information, context of the data, and general trends in contractor performance. If any firm has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the offer or by the team member. Owners/references may be asked to comment on items such as quality of construction, timeliness, management of the work subcontractor management, including timely payment to subs or suppliers, safety, relations between owner and contractor, level of support for such things as as-built documentation, O&M manuals, training, correcting construction errors, warranty work, etc. The Government will target areas covered in the requirements of this proposal including records of conforming to quality, schedule, cost control, customer satisfaction, and level of support for such things as as-built documentation, O&M manuals, training, and problem resolution for construction errors, warranty work, and safety. The Government will not release interview information to the Offeror at any time, in order for the Government to solicit candid, unbiased interview comments. The Government also places a higher value on projects, which document successful outcomes and are supported by outside source confirmation, for example, but not limited to telephone interviews with points of contact identified in the proposal, CCASS/ACASS or other agency performance databases, Offeror furnished references, or personal knowledge. The Government also places a higher value on recent relevant projects and projects, which provided particularly difficult or unique challenges and the innovative methods the contractor used to resolve problems successfully. The Government’s evaluation is not limited to past performance information on the cited example projects. Firms without a history of past performance will receive a neutral rating.
b. Each entity (firm) will be rated on its own performance or that of its predecessor, if relevant. An entity may not establish past performance based on the past performance of its proposed key personnel, apart from that of the entity. If the Government does not obtain past performance information for the projects identified by the Offeror and cannot establish a past performance record for the Offeror through other sources, past performance will be rated neither favorably nor unfavorably. The performance risk will be considered “unknown”.
7.0 TAB D – FACTOR 3 - ORGANIZATION AND TECHNICAL APPROACH
7.1. SUBMISSION REQUIREMENTS:
7.1.1 Provide information that describes the offeror’s organization and intended technical approach to executing the design-build contract per the detailed requirements herein. Limit the information to fifteen limit does not include resumes submitted for key personnel or the Safety Plan, below. Address the items in the order shown below.
7.1.2 Organization: Describe what firms, their resources and how their resources will be utilized, their roles and responsibilities and any contractual arrangements that have been established. Clearly describe any teaming or joint venture arrangements, including a clear description of each firm’s roles and responsibilities on the project.
The Offeror shall document unequivocal teaming arrangements with its design firms(s) (see Attachment 7). A copy of the teaming or joint venture agreement(s) may be appended to the plan (not included in the page limitation). Include a simple organizational chart, illustrating the organization, including the proposed quality control group(s).
Present a matrix of responsibilities for each firm in executing the key work breakdown structure activities of the project, including design and construction activities for each major feature (i.e., demolition, site work, electrical, mechanical, etc.). Identify the design firm(s) chosen for the project, if not to be self-performed. Phase 2 Offerors will be required identify the specific firm(s) chosen for mechanical and interior finish work. Describe the proposed management structure for the team, describing the how the design and construction process will be managed and the authorities and the delegations of authority within the team Include a key personnel organization chart that clearly depicts the key positions and the names of the personnel, their firm affiliations and their job locations, their job/position title within the organization. The key personnel organization chart shall be consistent with the corporate organization chart, with the matrix of responsibilities assigned to the D-B team firms, and with the list of key personnel. Chart may be 11”x17” foldout to be counted as one (1) page.
7.1.3 Technical Approach for Design and Construction: Describe the technical approach to design and construction of the project. Include any consideration of fast-tracking design and construction (if applicable). The construction is required to be conducted in 2-phases with 1 of the 2 phases fully occupied during construction. Discuss how the construction will be conducted with no or minimal impact to the occupied portion of the facility. The Government is looking for ways to streamline construction, manage labor and other resource constraints in an effort to reduce costs and achieve an aggressive schedule with no or minimum impact to the occupants of the facility. In Phase 2, the Offeror will describe its design packaging plan for fast tracking (if applicable), the proposed project schedule, and contract duration. That level of detail is not required in Phase 1.”
7.1.4 Collaborative Approach for Design-Build: Describe interactions within the team and with the Corps of Engineers during the design. Discuss how the configuration management system will track and control design evolution and changes during design for quality control and to facilitate quicker Government reviews. Describe the role of the construction team members during design. Describe the role and interaction of the design team with the construction team during construction, addressing, as a minimum, maintaining configuration management of the design during construction, including control and approval of revisions to the accepted design; requests for information;
inspection support, shop drawing and submittal reviews and approvals;
progress meetings; site visits, if any; contract completion, closeout, as-built and completion documentation.
7.1.5 Planning and Scheduling: Describe the time control capabilities and systems to be used to plan design and construction and how the schedule will be used to manage design and construction. Discuss internal procedures for handling delays to minimize time growth or “schedule creep”. In Phase 2, the offeror will develop a summary schedule. In Phase 1, the Government is interested in the offeror’s planning and scheduling capabilities. Schedule and Scheduler shall meet the requirements of section 01 32 01.00 10 PROJECT SCHEDULE.
7.1.6 Self-Performed Work: Generally describe the items the offeror will self-perform to comply with the requirements in Section 00 73 00 for self-performed work.
7.1.7 Quality Control: Describe the team’s quality control approach, corporate systems and capabilities to maintain quality control of the design and construction. Describe the proposed quality control organization, including the proposed staffing plan. Provide specific information on how you will manage design quality control, track design evolution and changes during design to meet the schedule and to facilitate quicker Government reviews. Provide information on how you will handle internal and external requests for information, shop drawings, submittal reviews, progress meetings, site visits, contract completion, closeout, as-built, and completion documentation. In addition to the required designer-of-record roles specified within the RFP for maintaining integrity of the design, describe any other DOR involvement in the quality control process, if any. There is no need to submit a quality control plan as the successful offeror will provide that after award. In phase 1, the Government is interested in demonstrable capabilities to assure and control quality and how the offeror can achieve or exceed the contract’s minimum quality control system requirements. Quality Control System and Quality Control Manager shall meet the requirements of section 01 45 00.00 10 QUALITY CONTROL.
7.1.8 Key Project Personnel Capabilities and Experience: (Not included in the 15 page count limit above.) Provide a consolidated list of key personnel with name, position title and description of project responsibility for each. Indicate whether each individual has had a significant role in any of the cited project examples. If re-assignment of personnel is considered possible, provide alternate professionals in each assignment. Include key designers, whether employed by the prime or by a design subcontractor. For each person provide a brief resume, using the Key Personnel Resume forms (Attachment 5) at the end of this section. Include the Contractor’s Project Manager responsible for design and construction, the Design Manager, the Designers of Record (DoR’s) for architecture, structural, civil, fire protection, electrical, mechanical/plumbing, and permit preparers.
7.1.8.1 The contractor shall provide a Project Manager (PM) over this project who is…