amendment0004.pdf

PDF 34 MB Posted

Attached to
Canton Blaine Park Remediation/Various Improvements
Solicitation number
W912BV-17-R-0018
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
amendment_0003.pdf PDF
amendment_0002.pdf PDF
amendment0001.pdf PDF
solicitation.pdf PDF
100__Plans.pdf PDF
Canton_Blaine_Park_Remediation-Various_Improvements_Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Summary of Changes by Amendment 0004

1. The SF1442 has been revised from 10 copies of proposals to 1.

2.. Sheet CS-551.1 replaces CS-551. Revised sheet includes a sketch of the access panel in the toe drain pipe.

3.. Appendices A, B, C, & D have been included in the specifications. Appendices provide geotechnical information.

1. CONTRACT ID CODE PAGE OF PAGES

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 20-Apr-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-17-R-0018

X 9B. DATED (SEE ITEM 11)

22-Mar-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Apr-2017

CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

W912BV 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

TABLE OF CONTENTS

SOLICITATION NO. W912BV-17-R-0018

CANTON BLAINE PARK REMEDIATION/VARIOUS IMPROVEMENTS

CANTON LAKE, OKLAHOMA

APRIL 19, 2017

TOC-1

Revised by Amendment 0004

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 11 00 SF 1442 AND CLIN SCHEDULE

00 21 00 INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS

00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,

BASIS OF AWARD

00 45 00 REPRESENTATIONS & CERTIFICATIONS

00 72 00 CONTRACT CLAUSES

00 73 00 SPECIAL CONTRACT REQUIREMENTS

00 73 46 WAGE DETERMINATION SCHEDULE

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 SUMMARY OF WORK

01 22 00 MEASUREMENT AND PAYMENT

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 45 00 QUALITY CONTROL

01 46 00 QUALITY CONTROL SYSTEM (QCS)

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20 ENVIRONMENTAL PROTECTION

01 58 00 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN

01 78 00 CLOSEOUT SUBMITTALS

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 30 00 CONCRETE

DIVISION 05 - METALS

05 50 00 BOLLARDS

DIVISION 26 - ELECTRICAL

26 56 00 SOLAR POWERED SECURITY LIGHTS AND POLES

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 22 GEOTEXTILES USED AS FILTERS

TABLE OF CONTENTS

SOLICITATION NO. W912BV-17-R-0018

CANTON BLAINE PARK REMEDIATION/VARIOUS IMPROVEMENTS

CANTON LAKE, OKLAHOMA

APRIL 19, 2017

TOC-2

Revised by Amendment 0004

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 00 00 WORK COVERED UNDER OKLAHOMA DEPARTMENT OF TRANSPORTATION

2009 STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION

32 92 23 BERMUDA SOD

32 92 26 BERMUDA SPRIGGING

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

35 22 77 FLAP GATES AND MISCELLANEOUS METAL FABRICATIONS

35 31 19 STONE PROTECTION AND FILTER MATERIAL

35 59 43 WATERWAY BARRIERS (BOOMS)

APPENDICES

APPENDIX A – EMBANKMENT BORINGS & CPT DATA

APPENDIX B – AUXILIARY SPILLWAY CHANNEL BORINGS

APPENDIX C – EXCAVATABILITY REPORT

APPENDIX D – PIEZOMETER PLOTS

-- End of Table of Contents --

APPENDIX A

Embankment Borings & CPT Data

1,540

1,575

1,570

1,565

1,560

1,555

1,550

1,545

300 1,000900800700600400

Distance Along Baseline (feet)

2001000

1,590

1,585

500 1,100

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

STA. 32+00 TO STA. 40+00

200' D/S

SEEP-155/SEEP-193/SEEP-189

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

CANTON LAKE

CPT SECTIONS

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,540

1,580

1,0003000 100 1,100200 400 500 600 700

FRICTION

(tsf)

100 200 300 400

FRICTION

RATIO (%)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

048 4

SEEP-193

3-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

CONE

RESISTANCE

(tsf)

SEEP-155

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-189

100 200 300 400 -1 1 2

S

IL

T M

IX

E

S

200 1,2001,1001,000900800700600500 1,3003001000

1,585

1,580

STA. 48+00 TO STA. 56+00

200' D/S

SEEP-160/SEEP-156/SEEP-91

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

CANTON LAKE

CPT SECTIONS

1,555

Distance Along Baseline (feet)

500 1,3001,2001,1001,000900800

1,565

1,575

4003002001000 700

1,545

1,570

1,560

1,550

1,545

1,540

1,585

1,580

1,550

1,555

1,560

1,565

1,570

1,575

1,540

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

P E

A T

310 4 8

CONE

RESISTANCE

(tsf) -1100 200 300 400

SEEP-91

FRICTION

(tsf)

FRICTION

RATIO (%)

S A

N D

S /G

R A

V E

LS

-1

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

5432 1

S A

N D

S /G

R A

V E

LS

100 200 300 400

SEEP-156

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8 2100 200 300 400

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

P E

A T

-1

S A

N D

M

IX

E S

SEEP-160

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8

S A

N D

M

IX

E

1,000

1,560

1,565

1,570

1,575

1,580

1,585

0 200 400 800

1,545

1,200 1,400 1,600

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

STA. 70+00 TO STA. 81+00

200' D/S

SEEP-182/SEEP-145

1,600

1,585

1,580

0 200 400 600 800 1,000

1,555

1,400

1,550

1,575

1,570

1,565

1,560

1,555

1,550

1,545 1,200

00 5

FRICTION

(tsf)

SEEP-182

100 200 300 400 -1 21 2 4

CONE

RESISTANCE

(tsf)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

S A

N D

S

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

100 200 300 400

SEEP-145

FRICTION

(tsf)

FRICTION

RATIO (%)

048 0 4 8

FRICTION

RATIO (%)

S

IL

T M

IX

E

S

C

LA

Y

5-1 430 4 8

P E

A T

CONE

RESISTANCE

(tsf)

1,590

800700600500400300200100 900

1,585

1,580

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

1,100

STA. 81+00 TO STA. 90+00

200' D/S

SEEP-145/SEEP-150/SEEP-174

1,000

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

CANTON LAKE

CPT SECTIONS

Distance Along Baseline (feet)

1,550

1,200

1,575

1,560

1,2001,1001,000900800

1,585

1,580

4003002001000 700

1,550

1,565

1,555

1,545

1,5401,540

1,590

1,570

1,555

1,560

1,565

1,570

1,575

1,545

S A

N D

M

IX

E S

C

LA

Y

S

IL

T M

IX

E

S

P E

A T

S A

N D

S /G

R A

V E

LS

S A

N D

S

420 4 8

CONE

RESISTANCE

(tsf) -1100 200 300 400

SEEP-174

FRICTION

(tsf)

FRICTION

RATIO (%)

S A

N D

S /G

R A

V E

LS

-1

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

S A

N D

S /G

R A

V E

LS

100 200 300 400

SEEP-145

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8 2

100 200 300 400

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

P E

A T

-1

S A

N D

M

IX

E S

SEEP-150

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8

S A

N D

M

IX

E

7006005004003002001000 800

1,595

1,585

1,580

STA. 90+00 TO STA. 98+00

200' D/S

SEEP-174/SEEP-161/SEEP-171

1,000

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

CANTON LAKE

CPT SECTIONS

Distance Along Baseline (feet)

1,550

1,100

1,575

1,560

1,000900800700600

1,585

1,580

2001000

1,590

1,595

1,550

1,565

1,555

1,545

1,5401,540 1,100

1,570

1,555

1,560

1,565

1,570

1,575

1,545

S A

N D

M

IX

E S

C

LA

Y

S

IL

T M

IX

E

S

P E

A T

S A

N D

S /G

R A

V E

LS

S A

N D

S

420 4 8

CONE

RESISTANCE

(tsf) -1100 200 300 400

SEEP-174

FRICTION

(tsf)

FRICTION

RATIO (%)

S A

N D

S /G

R A

V E

LS

-1

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

S A

N D

S /G

R A

V E

LS

100 200 300 400

SEEP-161

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8 2

100 200 300 400

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

P E

A T

-1

S A

N D

M

IX

E S

SEEP-171

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8

S A

N D

M

IX

E

900800700600500400300200 1,0000

1,595

1,590

1,585

100 1,100

1,580

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

CANTON LAKE

CPT SECTIONS

Distance Along Baseline (feet)

1,560

1,200

1,570

1,2001,1001,000900800

1,590

1,585

4003002001000 700

1,555

1,565

1,555

1,550

1,5451,545

1,595

1,575

1,560

1,565

1,570

1,575

1,580

1,550

STA. 98+00 TO STA. 106+00

200' D/S

SEEP-171/SEEP-163/SEEP-167

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

S A

N D

M

IX

E S

0 4 8

S A

N D

S /G

R A

V E

LS

P E

A T

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

048 1-1100 200 300 400

SEEP-171

FRICTION

(tsf)

3 1

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

0 4 8

-1100 200 300 400

SEEP-163

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf)

-1

S A

N D

M

IX

E S

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

100 200 300 400

SEEP-167

FRICTION

(tsf)

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf)

S A

N D

S /G

R A

V E

LS

0 4 8

1,565

1,600

1,595

1,590

1,585

1,580

1,570

1,560

1,555

1,550

1,575

1,545

400 600 800 1,000 1,200 1,400 1,600

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

1,200

1,600

1,595

1,590

1,585

1,580

0 200 400 600 1,545

1,000 1,400 1,600

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

1,575

1,570

1,565

1,560

1,555

1,550

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

E le va tio n (fe et

STA. 106+00 TO STA. 118+00

200' D/S

SEEP-167/SEEP-128

FRICTION

(tsf)

SEEP-167

100 200 300 400 -1

-1

1 2 4

CONE

RESISTANCE

(tsf)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

100 200 300 400

S A

N D

S /G

R A

V E

LS

FRICTION

RATIO (%)

CONE

RESISTANCE

(tsf) 0 4 8

P E

A T

S A

N D

S

C

LA

Y

FRICTION

RATIO (%)

SEEP-128

FRICTION

(tsf)

0 4 8

S A

N D

M

IX

E S

S

IL

T M

IX

1,590

1,580

1,575

1,565

1,540

1,545

1,550

1,555

1,570

Distance Along Baseline (feet)

900800

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

4003002001000 700

CANTON LAKE

CPT SECTIONS

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

STA. 28+00 to STA. 36+00

TOE

SEEP-44/SEEP-33/SEEP-5

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,540

1,595

800600

5004003002001000 900

100 200 300 400

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

0 4 8

SEEP-44

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-05

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-33

100 200 300 400 -1 1

CONE

RESISTANCE

(tsf)

S

IL

T M

IX

1,545

1,550

1,555

1,560

1,540

1,570

1,575

1,565

5003002001000

1,595

1,590

1,585

1,000

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 36+00 TO STA. 44+00

TOE

SEEP-5/SEEP-23/SEEP-45

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

900800700600

1,595

1,570

1,540

1,545

1,550

1,555

1,565

1,575

1,580

1,585

1,590

1,560

1,000900

1,580

700500400300100 200

FRICTION

RATIO (%)

100 200 300 400

0 4 8

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-23

100 200 300 400 -1 0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

0480 4 8

SEEP-45

S A

N D

S /G

R A

V E

LS

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

(tsf)

SEEP-05

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

CONE

RESISTANCE

(tsf)

S A

N D

S

CONE

RESISTANCE

(tsf)

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S

IL

T M

IX

2001000

1,580

1,565

1,570

1,575

1,545

1,550

1,555

1,560

500 600 700 800 900 1,000

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 44+00 TO STA. 52+00

TOE

SEEP-45/SEEP-46/SEEP-47

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,000900800700600500400300200100

100 200 300 400

CONE

RESISTANCE

(tsf)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-47

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-45

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-46

100 200 300 400 -1 1 2

S

IL

T M

IX

1,580

1,575

1,570

1,565

1,560

1,545

1,550

1,555

500 600 700 800 900 1,000

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 52+00 TO STA. 60+00

TOE

SEEP-47/SEEP-48/SEEP-49

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

2000 100 300

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,000900800700600500400300200100

-1 100 200 300 400

SEEP-47

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-49

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

100 200 300 400 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-48

100 200 300 400 -1 1 2

S

IL

T M

IX

1,550

1,585

1,580

1,545

1,555

1,560

1,565

1,570

1,575

1,540

600 700 800

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 60+00 TO STA. 66+00

TOE

SEEP-49/SEEP-147/SEEP-63

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

400300

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,540

7006005004003002001000

FRICTION

(tsf)

100 200 300 400

FRICTION

RATIO (%)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-63

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

CONE

RESISTANCE

(tsf)

SEEP-147

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-49

100 200 300 400 -1 1 2

S

IL

T M

IX

1,555

1,590

1,585

1,580

1,575

1,570

1,560

1,545

1,550

1,565

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 66+00 TO STA. STA. 74+00

TOE

SEEP-63/SEEP-146/SEEP-52

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

400100 500300200

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

6005004003002001000

-1100 200 300 400

SEEP-146

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-63

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

100 200 300 400 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-52

100 200 300 400 -1 1 2

S

IL

T M

IX

1,565

1,585

1,590

1,580

1,575

1,570

1,545

1,550

1,555

1,560

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

200 400 600 800 1,000 1,200 1,400 1,600 1,800

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 74+00 TO STA. 87+00

TOE

SEEP-52/SEEP-17/SEEP-43

E le va tio n (fe et

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

1,6001,4001,2001,0008006004002000 1,800

100 200 300 400

CONE

RESISTANCE

(tsf)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-52

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-17

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-43

100 200 300 400 -1 1 2

S

IL

T M

IX

1,595

1,585

1,580

1,570

1,560

1,545

1,550

1,555

1,565

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

100 200 300 400 500 600 700 800 900

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 87+00 TO STA. 94+00

TOE

SEEP-43/SEEP-42/SEEP-41

E le va tio n (fe et

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,545

7006005004003002001000

FRICTION

(tsf)

100 200 300 400

FRICTION

RATIO (%)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

048 4

SEEP-43

3-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

CONE

RESISTANCE

(tsf)

SEEP-41

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-42

100 200 300 400 -1 1 2

S

IL

T M

IX

1,585

1,580

1,570

1,550

1,565

1,560

1,555

1,575

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

200 300 400 500 600 700 800 900 1,000

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

STA. 94+00 TO STA. 102+00

TOE

SEEP-41/SEEP-40/SEEP-39

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

E le va tio n (fe et

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,0009008007006005004003002001000

048100 200 300 400

CONE

RESISTANCE

(tsf)

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

048 4

SEEP-41

3-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-39

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

0 4 8

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-40

100 200 300 400 -1 1 2

S

IL

T M

IX

1,585

1,580

1,575

1,560

1,565

1,555

1,550

1,570

E le va tio n (fe et

100 200 300 400 500 600 700 800 900 1,000 1,100

CANTON LAKE

CPT SECTIONS

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

STA. 102+00 TO STA. 111+00

TOE

SEEP-39/SEEP-30/SEEP-35

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

Distance Along Baseline (feet)

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550 1,000

1,100

900800700600500400300200100

100 200 300 400

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

0 4 8

SEEP-39

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-30

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-35

100 200 300 400 -1 1

CONE

RESISTANCE

(tsf)

S

IL

T M

IX

1,605

1,600

1,595

1,590

1,580

1,550

1,555

1,560

1,565

1,570

1,575

1,585

STA. 111+00 TO STA. 122+00

TOE

SEEP-35/SEEP-38/SEEP-129

0 200 400 600 800 1,000 1,200 1,400 1,600

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

E le va tio n (fe et

1,600

1,595

1,590

1,585

1,580

1,575

1,570

1,565

1,560

1,555

1,550

1,605

1,6001,4001,200

1,0008006004002000

FRICTION

RATIO (%)

100 200 300 400

0 4 8

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

SEEP-38

-1 1 2 3 4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

FRICTION

(tsf)

P E

A T

FRICTION

(tsf)

SEEP-129

100 200 300 400 -1 1 2 3 4 5

C

LA

Y

S A

N D

S

CONE

RESISTANCE

(tsf)

S A

N D

M

IX

E S

S A

N D

S /G

R A

V E

LS

0 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-35

100 200 300 400 -1 1 2

S

IL

T M

IX

1,605

1,600

1,595

1,590

1,610

1,580

1,570

1,565

1,585

1,585

100 150 200 250 300 350 400 450 500 550

5500 50 100 150 200 250 300 350 400

1,575

1,565

600 650

1,610

1,605

1,600

1,595

1,590

1,580

1,570

Distance Along Baseline (feet)

CANTON LAKE

CPT SECTIONS

E le va tio n (fe et

TD

_C

P T_

FE

N

C E

_1 1X

C

A N

TO

N

_C P

T.

G

P J

F N

C A

B G

N G

N

.G D

T

3/

/0

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

OCT 2007

STA. 122+00 TO STA. 126+00

TOE

SEEP-129/SEEP-118

FRICTION

RATIO (%)

S A

N D

S /G

R A

V E

LS

S A

N D

M

IX

E S

P E

A T

S A

N D

S

S

IL

T M

IX

E

S

C

LA

Y

3 4048 21-1100 200 300 400

SEEP-129

FRICTION

(tsf)

30 4 8

CONE

RESISTANCE

(tsf)

FRICTION

RATIO (%)

FRICTION

(tsf)

SEEP-118

100 200 300 400 -1

S A

N D

S /G

R A

V E

LS

CONE

RESISTANCE

(tsf)

4 5

C

LA

Y

S

IL

T M

IX

E

S

S A

N D

S

P E

A T

S A

N D

M

IX

E S

0 4 8

CONE RESISTANCE

(tsf) ELEV.

(feet)

20 40 60 80 100 120 140

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1799104.586 ft

FRICTION

(tsf)

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

K. Konecny

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 399863.648 ft

X-Section 8 @ STA. 119

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-128

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

2 4 60 8

DEPTH

(feet)

8/19/2006

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:

ELEV.

(feet)

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 900 1 2 3 4

P ea t

FRICTION

RATIO (%)

2 4 60 8

Berm

DEPTH

(feet)

DATE DRILLED:DRILLED BY:

K. Konecny 8/19/2006

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

S ilt

M ix tu re s

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

C la ys

50 100 150 200 250 300 3500 400

Soil Classification

Number

X-Section 9 @ STA. 122+00 North = 400231.032 ft

Seepage Berm Canton Lake, Oklahoma

PROJECT:

CONE RESISTANCE

(tsf)

FRICTION

(tsf)

2 4 60 8

East = 1799564.679 ft

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

LOG OF SEEP-129

0 40050 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

ELEV.

(feet)

East = 1795990.006 ft

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

8/21/2006

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

K. Konecny

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 397789.035 ft

X-Section 5 @ STA. 81+00

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-145

1 2 3

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 4

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

(feet)

50 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1795006.833 ft

FRICTION

(tsf)

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

K. Konecny

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 397254.986 ft

STA. 70+00 @ D/S Toe

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-146

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

1 2 30 4

DEPTH

(feet)

8/21/2006

FRICTION

RATIO (%)

ELEV.

(feet)

0 1 2 3 4 1580

Pore Pressure

(psi)

S an d M ix tu re s

10 20 30 40 50 60 70 80 90

S an ds a nd G ra ve ls

P ea t

2 4 60 8

East = 1794418.381 ft

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

LOG OF SEEP-147

FRICTION

(tsf)

PROJECT:

FRICTION

RATIO (%)

Berm

2 4 60 8

DEPTH

(feet)

50 100 150 200 250 300 350

S ilt

M ix tu re s

8/21/2006K. Konecny

DRILLED BY: DATE DRILLED:

C la ys

CONE RESISTANCE

(tsf)

S an ds

0 400

Soil Classification

Number

STA. 63+00 @ D/S Toe

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

North = 396852.05 ft Seepage Berm

Canton Lake, Oklahoma

Pore Pressure

(psi) ELEV.

(feet)

10 20 30 40 50 60 70 80 900 1 2 3 4

FRICTION

(tsf)

P ea t

FRICTION

RATIO (%)

1 2 30

CONE RESISTANCE

(tsf)

Berm

S ilt

M ix tu re s C la ys

DATE DRILLED:DRILLED BY:

K. Konecny 8/22/2006

S an ds a nd G ra ve ls

S an ds

East = 1796559.41 ft

S an d M ix tu re s

50 100 150 200 250 300 3500 400

Soil Classification

Number

X-Section 6 @ STA. 89+00 North = 398010.81 ft

Seepage Berm Canton Lake, Oklahoma

DEPTH

(feet)

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

2 4 60 8

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

LOG OF SEEP-150

PROJECT:

0 40050 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

ELEV.

(feet)

East = 1795841.02 ft

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/14/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 397877.13 ft

STA. 80+50 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-17

2 4 6

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 8

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

1 2 30 4

DATE DRILLED:DRILLED BY:

ilt

M ix tu re s

LOG OF SEEP-182U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

East = 1795089.812 ft PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 397133.141 ft

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

Soil Classification

Number

0 1 2 3 4

C la ys

S an d M ix tu re s

S an ds

S an ds a nd G ra ve ls

3/20/2007

STA. 70+00 (200') (P-25)

400 80 2 4 6

FRICTION

RATIO (%)

FRICTION

(tsf)

0.5 1.0 1.50 20

K. Konecny

ELEV.

(feet)

DEPTH

(feet)

Pore Pressure

(psi)

0 10 20 30 40 50 60 70 80 9050 100 150 200 250 300 350

DRILLED BY: DATE DRILLED:

Berm

P ea t

ELEV.

(feet)

10 20 30 40 50 60 70 80 900 1 2 3 4

Pore Pressure

(psi)

P ea t

CONE RESISTANCE

(tsf)

FRICTION

RATIO (%)

2 4 60

DEPTH

(feet)

Berm

S ilt

M ix tu re s C la ys

DATE DRILLED:DRILLED BY:

K. Konecny 8/3/2007

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

20 40 60 80 100 120 1400 160

Soil Classification

Number

STA. 40+00 (200') P-10

North = 395436.436 ft

PROJECT:

FRICTION

(tsf)

East = 1792552.177 ft

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

2 4 60 8

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

LOG OF SEEP-189

Seepage Berm Canton Lake, Oklahoma

ELEV.

(feet)

10 20 30 40 50 60 70 80 900 1 2 3 4

Pore Pressure

(psi)

P ea t

CONE RESISTANCE

(tsf)

FRICTION

RATIO (%)

2 4 60 8

Berm

DEPTH

(feet)

DATE DRILLED:DRILLED BY:

K. Konecny 8/4/2007

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

S ilt

M ix tu re s

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

C la ys

50 100 150 200 250 300 3500 400

Soil Classification

Number

STA. 36+00 (200') (P-8)

North = 395238.15 ft

Seepage Berm Canton Lake, Oklahoma

PROJECT:

FRICTION

(tsf)

2 4 60 8

East = 1792237.745 ft

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

LOG OF SEEP-193

(feet)

50 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1792464.76 ft

FRICTION

(tsf)

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

C. Sloan

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 395629.63 ft

STA. 40+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-23

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

2 4 60 8

DEPTH

(feet)

12/15/2002

FRICTION

RATIO (%)

50 100 150 200 250 300 350 10 20 30 40 50 60 70 80 90400

(tsf)

ELEV.

(feet)

Pore Pressure

(psi)

East = 1791771.27 ft

2 4 6

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/15/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 395235.01 ft

STA. 32+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-33

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

(tsf)

0 50 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 904

ELEV.

(feet)

PROJECT:

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

LOG OF SEEP-39

1 2 3

East = 1797615.95 ft C. Sloan

Seepage Berm Canton Lake, OklahomaNorth = 399086.5 ft

STA. 102+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

FRICTION

RATIO (%)

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet)

S an ds a nd G ra ve ls

12/16/2002

1 2 30 4

DATE DRILLED:DRILLED BY:

FRICTION

(tsf)

0 50 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 904

ELEV.

(feet)

PROJECT:

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

LOG OF SEEP-41

1 2 3

East = 1796939.22 ft C. Sloan

Seepage Berm Canton Lake, OklahomaNorth = 398658.43 ft

STA. 94+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

FRICTION

RATIO (%)

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet)

S an ds a nd G ra ve ls

12/16/2002

2 4 60 8

DATE DRILLED:DRILLED BY:

FRICTION

50 100 150 200 250 300 350

(tsf)

Pore Pressure

(psi)

ELEV.

(feet)

10 20 30 40 50 60 70 80 90

East = 1796364.5 ft

2 4 6

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/16/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 398258.67 ft

STA. 87+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-43

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

(tsf)

50 100 150 200 250 300 350

ELEV.

(feet)

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1791429.89 ft

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 395026.29 ft

STA. 28+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-44

FRICTION

(tsf)

2 4 6

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 8

DEPTH

(feet)

12/17/2002C. Sloan

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:

(tsf)

50 100 150 200 250 300 350

ELEV.

(feet)

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1792803.11 ft

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 395849.89 ft

STA. 44+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-45

FRICTION

(tsf)

2 4 6

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 8

DEPTH

(feet)

12/17/2002C. Sloan

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:

0 40050 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

ELEV.

(feet)

East = 1793138.35 ft

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/17/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 396068.13 ft

STA. 48+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-46

2 4 6

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 8

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

50 100 150 200 250 300 350 10 20 30 40 50 60 70 80 90400

(tsf)

ELEV.

(feet)

Pore Pressure

(psi)

East = 1793466.09 ft

2 4 6

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/17/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 396297.63 ft

STA. 52+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-47

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

50 100 150 200 250 300 350

(tsf)

Pore Pressure

(psi)

ELEV.

(feet)

10 20 30 40 50 60 70 80 90

East = 1794135.7 ft

2 4 6

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

12/17/2002

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

C. Sloan

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 396735.44 ft

STA. 60+00 @ D/S TOE

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-49

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

0 40050 100 150 200 250 300 350 1580

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

ELEV.

(feet)

East = 1794705.02 ft

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

8/11/2006

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

K. Konecny

PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 397020.193 ft

STA. 66+30 @ D/S Toe

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-63

0.5 1.0 1.5

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

0 2

DEPTH

(feet) S an ds a nd

G ra ve ls

FRICTION

(tsf)

FRICTION

RATIO (%)

2 4 60 8

DATE DRILLED:DRILLED BY:

(feet)

50 100 150 200 250 300 350

Pore Pressure

(psi)

10 20 30 40 50 60 70 80 90

East = 1794021.963 ft

FRICTION

(tsf)

S an ds a nd G ra ve ls

S an ds

S an d M ix tu re s

C la ys

P ea t

Berm

S ilt

M ix tu re s

K. Konecny

U.S. ARMY CORPS OF ENGINEERS

TULSA DISTRICT

DRILLED BY:PROJECT:

Seepage Berm Canton Lake, OklahomaNorth = 396447.958 ft

X-Section 3 @ STA. 57+00

Soil Classification

Number

0 1 2 3 4

LOG OF SEEP-91

C P

T C

A N

TO

N

_C P

T.

G

P J

T D

.G D

T

6/ 6/

2 4 60 8

DEPTH

(feet)

8/13/2006

FRICTION

RATIO (%)

APPENDIX B

Auxiliary Spillway Channel Borings

P O E

H

V

H

V

H V

H V

2H:1V

2H:1V

H

V

2H:1V

2H:1V

H

V

PZ-1

03-10

04-10

PZ-3

02-10

PZ-4

07-10

09-10

08-10

PZ-506-10

05-10

E-05

01-10

D-WALL 6

B 7-08

B-6/06

D-WALL 7

B 6-08 S-05

E-06

B 5-08 S-03A

S-08

CUT-0FF WALL 5+00/09

B-4/06

B 4-08

B 3-08

S-01

S-07

S-06

B 2-08

S-04A

D-WALL 8

B 1-08

B-5/06

E-07

S-08

E-06

B-4/06

PZ-5

01-10

D-WALL 6

B 1-08

E-08

S-02B

10-10

NORTH

SOUTH

NORTH

PW-1

PW-2

CUT-0FF WALL 2+00/09

PW-3

E-01

E-03

E-02

E-04

B-2/06

E-10

E-11

E-12

E-13

E-14

E-09

B-8/06

B-7/06

B-9/06

CUT-0FF WALL 5+00/09

PIEZOMETER NEAR BENTONITE SLURRY WALL

SW-1 2007 SLURRY WALL BORINGS

SW-6

PZ-2

SW-5

SW-4

SW-3

SW-2

SW-1

2004 STRUCTURE BORING

2004 CHANNEL BORING

2006 STRUCTURE BORING

DESIGN BORING

2008 DIAPHRAGM WALL

2009 CONSTRUCTION BORING

2010 NORTH WALL EXT. & PLUG BORINGS

TCP LOCATION

EXISTING INCLINOMETERI

I

I

P

P

P

09A-10

B

B

E

E

C

C

D D

F

F

G

H

H

G 07-10

TEST PIT

A

APPENDICES.

ARE INCLUDED WITHIN THE SPECIFICATION

2. PIEZOMETER READINGS FOR PZ-1 THROUGH PZ-5

WITHIN THE SPECIFICATION APPENDICES.

1. DETAILS OF THE TEST PIT EXCAVATION IS INCLUDED

NOTES:

WALL BEGINS 2+32

EXISTING NORTH DIAPHRAGM

E X I S

T I N

G

R

A V I T

Y

W

L L

B E

G I

R

H

L

I G

N M

E N

T

+0

1+

2+0

3+00

4+00

+0

(SUBSURFACE CROSS SECTION A-A)

ALONG ALIGNMENT OF NORTH WALL EXTENSION

SEE SHEET B102 FOR SUBSURFACE CROSS SECTION

PLAN OF GEOTECHNICAL EXPLORATION

B101

0 100 200

SCALE OF FEET

N

AS SHOWN

CL12EX-b101-boreplan b101.dgn

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

6 5 4 3

DWG. CODE:

NUMBER

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

CANTON LAKE

AUXILIARY SPILLWAY

CHANNEL EXCAVATIION PHASE II

BLACKMORE

NONE

MAR 2014

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

W912BV-14-C-0027

FY:2014

P O E

C C

C

C

C C

C

B

+0

+0

+0

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

40+00

41+00

42+00

43+00

44+00

45+00

45+28

CC

+0

+0

26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

40+00

C C

C

C

C C

C

B

POE 45+27.97

POE 40+34.39

BA

AA

A

B

2+0

3+00

4+00

P O E

C C

C

C

C C

C

B

+0

+0

+0

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

40+00

41+00

42+00

43+00

44+00

45+00

45+28

CC

+0

+0

26+00

27+00

28+00

29+00

30+00

31+00

32+00

33+00

34+00

35+00

36+00

37+00

38+00

39+00

40+00

C C

C

C

C C

C

B

POE 45+27.97

POE 40+34.39

BA

AA

A

B

2+0

3+00

4+00

H

V

H

V

H

V

H

V

2H:1V 2H:1V

2H:1V 2H:1V

H

V

H

V

2H:1V 2H:1V

2H:1V 2H:1V

BB

B

B

B

B

B

B

B

B

H

V

H

V

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

3+001+000+00 1,560

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

LEGEND

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

E le v a ti o n f e e t)

Topsoil border line lean clay-silt SPT= Standard Penetration Test

(uncorrected blow counts)

RQD= Rock Quality Designation (%)

4+002+00

Silty Sand

Silt

Gravel Clay, Low Plasticity

Augured without sampling

Clay Shale (Mudstone) Siltstone/Silty Shale

3 6 9

15 20 22

29 50+/0.3

05-10

SPT

RQD(%)

U.C.=40 psi

2 9 10

4 9 22

06-10

SPT

RQD(%)

U.C.=80 psi

19 31 50+/0.4

10 15 23

5 10 10

9 8 14

10 21 25

07-10

SPT

RQD(%)

08-10

SPT

RQD(%)

5 15 15

3 3 4

3 6 9

12 18 28

38 50+/0.4

U.C.=80 psi

4 10 10

4 6 6

5 6 7

3 3 6

3 4 7

1 3 4

3 4 5

3 2 2

4 10 10

3 2 1

1 1 1

1 1 3

09-10

SPT

36 50+/0.4

09A-10

RQD(%)

12 12 14

3 4 5

2 1 2

3 3 5

2 3 5

4 9 10

4 9 10

4 9 12

4 5 7

21 30 31

29 50+/0.2

10-10

SPT

RQD(%)

U.C.=30 psi

.0

E le v a ti o n f e e t)

1,660

1,670

U.C.=128 psi; E=-0.07E6 psi

U.C.=67 psi; E=-0.02E6psi

U.C.=43 psi; E=-0.01E6 psi

U.C.=177 psi; E=-0.08E6 psi

U.C.= Unconfined Compressive Strength (psi)

E=Young's Modulus (psi)

7 11 12

8 10 15

5 15 22

13 18 39

50/6"

D-Wall No. 6

SPTRQD(%)

Shale Water Table at Time of Drilling

EXISTING DIAPHRAGM WALL

TOP OF CAP BEAM FOR

5+00

EXISTING RETAINING WALL

D I A

P H

R A

M

L L

B

G I

X I S

T I N

G

R E

T A I N I

L L

D

X I S

T I N

G

NEAR WALL ALIGNMENT

PROPOSED CHANNEL BOTTOM

SUBSURFACE CROSS SECTION A-A

B102

Subsurface Cross Section A-A

CL12EX-b102-sec-a_b102.dgn

Sub Surface Data Along North Wall Alignment

EXISTING EXCAVATION LINE

DURING CONSTRUCTION.

FROM WATER LEVELS OBSERVED

DRILLING PROFILES MAY VARY

WATER LEVELS SHOWN IN

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

W912BV-14-C-0027

FY:2014

1,550

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200 1,550

1,560

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

0 100 200 300 400 500 600 700 800 900 1,000 1,100 1,200

2 9 10

4 9 22

10 15 23

19 31 50+/0.4

06-10

SPT

RQD(%)

U.C.(psi)

SW-2

RQD(%)

SW-3

SW-4

RQD(%)

SW-5

RQD(%)

SW-6

SPTRQD(%)U.C.(psi)

E-01 E-02

LEGEND

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

Canton Dam North Wall Extension

E le v a ti o n f e e t)

Topsoil

Shale border line lean clay-silt

Sandstone

Baseline (feet)

SPT= Standard Penetration Test

(uncorrected blow counts)

RQD= Rock Quality Designation (%)

U.C.= Unconfined Compressive Strength (psi)

T D

F E

N C

E

S P

T

R Q

A N

T

C

R

U R

L L .G

J

1,300

RQD(%)

RQD(%)

WLL PL %FI

WLL PL %FI

Siltstone/Silty Shale

Silt

Clay shale (mudstone)

Clay, Low Plasticity Augered without sampling

Silty Clayey Sand

Sandy Clay, Low Plasticity

Silty Sand

LL= Liquid Limit

PL= Plastic Limit

%FI= Percent - 200 (%)

W= Water Content (%)

35 18 16.7 91

42 17 16.2 85

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 100 200 300 400 500 600 700 800 1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 100 200 300 400 500 600 700 800

5 11 13

3 4 6

27 50+/0.3

02-10

SPTRQD(%)U.C.(psi)

10 12 12

1 1 2

15 42 50+/0.3

39 50+/0.4

03-10

SPTRQD(%)U.C.(psi)

3 2 3

7 14 19

15 50+/0.3

20 22 38

12 20 28

15 20 25

04-10

SPTRQD(%)U.C.(psi)

3 6 9

15 20 22

29 50+/0.3

05-10

SPTRQD(%)U.C.(psi)

LEGEND

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

Canton Dam North Wall Extension

E le v a ti o n f e e t)

Siltstone Topsoil

Baseline (feet)

SPT= Standard Penetration Test

(uncorrected blow counts)

RQD= Rock Quality Designation (%)

U.C.= Unconfined Compressive Strength (psi)

T D

F E

N C

E

S P

T

R

A N

T

R

U R

L L .G

Silt Clay shale (mudstone)

SUBSURFACE CROSS SECTION C-C

1,590

1,595

1,600

1,605

1,610

1,615

1,620

1,625

1,630

1,635

1,640

1,645

1,650

1,655

0 50 100 150 200 250 300 350 400 450 1,590

1,595

1,600

1,605

1,610

1,615

1,620

1,625

1,630

1,635

1,640

1,645

1,650

1,655

0 50 100 150 200 250 300 350 400 450

37.4

43.4

NP

NP

NP

NP

34.1

29.2

W phi'LL PL %FI phi c c' B-2/06

27 19 21.0 40

W phi'LL PL %FI phi c c' E-03

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

SPILLWAY CHANNEL

CANTON LAKE

E le v a ti o n f e e t)

USCS Silt Siltstone Sandstone Shale

USCS Low Plasticity Clay

Baseline (feet)

LL= Liquid Limit

PL= Plastic Limit

%FI= Percent - 200 (%)

LEGEND

phi= Undrained Friction

Angle (degrees) c= Undrained Cohesion (psf) phi'=Drained Friction

Angle (degrees) c'= Drained Cohesion (psf)

W= Water Content (%)

T D

F E

N C

E

L A

B

R E

S U

L T

N T

O N

C

H A

N N

R

IN

G S .G

E

.G

CHANNEL SUBSURFACE CROSS SECTION D-D

SUBSURFACE CROSS SECTION B-B

SUBSURFACE CROSS SECTIONS

CL12EX-b103-sec-bcd b103.dgn

B103

B-B, C-C, AND D-D

BOTTOM

CHANNEL

PROPOSED

EXISTING GROUND SURFACE

BOTTOM

CHANNEL

PROPOSED

BOTTOM

CHANNEL

PROPOSED

EXISTING GROUND SURFACE

EXISTING GROUND SURFACE

DURING CONSTRUCTION.

FROM WATER LEVELS OBSERVED

DRILLING PROFILES MAY VARY

WATER LEVELS SHOWN IN

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

1,580

1,600

1,610

1,620

1,630

1,640

1,650

1,660

1,670

0 50 100 150 200 250 300 350 400 450 500 550 1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

1,670

0 50 100 150 200 250 300 350 400 450 500 550

29 18 10.8 93

WLL PL %FI

E-04

23 16 6.3 25

WLL PL %FI

E-05

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

E le v a ti o n f e e t)

Sandstone

Clay Shale Siltstone

Baseline (feet)

LL= Liquid Limit

PL= Plastic Limit

%FI= Percent - 200 (%)

LEGEND

W= Water Content (%)

T D

F E

N C

E

L A

B

R E

S U

L T

N T

O N

C

H A

N N

R

IN

G S .G

E

.G

CHANNEL SUBSURFACE CROSS SECTION F-F

1,550

1,560

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 50 100 150 200 250 300 350 400 450 500 550 600 1,550

1,560

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 50 100 150 200 250 300 350 400 450 500 550 600

3 8 6

18 35 50+/0.4

28 44 50+/0.3

01-10

SPTRQD(%)U.C.(psi)

5 11 13

3 4 6

27 50+/0.3

02-10

SPTRQD(%)U.C.(psi)

SW-2

SPTRQD(%)U.C.(psi)

LEGEND

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

E le v a ti o n f e e t)

Baseline (feet)

SPT= Standard Penetration Test

(uncorrected blow counts)

RQD= Rock Quality Designation (%)

U.C.= Unconfined Compressive Strength (psi)

T D

F E

N C

E

S P

T

R

A N

T

R

U R

L L .G

SandstoneSilt Clay, Low Plasticity Silty Sand

Clay Shale (Mudstone) Silty Clayey SandSiltstone/ Silty Shale

CHANNEL SUBSURFACE CROSS SECTION E-E

43.4

1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 100 200 300 400 500 600 700 1,570

1,580

1,590

1,600

1,610

1,620

1,630

1,640

1,650

1,660

0 100 200 300 400 500 600 700

7 11 12

8 10 15

5 15 22

13 18 39

50/6"

D-Wall No. 6

SPTRQD(%)

1 2 3

2 3 3

2 4 4

2 4 4

2 2 3

1 2 1

2 3 3

4 7 9

2 3 8

7 9 14

35 50/5"

40 47 50/5"

30 42 50/5.5"

49 50/4"

D-Wall No. 8

SPTRQD(%) B-4/06

E-06

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

E le v a ti o n f e e t)

Siltstone

Sandstone

Baseline (feet)

T D

F E

N C

E

S P

T

R

A N

T

R

U R

L L .G

30.1

43.7

31.4 phi'LL PL W %FI cphi c'

NP

NP

NP

NP

NP

NP

NP

NP

30 20 19.5 82

WLL PL %FI

LEGEND

SPT= Standard Penetration Test

(uncorrected blow counts)

RQD= Rock Quality Designation (%)

U.C.= Unconfined Compressive Strength (psi)

LL= Liquid Limit

PL= Plastic Limit

%FI= Percent - 200 (%) phi= Undrained Friction

Angle (degrees) c= Undrained Cohesion (psf) phi'=Drained Friction

Angle (degrees) c'= Drained Cohesion (psf)

W= Water Content (%)

Low Plasticity Silty Clay

Poorly-graded Sand

Sandy Silt Silty Sand

Silt

Silt Clay, Low Plasticity Silty Sand

Clay Shale

CHANNEL SUBSURFACE CROSS SECTION G-G

B104 CL12EX-b104-sec-efg b104.dgn

SUBSURFACE CROSS SECTIONS

E-E, F-F, G-G

BOTTOM

CHANNEL

PROPOSED

EXISTING GROUND SURFACE

BOTTOM

CHANNEL

PROPOSED

BOTTOM

CHANNEL

PROPOSED

EXISTING GROUND SURFACE

EXISTING GROUND SURFACE

DURING CONSTRUCTION.

FROM WATER LEVELS OBSERVED

DRILLING PROFILES MAY VARY

WATER LEVELS SHOWN IN

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

1,480

1,500

1,520

1,540

1,560

1,580

1,600

1,620

1,640

1,660

0 50 100 150 200 250 300 350 400 450 500 550 600 650 1,480

1,500

1,520

1,540

1,560

1,580

1,600

1,620

1,640

1,660

0 50 100 150 200 250 300 350 400 450 500 550 600 650

S-01

S-02B S-03A

S-04A S-05

Baseline (feet)

E le v a ti o n f e e t)

Fill (made ground) Siltstone

Sandstone Shale Breccia

T D

F E

N C

N T

O N

C

H A

N N

R

IN

G S .G

E

.G

CHANNEL SUBSURFACE CROSS SECTION H-H

USACE

SOUTHWESTERN DIVISION

TULSA DISTRICT

Silt Silty Sand

B105

H-H

SUBSURFACE CROSS SECTION

CL12EX-b105-sec-h_b105

BOTTOM

CHANNEL

PROPOSED

DURING CONSTRUCTION.

FROM WATER LEVELS OBSERVED

DRILLING PROFILES MAY VARY

WATER LEVELS SHOWN IN

SURFACE

GROUND

EXISTING

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

+1650.4

+1648.9

+1647.4

+1646.9

+1645.5

+1641.9

+1641.5

1.5

3.0

4.5

5.0

6.4

10.0

10.4

SANDY SILT, RED-BROWN TO BROWN, DRY TO DAMP,

VERY STIFF

AUGERED WITHOUT SAMPLING

SANDY SILT, RED-BROWN, DRY TO DAMP, VERY

STIFF, WITH GRAY INCLUSIONS

AUGERED WITHOUT SAMPLING

SANDY SILT, BROWN, DRY TO DAMP, VERY STIFF,

WITH GRAY INCLUSIONS

AUGERED WITHOUT SAMPLING

SANDY SILT, RED-BROWN, DRY TO DAMP, VERY STIFF

SILTY SHALE, RED-BROWN WITH GRAY INCLUSIONS,

SILTY TO SANDY, HIGHLY TO SEVERELY

WEATHERED, WEAKLY CEMENTED, VERY SOFT

50+/0.4

50+/0.3

100%

100%

100%

100%

0%

Jar 1

UD-1

Jar 2

Jar 3

Box 1 Pull 1 = 13 ft to 16.4 ft

Run = 3.4 ft

Recovery = 0 ft

Loss = 3.4 ft

RQD = 0 %

1.5

3.0

4.5

5.0

6.4

10.0

10.4

Boring backfilled with a non-shrink grout

UD refused at 4.5 ft

Top of Rock at 10.4 ft

Set 6" casing at 13.0 ft

Begin Rock Coring at 13.0 ft

UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

N 393,929.2 E 1,789,513.2

+1651.9

DISTURBED

10. SIZE AND TYPE OF BIT

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

2. LOCATION (Coordinates or Station)

SHEETS

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

9. TOTAL DEPTH OF HOLE

19. SIGNATURE OF INSPECTOR

VERTICAL

01-10

INCLINED

DRILLING LOG

0.0

DIVISION

COMPLETED

1. PROJECT

STARTED

INSTALLATION SHEET

11/09/2010

10.4

Mark Martin

Stantec Consulting Services, Inc.

Canton Dam North Wall Extension

Southwest

CME-55 #2

+1651.9

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

6-inch Casing & PQ3 (3.27") Rock Core

25.9

11/09/2010

59.6

63.3

Tulsa District

NAVD 88 (US Survey feet)

BOX OR

SAMPLE

NO.

CLASSIFICATION OF MATERIALS

(Description)

DEPTH

a fc eb gd

ELEVATION

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

Blow Counts or

Torvane

Measurements

(kg/sq cm)

LEGEND % Recovery

Hole No. 01-10

01-10

ENG FORM

Canton Dam North Wall Extension

PROJECT HOLE NO.

PREVIOUS EDITIONS ARE OBSOLETE.1836

MAR 71

SILTY SHALE, RED-BROWN WITH GRAY INCLUSIONS,

SILTY TO SANDY, HIGHLY TO SEVERELY

WEATHERED, WEAKLY CEMENTED, VERY SOFT

(continued)

HIGHLY WEATHERED AND ERODED ZONE FROM 19.1

TO 20.2

SOIL-LIKE FROM 23.8 TO 25.3

LOSS FROM 26.4 TO 41.4

90%

92%

0%

0%

0%

Box 1

Box 1 and Box

Box 2

Box 2

Box 2

Pull 2 = 16.4 ft to 21.4 ft

Run = 5 ft

Recovery = 4.5 ft

Loss = 0.5 ft

RQD = 58 %

Pull 3 = 21.4 ft to 26.4 ft

Run = 5 ft

Recovery = 4.6 ft

Loss = 0.4 ft

RQD = 65 %

Pull 4 = 26.4 ft to 31.4 ft

Run = 5 ft

Recovery = 0 ft

Loss = 5 ft

RQD = 0 %

Pull 5 = 31.4 ft to 33.9 ft

Run = 2.5 ft

Recovery = 0 ft

Loss = 2.5 ft

RQD = 0 %

(See next page for description)

Cored hard

4 SHEETS

PROJECT 2INSTALLATION

Tulsa District

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

SHEET

OF

+1651.9

BOX OR

SAMPLE

NO.

CLASSIFICATION OF MATERIALS

(Description)

DEPTH

a fc eb gd

ELEVATION

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

Blow Counts or

Torvane

Measurements

(kg/sq cm)

LEGEND % Recovery

Hole No. 01-10

01-10

ENG FORM

Canton Dam North Wall Extension

PROJECT HOLE NO.

1836-A

JUN 67

+1602.8 49.1

SILTY SHALE, RED-BROWN WITH GRAY INCLUSIONS,

SILTY TO SANDY, HIGHLY TO SEVERELY

WEATHERED, WEAKLY CEMENTED, VERY SOFT

(continued)

SOIL-LIKE FROM 48.5 TO 48.6

CLAY SHALE (MUDSTONE), RED-BROWN,

MODERATELY HARD

GYPSUM STRINGERS AT 51.0 AND 51.3

0%

0%

84%

88%

100%

100%

Box 2

Box 2

Box 2

Box 2 and Box

Box 3

Box 3 and Box

Pull 6 = 33.9 ft to 36.4 ft

Run = 2.5 ft

Recovery = 0 ft

Loss = 2.5 ft

RQD = 0 %

Pull 7 = 36.4 ft to 38.9 ft

Run = 2.5 ft

Recovery = 0 ft

Loss = 2.5 ft

RQD = 0 %

Pull 8 = 38.9 ft to 41.4 ft

Run = 2.5 ft

Recovery = 0 ft

Loss = 2.5 ft

RQD = 0 %

Pull 9 = 41.4 ft to 43.9 ft

Run = 2.5 ft

Recovery = 2.1 ft

Loss = 0.4 ft

RQD = 77 %

Pull 10 = 43.9 ft to 46.4 ft

Run = 2.5 ft

Recovery = 2.2 ft

Loss = 0.3 ft

RQD = 80 %

Pull 11 = 46.4 ft to 51.4 ft

Run = 5 ft

Recovery = 5 ft

Loss = 0 ft

RQD = 85 %

Pull 12 = 51.4 ft to 56.4 ft

Run = 5 ft

Recovery = 5 ft

Loss = 0 ft

RQD = 100 %

49.1

Return water very silty

Return water very silty

15 sec core time

4 SHEETS

PROJECT 3INSTALLATION

Tulsa District

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

SHEET

OF

+1651.9

BOX OR

SAMPLE

NO.

CLASSIFICATION OF MATERIALS

(Description)

DEPTH

a fc eb gd

ELEVATION

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

Blow Counts or

Torvane

Measurements

(kg/sq cm)

LEGEND % Recovery

Hole No. 01-10

01-10

ENG FORM

Canton Dam North Wall Extension

PROJECT HOLE NO.

1836-A

JUN 67

+1581.9 70.0

CLAY SHALE (MUDSTONE), RED-BROWN,

MODERATELY HARD (continued)

FRACTURED ZONES AT 56.8, 57.1 AND 57.5

VUGGY WITH HEALED FRACTURES FROM 59.0 TO 61.4

BOTTOM OF BORING

94%

82%

100%

Box 4 and Box

Box 5

Box 6

Pull 13 = 56.4 ft to 61.4 ft

Run = 5 ft

Recovery = 4.7 ft

Loss = 0.3 ft

RQD = 85 %

Pull 14 = 61.4 ft to 66.4 ft

Run = 5 ft

Recovery = 4.1 ft

Loss = 0.9 ft

RQD = 57 %

Pull 15 = 66.4 ft to 70 ft

Run = 3.6 ft

Recovery = 3.6 ft

Loss = 0 ft

RQD = 84 %

70.0

4 SHEETS

PROJECT 4INSTALLATION

Tulsa District

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

SHEET

OF

+1651.9

BOX OR

SAMPLE

NO.

CLASSIFICATION OF MATERIALS

(Description)

DEPTH

a fc eb gd

ELEVATION

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

Blow Counts or

Torvane

Measurements

(kg/sq cm)

LEGEND % Recovery

Hole No. 01-10

01-10

ENG FORM

Canton Dam North Wall Extension

PROJECT HOLE NO.

1836-A

JUN 67

PHOTO IN APPENDIX

PHOTO IN APPENDIX

PHOTO IN APPENDIX

PHOTO IN APPENDIX

Moist Unit Weight:130.9 pcf

Poissons Ratio: 0.46

Lateral Tangent Modulus: 0.03E6 psi

Young's Modulus, Axial Tangent Modulus: -0.01E6 psi

Unconfined Compressive Strength: 82 psi

Lab Sample: 65.1-66.7

PHOTO IN APPENDIX

CL12EX-b106-1-10 b106.dgn

BORING LOGS

1-10

B106

DURING CONSTRUCTION.

FROM WATER LEVELS OBSERVED

DRILLING PROFILES MAY VARY

WATER LEVELS SHOWN IN

"DRAWING OF WORK AS-BUILT"

A

B

C

D

123456

D

C

B

REFERENCE

SHEET

INVITATION NO.

CONTRACT NO.SHEET OF

US Army Corps of Engineers

Tulsa District

Tulsa, Oklahoma

CONTRACT DATE:PLOT SCALE:

PLOT DATE:

DESIGN FILE:

SYMBOL DESCRIPTION DATE APPR

DESIGNED BY:

REVIEWED BY:

DRAWN BY:

SUBMITTED BY:

ARKANSAS RIVER WATERSHED NORTH CANADIAN RIVER, OKLAHOMA

J WALDIE

W912-BV-14-R-0039

DEPUTY DIRECTOR

DAM SAFETY PROD CTR

MARK A. LOCKE, P.E

+1656.2

+1652.7

+1651.2

+1650.7

+1648.7

+1647.7

+1647.6

+1646.9

+1646.7

1.5

5.0

6.5

7.0

9.0

10.0

10.1

10.8

11.0

SANDY SILT, RED-BROWN, DRY, VERY STIFF

AUGERED WITHOUT SAMPLING

SANDY SILT, LIGHT BROWN, DAMP, VERY STIFF

AUGERED WITHOUT SAMPLING

SANDY SILT, RED-BROWN, DAMP, VERY STIFF

AUGERED WITHOUT SAMPLING

SANDY SILT, RED-BROWN, DAMP, VERY STIFF

SILTY SHALE, RED-BROWN, SILTY TO SANDY,

HIGHLY TO SEVERELY WEATHERED, WEAKLY

CEMENTED, VERY SOFT

SET CASING, DID NOT SAMPLE

SILTY SHALE, RED-BROWN, SILTY TO SANDY,

HIGHLY TO SEVERELY WEATHERED, WEAKLY

CEMENTED, VERY SOFT

50+/0.3

87%

100%

65%

100%

28%

0%

Jar 1

Jar 2

UD-1

Jar 3

Box 1

Box 1

Pull 1 = 11 ft to 13.5 ft

Run = 2.5 ft

Recovery = 0.7 ft

Loss = 1.8 ft

RQD = 20 %

Pull 2 = 13.5 ft to 16.1 ft

Run = 2.6 ft

Recovery = 0 ft

Loss = 2.6 ft

RQD = 0 %

1.5

5.0

6.5

7.0

9.0

10.0

1…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .