SEE ADDENDUM
(No Collect Calls)
W912BV-17-R-0016 12-Jan-2017
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
10:00 AM 13 Feb 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DOUGLAS D BUFFINGTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$7,500,000.00
NAICS:
561730
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF91
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BV-17-R-0016
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments before submitting documents. Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to
Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes in a file format readable by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address CESWT‐CT‐SS‐Quotes@usace.army.mil and copy
Douglas.D.Buffington@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
TULSA DISTRICT CORPS OF ENGINEERS
DOUGLAS BUFFINGTON, CECT‐SWT‐E
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
FAX: (918) 669‐7495
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x
17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7078) or Douglas.D.Buffington@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.
Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District
Office. The address of the Tulsa District Office is below:
TULSA DISTRICT CORPS OF ENGINEERS
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the past performance references page, if included in solicitation.
3) Complete the Excel pricing schedule provided in the solicitation (all cells except for the unit prices are locked).
4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M
5) Provide Subcontracting Plan if utilitizing Subcontractors (See SECTION I 52.219‐14)
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via
Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV‐17‐R‐0016
The Bidder Inquiry Key is: AQSTNI‐WXR8UP
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 2:00pm (Central) Monday, 6 February 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington
Telephone: 918‐669‐7078
E‐MAIL: Douglas.D.Buffington@usace.army.mil
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 1:00 PM local time on 25 January 2017. US Army Corps of
Engineers, 13173 CR 2631, Crowell, Texas 79227. From Truscott Texas, go west on FM1756, turn right on Co Rd
2600, continue onto Co Rd 2631, continue to Corps building on the left. 33.777675, ‐99.833550
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
Section B - Supplies or Services and Prices
PRICE SCHEDULE
PRICE SCHEDULE Company Name
RED RIVER CHLORIDE CONTROL PROJECT, TEXAS
MOWING SERVICES Total $
BASE YEAR: 1 MAR 17 ‐ 28 Feb 18
CLIN Description QTY Unit Unit Price Total Amount
IMPROVED AREAS
0001 Maintenance Area 8 EACH $ ‐ $
0002 Spillway Area 6 EACH $ ‐ $
SEMI‐IMPROVED AREAS
0003 Dam Embankment 6 EACH $ ‐ $
0004 Left Abutment Access Road 6 EACH $ ‐ $
0005 Right Abutment Access Road 8 EACH $ ‐ $
LAWN AREAS
0006 Project Office and Overlook 12 EACH $ ‐ $
ADDITIONAL WORK
0007 Weedeating 40 HR $ ‐ $
0008 Mowing 80 HR $ ‐ $
2nd Opt YEAR: 1 MAR 18 ‐ 28 Feb 19
IMPROVED AREAS
1001 Maintenance Area 8 EACH $ ‐ $
1002 Spillway Area 6 EACH $ ‐ $
SEMI‐IMPROVED AREAS
1003 Dam Embankment 6 EACH $ ‐ $
1004 Left Abutment Access Road 6 EACH $ ‐ $
1005 Right Abutment Access Road 8 EACH $ ‐ $
LAWN AREAS
1006 Project Office and Overlook 12 EACH $ ‐ $
ADDITIONAL WORK
1007 Weedeating 40 HR $ ‐ $
1008 Mowing 80 HR $ ‐ $
3rd Opt YEAR: 1 MAR 19 ‐ 29 Feb 20
IMPROVED AREAS
2001 Maintenance Area 8 EACH $ ‐ $
2002 Spillway Area 6 EACH $ ‐ $
SEMI‐IMPROVED AREAS
2003 Dam Embankment 6 EACH $ ‐ $
2004 Left Abutment Access Road 6 EACH $ ‐ $
2005 Right Abutment Access Road 8 EACH $ ‐ $
LAWN AREAS
2006 Project Office and Overlook 12 EACH $ ‐ $
ADDITIONAL WORK
2007 Weedeating 40 HR $ ‐ $
2008 Mowing 80 HR $ ‐ $
4th Opt YEAR: 1 MAR 20 ‐ 28 Feb 21
IMPROVED AREAS
3001 Maintenance Area 8 EACH $ ‐ $
3002 Spillway Area 6 EACH $ ‐ $
SEMI‐IMPROVED AREAS
3003 Dam Embankment 6 EACH $ ‐ $
3004 Left Abutment Access Road 6 EACH $ ‐ $
3005 Right Abutment Access Road 8 EACH $ ‐ $
LAWN AREAS
3006 Project Office and Overlook 12 EACH $ ‐ $
ADDITIONAL WORK
3007 Weedeating 40 HR $ ‐ $
3008 Mowing 80 HR $ ‐ $
5th Opt YEAR: 1 MAR 21 ‐ 28 Feb 22
IMPROVED AREAS
4001 Maintenance Area 8 EACH $ ‐ $
4002 Spillway Area 6 EACH $ ‐ $
SEMI‐IMPROVED AREAS
4003 Dam Embankment 6 EACH $ ‐ $
4004 Left Abutment Access Road 6 EACH $ ‐ $
4005 Right Abutment Access Road 8 EACH $ ‐ $
LAWN AREAS
4006 Project Office and Overlook 12 EACH $ ‐ $
ADDITIONAL WORK
4007 Weedeating 40 HR $ ‐ $
4008 Mowing 80 HR $ ‐ $
Section C - Descriptions and Specifications
STATEMENT OF WORK
S P E C I F I C A T I O N S
CHLORIDE CONTROL PROJECT
TRUSCOTT, TEXAS
MAINTENANCE CONTRACT
FOR
MOWING
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following page.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title 1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Reporting Defective Facilities 12 Prework Conference 13 Contractor Submittals 14 Billing 15 Changes in Amount of Facilities Serviced 16 Antiterrorism and Operations Security Requirements
EXHIBITS
No. TITLE
1 Performance Requirements Table 2 Quality Assurance Report 3 Quality Control Inspection Log 4 Example of Job Hazard Analysis 5 Invoice Format
APPENDICES
Appendix Title A Mowing - Performance Based
Facilities Inventory & Mowing Maps
1. SCOPE OF WORK. The work required under this specification provides for the mowing, trimming, and edging of public use areas, the dam embankment, and other project lands at Chloride Control Project.
2. DEFINITIONS.
2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 2.
2.3. Government. The term "Government" as used herein means the United States of America.
2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.
2.5. Project. The term "project" as used herein means all
Government property and easements at Chloride Control Project.
2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.7. Quality. Conformance with the contract specification.
2.8. Quality Assurance (QA). The procedure by which the
Government determines CQC is functioning effectively.
2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.10. Workday. Any day, Monday through Friday, exclusive of
Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, current version) is hereby incorporated into this specification. A copy of the manual may be found on-line a @http://www.usace.army.mil/inet/usace-docs/eng-manuals/em385-1-1/toc.htm.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. PERFORMANCE BASED MOWING.
4.1.1. Initiation and execution of work. This contract is
for mowing services for the period 1 April – 30 September. Work shall be performed as required to comply with the performance standards (Performance Requirements Table, Exhibit 1). It is the contractor’s responsibility to determine mowing frequency and perform the mowing without work orders from the Contracting Officer or the Contracting Officer’s Representative (COR). Work will be accepted based on compliance with performance requirements. Refer to Paragraph 7. for inspection criteria and contractor performance evaluation.
4.1.2. Acceptance of work. The Government shall accept
work unless the Contracting Officer notifies the contractor of deficient services.
4.1.2.1. Initial notification of deficiencies may be
written or oral; however, all oral notification shall be confirmed by the Contracting Officer or the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 2).
4.1.2.2. If the Contracting Officer or the COR
notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be reperformed the same day. Work performed on less than a daily schedule shall be reperformed not later than the following day. Refer to paragraph 10 for deficient work not reperformed.
4.1.2.3. The contractor shall notify the Contracting
Officer and the COR when corrective work is completed.
Notification shall be made by completing Part IV of the QA Report provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer or the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor and place a copy in the files.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide
personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the
project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during any absence, shall be designated in writing to the COR and the Contracting Officer prior to initiation of work.
5.2.2. The contractor shall provide the COR and the
Contracting Officer a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish work required performing the various types of work specified.
6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR or the Contracting Officer for inspection. The contractor shall not use equipment until it has passed inspection by the COR or the Contracting Officer. The COR or the Contracting Officer shall establish the time and location for these inspections.
6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.
6.2.1. Tractors shall be equipped and operated in
accordance with the following:
6.2.1.1. Power take offs on tractors shall operate at
a minimum of 540 rpm during mowing operations.
6.2.1.2. Seat belts shall be worn at all times by
tractor operators. Refer to subparagraph 16.B.08. of EM 385-1-1.
6.2.1.3. A substantial guard or shield shall be
installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than 1/4-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.11.a of EM 385-1-1.
6.2.1.4. Rollover protection shall be provided. If
the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.
6.2.2. Mowers shall be rotary-type or flail-type and shall
meet the following requirements (Use of a Riding Wide Area Mower of at least 100 inches of cutting surface is acceptable in lieu of a 15 foot batwing mower.):
6.2.2.1. Mowers shall be equipped with safety chains
or other protective devices to prevent flying objects from injuring people or damaging property.
6.2.2.2. Mowers shall be equipped with slides and
wheels.
6.2.2.3. Brush hogs shall not be used on the slopes of
dikes around oxidation ponds.
6.2.2.4. Mowers used on the embankment of the dam
shall have a minimum cutting width of 15 feet. Contractor may use a Riding Wide Area Mower of at least 100 inches of cutting surface in lieu of a 15 foot mower.
6.2.2.5. Mulching mowers shall not be used.
6.2.2.6. Brush hogs shall not be used when mowing
within 10 feet of facilities in improved areas.
6.2.2.7. All safety devices provided by the
manufacturers of push and riding mowers shall function and be utilized as designed.
6.2.3. Edgers shall be equipped with a rotary blade in an
upright position. A protective guard for the blade shall be provided.
6.2.4. Signs located on each side of the vehicles shall
mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project.
Lettering shall be at least 2 inches high. Each sign shall contain the following:
CHLORIDE CONTROL PROJECT
MOWING SERVICES
PROVIDED BY
(Contractor's Name)
6.3. Equipment Operation.
6.3.1. Mowing equipment shall be operated in a manner that
will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.
6.3.2. Power operated trimming equipment shall not be used
around any shrubs or trees with a diameter less than 3 inches at breast height.
6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR and the Site Manager approves use of other areas.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.
7.2. Deficient services are determined during initial QA
inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246-4 “Inspection of Services” to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 1.
8.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 3). A copy of completed inspection logs shall be furnished the COR on a weekly basis.
8.2. The Contracting Officer may waive the requirements in
subparagraph 8.1. if they determine proper CQC can be achieved without the required submissions. The Contracting Officer will normally make this determination on the basis of actual performance by the contractor. If the requirements in subparagraph 8.1. are determined by the Contracting Officer to once again become required submissions this will be at no additional cost to the Government.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and reperformed by the
contractor: No deduction.
9.2. Each service found deficient and performed by the
Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another
contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not reperformed by anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. The contractor shall furnish the COR and the Contracting Officer a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:
10.1.1. Procedures for training employees in
responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal
safety equipment and apparel.
10.1.3. Procedures for handling, reporting, and correcting
unsafe conditions, practices, and safety violations.
10.1.4. Procedures for treating and transporting injured
persons to medical facilities.
10.1.5. Fire prevention plans.
10.1.6. Job hazard analyses shall include an evaluation of
hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job.
Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 4.
10.1.6.1. Loading and unloading of equipment (analysis
for each type of equipment to be used to perform services required by this specification).
10.1.6.2. Equipment operation and maintenance (for
each type of equipment).
10.1.6.3. Vehicle operation and maintenance.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged from this effort upon the written request of the Contracting Officer.
10.3. Personal Clothing and Safety Apparel. Contractor
personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts).
Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the
Contracting Officer and the COR of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents
involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer and the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an
accurate record of exposure data (man-hours worked) and submit the figure to the COR in writing monthly by the 2nd workday of the following month.
11. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR or Site Manager each workday.
12. PREWORK CONFERENCE. The Contracting Officer or their designated representative shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 13 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting Officer or their designated representative shall establish the location, date, and time of the Prework Conference after consultation with the contractor.
13. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer and/or the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original shall be furnished the Contracting Officer. If the Contracting Officer and the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
13.1. Names of on-site supervisor and their alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
13.2. Safety Plan (subparagraph 10.1.).
13.3. Job Hazard Analysis (subparagraph 10.1.6.)
13.4. Exposure reports (submit by 2nd workday of each month)
(subparagraph 10.5.).
13.5. AT/OPSEC Training form provided prior to initiation of work and prior to any employee entering the facility (paragraph 16)
13.6. E-Verify completed (subparagraph 16.2.)
14. BILLING.
14.1. The contractor shall submit an original invoice when work is completed at the end of each month.
14.2. Invoices shall be prepared in the format shown at
Exhibit 5.
14.3. All exposure reports shall be submitted before an invoice will be accepted or paid.
14.4. Invoices and supporting documents shall be delivered or mailed to
15. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.
15.1. Services required are deleted for a period of one (1)
month or longer in an entire park.
15.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.
16. Antiterrorism And Operations Security Requirements: The Contractor shall be responsible for ensuring all personnel, to include sub-contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award (or NTP for construction contracts). In no event shall any contractor or sub-contractor personnel be onsite prior to completion of any applicable training, submission of training verification, and pre-screening via E-Verify Program.
16.1. Training materials and verification forms will be provided to the contractor within two business days of Contract Award.
16.2 The Contractor must pre-screen Candidates using the E-
verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 10 business days after the initial contract award.
When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative.
This Form will be provided to the Contracting Officer and shall become part of the official contract file.
EXHIBIT 1
PERFORMANCE REQUIREMENTS
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS
APPENDIX A
Improved areas 1 Smooth cut. 1Height of cut grass does not exceed 1/2 inch from that specified. No uncut vegetation.
Lawn areas 2 Smooth cut. 1Height of cut grass does not exceed 1/2 inch from that specified. No uncut vegetation.
Edging 3 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.
APPENDIX B
Semi-Improved areas 4 Smooth cut. 1Height of cut grass does not exceed 1 inch from that specified. 2No uncut strips of vegetation.
Embankment area 5 Smooth cut. 1Height of cut grass does not exceed 1 inch from that specified. 2No uncut vegetation.
APPENDICES A & B
Trimming 6 Uniform cut with no scalping of grass. No damage to trees or shrubs.
Clean designated areas after mowing
7 No vegetation or debris left on paved surfaces.
1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.
2. The Contracting Officer will relax this requirement to a degree when the height of grass prior to mowing is excessive when the growth is outside the control of the contractor.
3. The Contracting Officer or the COR shall make the determination of excessive grass height unilaterally.
EXHIBIT 2
QUALITY ASSURANCE REPORT
The Quality Assurance Report (SWT Form 982) is provided at SECTION J as Attachment 1.
EXHIBIT 3
QUALITY CONTROL INSPECTION LOG
The Quality Control Inspection Log (SWT Form 990) is provided at SECTION J as Attachment 2.
EXHIBIT 4
EXAMPLE OF JOB HAZARD INSPECTION LOG
The Example of Job Hazard Inspection Log is provided at SECTION J as Attachment 3.
EXHIBIT 5
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT
PROJECT: ________________________________ SHEET ___ OF ___
CONTRACTOR: _____________________________ DATE: ___________
ADDRESS: ________________________________ CONTRACT NO: DACW56-____-__-______
BILLING PERIOD: ________ THRU __________ INVOICE NO: __________
PAYMENT TERMS: ____________________________
(Payment Discount or N/A)
IWO OR
BID ITEM
NO. DEDUCTION AMOUNT TOTAL
PAYMENT REQUESTED: ______________
CONTRACTOR (Signature/Date)
APPENDIX A
PERFORMANCE BASED MOWING
1. FACILITIES TO BE SERVICED. Public use areas and Lake Office complex. An inventory of mowing areas bid by the "month" is given in Table A. Dam embankments, saddle dikes, levees, public use areas, lake office complex and other project lands. An inventory of mowing areas bid by the mowing is given in Table B.
All mowing maps are attached at SECTION J.
2. DESCRIPTION OF WORK. The contractor shall perform the following work as directed.
2.1. Mowing shall be performed in the following areas:
2.1.2. Improved Areas shall be maintained between a minimum
height of 2 inches and a maximum height of 6 inches. These areas shall include: campsites and the area within 25 feet of the tables and pullouts. The limits of most of these areas are shown on the attached maps. In addition, mow the areas described below and around facilities shown on the drawings.
2.1.1.1. Areas adjacent to all roads and parking areas
shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the Contracting Officer or the COR to provide a safe viewing distance for vehicles approaching the intersections.
2.1.1.2. Areas around park and lake entrance signs.
Park entrance signs are located beside roads shown on the attached maps. A triangular shaped area shall be mowed around these signs, and trimming around the structures shall be accomplished with “weedeater” type trimmers. This area shall extend from the edge of the roadway to a point 10 feet on the other side of the sign at its widest point. It shall extend 10 feet behind the sign and shall provide a clear view of the front of the sign from vehicles using the adjacent roadway. The COR or the Contracting Officer will determine the length of the area to be mowed in front of these signs.
2.1.1.3. Areas around toilets located outside the
limits of improved areas shown on the attached maps shall be mowed for a distance of 10 feet from the back and sides of toilets. The area between the nearby road or parking area and the toilet shall be mowed. In addition, the area between pairs of toilets shall be mowed.
2.2. Lawn areas shall be maintained between a minimum of 1½
inches and a maximum height of 4 inches. These areas are around the Lake Office complex. The limits of these areas are shown on the attached maps.
2.3. Trimming.
2.3.1. Every time improved areas are mowed, trimming shall
be accomplished around all vertical objects protruding from the ground, including under guardrails, within the limits of these areas. This includes trimming along railroad ties delineating pullouts, guardrails, lighting posts and piezometers. Trimming around trees shall not be accomplished with “weedeater” type trimmers.
2.3.2. Edging shall be accomplished along all concrete
walkways and curbs that are flush with the ground each time areas are mowed.
2.3.3. The contractor may apply approved herbicides in lieu
of trimming. The Project Manager and the COR must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers/materials safety data sheets (MSDS) for review. All herbicides shall be applied by a Texas state certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The COR shall furnish the forms.
2.4. Cleanup. Prior to mowing, the contractor shall remove
rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.
2.5. Flower and Shrub beds. Each time mowing is accomplished in lawn and improved areas, weeds, grass, debris, and litter shall be removed from flower and shrub beds. Beds shall be thoroughly watered. The number and size of flower and shrub beds is as follows:
Location Number Size (SY) Picnic Sites 3 4 (ea) Project Office 1 185 Group Picnic Shelter 1 66
2.6 Tree Trimming. Each time lawn mowing is ordered; trees in and around lawn areas and around the maintenance shop area will be trimmed of excessive growth. Dead limbs shall also be removed. Limbs are to be disposed of in appropriate recepticlesC.
2.7. Semi-improved areas are undeveloped areas within PUAs, and near the office complex that require occasional mowing. They shall be mowed to a height of 4 inches. The limits of these areas are shown on the attached maps. Areas around oxidation ponds shall be mowed from the edge of the water to a point 10 feet outside of fences or 10 feet from the toe of dikes around the ponds, whichever is greater. The areas shall be mowed once they reach a height of 12 inches.
2.8. Dam Embankment area shall be mowed to a height of 4 inches.
The limits of these areas are shown on the attached maps. The area shall be mowed once grass reaches a height of 12 inches but not more often than once every four weeks.
2.9. Levees, dikes, and contiguous ponding areas shall be mowed to a height of 4 inches. The locations of these areas are shown on the attached maps. The limits of mowing of the ponding area and an area adjacent to the lake side toe of the Hulah saddle dike are shown, the limits of mowing on the dike and levee are not shown but are described below. The areas shall be mowed once they reach a height of 12 inches.
2.10. Trimming.
2.10.1. Every time semi-improved areas are mowed, trimming
shall be accomplished around all facilities and signs within the limits of these areas.
2.10.2. Every time the embankments and levees are mowed
trimming shall be accomplished around piezometers, culvert ends, staff gauges, relief wells, manholes, guard posts, and buildings located on the embankment; along the edge of the embankment riprap; and around guardrail and signposts on both sides of the embankment road.
2.10.3. The contractor may apply approved herbicides in
lieu of trimming. The Project Manager and the COR must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers/materials safety data sheets (MSDS) for review. All herbicides shall be applied by a Texas state certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied.
The COR shall furnish the forms.
2.11. Shrubs shall be trimmed to the height of 2 feet 6 inches and maintained in the shape of a box.
3. RESTRICTIONS ON WORKING.
3.1. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground. The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the Contracting Officer disagree about the suitability of conditions for mowing operations, the Contracting Officer will determine whether work shall progress or stop. Areas excluded by these conditions will also be excluded in the inspections.
3.2. Work Periods.
3.2.1. Mowing of PUAs shall not be accomplished on
Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.
3.2.2. Work in parks shall be performed between 7:00 a.m.
and 8:00 p.m.
3.2.3. Improved and lawn mowing shall be performed 1 April
through 30 September.
TABLE A
INVENTORY OF PERFORMANCE BASED MOWING AREAS
IMPROVED LAWN
AREAS AREAS CAMPSITES PLAYGROUNDS TOILETS SHELTERS
LOCATION (AC) (AC) (NO) (NO) (NO) (NO)
Project Office/ Overlook Area 8 Maint. Area 9.12 Spillway Area 32.00 1 1 Totals 41.12 8 1 1
AC = Acres NO = Number
TABLE B
SEMI-IMPROVED MOWING AREAS
SEMI-IMPROVED EMBANKMENT LEVEE/DIKE/
AREAS AREAS PONDING AREAS
LOCATION (AC) (AC) (AC)
Embankment Area 46 Left Abutment 12 Access Road Right Abutment 18 Access Road
TOTALS 30 46
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY REFERENCE
52.246-4 Inspection Of Services--Fixed Price AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991 252.204-7006 Billing Instructions OCT 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
Section H - Special Contract Requirements
WAGE RATES
WD 15‐5269 (Rev.‐2) was first posted on www.wdol.gov on 01/03/2017
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015‐5269 Daniel W. Simms Division of | Revision No.: 2 Director Wage Determinations| Date Of Revision: 12/30/2016 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Texas
Area: Texas Counties of Andrews, Bailey, Borden, Briscoe, Brown, Castro, Childress, Cochran, Coke, Coleman, Collingsworth, Comanche, Concho, Cottle, Crane, Crockett, Dallam, Dawson, Deaf Smith, Dickens, Donley, Eastland, Fisher, Floyd, Foard, Gaines, Garza, Glasscock, Gray, Hale, Hall, Hansford, Hardeman, Hartley, Haskell, Hemphill, Hockley, Howard, Hutchinson, Kent, Kimble, King, Knox, Lamb, Lipscomb, Loving, Lynn, Martin, McCulloch, Menard, Mitchell, Moore, Motley, Nolan, Ochiltree, Oldham, Parmer, Pecos, Reagan, Reeves, Roberts, Runnels, Schleicher, Scurry, Shackelford, Sherman, Stephens, Sterling, Stonewall, Sutton, Swisher, Terry, Throckmorton, Upton, Ward, Wheeler, Winkler, Yoakum, Young **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE ‐ TITLE FOOTNOTE RATE
01000 ‐ Administrative Support And Clerical Occupations 01011 ‐ Accounting Clerk I 12.80 01012 ‐ Accounting Clerk II 14.37 01013 ‐ Accounting Clerk III 16.10 01020 ‐ Administrative Assistant 21.36 01035 ‐ Court Reporter 17.77 01041 ‐ Customer Service Representative I 10.42 01042 ‐ Customer Service Representative II 11.72 01043 ‐ Customer Service Representative III 12.78 01051 ‐ Data Entry Operator I 11.21 01052 ‐ Data Entry Operator II 11.91 01060 ‐ Dispatcher, Motor Vehicle 18.03 01070 ‐ Document Preparation Clerk 11.95 01090 ‐ Duplicating Machine Operator 11.95 01111 ‐ General Clerk I 11.75 01112 ‐ General Clerk II 16.25 01113 ‐ General Clerk III 16.70 01120 ‐ Housing Referral Assistant 19.21 01141 ‐ Messenger Courier 9.96 01191 ‐ Order Clerk I 10.92 01192 ‐ Order Clerk II 12.88 01261 ‐ Personnel Assistant (Employment) I 14.21 01262 ‐ Personnel Assistant (Employment) II 17.32 01263 ‐ Personnel Assistant (Employment) III 18.25
01270 ‐ Production Control Clerk 17.75 01290 ‐ Rental Clerk 13.42 01300 ‐ Scheduler, Maintenance 15.37 01311 ‐ Secretary I 15.37 01312 ‐ Secretary II 17.77 01313 ‐ Secretary III 19.21 01320 ‐ Service Order Dispatcher 16.09 01410 ‐ Supply Technician 21.36 01420 ‐ Survey Worker 15.22 01460 ‐ Switchboard Operator/Receptionist 11.31 01531 ‐ Travel Clerk I 11.80 01532 ‐ Travel Clerk II 12.71 01533 ‐ Travel Clerk III 13.54 01611 ‐ Word Processor I 12.98 01612 ‐ Word Processor II 15.37 01613 ‐ Word Processor III 17.77 05000 ‐ Automotive Service Occupations 05005 ‐ Automobile Body Repairer, Fiberglass 19.73 05010 ‐ Automotive Electrician 19.89 05040 ‐ Automotive Glass Installer 18.62 05070 ‐ Automotive Worker 18.62 05110 ‐ Mobile Equipment Servicer 16.12 05130 ‐ Motor Equipment Metal Mechanic 21.40 05160 ‐ Motor Equipment Metal Worker 18.62 05190 ‐ Motor Vehicle Mechanic 21.40 05220 ‐ Motor Vehicle Mechanic Helper 14.89 05250 ‐ Motor Vehicle Upholstery Worker 17.39 05280 ‐ Motor Vehicle Wrecker 18.62 05310 ‐ Painter, Automotive 19.89 05340 ‐ Radiator Repair Specialist 18.62 05370 ‐ Tire Repairer 12.90 05400 ‐ Transmission Repair Specialist 21.40 07000 ‐ Food Preparation And Service Occupations 07010 ‐ Baker 10.56 07041 ‐ Cook I 9.71 07042 ‐ Cook II 11.25 07070 ‐ Dishwasher 8.11 07130 ‐ Food Service Worker 8.57 07210 ‐ Meat Cutter 13.09 07260 ‐ Waiter/Waitress 8.37 09000 ‐ Furniture Maintenance And Repair Occupations 09010 ‐ Electrostatic Spray Painter 19.02 09040 ‐ Furniture Handler 11.85 09080 ‐ Furniture Refinisher 19.02 09090 ‐ Furniture Refinisher Helper 14.25 09110 ‐ Furniture Repairer, Minor 16.63 09130 ‐ Upholsterer 19.02 11000 ‐ General Services And Support Occupations 11030 ‐ Cleaner, Vehicles 9.22 11060 ‐ Elevator Operator 9.22 11090 ‐ Gardener 12.32 11122 ‐ Housekeeping Aide 9.97 11150 ‐ Janitor 11.51 11210 ‐ Laborer, Grounds Maintenance 10.58 11240 ‐ Maid or Houseman 8.50 11260 ‐ Pruner 9.57 11270 ‐ Tractor Operator 12.83 11330 ‐ Trail Maintenance Worker 10.58 11360 ‐ Window Cleaner 11.52 12000 ‐ Health Occupations 12010 ‐ Ambulance Driver 15.14 12011 ‐ Breath Alcohol Technician 16.47 12012 ‐ Certified Occupational Therapist Assistant 24.04 12015 ‐ Certified Physical Therapist Assistant 26.70 12020 ‐ Dental Assistant 13.32 12025 ‐ Dental Hygienist 33.99 12030 ‐ EKG Technician 25.38 12035 ‐ Electroneurodiagnostic Technologist 25.38
12040 ‐ Emergency Medical Technician 15.14 12071 ‐ Licensed Practical Nurse I 14.18 12072 ‐ Licensed Practical Nurse II 15.86 12073 ‐ Licensed Practical Nurse III 17.68 12100 ‐ Medical Assistant 12.42 12130 ‐ Medical Laboratory Technician 16.53 12160 ‐ Medical Record Clerk 12.51 12190 ‐ Medical Record Technician 14.89 12195 ‐ Medical Transcriptionist 15.16 12210 ‐ Nuclear Medicine Technologist 32.67 12221 ‐ Nursing Assistant I 10.49 12222 ‐ Nursing Assistant II 11.80 12223 ‐ Nursing Assistant III 12.88 12224 ‐ Nursing Assistant IV 14.52 12235 ‐ Optical Dispenser 12.88 12236 ‐ Optical Technician 12.77 12250 ‐ Pharmacy Technician 14.75 12280 ‐ Phlebotomist 14.52 12305 ‐ Radiologic Technologist 23.36 12311 ‐ Registered Nurse I 24.19 12312 ‐ Registered Nurse II 29.61 12313 ‐ Registered Nurse II, Specialist 29.61 12314 ‐ Registered Nurse III 35.83 12315 ‐ Registered Nurse III, Anesthetist 35.83 12316 ‐ Registered Nurse IV 42.