Solicitation No. W912BV-17-R-0010
US Army Corps of Engineers Tulsa District Arkansas River Watershed Skiatook Lake, Oklahoma
Repair Service & Emergency Gates
Specifications
August 4, 2017 rsl
TABLE OF CONTENTS
SOLICITATION NO. W912BV-17-R-0010
REPAIR SERVICE AND EMERGENCY GATES
SKIATOOK LAKE, OKLAHOMA
TOC-1
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 11 00 SF 1442 AND CLIN SCHEDULE
00 21 00 INSTRUCTIONS, CONDITIONS, & NOTICES TO OFFERORS
00 22 11 PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA,
BASIS OF AWARD
00 45 00 REPRESENTATIONS & CERTIFICATIONS
00 72 00 CONTRACT CLAUSES
00 73 00 SPECIAL CONTRACT REQUIREMENTS
00 73 46 WAGE DETERMINATION SCHEDULE
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 SUMMARY OF WORK
01 22 00 MEASUREMENT AND PAYMENT
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 45 00 QUALITY CONTROL
01 46 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
01 58 00 BULLETIN BOARD, PROJECT SIGN, AND SAFETY SIGN
01 78 00 CLOSEOUT SUBMITTALS
DIVISION 02 - EXISTING CONDITIONS
02 00 00 CONTROL OF WATER
02 41 00 DEMOLITION AND DECONSTRUCTION
02 50 00 DISASSEMBLY AND REASSEMBLY OF SERVICE AND EMERGENCY GATES
HYDRAULIC OPERATING EQUIPMENT
02 83 13 LEAD PAINT
DIVISION 05 - METALS
05 05 20 NON-DESTRUCTIVE EXAMINATION OF HYDRAULIC STEEL STRUCTURES
05 05 25 STRUCTURAL WELDING
05 50 13 MATERIALS FOR REHABILITATION OF HYDRAULIC STEEL STRUCTURES
AND HYDRAULIC OPERATING EQUIPMENT
05 60 00 GATE SILL REHABILITATION
05 70 00 BRIDLE FOR BULKHEAD
DIVISION 09 - FINISHES
09 90 00 PAINTING: MECHANICAL AND HYDRAULIC SYSTEMS
09 97 02 PAINTING: HYDRAULIC STRUCTURES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
35 20 00 PROOF LOAD TESTING
-- End of Table of Contents --
PROPOSAL SCHEDULE
SOLICITATION NO. W912BV-17-R-0010
REPAIR SERVICE & EMERGENCY GATES
SKIATOOK LAKE, OKLAHOMA
AUGUST 4, 2017
Item Estimated Unit No. Description Quantity Unit Price Amount
00 11 00-1
1. Modify Lifting Beam and
Emergency Bulkhead 1 Job $________ $_________
2. Load Test Stirrup Assembly 1 Job $________ $_________
3. Map Corrosion Pits on Emergency Gate Leafs and Gate Frames 1 Job $________ $_________
4. Paint Emergency Gate Leafs and Gate Frames 2 EA $________ $_________
5. Map Corrosion Pits on Service Gate Leafs and Gate Frames 1 Job $________ $_________
6. Paint Service Gate Leafs and Gate Frames 2 EA $________ $_________
7. Map Corrosion Pits on Main Conduit Liners 1 Job $________ $_________
8. Paint Main Conduit Liners 2 EA $________ $_________
9. Paint Main Air Vents 2 EA $________ $_________
10. Replace Emergency and Service Gate Leaf Seals and Gate Frame Seals 4 Set $________ $_________
11. Rehabilitate Gate Sills 4 EA $________ $_________
12. Paint Mechanical and Hydraulic
Equipment 1 Job $________ $_________
TOTAL PROPOSAL $___________________
EA = Each
Skiatook Repair & Emergency Gates FY17 SKIATOOKGATEFY17
SECTION 01 00 00
SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE
This section provides a general summary of the work to be performed to rehabilitate hydraulic structures and mechanical equipment at Skiatook Lake, Oklahoma. See the specifications and drawings for detailed requirements. The Contractor shall provide all plant, materials, equipment, labor, instruments tools, subcontractors, supervision, management, and travel necessary to complete all work in accordance with this summary of work, the attached drawings, the specifications, and all other contract documents and requirements. The Government will provide no materials, equipment, or labor unless stated otherwise in writing in the plans and specifications.
1.2 EXPLANATION OF CONTRACT AUTHORITY AND RELATIONSHIPS
The U. S. Army Corps of Engineers (USACE), Tulsa District will award and administer this contract and shall be the sole authority to interact contractually with, direct, and provide oversight to the Contractor.
References to any other organization, entity, or individual either directing, authorizing, approving, or in any other way contractually interacting with the Contractor shall denote such action by the designated representative(s) of the Contracting Officer, USACE, Tulsa District.
1.3 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
1.4 SUMMARY OF WORK
This project will be a total turn-key contract with all work being performed by the Contractor. See other specifications sections, drawings, contract clauses, and other contract documents for detailed requirements of the work to be performed by the Contractor. The work required is summarized as follows:
a. Modify lifting beam and emergency bulkhead;
b. Load test stirrup assembly;
c. Map corrosion pits and paint emergency and service gate leafs and emergency and service gate frames;
d. Map corrosion pits and paint main air vents;
e. Remove and replace babbit for two service gates;
SECTION 01 00 00 Page 1
f. Replace gate leaf seals and gate frame seals for service and emergency gates; and
g. Paint mechanical and hydraulic equipment.
Modification and acceptance of the lifting beam and emergency bulkhead for use in this contract and successful load tests of the lifting beam and stirrup assembly shall be completed before any other activities begin.
1.5 SAFETY
All work shall be performed in accordance with EM 385-1-1 dated 30 November 2014 and all subsequently issued interim changes and errata, 29 CFR 1910, 29 CFR 1926, and other references as listed herein. Matters of interpretation of the safety standards shall be submitted to the ACO for resolution before starting work. Where the regulations conflict, the most stringent requirements shall apply. The Government stresses the importance of safety on all USACE job sites. If safety violations occur, all work shall cease immediately and no work will resume until all safety violations are corrected. Lost time for safety violations will not be subject to time extensions for contract completion.
1.6 WORK HOURS
The Contractor shall work only between 7 a.m. and 7 p.m. Monday through Friday unless otherwise requested in writing by the Contractor and approved in writing by the ACO.
1.7 BULKHEAD PLACEMENT AND REMOVAL
The Government will move the bulkhead. The Contractor shall notify the ACO a minimum of 96 hours before the Contractor needs the bulkhead to be moved.
1.8 GATES OUT OF SERVICE
Only one gate may be taken out of service at a time.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTION
Not Used.
-- End of Section --
SECTION 01 00 00 Page 2
SECTION 01 22 00
MEASUREMENT AND PAYMENT
PART 1 GENERAL
Payment items for all work in this contract for which payments will be made are listed in the PROPOSAL SCHEDULE and described below. All costs for items of work which are not specifically mentioned to be included in a particular payment item shall be included in the listed payment item most closely associated with the work involved.
Payment for the items listed below shall constitute full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management and performing all associated Contractor quality control, environmental protection, safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.1 MODIFY LIFTING BEAM AND EMERGENCY BULKHEAD
MEASUREMENT
Work pertaining to modification of the lifting beam and emergency bulkhead shall not be separately measured.
PAYMENT
Payment for modifying the lifting beam and emergency bulkhead will be made at the contract job price for the item "Modify Lifting Beam and Emergency Bulkhead" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete all modifications to the lifting beam and emergency bulk and all related work in accordance with the contract documents.
1.2 LOAD TEST STIRRUP ASSEMBLY
MEASUREMENT
Work pertaining to load testing the stirrup assembly shall not be separately measured.
PAYMENT
Payment for load testing of stirrup assembly will be made at the contract job price for the item "Load Test Stirrup Assembly" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete all load testing and associated work in accordance with the contract documents.
1.3 MAP CORROSION PITS ON EMERGENCY GATE LEAFS AND GATE FRAMES
MEASUREMENT
Work pertaining to mapping of corrosion pits on emergency gate leafs and
SECTION 01 22 00 Page 1 gate frames shall not be separately measured.
PAYMENT
Payment for mapping of corrosion pits on the emergency gate leafs and gate frames will be made at the contract job price for the item "Map Corrosion Pits on Emergency Gate Leafs and Gate Frames" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete mapping of the corrosion pits and all associated work in accordance with the contract documents.
1.4 PAINT EMERGENCY GATE LEAFS AND GATE FRAMES
MEASUREMENT
Work pertaining to painting of emergency gate leafs and gate frames shall be based on the number of emergency gate leafs and gate frames acceptably painted.
PAYMENT
Payment for painting of the emergency gate leafs and gate frames will be made at the contract price per each for the item "Paint Emergency Gate Leafs and Gate Frames" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to paint the emergency gate leafs and gate frames and all associated work in accordance with the contract documents.
1.5 MAP CORROSION PITS ON SERVICE GATE LEAFS AND GATE FRAMES
MEASUREMENT
Work pertaining to mapping of corrosion pits on service gate leafs and gate frames shall not be separately measured.
PAYMENT
Payment for mapping of corrosion pits on the service gate leafs and gate frames will be made at the contract job price for the item "Map Corrosion Pits on Service Gate Leafs and Gate Frames" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete mapping of the corrosion pits and all associated work in accordance with the contract documents.
1.6 PAINT SERVICE GATE LEAFS AND GATE FRAMES
MEASUREMENT
Work pertaining to painting of service gate leafs and gate frames shall be based on the number of service gate leafs and gate frames acceptably painted.
PAYMENT
Payment for painting of the service gate leafs and gate frames will be made at the contract price per each for the item "Paint Service Gate Leafs and
SECTION 01 22 00 Page 2
Gate Frames" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to paint the service gate leafs and gate frames and all associated work in accordance with the contract documents.
1.7 MAP CORROSION PITS ON MAIN CONDUIT LINERS
MEASUREMENT
Work pertaining to mapping of corrosion pits on main conduit liners shall not be separately measured.
PAYMENT
Payment for mapping of corrosion pits on the main conduit liners will be made at the contract job price for the item "Map Corrosion Pits on Main Conduit Liners" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete mapping of the corrosion pits and all associated work in accordance with the contract documents.
1.8 PAINT MAIN CONDUIT LINERS
MEASUREMENT
Work pertaining to painting of main conduit liners shall be based on the number of main conduit liners acceptably painted.
PAYMENT
Payment for painting of the main conduit liners will be made at the contract price per each for the item "Paint Main Conduit Liners" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to paint the main conduit liners and all associated work in accordance with the contract documents.
1.9 PAINT MAIN AIR VENTS
MEASUREMENT
Work pertaining to painting of main air vents shall be based on the number of main air vents acceptably painted.
PAYMENT
Payment for painting of the main air vents will be made at the contract price per each for the item "Paint Main Air Vents" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to paint the main air vents and all associated work in accordance with the contract documents.
1.10 REPLACE EMERGENCY AND SERVICE GATE LEAF SEALS AND GATE FRAME SEALS
MEASUREMENT
Work pertaining to replacement of the emergency and service gate leaf seals
SECTION 01 22 00 Page 3 and gate frame seals shall be based on the number of sets of seals acceptably replaced. One set of seals includes two each vertical frame seals, one each horizontal frame seal, two each vertical gate seals, one each horizontal frame seal, and all cap screws for attachment of all seals to gates and gate frames.
PAYMENT
Payment for replacement of the emergency and service gate leaf seals and gate frame seals will be made at the contract price per set for the item "Replace Emergency and Service Gate Leaf Seals and Gate Frame Seals" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete replacement of the seals and all associated work in accordance with the contract documents.
1.11 REHABILITATE GATE SILLS
MEASUREMENT
Work pertaining to rehabilitation of the gate sills shall be based on the number of gate sills acceptably rehabilitated.
PAYMENT
Payment for rehabilitation of the gate sills will be made at the contract price per each for the item "Rehabilitate Gate Sills" which shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to complete rehabilitation of the gate sills and all associated work in accordance with the contract documents.
1.12 PAINT MECHANICAL AND HYDRAULIC EQUIPMENT
MEASUREMENT
Work pertaining to painting the mechanical and hydraulic equipment shall not be separately measured.
PAYMENT
Payment for painting the mechanical and hydraulic equipment will be made at the contract job price for the item "Paint Mechanical and Hydraulic Equipment" which price shall be full compensation for furnishing all plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management required to paint the mechanical and hydraulic equipment and all associated work in accordance with the contract documents.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT USED)
SECTION 01 22 00 Page 4
SECTION 01 32 01
PROJECT SCHEDULE
PART 1 GENERAL
Project schedule shall be in accordance with the contract clause SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984) in Section 00 72 00 - CONTRACT
CLAUSES.
PART 2 PRODUCTS (NOT APPLICABLE)
PART 3 EXECUTION (NOT APPLICABLE)
SECTION 01 32 01 Page 1
SECTION 01 33 00
SUBMITTAL PROCEDURES
05/11
PART 1 GENERAL
1.1 SUMMARY
The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work covered in the respective sections.
Units of weights and measures used on all submittals are to be the same as those used in the contract drawings.
Each submittal is to be complete and in sufficient detail to allow ready determination of compliance with contract requirements.
Contractor's Quality Control (CQC) System Manager shall check and approve all items prior to submittal and stamp, sign, and date indicating action taken. Proposed deviations from the contract requirements are to be clearly identified. Include within submittals items such as:
Contractor's, manufacturer's, or fabricator's drawings; descriptive literature including (but not limited to) catalog cuts, diagrams, operating charts or curves; test reports; test cylinders; samples; O&M manuals (including parts list); certifications; warranties; and other such required submittals.
Submittals requiring Government approval are to be scheduled and made prior to the acquisition of the material or equipment covered thereby. Pick up and dispose of samples not incorporated into the work in accordance with manufacturer's Material Safety Data Sheets (MSDS) and in compliance with existing laws and regulations.
A draft submittal register showing submittals required by the specifications is provided at the end of this section.
1.2 DEFINITIONS
1.2.1 Submittal Descriptions (SD)
Submittals requirements are specified in the technical sections.
Submittals are identified by Submittal Description (SD) numbers and titles as follows:
SD-01 Preconstruction Submittals
Submittals which are required prior to the start of construction includes schedules, tabular list of data, or tabular list including location, features, or other pertinent information regarding products, materials, equipment, or components to be used in the work.
Certificates of insurance Surety bonds List of proposed Subcontractors List of proposed products Construction progress schedule
SECTION 01 33 00 Page 1
Network Analysis Schedule (NAS) Submittal register Schedule of prices or Earned Value Report Health and safety plan Work plan Quality Control (QC) plan Environmental protection plan
SD-02 Shop Drawings
Drawings, diagrams and schedules specifically prepared to illustrate some portion of the work.
Diagrams and instructions from a manufacturer or fabricator for use in producing the product and as aids to the Contractor for integrating the product or system into the project.
Drawings prepared by or for the Contractor to show how multiple systems and interdisciplinary work will be coordinated.
SD-03 Product Data
Catalog cuts, illustrations, schedules, diagrams, performance charts, instructions and brochures illustrating size, physical appearance and other characteristics of materials, systems or equipment for some portion of the work.
Samples of warranty language when the contract requires extended product warranties.
SD-04 Samples
Fabricated or unfabricated physical examples of materials, equipment or workmanship that illustrate functional and aesthetic characteristics of a material or product and establish standards by which the work can be judged.
Color samples from the manufacturer's standard line (or custom color samples if specified) to be used in selecting or approving colors for the project.
Field samples and mock-ups constructed on the project site establish standards by which the ensuring work can be judged. Includes assemblies or portions of assemblies which are to be incorporated into the project and those which will be removed at conclusion of the work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report which includes findings of a test required to be performed by the Contractor on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report which includes finding of a test made at the job site or on
SECTION 01 33 00 Page 2 sample taken from the job site, on portion of work during or after installation.
Investigation reports.
Daily logs and checklists.
Final acceptance test and operational test procedure.
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Confined space entry permits.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (MSDS) concerning impedances, hazards and safety precautions.
SD-09 Manufacturer's Field Reports
Documentation of the testing and verification actions taken by manufacturer's representative at the job site, in the vicinity of the job site, or on a sample taken from the job site, on a portion of the work, during or after installation, to confirm compliance with manufacturer's standards or instructions. The documentation must be signed by an authorized official of a testing laboratory or agency and state the test results; and indicate whether the material, product, or system has passed or failed the test.
Factory test reports.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction contract. For example, Record Drawings and as-built drawings. Also, submittal requirements necessary to properly close out a major phase of construction on a multi-phase contract.
1.2.2 Approving Authority
Office or designated person authorized to approve submittal.
SECTION 01 33 00 Page 3
1.2.3 Work
As used in this section, on- and off-site construction required by contract documents, including labor necessary to produce submittals, except those SD-01 Pre-Construction Submittals noted above, construction, materials, products, equipment, and systems incorporated or to be incorporated in such construction.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with this section.
SD-01 Preconstruction Submittals
Submittal Register; G
1.4 SUBMITTAL CLASSIFICATION
Submittals are classified as follows:
1.4.1 Government Approved (G)
Government approval is required for extensions of design, critical materials, deviations, equipment whose compatibility with the entire system must be checked, and other items as designated by the Contracting Officer.
Within the terms of the Contract Clause SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION, they are considered to be "shop drawings."
1.4.2 For Information Only
Submittals not requiring Government approval will be for information only.
They are not considered to be "shop drawings" within the terms of the Contract Clause referred to above.
1.5 PREPARATION
1.5.1 Transmittal Form
Use Form 4025-R for submitting both Government approved and information only submittals in accordance with the contract requirements. These forms are included in the QCS software that the Contractor is required to use for this contract. Properly complete this form by filling out all the heading blank spaces and identifying each item submitted. Exercise special care to ensure proper listing of the specification paragraph and sheet number of the contract drawings pertinent to the data submitted for each item.
1.5.2 Source Drawings for Shop Drawings
The entire set of Source Drawing files (DWG) will not be provided to the Contractor. Only those requested by the Contractor to prepare shop drawings may be provided. Request the specific Drawing Number only for the preparation of Shop Drawings. These drawings may only be provided after award.
SECTION 01 33 00 Page 4
1.5.2.1 Terms and Conditions
Data contained on these electronic files must not be used for any purpose other than as a convenience in the preparation of construction data for the referenced project. Any other use or reuse shall be at the sole risk of the Contractor and without liability or legal exposure to the Government.
The Contractor must make no claim and waives to the fullest extent permitted by law, any claim or cause of action of any nature against the Government, its agents or sub consultants that may arise out of or in connection with the use of these electronic files. The Contractor must, to the fullest extent permitted by law, indemnify and hold the Government harmless against all damages, liabilities or costs, including reasonable attorney's fees and defense costs, arising out of or resulting from the use of these electronic files.
These electronic Source Drawing files are not construction documents.
Differences may exist between the Source Drawing files and the corresponding construction documents. The Government makes no representation regarding the accuracy or completeness of the electronic Source Drawing files, nor does it make representation to the compatibility of these files with the Contractor hardware or software. In the event that a conflict arises between the signed and sealed construction documents prepared by the Government and the furnished Source Drawing files, the signed and sealed construction documents govern. The Contractor is responsible for determining if any conflict exists. Use of these Source Drawing files does not relieve the Contractor of duty to fully comply with the contract documents, including and without limitation, the need to check, confirm and coordinate the work of all contractors for the project.
If the Contractor uses, duplicates or modifies these electronic Source Drawing files for use in producing construction data related to this contract, remove all previous indicia of ownership (seals, logos, signatures, initials and dates).
1.5.3 Electronic File Format
Provide submittals in electronic format with the exception of material samples required for SD-04 Samples items. Compile the submittal file as a single, complete document, to include the Transmittal Form described within. Name the electronic submittal file specifically according to its contents, submit the file naming convention to the Contracting Officer for approval before first electronic file is produced. Electronic files must be of sufficient quality that all information is legible. Use PDF as the electronic format, unless otherwise specified or directed by the Contracting Officer. Generate PDF files from original documents with bookmarks so that the text included in the PDF file is both searchable and can be copied. If documents are scanned, Optical Character Resolution (OCR) routines are required. Index and bookmark files exceeding 30 pages to allow efficient navigation of the file. When required, the electronic file must include a valid electronic signature, or scan of a signature.
Email electronic submittal documents fewer than 10MB to an email address as directed by the Contracting Officer. Provide electronic documents over 10MB on an optical disc, or through an electronic file sharing system such as the AMRDEC SAFE Web Application located at the following website:
https://safe.amrdec.army.mil/safe/.
Provide hard copies of submittals when requested by the Contracting Officer. Up to three additional hard copies of any submittal may be requested at the discretion of the Contracting Officer, at no additional
SECTION 01 33 00 Page 5 cost to the Government.
1.6 QUANTITY OF SUBMITTALS
1.6.1 Number of Samples SD-04 Samples
a. Submit two samples/sets of samples showing range of variation, of each required item. One approved sample/set of samples will be retained by approving authority and one will be returned to Contractor. Additional samples wil be necessary for paint and paint components.
b. Submit one sample panel or provide one sample installation where directed. Include components listed in technical section or as directed.
c. Submit one sample installation, where directed.
d. Submit one sample of non-solid materials.
1.7 INFORMATION ONLY SUBMITTALS
Normally submittals for information only will not be returned. Approval of the Contracting Officer is not required on information only submittals.
The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications; will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work;
and does not relieve the Contractor of the requirement to furnish samples for testing by the Government laboratory or for check testing by the Government in those instances where the technical specifications so prescribe.
1.8 SUBMITTAL REGISTER
Prepare and maintain submittal register, as the work progresses. Do not change data which is output in columns (c), (d), (e), and (f) as delivered by Government; retain data which is output in columns (a), (g), (h), and
(i) as approved. A draft submittal register showing items of equipment and materials for which submittals are required by the specifications is provided at the end of this section. This list may not be all inclusive and additional submittals may be required. Maintain a submittal register for the project in accordance with Section 01 46 00 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)). The Government will provide the initial draft submittal register in electronic format with the following fields completed, to the extent that will be required by the Government during subsequent usage.
Column (c): Lists specification section in which submittal is required.
Column (d): Lists each submittal description (SD No. and type, e.g. SD-02 Shop Drawings) required in each specification section.
Column (e): Lists one principal paragraph in specification section where a material or product is specified. This listing is only to facilitate locating submitted requirements. Do not consider entries in column (e) as limiting project requirements.
SECTION 01 33 00 Page 6
Thereafter, the Contractor is to track all submittals by maintaining a complete list, including completion of all data columns, including dates on which submittals are received and returned by the Government.
1.8.1 Use of Submittal Register
Submit submittal register. Submit with QC plan and project schedule.
Verify that all submittals required for project are listed and add missing submittals. Coordinate and complete the following fields on the register submitted with the QC plan and the project schedule:
Column (a) Activity Number: Activity number from the project schedule.
Column (g) Contractor Submit Date: Scheduled date for approving authority to receive submittals.
Column (h) Contractor Approval Date: Date Contractor needs approval of submittal.
Column (i) Contractor Material: Date that Contractor needs material delivered to Contractor control.
1.8.2 Contractor Use of Submittal Register
Update the following fields in the Government-furnished submittal register program with each submittal throughout contract.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (j) Action Code (k): Date of action used to record Contractor's review when forwarding submittals to QC.
Column (l) List date of submittal transmission.
Column (q) List date approval received.
1.8.3 Approving Authority Use of Submittal Register
Update the following fields in the Government-furnished submittal register program.
Column (b) Transmittal Number: Contractor assigned list of consecutive numbers.
Column (l) List date of submittal receipt.
Column (m) through (p) List Date related to review actions.
Column (q) List date returned to Contractor.
1.8.4 Copies Delivered to the Government
Deliver one copy of submittal register updated by Contractor to Government with each invoice request.
SECTION 01 33 00 Page 7
1.9 VARIATIONS
Variations from contract requirements require Government approval pursuant to contract Clause FAR 52.236-21 and will be considered where advantageous to Government.
1.9.1 Considering Variations
Discussion with Contracting Officer prior to submission will help ensure functional and quality requirements are met and minimize rejections and re-submittals. When contemplating a variation which results in lower cost, consider submission of the variation as a Value Engineering Change Proposal
(VECP).
Specifically point out variations from contract requirements in transmittal letters. Failure to point out deviations may result in the Government requiring rejection and removal of such work at no additional cost to the Government.
1.9.2 Proposing Variations
When proposing variation, deliver written request to the Contracting Officer, with documentation of the nature and features of the variation and why the variation is desirable and beneficial to Government. If lower cost is a benefit, also include an estimate of the cost savings. In addition to documentation required for variation, include the submittals required for the item. Clearly mark the proposed variation in all documentation.
Check the column "variation" of ENG Form 4025 for submittals which include proposed deviations requested by the Contractor. Set forth in writing the reason for any deviations and annotate such deviations on the submittal.
The Government reserves the right to rescind inadvertent approval of submittals containing unnoted deviations.
1.9.3 Warranting that Variations are Compatible
When delivering a variation for approval, Contractor warrants that this contract has been reviewed to establish that the variation, if incorporated, will be compatible with other elements of work.
1.9.4 Review Schedule Extension
In addition to normal submittal review period, a period of 15 working days will be allowed for consideration by the Government of submittals with variations.
1.10 SCHEDULING
Schedule and submit concurrently submittals covering component items forming a system or items that are interrelated. Include certifications to be submitted with the pertinent drawings at the same time. No delay damages or time extensions will be allowed for time lost in late submittals.
a. Coordinate scheduling, sequencing, preparing and processing of submittals with performance of work so that work will not be delayed by submittal processing. Allow for potential resubmittal of requirements.
b. Submittals called for by the contract documents will be listed on the register. If a submittal is called for but does not pertain to the
SECTION 01 33 00 Page 8 contract work, the Contractor is to include the submittal in the register and annotate it "N/A" with a brief explanation. Approval by the Contracting Officer does not relieve the Contractor of supplying submittals required by the contract documents but which have been omitted from the register or marked "N/A."
c. Re-submit register and annotate monthly by the Contractor with actual submission and approval dates. When all items on the register have been fully approved, no further re-submittal is required.
d. Carefully control procurement operations to ensure that each individual submittal is made on or before the Contractor scheduled submittal date shown on the approved "Submittal Register."
1.11 GOVERNMENT APPROVING AUTHORITY
When approving authority is Contracting Officer, the Government will:
a. Note date on which submittal was received.
b. Review submittals for approval within scheduling period specified and only for conformance with project design concepts and compliance with contract documents.
c. Identify returned submittals with one of the actions defined in paragraph REVIEW NOTATIONS and with markings appropriate for action indicated.
Upon completion of review of submittals requiring Government approval, stamp and date submittals.
1.11.1 Review Notations
Contracting Officer review will be completed within 30 calendar days after date of submission. Submittals will be returned to the Contractor with the following notations:
a. Submittals marked "approved" or "accepted" authorize the Contractor to proceed with the work covered.
b. Submittals marked "approved as noted" or "approved, except as noted, resubmittal not required," authorize the Contractor to proceed with the work covered provided he takes no exception to the corrections.
c. Submittals marked "not approved" or "disapproved," or "revise and resubmit," indicate noncompliance with the contract requirements or design concept, or that submittal is incomplete. Resubmit with appropriate changes. No work shall proceed for this item until resubmittal is approved.
d. Submittals marked "not reviewed" will indicate submittal has been previously reviewed and approved, is not required, does not have evidence of being reviewed and approved by Contractor, or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals returned for lack of review by Contractor or for being incomplete, with appropriate action, coordination, or change.
SECTION 01 33 00 Page 9
1.12 DISAPPROVED SUBMITTALS
Make corrections required by the Contracting Officer. If the Contractor considers any correction or notation on the returned submittals to constitute a change to the contract drawings or specifications; notice as required under the FAR clause entitled CHANGES, is to be given to the Contracting Officer. Contractor is responsible for the dimensions and design of connection details and construction of work. Failure to point out deviations may result in the Government requiring rejection and removal of such work at the Contractor's expense.
If changes are necessary to submittals, make such revisions and submission of the submittals in accordance with the procedures above. No item of work requiring a submittal change is to be accomplished until the changed submittals are approved.
1.13 APPROVED SUBMITTALS
The Contracting Officer's approval or acceptance of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing and other information are satisfactory.
Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for dimensions, the design of adequate connections and details, and the satisfactory construction of all work.
After submittals have been approved or accepted by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.
1.14 APPROVED SAMPLES
Approval of a sample is only for the characteristics or use named in such approval and is not be construed to change or modify any contract requirements. Before submitting samples, the Contractor to assure that the materials or equipment will be available in quantities required in the project. No change or substitution will be permitted after a sample has been approved.
Match the approved samples for materials and equipment incorporated in the work. If requested, approved samples, including those which may be damaged in testing, will be returned to the Contractor, at his expense, upon completion of the contract. Samples not approved will also be returned to the Contractor at its expense, if so requested.
Failure of any materials to pass the specified tests will be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. Government reserves the right to disapprove any material or equipment which previously has proved unsatisfactory in service.
Samples of various materials or equipment delivered on the site or in place may be taken by the Contracting Officer for testing. Samples failing to meet contract requirements will automatically void previous approvals.
Contractor to replace such materials or equipment to meet contract
SECTION 01 33 00 Page 10 requirements.
Approval of the Contractor's samples by the Contracting Officer does not relieve the Contractor of his responsibilities under the contract.
1.15 WITHHOLDING OF PAYMENT
Payment for materials incorporated in the work will not be made if required approvals have not been obtained.
1.16 STAMPS
Stamps used by the Contractor on the submittal data to certify that the submittal meets contract requirements is to be similar to the following:
SECTION 01 33 00 Page 11
| CONTRACTOR |
| (Firm Name) | | _____ Approved | | _____ Approved with corrections as noted on submittal data and/or | | attached sheets(s) |
| SIGNATURE: __________________________________________________________ |
| TITLE: ______________________________________________________________ |
| DATE: _______________________________________________________________ |
PART 2 PRODUCTS
Not Used
PART 3 EXECUTION
Not Used
SECTION 01 33 00 Page 12
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
Skiatook Repair & Emergency Gates FY17
01 33 00 SD-01 Preconstruction Submittals
1.8 GSubmittal Register
01 35 26 SD-01 Preconstruction Submittals
1.7 GAccident Prevention Plan (APP)
SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports
1.12.2 GAccident Reports
1.12.3LHE Inspection Reports
SD-07 Certificates 1.6.1.4Crane Operators/Riggers
1.7.2.2 GStandard Lift Plan
1.7.2.3 GCritical Lift Plan
1.7.2.3 GNaval Architecture Analysis
1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.9.1Hot Work Permit 1.12.4Certificate of Compliance 1.14License Certificates
01 45 00 SD-01 Preconstruction Submittals
3.2 GContractor Quality Control (CQC)
Plan SD-06 Test Reports
3.9Verification Statement 01 50 00 SD-01 Preconstruction Submittals
1.3 GConstruction Site Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
01 50 00 3.6 GCrane Operator Certification
3.6 GCrane Inspection Reports
01 57 19 SD-01 Preconstruction Submittals 1.5.1Preconstruction Survey
1.6 GEnvironmental Protection Plan
1.6.6.1 GDirt and Dust Control Plan
1.5.4 GEmployee Training Records
SD-07 Certificates
1.5.4 GEmployee Training Records
SD-11 Closeout Submittals
1.5.2 GRegulatory Notifications
01 78 00 SD-03 Product Data 1.5Spare Parts Data
SD-11 Closeout Submittals
3.1 GAs-Built Drawings
3.3Final Approved Shop Drawings 3.4Construction Contract
Specifications 02 00 00 SD-01 Preconstruction Submittals
1.4 GWater Control Plan
02 41 00 SD-01 Preconstruction Submittals
1.2.1 GDeconstruction Plan
1.7 GExisting Conditions
02 50 00 SD-01 Preconstruction Submittals
1.5 GDisassembly and Reassembly
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
02 50 00 SD-03 Product Data
1.5 GHydraulic Oil
05 05 20 SD-01 Preconstruction Submittals
1.2.1 G EC-DInspection Weld Tracking Log
Template
3.2.4.3 G EC-DStructural Inspection Map
Template SD-06 Test Reports
3.2.4 G EC-DInspection Test Reports
3.2.5 G EC-DFinal Inspection Test Report
1.2.2 G EC-DWeld Tracking Log
1.5.5UT Equipment Qualification Test
Reports 1.5Witness Points
SD-07 Certificates
1.5.1 G EC-DInspector Qualifications
05 05 25 SD-01 Preconstruction Submittals 3.2Welding Quality Assurance Plan
SD-03 Product Data 1.3.5Welder, Welding Operator, and
Tacker Qualification 1.3.6Inspector Qualification 1.3.2Previous Qualifications 1.3.3Pre-Qualified Procedures 2.2Welding Electrodes and Rods
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES
05 05 25 3.3Nondestructive Testing SD-07 Certificates
1.3Certified Welding Procedure Specifications (WPS)
05 50 13 SD-02 Shop Drawings
2.4 G EC-DHydraulic Operating Equipment
Replacement Parts Assembly SD-03 Product Data
2.1 G EC-DGate Stem Wiper Seal
2.2 G EC-DIndicator Rod Assembly
2.3 G EC-DLeaded Red Brass Seal
Assembly
2.4 G EC-DHydraulic Operating Equipment
Replacement Parts Assembly SD-07 Certificates
2.3 G EC-DLeaded Red Brass Seal
Assembly
2.4 G EC-DHydraulic Operating Equipment
Replacement Parts Assembly
3.3 G EC-DTorque Wrench Calibration
SD-08 Manufacturer’s Instructions
2.3 G EC-DLeaded Red Brass Seal
Assembly
2.4 G EC-DHydraulic Operating Equipment
Replacement Parts Assembly
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES
05 50 13 SD-09 Manufacturer’s Field Reports
2.3 G EC-DLeaded Red Brass Seal
Assembly
2.4 G EC-DHydraulic Operating Equipment
Replacement Parts Assembly
05 60 00 SD-07 Certificates
2.1 GBabbitt Material
05 70 00 SD-02 Shop Drawings
2.1 GWire Rope Sling Assembly
SD-07 Certificates
2.1 GWire Rope Sling Assembly
09 90 00 SD-03 Product Data Manufacturer's Technical Data Sheets
SD-04 Samples Paint Component Samples
09 97 02 SD-01 Preconstruction Submittals
1.2 GSafety, Health, and
Environmental Requirements
1.2.1 GSafety Plan
1.2.1.5 GConfined Spaces Plan
1.2.1.6 GRespiratory Protection Plan
1.2.2.1 GAirborne Sampling Plan
1.2.1 GVentilation Assessment Plan
1.2.2 GMedical Surveillance Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES
09 97 02 1.2.2.2 GWorker Protection Plan
1.2.3 GEnvironmental Protection Plan
1.2.3.1Waste Manifest
1.2.3.1 GWaste Disposal Plan
1.2.3.2 GContainment Plan
1.2.3.3 GVisible Emissions Monitoring
Plan
1.2.3.4 GTSP Monitoring Plan
1.2.3.5 GWater Quality Plan
1.2.3.6 GSoil Quality Plan
SD-03 Product Data Part 2 GManufacturer's Product Data
Sheet SD-04 Samples
Part 2 GProduct Samples
2.1 GSpecial Paint Formulas
GSolvent and Thinners SD-06 Test Reports
1.2.3.4TSP Test Report 1.2.3.6Soil Quality Test Report 3.4Inspection Reports 1.2.2.2Medical Status Report 1.2.2.3Change in Medical Status Report
1.2.2.1 GAir Monitoring Test Plan
1.2.2.1Air Monitoring Test Report
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES
09 97 02 1.4.1Certified EHS Professional 1.4.2Certified Lead Laboratory 1.4.3SSPC QP 1 Certificate 1.4.4SSPC QP 2 Certificate
1.4.4 GQualified Hazardous Paint
Removal Contractor 1.4.6Coating Thickness Gage
Qualification
1.4.5 GQualified Paint Applicator
35 20 00 SD-01 Preconstruction Submittals
1.4.1 GProof Load Plan
1.4.1 GProof Load Plan
SD-06 Test Reports
1.4.2 G EC-DProof Load Test Report
1.4.1.1 G EC-DMechanical System Certified
Inspection Reports SD-07 Certificates
1.4.1.2 G EC-DLoad Monitoring Device(s)
Certificate(s) of Calibration
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM…
This is the start of the file's text. The full file is on GovTribe.