*Amendment No. 0003
BID SCHEDULE
CXT NAVAJO SHOWER BUILDING INSTALLATION
PINE CREEK COVE PUA, PINE CREEK LAKE
Item Unit No. Description Quantity Unit Price Amount
0001 - All materials, labor, and equipment necessary to demolish the existing shower building and remove and dispose of all debris off of government property.
1 JOB $_______ $________
0002 - All materials, labor, and equipment necessary to construct pad, install electric, *plumbing, and sewer stub ups. Install new 1 2” Schedule 40 PVC water line and water shut off valve and valve box. Install new sewer pipe from stub up to existing sewer line. Replace existing *175 amp panel box with a new 200 300 amp panel box.
*Install a 200 300 amp disconnect alongside new 200 300 amp *panel box. Lay new electric service line from new 200 300 *amp panel box to 200 300 amp disconnect. Lay new
* electric service line from 200 300 amp disconnect to CXT location.
0003 - Provide all materials, labor, and equipment to make final connections of electric, plumbing and sewer utilities, place concrete sidewalks, and landscape after placement of restroom.
TOTAL: $__________