*Amendment No. 0003

BID SCHEDULE

CXT NAVAJO SHOWER BUILDING INSTALLATION

PINE CREEK COVE PUA, PINE CREEK LAKE

Item Unit No. Description Quantity Unit Price Amount

0001 - All materials, labor, and equipment necessary to demolish the existing shower building and remove and dispose of all debris off of government property.

1 JOB $_______ $________

0002 - All materials, labor, and equipment necessary to construct pad, install electric, *plumbing, and sewer stub ups. Install new 1 2” Schedule 40 PVC water line and water shut off valve and valve box. Install new sewer pipe from stub up to existing sewer line. Replace existing *175 amp panel box with a new 200 300 amp panel box.

*Install a 200 300 amp disconnect alongside new 200 300 amp *panel box. Lay new electric service line from new 200 300 *amp panel box to 200 300 amp disconnect. Lay new

* electric service line from 200 300 amp disconnect to CXT location.

0003 - Provide all materials, labor, and equipment to make final connections of electric, plumbing and sewer utilities, place concrete sidewalks, and landscape after placement of restroom.

TOTAL: $__________

*Amendment No. 0003

Contractor Name (printed) Signature