W912BV-17-Q-0059.pdf

PDF 2 MB Posted

Attached to
Mowing Services Federal contract opportunity
Solicitation number
W912BV-17-Q-0059
Issued by
Department of the Army Corps of Engineers Engineering District Tulsa

View the file

Other files for this federal contract opportunity

Other files attached to Mowing Services, newest first.
File Type Posted
Price_Schedule.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BV-17-Q-0059 09-Mar-2017

b. TELEPHONE NUMBER

918.669.7275

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 20 Mar 2017

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA X ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

RUDOLFO J MORALES

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$7,500,000.00

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF88

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BV-17-Q-0059

Section B - Supplies or Services and Prices

INSTRUCTIONS TO OFFERORS

Instructions to Offers

Read the solicitation in its entirety and all amendments before submitting documents.

Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST

MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS

Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.

EMAIL

Emailed quotes in a file format readible by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address CESWT‐CT‐SS‐Quotes@usace.army.mil and copy Rudolfo.morales@usace.army.mil.

Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.

FAX or MAIL

Include a cover sheet that references the Contract Specialist – Rudolfo Morales and the solicitation number. When submitting through mail ensure you clearly mark the envelope to:

TULSA DISTRICT CORPS OF ENGINEERS

Rudolfo J. Morales, CECT‐SWT‐E

1645 S. 101ST EAST AVE

TULSA, OK 74128‐4609

FAX: (918) 669‐7495

Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x 17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers.

Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.

Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing.

Ensure to allow enough time to submit your quote before the due date and time.

HAND DELIVER

If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7275) or Rudolfo.morales@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points. Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District Office. The address of the Tulsa District Office is below:

TULSA DISTRICT CORPS OF ENGINEERS

1645 S. 101ST EAST AVE

TULSA, OK 74128‐4609

This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.

Submit the following documents:

1) A signed copy of the 1st page of the solicitation and all amendments

2) Complete the past performance references page, if included in solicitation.

3) Complete the Excel pricing schedule provided in the solicitation (all cells except for the unit prices are locked).

4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors should submit questions and inquiries related to this solicitation in accordance with the following (collect calls will not be accepted):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and clicks continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.

4. The Solicitation Numbers are: W912BV‐17‐Q‐0059 The Bidder Inquiry Key is: AN8SR7-I76XQT

5. Address/enter only one question/issue per entry.

c. The Bidder Inquiry System will be unavailable for new inquiries 4:00pm (Central) Thursday, 17 March 2017 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Rudy Morales Telephone: 918‐669‐7275 E‐MAIL: Rudolfo.Morales@usace.army.mil

PREPROPOSAL/SITE VISIT CONFERENCE

A Pre‐proposal Conference will be held on Wednesday, 16 March 2017 at 1:00 p.m. CST, at the Canton Lake Project Office located at US Army Corps of Engineers, HC 65, Box 120, Canton, OK, 73724 The purpose of the conference will be to familiarize prospective offerors with the extent and nature of the requirement and location of performance. Oral questions pertaining to the

Statement of Work or other contractual matters will not be answered during the tour of the performance work areas.

This conference is not mandatory for prospective offerors. All prospective offerors are strongly urged to attend the pre‐proposal conference and to satisfy themselves as to all general conditions that may affect the cost and schedule of performance of this contract.

Any questions pertaining to past or current contract information for any of the past or current contracts should be submitted to the Office of Counsel, Tulsa District Office in the form of a FOIA (Freedom of Information Act) request. Below is the contact information for the Office of Counsel, Tulsa District.

CESWT‐OC

1645 South 101st East Ave Tulsa, OK 74128‐4609 foia‐swt@usace.army.mil

Guidance on how to submit a FOIA request can be found at http://www.usace.army.mil/FOIA.aspx. Please ensure your request is submitted in a timely matter to receive feedback before the solicitation closing.

PRICE SCHEDULE

See Section J for Price Schedule

Section C - Descriptions and Specifications

PWS

S P E C I F I C A T I O N S

CANTON LAKE

OKLAHOMA

MAINTENANCE CONTRACT

FOR

MOWING

ORGANIZATION OF SPECIFICATIONS

This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.

The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.

Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.

TABLE OF CONTENTS

Para.

No. Paragraph Title

1 Scope of Work

2 Definitions

3 References

4 Initiation, Execution, and Acceptance of Work

5 Personnel

6 Equipment

7 Materials and Supplies

8 Performance Requirements

9 Contractor Quality Control

10 Deductions for Deficient Work

11 Safety

12 Reporting Defective Facilities

13 Prework Conference

14 Contractor Submittals

15 Required Insurance and Insurance Certificate

16 Billing

17 Changes in Amount of Facilities Serviced

EXHIBITS

No. TITLE

1 Maximum Response Times

2 Performance Requirements Table

3 Quality Control Inspection Log

4 Quality Assurance Report

5 Invoice Format

APPENDICES

Appendix Title

A Mowing

Facilities Inventory & Mowing Maps

1. SCOPE OF WORK. The work required under this specification provides for the mowing, trimming, and edging of public use areas, the dam embankment, and other project lands at Canton Lake.

2. DEFINITIONS.

2.1. Contracting Officer Representative (COR). A Government

employee designated by the Contracting Officer as their representative in administering this contract.

2.2. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.

2.3. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 3.

2.4. Government. The term "Government" as used herein means the United States of America.

2.5. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.

2.6. Project. The term "project" as used herein means all

Government property and easements at Canton Lake.

2.7. Public Use Area (PUA). Parks as well as overlooks, access points, and other areas used by the public for recreation.

2.8. Quality. Conformance with the contract specification.

2.9. Quality Assurance (QA). The procedure by which the

Government determines CQC is functioning effectively.

2.10. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.11. Workday. Any day, Monday through Friday, exclusive of

Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.

3. REFERENCES. Corps of Engineers Safety & Health Requirements Manual (EM 385-1-1, dated 30 November 2014) is hereby incorporated into this specification. The Contract Administrator will furnish EM 385-1-1 to the contractor after contract award.

It is also available on-line at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual .aspx .

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. Initiation and execution of work. Work shall be performed in accordance with this specification and the performance requirements (Exhibit 2, Performance Requirements).

4.1.2. Acceptance of work. The Government shall accept work

unless the Contracting Officer Representative (COR) notifies the contractor of deficient services. Work will be accepted based on compliance with performance requirements. Refer to paragraph 9 for inspection criteria and contractor performance evaluation.

4.1.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (Exhibit 5, Quality Assurance Report).

4.1.2.2. If the COR notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re-performed the same day. Work performed on less than a daily schedule shall be re-performed not later than the following day. Refer to paragraph 9 for deficient work not re-performed.

4.1.2.3. The contractor shall notify the COR when corrective

work is completed. Notification shall be made by completing Part IV of the QA Report provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the COR shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and Skills. The contractor shall provide

personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.

5.2. Supervision.

5.2.1. The contractor shall provide one on—site supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.

5.2.2. The on-site supervisor shall contact the COR each day

work is being performed, between 8:00 a.m. and 8:30 a.m.

5.2.3. The contractor shall provide the COR a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish work within reasonable time frames not to exceed the response times set forth in Exhibit 1.

6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the COR for inspection. Equipment brought to the project shall not be used until it has passed inspection by the COR. The COR shall establish the time and location for these inspections.

6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.

6.2.1. Tractors shall be equipped and operated in accordance

with the following:

6.2.1.1 Power take offs on tractors shall operate at a minimum of 540 r.p.m. during mowing operations.

6.2.1.2. Seat belts shall be worn at all times by tractor

operators. Refer to subparagraph 16.B.08. of EM 385-1-1.

6.2.1.3. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than ¼-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.03.a and 16.B.11.a of EM 385-1-1.

6.2.1.4. Rollover protection shall be provided. If the

structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.

6.2.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:

6.2.2.1. Mowers shall be equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.

6.2.2.2. Mowers shall be equipped with slides and wheels.

6.2.2.3. Mowers shall not weigh more than 600 lbs. and not be more than a 36” cutting width when used within 6 feet of campsite utilities and at the restrooms located in the Canadian A Campground. Campsites in this area are close together, have utilities that are close together and some campsites have sloping sides. Restrooms have utilities and septic laterals in the immediate lawn area.

6.2.2.4. Brush hogs shall not be used on the slopes of dikes

around oxidation ponds.

6.2.2.5. Mulching mowers shall not be used.

6.2.2.6. Brush hogs shall not be used when mowing within 10 feet of facilities in improved areas or as specified in 5.2.2.3.

6.2.2.7. All safety devices provided by the manufacturers of

push and riding mowers shall function as designed.

6.2.3. Edgers shall be equipped with a rotary blade in an

upright position. A protective guard for the blade shall be provided.

6.3. Equipment Operation.

6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.

6.3.2. Power operated trimming equipment shall not be used

around any shrubs or trees with a diameter less than 3 inches at breast height.

6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the COR approves use of other areas.

6.5. Vehicles. The contractor shall furnish suitable vehicle(s) for personal transportation, work area use, pickup and delivery of supplies, and transport of refuse to bulk storage dumpsters.

6.5.1. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project.

Lettering shall be at least 2 inches high. Each sign shall contain the following:

CANTON LAKE

MOWING SERVICES

PROVIDED BY

(Contractor’s Name)

6.6. Equipment Storage. The area south of the Project Office

will be available for storage of mowing equipment on an interim basis while mowing work is being performed.

7. MATERIALS AND SUPPLIES.

7.1. Government Furnished.

7.1.1. Potable water.

7.1.2. All forms for submitting required reports.

7.1.3. Gate keys

7.2. Contractor Furnished. The contractor shall furnish all

materials and supplies necessary to perform the duties and services of this contract, except where otherwise stated as Government furnished.

7.2.1. Sustainability Compliance. The contractor furnished

materials and supplies shall be in compliance and meet the minimum standards for the BioPreferred Program requirements set forth by the EPA and USDA. Information for EPA and USDA designated product categories can be found at:

https://www3.epa.gov/epawaste/conserve/tools/cpg/products/index.h tm https://www.biopreferred.gov/BioPreferred/

8. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 2. The contractor's performance will be evaluated using these PRs as follows:

8.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the COR.

8.2. Deficient services are determined during initial QA

inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.

9. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.212-4(a) "Inspection/Acceptance" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 2.

9.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 3). A copy of completed inspection logs shall be furnished the COR daily or when an area is completed, whichever is later.

9.2. The COR may waive the requirements in subparagraph 8.1. if he determines proper CQC can be achieved without the required submissions. The COR will normally make this determination on the basis of actual performance by the contractor.

10. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 2. Deductions for documented defects will be made in accordance with the following procedures:

10.1. Each service found deficient and reperformed by the

contractor: No deduction.

10.2. Each service found deficient and performed by the

Government: Deduction for loss in value shall be based on the Government's cost for performing the work.

10.3. Each service found deficient and performed by another

contractor: Deduction is the contract price paid the other contractor to perform the work.

10.4. Each service found deficient and not reperformed by

anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.

11. SAFETY.

11.1. Safety Plan. The contractor shall furnish the COR a

safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:

11.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

11.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

11.1.3. Procedures for handling, reporting, and correcting

unsafe conditions, practices, and safety violations.

11.1.4. Procedures for treating and transporting injured persons to medical facilities.

11.1.5. Fire prevention plans.

11.1.6. Activity hazard analysis shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with an activity hazard analysis. Initially, the safety plan shall include, but not be limited to, activity hazard analysis for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the COR directs.

An activity hazard analysis form, as seen in EM 385 -1-1, will be given to the contractor and discussed thoroughly and shall be submitted for approval within one (1) week after the prework conference.

11.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).

11.1.6.2. Equipment operation and maintenance (for each type of equipment).

11.1.6.3. Vehicle operation and maintenance.

11.2. Safety Meetings. A safety meeting shall be conducted

prior to initiation of mowing. Employees of the contractor and su2bcontractor, if applicable, shall attend safety meetings. A report of safety meetings shall be furnished the COR each time a meeting is held. The report shall include the following information: Date, location, and names of persons attending, safety items discussed, and persons who conducted the meeting.

11.3. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the COR.

11.4. Personal Clothing and Safety Apparel. Contractor

personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts, tank tops, or shorts).

Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385-1-1.

11.5. Accident Reports.

11.5.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.

11.5.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

11.6. Exposure Reports. The contractor shall maintain an

accurate record of exposure data (man-hours worked) and submit the figure in writing after each mowing has been completed.

12. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the COR each workday.

13. PREWORK CONFERENCE. The COR shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 14 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The COR shall establish the location, date, and time of the Prework Conference after consultation with the contractor.

14. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the COR. If the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

14.1. Names of on-site supervisor and his alternate (submit

prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).

14.2. Safety Plan (subparagraph 11.1.).

14.3. Job Hazard Analysis (subparagraph 11.1.6.)

14.4. Exposure reports (submit after completion of each mowing) (subparagraph 11.6.).

15. REQUIRED INSURANCE AND INSURANCE CERTIFICATE. Pursuant to FAR 28.301(b) for the protection of the Government, and FAR 28.306(b) and 52.228-5, Work on a Government Installation, the Contractor shall procure and maintain during the entire period of his performance under this contract the following minimum insurance:

15.1. Worker’s Compensation and Employer’s Liability: Workers' compensation and employers' liability insurance in compliance with applicable state statutes, with a minimum liability coverage of $100,000.

15.2. General Liability: Comprehensive general liability

insurance for bodily injury in the minimum limits of $500,000 per occurrence. Property damage liability insurance shall be required in an amount of at least $100,000.

15.3. Automobile liability: Liability insurance shall be

written on the comprehensive form of policy. The policy shall provide for bodily injury and property damage liability covering the operation of all automobiles used in connection with performing the contract. Policies covering automobiles operated in the United States shall provide coverage of at least $200,000 per person and $500,000 per occurrence for bodily injury and $20,000 per occurrence for property damage. The amount of liability coverage on other policies shall be commensurate with any legal requirements of the locality and sufficient to meet normal and customary claims.

16. BILLING.

16.1. The contractor shall submit an invoice at the end of each mowing in a timely manner.

16.2. An example invoice is shown at Exhibit 5.

16.3. All exposure reports shall be submitted before an invoice will be accepted.

16.4. Invoices and supporting documents shall be delivered or mailed to the Project Manager, Canton Project Office, HC 65 Box 120, Canton, OK 73724.

17. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.

17.1. Services required are deleted for a period of one (1)

month or longer in an entire park.

17.2. Services would cease to be required during natural

emergencies or disasters, such as a major flood event or tornadoes that would render the PUA’s inaccessible or cause public safety to be a concern, or during a period of prolonged disruption of utility services requiring closure of either partial or entire PUA’s, or in the event of a Temporary Government Shutdown which would close entire PUA’s. In any event, the Contracting Officer or the COR will contact the prime contractor and provide detailed guidance as to how the contractor shall proceed, or not proceed, with mowing services, depending upon the specific circumstances at the time. Services not able to be performed or not required will not be charged.

EXHIBIT 1

MAXIMUM RESPONSE TIMES

MAXIMUM RESPONSE TIMES FOR SCHEDULED MOWINGS

RESPONSE TIMES

WORK DESCRIPTION START1 FINISH2

Improved & Lawn Areas 2 WD 10 WD

Improved, semi-improved, Dam embankment, and dikes 2 WD 16 WD

WD - Workdays CD - Calendar Days

START - 1The maximum allowable time to begin work at the work site once notified of the mowing schedule.

FINISH - 2The maximum allowable time to complete work after a mowing has been initiated.

EXHIBIT 2

PERFORMANCE REQUIREMENTS

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS

APPENDIX A – MOWING

Improved & Lawn areas

A 1 Smooth cut. 1Height of cut grass does not exceed ±½ inch from that specified. No uncut vegetation.

Semi-Improved areas A 2 Smooth cut. 1Height of cut grass does not exceed ±½ inch from that specified. No uncut strips of vegetation.

Embankment area A 3 Smooth cut. 1Height of cut grass does not exceed ±1 inch from that specified. No uncut vegetation.

Dike Areas A 4 Smooth cut. 1Height of cut grass does not exceed ±1 inch from that specified. No uncut vegetation.

Edging A 6 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.

Trimming A 7 Uniform cut with no scalping of grass. No damage to trees or shrubs.

Clean designated areas after mowing

A 8 No vegetation or debris left on paved surfaces.

1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.

EXHIBIT 3

QUALITY CONTROL INSPECTION LOG

EXHIBIT 4

QUALITY ASSURANCE REPORT

EXHIBIT 5

INVOICE FORMAT

SMALL BUSINESS

BILLING FOR

MAINTENANCE CONTRACT

PROJECT: _________________________________ SHEET ___ OF ___

CONTRACTOR: ______________________________ DATE: ______________

ADDRESS: _________________________________ CONTRACT NO: W912BV-17-P_-___

BILLING PERIOD: ________ THRU __________ INVOICE NO: __________

PAYMENT TERMS: _______________________________

(Payment Discount or N/A)

BID ITEM

NO. DEDUCTION AMOUNT TOTAL

PAYMENT REQUESTED: _________________

CONTRACTOR (Signature/Date)

MANHOURS:________

APPENDIX A

MOWING

1. FACILITIES TO BE SERVICED. Public use areas, project office complex, Auxiliary Spillway channel, saddle dikes, and other project lands. An inventory of mowing areas is given in Table A.

Maps are located at the end of this appendix.

2. FREQUENCIES AND TIMES OF SERVICE.

2.1. The COR will provide the contractor with a proposed mowing schedule which shall direct work between 1 April and 31 October.

2.2. Work in parks shall be performed between 8 am and 6 pm.

2.3. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, during the Walleye Rodeo event, or one workday before Federal holidays. Mowing at other locations is permitted on these days.

2.4. Restrictions.

2.4.1. Mowing of all improved areas will be directed at the same time with one exception. When all or part of these areas are flooded, or covered by debris deposited during a flood, they will be excluded from the mowing requirements. Payment will be reduced by the price bid per each area excluded or pro rata portion thereof.

2.4.2. Mowing in semi-improved areas and dike areas will be

directed only when mowing of improved areas is directed.

2.4.3. The COR shall determine the location at which work shall be started each time mowing is scheduled to begin.

2.4.4. Mowing of all areas at each of the locations listed in Table A shall be completed before work at another location is started.

2.4.5. Mowers shall not weigh more than 600 lbs. and not be more than a 36” cutting width when used within 6 feet of campsite utilities and at the restrooms located in the Canadian A Campground. Campsites in Canadian A Campground are close together, have utilities that are close together, and some campsites have sloping sides. Restrooms have utilities and septic laterals in their immediate lawn area.

2.4.6. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground. The contractor shall use good judgment in determining whether conditions are suitable for mowing operations. In cases where the contractor and the COR disagree about the suitability of conditions for mowing operations, the COR will determine whether work shall progress or stop. When work is stopped, the negotiated finish date for the mowing cycle will be extended by the number of days lost due to wet conditions.

3. DESCRIPTION OF WORK. The contractor shall perform the following work as directed. See maps.

3.1. Mowing shall be performed in the following areas:

3.1.1. Improved areas are highly developed areas, normally

located in PUAs. These areas shall be mowed to a height of 3 inches. The limits of most of these areas are shown on the attached maps. In addition, mow the areas described below and around facilities shown on the drawings.

3.1.1.1. Areas adjacent to all roads and parking areas shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the COR to provide a safe viewing distance for vehicles approaching the intersections.

3.1.1.2. Areas around park and lake entrance signs. Park

entrance signs are located beside roads shown on the attached maps. A triangular shaped area shall be mowed around these signs. This area shall extend from the edge of the roadway to a point 10 feet on the other side of the sign at its widest point.

It shall extend 10 feet behind the sign and shall provide a clear view of the front of the sign from vehicles using the adjacent roadway. The COR will determine the length of the area to be mowed in front of these signs.

3.1.1.3. Areas around toilets and the changehouse located

outside the limits of improved areas shown on the attached maps shall be mowed for a distance of 10 feet from the back and sides of toilets. The area between the nearby road or parking area and the toilet shall be mowed. In addition, the area between pairs of toilets shall be mowed.

3.1.2. Lawn areas shall be mowed to a height of 2 inches.

These areas are located around the project office, amphitheater, and overlook complex. The limits of these areas are shown on the attached maps.

3.1.3. Semi-improved areas are undeveloped areas within or

adjacent to improved mowing areas that require less frequent mowing. They shall be mowed to a height of 4 inches. The limits of these areas are shown on the attached maps.

3.1.4. Fishing Area limits are shown on the map and will be

mowed as a part of the Blaine Park mowing. Sidewalk and step areas will be mowed a minimum of 5 feet from the edge on the slope and rip rapped areas. Due to the steep slope in the areas adjacent to the spillway, including fishing areas, trimming may be required in lieu of mowing. Jetty areas will be trimmed along the parking perimeter.

3.1.4.1. The area around the oxidation pond shall be mowed from the edge of the water to a point 10 feet outside the fence.

3.1.5. Saddle Dike areas shall be mowed to a height of 4 inches.

A 15-foot strip adjacent to the downstream toe of dikes shall be mowed. The area adjacent to the upstream toe of these structures shall be mowed for a distance of 15 feet, or to the tree line, whichever is less. Areas adjacent to access roads shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 10 feet from the edge of the road or to the tree line, whichever is closer. The locations of dikes are shown on the attached maps, but the limits of mowing are not shown.

3.1.6. Embankment Toe Road is the inspection road located at the base of the downstream embankment of the dam. Areas adjacent to the roadway shall be mowed to the base of the riprap slope on the west side and to the edge of the fencing on the east side where possible for the complete distance of the toe road.

3.2. Trimming.

3.2.1. Every time improved areas are mowed, trimming shall be accomplished around all vertical objects protruding from the ground, including but not limited to guardrails, split rail fence, rail road ties, signs, trees, landscape rocks, camping pads, picnic tables, utility tables, fire rings, grills, retaining walls and shoreline rip-rap behind campsites and along roadways located within the limits of these areas.

3.2.2. Every time semi-improved areas are mowed trimming shall be accomplished around all facilities and signs within the limits of these areas.

3.2.3. Every time the Sandy Cove Recreation Area is mowed

trimming shall be accomplished around guardrail and signposts on both sides of the embankment road located above the Sandy Cove Recreation Area.

3.2.4. Every time lawn areas are mowed trimming shall be

accomplished around all vertical objects protruding from the ground, including walkways, signs, and curbs within the limits of these areas.

3.2.5. The contractor may apply an approved herbicide in lieu of trimming. The Project Manager must approve use of chemicals and locations to be sprayed. The contractor shall submit a list of proposed products with manufacturers Material Safety Data Sheets (MSDS) for review. Proof of certification shall be provided before application of herbicide. The contractor shall submit an application report each time herbicides are applied. The COR can furnish forms if needed.

3.3. Edging shall be accomplished along all concrete walkways and curbs that are flush with the ground each time improved and lawn areas are mowed.

3.4. Cleanup. Prior to mowing, the contractor shall remove

rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished at each location, the contractor shall remove vegetation and debris from parking lots, paved walkways, camper pads, and table and picnic shelter slabs.

Mowing should not continue to the next location without having accomplished the cleanup of the current location.

4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 3.

-------ENTER CANTON LAKE MAP HERE---

-----ENTER ALL OF THE INDIVIDUAL MOWING

MAPS HERE----

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY REFERENCE

52.246-4 Inspection Of Services--Fixed Price AUG 1996

Section F - Deliveries or Performance

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC

52.242-15 Stop-Work Order AUG 1989

Section G - Contract Administration Data

WAGE RATES

WD 15-5321 (Rev.-2) was first posted on www.wdol.gov on 01/03/2017

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2015-5321

Daniel W. Simms Division of | Revision No.: 2

Director Wage Determinations| Date Of Revision: 12/30/2016

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Service Contract

Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.

Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: Oklahoma

Area: Oklahoma Counties of Alfalfa, Blaine, Dewey, Ellis, Garfield, Grant, Harper, Kingfisher, Major, Noble, Payne, Woods, Woodward

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE FOOTNOTE RATE

01000 - Administrative Support And Clerical Occupations

01011 - Accounting Clerk I 13.04

01012 - Accounting Clerk II 14.63

01013 - Accounting Clerk III 18.28

01020 - Administrative Assistant 22.58

01035 - Court Reporter 18.46

01041 - Customer Service Representative I 10.53

01042 - Customer Service Representative II 11.84

01043 - Customer Service Representative III 12.92

01051 - Data Entry Operator I 12.37

01052 - Data Entry Operator II 13.50

01060 - Dispatcher, Motor Vehicle 18.13

01070 - Document Preparation Clerk 14.81

01090 - Duplicating Machine Operator 14.81

01111 - General Clerk I 13.10

01112 - General Clerk II 14.30

01113 - General Clerk III 18.00

01120 - Housing Referral Assistant 18.77

01141 - Messenger Courier 10.67

01191 - Order Clerk I 12.71

01192 - Order Clerk II 14.08

01261 - Personnel Assistant (Employment) I 14.35

01262 - Personnel Assistant (Employment) II 16.05

01263 - Personnel Assistant (Employment) III 17.90

01270 - Production Control Clerk 22.29

01290 - Rental Clerk 14.04

01300 - Scheduler, Maintenance 14.04

01311 - Secretary I 14.04

01312 - Secretary II 16.20

01313 - Secretary III 18.77

01320 - Service Order Dispatcher 16.20

01410 - Supply Technician 22.58

01420 - Survey Worker 17.05

01460 - Switchboard Operator/Receptionist 12.74

01531 - Travel Clerk I 12.32

01532 - Travel Clerk II 13.14

01533 - Travel Clerk III 13.77

01611 - Word Processor I 12.54

01612 - Word Processor II 14.07

01613 - Word Processor III 15.80

05000 - Automotive Service Occupations

05005 - Automobile Body Repairer, Fiberglass 19.95

05010 - Automotive Electrician 17.24

05040 - Automotive Glass Installer 16.31

05070 - Automotive Worker 14.96

05110 - Mobile Equipment Servicer 13.22

05130 - Motor Equipment Metal Mechanic 16.93

05160 - Motor Equipment Metal Worker 14.96

05190 - Motor Vehicle Mechanic 16.93

05220 - Motor Vehicle Mechanic Helper 12.63

05250 - Motor Vehicle Upholstery Worker 14.03

05280 - Motor Vehicle Wrecker 14.96

05310 - Painter, Automotive 15.95

05340 - Radiator Repair Specialist 14.96

05370 - Tire Repairer 12.73

05400 - Transmission Repair Specialist 16.93

07000 - Food Preparation And Service Occupations

07010 - Baker 12.16

07041 - Cook I 8.72

07042 - Cook II 10.01

07070 - Dishwasher 8.50

07130 - Food Service Worker 8.93

07210 - Meat Cutter 13.28

07260 - Waiter/Waitress 8.77

09000 - Furniture Maintenance And Repair Occupations

09010 - Electrostatic Spray Painter 14.86

09040 - Furniture Handler 10.57

09080 - Furniture Refinisher 14.86

09090 - Furniture Refinisher Helper 11.83

09110 - Furniture Repairer, Minor 13.35

09130 - Upholsterer 14.86

11000 - General Services And Support Occupations

11030 - Cleaner, Vehicles 11.06

11060 - Elevator Operator 10.81

11090 - Gardener 12.99

11122 - Housekeeping Aide 10.47

11150 - Janitor 10.19

11210 - Laborer, Grounds Maintenance 10.82

11240 - Maid or Houseman 8.69

11260 - Pruner 10.20

11270 - Tractor Operator 12.10

11330 - Trail Maintenance Worker 10.82

11360 - Window Cleaner 10.42

12000 - Health Occupations

12010 - Ambulance Driver 14.67

12011 - Breath Alcohol Technician 17.35

12012 - Certified Occupational Therapist Assistant 25.26

12015 - Certified Physical Therapist Assistant 24.31

12020 - Dental Assistant 14.67

12025 - Dental Hygienist 32.88

12030 - EKG Technician 23.05

12035 - Electroneurodiagnostic Technologist 23.05

12040 - Emergency Medical Technician 14.67

12071 - Licensed Practical Nurse I 15.51

12072 - Licensed Practical Nurse II 17.35

12073 - Licensed Practical Nurse III 19.35

12100 - Medical Assistant 12.64

12130 - Medical Laboratory Technician 16.14

12160 - Medical Record Clerk 13.88

12190 - Medical Record Technician 15.53

12195 - Medical Transcriptionist 13.24

12210 - Nuclear Medicine Technologist 35.11

12221 - Nursing Assistant I 10.67

12222 - Nursing Assistant II 12.00

12223 - Nursing Assistant III 13.10

12224 - Nursing Assistant IV 14.70

12235 - Optical Dispenser 14.41

12236 - Optical Technician 13.02

12250 - Pharmacy Technician 16.23

12280 - Phlebotomist 13.88

12305 - Radiologic Technologist 22.09

12311 - Registered Nurse I 27.48

12312 - Registered Nurse II 30.22

12313 - Registered Nurse II, Specialist 30.22

12314 - Registered Nurse III 36.56

12315 - Registered Nurse III, Anesthetist 36.56

12316 - Registered Nurse IV 43.82

12317 - Scheduler (Drug and Alcohol Testing) 21.50

12320 - Substance Abuse Treatment Counselor 20.38

13000 - Information And Arts Occupations

13011 - Exhibits Specialist I 18.53

13012 - Exhibits Specialist II 20.67

13013 - Exhibits Specialist III 24.88

13041 - Illustrator I 20.86

13042 - Illustrator II 25.12

13043 - Illustrator III 30.74

13047 - Librarian 20.60

13050 - Library Aide/Clerk 10.85

13054 - Library Information Technology Systems 18.60

Administrator

13058 - Library Technician 12.31

13061 - Media Specialist I 13.42

13062 - Media Specialist II 15.02

13063 - Media Specialist III 16.74

13071 - Photographer I 13.42

13072 - Photographer II 15.16

13073 - Photographer III 18.78

13074 - Photographer IV 22.98

13075 - Photographer V 27.80

13090 - Technical Order Library Clerk 15.49

13110 - Video Teleconference Technician 14.89

14000 - Information Technology Occupations

14041 - Computer Operator I 14.91

14042 - Computer Operator II 16.74

14043 - Computer Operator III 18.70

14044 - Computer Operator IV 20.75

14045 - Computer Operator V 22.97

14071 - Computer Programmer I (see 1) 24.07

14072 - Computer Programmer II (see 1)

14073 - Computer Programmer III (see 1)

14074 - Computer Programmer IV (see 1)

14101 - Computer Systems Analyst I (see 1)

14102 - Computer Systems Analyst II (see 1)

14103 - Computer Systems Analyst III (see 1)

14150 - Peripheral Equipment Operator 14.91

14160 - Personal Computer Support Technician 20.75

14170 - System Support Specialist 29.20

15000 - Instructional Occupations

15010 - Aircrew Training Devices…

This is the start of the file's text. The full file is on GovTribe.