SECTION J Attachments
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENTS_and_MAPS.pdf | ||
| W912BV-17-Q-0031_A0002_Texoma_Herbicide.pdf | ||
| W912BV-17-Q-0031_A0001_Texoma_Herbicide.pdf | ||
| W912BV-17-Q-0031_Texoma_Herbicide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENTS
TEXOMA LAKE
TEXAS/OKLAHOMA
MAINTENANCE CONTRACT
FOR
HERBICIDE APPLICATION
EXHIBIT 1
PERFORMANCE REQUIREMENTS
PERFORMANCE REQUIREMENTS
SERVICE
REQUIREMENT
PR
NO
PERFORMANCE STANDARDS
APPENDIX A – Herbicide Application
Broadleaf Application A 1 Vegetation shows signs of kill 7 days after treatment.
Woody Vegetation
Application
A 2 Vegetation shows signs of kill 7 days after treatment.
Completion of work A 3 Completed within scheduled time limits.
Safety A 4 All work performed in accordance with EM 385-1-1 &
Applicable Job Hazards Analyses.
EXHIBIT 2
EXAMPLE OF JOB HAZARD ANALYSIS
ACCIDENT PREVENTION PROGRAM
JOB HAZARD ANALYSIS
1. 2. _______________________________
PROJECT CONTRACTOR
3. 4. _________________________________
LOCATION Contract No.
5. ____________ 6.____________
Date Start Date
7. PHASE OF
WORK
8. SAFETY
HAZARD
9. PRECAUTIONARY ACTION TAKEN
Mowing Equipment hauling, loading and unloading
Operators must be experienced, qualified, and trained to operate the equipment. A signal person on the ground will be used during loading/unloading. Equipment will be equipped with rollover protective structures. Operators will wear their seat belts at all times during operation of equipment.
Trailer safety chains will be properly placed on towing vehicle when transporting equipment. Assure equipment trailer is level and truck and trailer brakes are set. Check for overhead clearances (powerlines, tree limbs, etc.). Check for objects or obstacles behind equipment before backing. Trailer bed and ramps shall be clean of oil, gravel, dirt, or materials that could become slippery or cause the equipment being unloaded to lose traction. Equipment will be lined up with trailer so it can be loaded with a minimum amount of adjustment when on the ramp or trailer.
Getting on/off equipment
Prevent injuries from slipping by maintaining 3-point contact with grab handles and steps. Never jump from equipment. Keep steps and decks free of mud, oil, and grease.
Equipment
Inspection
No vehicle will be placed into service until an inspection is performed and any deficiencies are corrected. Vehicles will be inspected prior to start of work each workday.
Fueling
Equipment shall not be allowed to run during refueling. An operable fire extinguisher shall be available during refueling.
Maintenance
Required maintenance will be performed at a location, which will provide protection from traffic for maintenance personnel. Preventive maintenance procedures recommended by the manufacturer will be followed.
Trimming/Edging
Operators will wear personal protective equipment at all times while using power trimming/edging equipment. Operators will follow manufacturer instructions while performing maintenance such as blade sharpening, carburetor adjustments, and spark plug maintenance.
SAFETY HAZARD 9. PRECAUTIONARY ACTION TAKEN
Operation of equipment
Proper clothing shall be worn at all times (long trousers, minimum of short sleeve shirt, hard hats, safety toe shoes, safety goggles, ear protection, etc.). Seat belts shall be secured at all times. No passengers will be allowed on equipment while in operation. Brakes shall be applied when equipment is stopped. Safety guards will remain installed and properly used. Equipment will not be left unattended while engine is operating. Personnel will not approach any equipment until power take off (PTO) shaft has come to a complete stop. Exit or entrance to vehicles is prohibited while equipment is in motion. Mowers and tractors will be operated to keep a safe distance from electrical outlet boxes, conduit, water faucets, sign or gateposts, and other obstacles. Equipment will be operated in a safe manner and under control at all times.
Terrain Prior to mowing, all slopes will be thoroughly inspected for washes, potholes or other surface irregularities that could cause a mower to overturn. Operators will be particularly watchful of soft areas or areas that may be undercut.
Traffic Hazard warning lights on all mechanized equipment will be in operation while mowing, transporting, or when equipment is parked along the roadside. Slow moving vehicle (SMV) emblems will be installed on every tractor used alongside or transported on any roadway. Extreme caution will be observed to prevent accidents when driving equipment onto access roads from connecting roads or mowing areas. Practice defensive driving techniques. Properly position mirrors for turning and backing. All vehicles will stop at railroad crossings and determine if a train is approaching before proceeding. Care shall be used in entering access or primary roads. All appropriate State Motor Vehicle Operating laws will always be observed.
Rocks and debris Rocks that can be thrown by mowers, and debris such as bottles, cans, tree limbs and other foreign matter shall be picked up before mowing operations begin.
Weather If lightning is present, all mowing operations will cease.
Personnel will move to a clear area away from trees and equipment and will remain there until the danger passes or if the Foreman directs them to another location.
Lifting Always use proper lifting techniques. Use adequate manpower or mechanical assistance.
10. DISCUSSED WITH CONTRACTOR/ON-SITE SUPERVISOR (Signature/Date)
11. CONTRACTING OFFICER or REPRESENTATIVE (Signature/Date)
EXHIBIT 3
INVOICE FORMAT
BILLING FOR
MAINTENANCE CONTRACT FOR HERBICIDE APPLICATION
SHEET OF____
PROJECT: ______________________________________
CONTRACTOR: __
DATE: ______________________
ADDRESS: ____________________________________
CONTRACT NO: W912BV-16- - __
BILLING PERIOD: THRU
INVOICE NO: __________________________________
PAYMENT TERMS: _______________________________
(Payment Discount or N/A)
BID ITEM
NO. DEDUCTION AMOUNT TOTAL
EXHIBIT 4
EXAMPLE OF HERBICIDE REPORT
Date Location Acres Target Rate Method Weather Gallons Mix Garlon
E-Pro
2 Glystar+
8/19/2007 N. Dike na Johnsongrass na Broadcast
SE 5-10,
80 225 .6 gal 2.5 gal
9/7/2007 S. Dike na Johnsongrass na Broadcast S 5-10, 90 675 1.8 gal 7.5 gal
12/19/2007 S. Dike na Woody Veg na Basal Bark calm, 60 12 4 gal
(diesel carrier)
E-Pro 2 GlyStar+ Garlon 4 Exposure 20-Dec 8-Jul 7-Sep
Etigra Albaugh, Inc Dow AgroSciences
Imazapyr Glysophate Triclopyr Herbicide Applicator 12 hrs 6 hrs 18 hrs
28.70% 41.00% 61.60% Light Truck Driver 4 hrs 6 hrs 4 hrs
EPA 81959-8
EPA 42750-
61 EPA 464-MI-1 Administrative 1 hr 1 hr 1 hr
Est 241-PR-002 42750-MO-1 62719-70
TABLE A-1
INVENTORY OF BROADLEAF VEGETATION CONTROL AREAS
LAKE TEXOMA
Location Acres
Dam Embankment 91
Cumberland North and South Dikes 123
Note: Acres listed is an estimate of the areas to be treated. Actual area requiring treatment varies at each location due to roads, structures, and heavy vegetation. Bids should be made after a visit to each location.
TABLE A-2
INVENTORY OF WOODY VEGETATION CONTROL AREAS
Cumberland North and South Dike 25
Outlet Channel 4
TABLE A-3
INVENTORY OF TOTAL VEGETATION CONTROL AREAS
Upstream of Dam Embankment 20
Rip Rap areas at Intake Structure and
Spillway Boat Ramp 1.5
Sand Filters 3.5
BOUNDARY MAPS
DAM EMBANKMENT – NORTH
BROADLEAF CONTROL
DAM EMBANKMENT – SOUTH
NORTH CUMBERLAND DIKE – EAST END
NORTH CUMBERLAND DIKE – WEST END
SOUTH CUMBERLAND DIKE
NORTH CUMBERLAND DIKE – EAST END
WOODY AND TOTAL VEGETATION CONTROL
NORTH CUMBERLAND DIKE – WEST END
WOODY AND TOTAL VEGEATION CONTROL
SOUTH CUMBERLAND DIKE
WOODY AND TOTAL VEGETATION CONTROL
OUTLET CHANNEL
WOODY VEGETATION CONTROL
UPSTREAM DAM EMBANKMENT - NORTH
TOTAL VEGETATION CONTROL
UPSTREAM DAM EMBANKMENT - SOUTH
INTAKE STRUCTURE AND SPILLWAY BOAT RAMP