W912BV-16-T-0087 Fall River Refuse Collection Services
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Fall_River_Refuse_Collection_MAPS.pdf | ||
| Fall_River_Refuse_Collection_Price_Schedule_Protected.xls | XLS spreadsheet | |
| SWT_Form_982.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912BV-16-T-0087 03-Mar-2016
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
09:00 AM 04 Apr 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912BV9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DOUGLAS D BUFFINGTON
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$38,500,000.00
NAICS:
562111
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF85
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912BV-16-T-0087
Section A - Solicitation/Contract Form
INSTRUCTIONS TO OFFERORS
Instructions to Offerors
Read the solicitation in its entirety and all amendments and complete the checklist before submitting documents.
Payments will be made after receipt of a proper invoice and receipt of acceptable supplies or services. Regular office hours: Monday to Friday, 8:00 a.m. to 4:30 p.m. CST
MAIL, FAX, EMAIL or HAND DELIVER YOUR DOCUMENTS
Do not include excess information, to include audio‐visual materials, electronic media, CD’s, thumbdrives, etc. or pages of the solicitation that do not contain information provided by the perspective offeror. NO cross outs or strike through marks. Submit a legible quote with no correction marks.
Emailed quotes in a file format readible by Adobe or MicroSoft Office readable file formats are the only acceptable methods of submitting a quote electronically. All documents must be attached in one file. Reference the solicitation in the subject line. Send quotes to E‐mail address Douglas.D.Buffington@usace.army.mil. Ensure your quote is received before the due date and time. In order for your quote to be considered responsive, all required materials must be received before the due date and time. If all required materials are not received your quote will not be considered.
FAX or MAIL
Include a cover sheet that references the Contract Specialist – Douglas Buffington and the solicitation number.
When submitting through mail ensure you clearly mark the envelope to:
TULSA DISTRICT CORPS OF ENGINEERS
DOUGLAS BUFFINGTON, CECT‐SWT‐E
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
FAX: (918) 669‐7495
Clearly mark the envelope in the lower left hand corner with the solicitation number. All pages should be numbered. Use only 8 ½ by 11 inch paper for fax or mail submissions. Do not use fold‐outs (e.g., 11” x 14” or 11” x
17” sheets). Do not use a font size smaller than 10, or condensed print for any submission. Time New Roman or
Arial Font are the only acceptable fonts. All page margins must be at least 1 inch wide, but may include headers and footers. Illegible handwritten quotes will not be considered. Typed quotes are highly encouraged and the preferred method. Do not use spring clamps, staples, or exceed the recommended capacity of the fastener or binder.
Do not use plastic multi‐hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages or removal of pages. DO NOT use tabbed dividers, flagged tabs, or any divider that extends beyond the paper size to separate sections. The pages must be able to be removed from their binding without ripping or tearing. Ensure to allow enough time to submit your quote before the due date and time.
HAND DELIVER
If your submission will be hand‐carried, please provide notification to the Contract Specialist at least one working day in advance (918‐669‐7078) or Douglas.D.Buffington@usace.army.mil, as unescorted visitors are not allowed in the Contracting Division offices. Please consider in your arrival that visitors must go through security check points.
Offerors can only submit their documents to the Contract Specialist or a Contracting Officer of the Tulsa District
Office. The address of the Tulsa District Office is below:
TULSA DISTRICT CORPS OF ENGINEERS
1645 S. 101ST EAST AVE
TULSA, OK 74128‐4609
This procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Parts 12 and 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicate that the Government may communicate with offerors/quoters as allowed under simplified acquisition procedures.
Submit the following documents:
1) A signed copy of the 1st page of the solicitation and all amendments
2) Complete the past performance references page, if included in solicitation.
3) Complete the pricing schedule provided in the solicitation.
4) Complete all FAR Clauses with applicable blanks filled in from SECTIONS I, K, L, and M
BIDDER'S INQUIRY
INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS
USE OF BIDDER’S INQUIRY
Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):
a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov
b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.
1. To submit and review bid inquiry items, offerors will need to be a current registered user or self‐register into the system. To self‐register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e‐mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continues.
2. From this page you may view all bidder inquiries or add an inquiry.
3. Bidders will receive an acknowledgement of their question via e‐mail, followed by an answer to their question after it has been processed.
4. The Solicitation Numbers are: W912BV‐16‐T-0087
The Bidder Inquiry Key is: D5WD6B-DBYZPE
5. Address/enter only one question/issue per entry.
c. The Bidder Inquiry System will be unavailable for new inquiries 3:00pm (Central) Thursday, 24 March 2016 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800‐428‐HELP.
f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
g. The point of contact for this solicitation is:
Contract Specialist: Douglas Buffington Telephone: 918‐669‐7078 E‐MAIL: Douglas.D.Buffington@usace.army.mil
Guidance on how to submit a FOIA request can be found at http://www.usace.army.mil/FOIA.aspx. Please ensure your request is submitted in a timely matter to receive feedback before the solicitation closing date.
PREPROPOSAL/SITE VISIT CONFERENCE
A Preproposal Conference/Site Visit is scheduled for 9:00 AM on 17 March 2016 at the Fall River Lake Office in
Kansas. Our address is 2453 Lake Road, Fall River, KS 67047. From US HWY 400 turn north on Z 50 Road, go .9 mi to the Y, go right for 1.2 miles, the project office sits on the left side of the road.
ANTITERRORISM AND OPERATIONS SECURITY REQUIREMENTS
The Government will provide the successful offeror with the required Army iWatch Antiterrorism Briefing documentation within two (2) business days of Contract Award.
Section B - Supplies or Services and Prices
PRICE SCHEDULE
Contractor Total Base and All
Option Years
Bid Schedule Base Year 1 April 2016 ‐ 31 March 2017
CLIN/Item No Service Qty Unit Unit Price Total Amount
0001 PUAs, Damsite, Whitehall Bay, North Rock
7 Month $ ‐
0002 Additional Collections 3 Each $ ‐ 0003 Lake Project Office 12 Month $ ‐
Bid Schedule First Option Year 1 April 2017 ‐ 31 March 2018
CLIN/Item No Service Qty Unit Unit Price Total Amount
1001 PUAs, Damsite, Whitehall Bay, North Rock
7 Month $ ‐
1002 Additional Collections 3 Each $ ‐ 1003 Lake Project Office 12 Month $ ‐
Bid Schedule Second Option Year 1 April 2018 ‐ 31
March 2019
CLIN/Item No Service Qty Unit Unit Price Total Amount
2001 PUAs, Damsite, Whitehall Bay, North Rock
7 Month $ ‐
2002 Additional Collections 3 Each $ ‐ 2003 Lake Project Office 12 Month $ ‐
Bid Schedule Third Option Year 1 April 2019 ‐ 31
March 2020
CLIN/Item No Service Qty Unit Unit Price Total Amount
3001 PUAs, Damsite, Whitehall Bay, North Rock
7 Month $ ‐
3002 Additional Collections 3 Each $ ‐ 3003 Lake Project Office 12 Month $ ‐
Bid Schedule Fourth Option Year 1 April 2020 ‐ 31
March 2021
CLIN/Item No Service Qty Unit Unit Price Total Amount
4001 PUAs, Damsite, Whitehall Bay, North Rock
7 Month $ ‐
4002 Additional Collections 3 Each $ ‐ 4003 Lake Project Office 12 Month $ ‐
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
S P E C I F I C A T I O N S
FALL RIVER LAKE KANSAS
MAINTENANCE CONTRACT
FOR REFUSE COLLECTION SERVICES
ORGANIZATION OF SPECIFICATIONS
This specification consists of a general section supplemented by exhibits and appendices. A Table of Contents is provided on the following pages.
The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.
Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.
TABLE OF CONTENTS
Para.
No. Paragraph Title
1 Scope of Work 2 Definitions 3 References 4 Initiation, Execution, & Acceptance of Work 5 Personnel 6 Equipment 7 Performance Requirements 8 Contractor Quality Control 9 Deductions for Deficient Work 10 Safety 11 Pre‐work Conference 12 Contractor Submittals 13 Billing 14 Changes in Amount of Facilities Serviced 15 Work Schedules
EXHIBITS
No. Title
1 Quality Assurance Report 2 Performance Requirements 3 Invoice Format 4 Activity Hazard Analysis
APPENDICES
NO. Title
A Refuse Collection Services
1. SCOPE OF WORK. The work required under this specification provides for labor, supervision, transportation, equipment, and supplies to perform refuse pickup at designated areas of Fall River Lake Project.
2. DEFINITIONS.
2.1. Bimonthly. Work required to be performed every other month.
2.2. Biweekly. Work required to be performed every other week.
2.3. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.
2.4. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 2.
2.5. Government. The term "Government" as used herein means the United States of America.
2.6. Performance Requirement (PR). The Government's requirement for each service provided under the contract. Performance Standard (PStd) specifies the minimum standard (quality) for each service provided under the contract.
2.7. Project. The term "project" as used herein means all Government property and easements at Fall River Lake.
2.8. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.
2.9. Quality. Conformance with the contract specification.
2.10. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.
2.11. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.
2.12. Semimonthly. Work required to be performed two times per month.
2.13. Semiweekly. Work required to be performed two times per week.
2.14. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.
3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385‐1‐1, current version) is hereby incorporated into this specification. The Contracting Officer or their designee will furnish EM 385‐1‐1 to the contractor after contract award.
4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.
4.1. Initiation and Execution of work shall be in accordance with this specification.
4.2. Acceptance of Work. The Government shall accept Work unless the Contracting Officer (CO) or Contracting Officer Representative (COR) notifies the contractor of deficient services.
4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the COR in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance Report (SWT Form 982, Exhibit 1).
4.2.2. If the COR notifies the contractor of deficient work, the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be re‐performed the same day.
Work performed on less than a daily schedule shall be re‐performed not later than the following day.
Refer to paragraph 9 for deficient work not re‐performed.
4.2.3 The contractor shall notify the COR when deficiencies have been corrected by completing Part IV of the QA Report, provided it has been furnished the contractor. If not, notification shall be made orally.
When work has been corrected, the Contracting Officer or the COR shall complete Part V of the QA Report and furnish the contractor a copy. A copy will also be provided the Contracting Officer at the Tulsa District Office.
5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.
5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the work specified.
5.2. Supervision.
5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing to the Contracting Officer and the COR.
5.2.2. The contractor shall provide the Contracting Officer and the COR a telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular‐type phone is acceptable.
5.3. The contractor shall provide a contingency plan for how work will be accomplished in the event of illness and/or emergencies.
6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish all work required by this specification within specified time limits.
6.1. All equipment must be in good operating and mechanical condition and shall comply with EM 385‐ 1‐1.
6.2. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer or the COR and the Site/Lake Manager approves use of other areas.
6.3. All refuse service vehicles shall be front or rear loading and be equipped with operational back‐up alarms (subparagraphs 16.B.01 and 16.B.02, EM 385‐1‐1).
6.4. All vehicles shall be properly licensed and maintained in a safe, clean condition. All vehicle operators shall maintain a valid state driver’s license.
7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit
2. The contractor's performance will be evaluated using these PRs as follows:
7.1. Services provided by the contractor will be inspected for compliance with PStds. Those not meeting PStds shall be considered deficient.
7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory re‐performance.
8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246‐4 "Inspection of Services" to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 2.
9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 2. Deductions for documented defects will be made in accordance with the following procedures:
9.1. Each service found deficient and re‐performed by the contractor: No deduction.
9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.
9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.
9.4. Each service found deficient and not re‐performed by anyone, or work not performed at all:
Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.
10. SAFETY.
10.1. Safety Plan. The contractor shall furnish the Contracting Officer and the COR a safety plan, accident prevention plan, and activity hazardous analysis (AHA) (Exhibit 4) to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385‐1‐
1. The safety plan shall include:
10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.
10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.
10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.
10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the written request of the Contracting Officer.
10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short‐sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section 5, EM 385‐1‐1.
10.4. Accident Reports.
10.4.1. The contractor shall immediately notify the COR of all known accidents that occur at the project and result in death or serious injury.
10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the COR immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.
10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man‐hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.
11. PREWORK CONFERENCE. The COR shall conduct a Pre‐work Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 12 below.
As a minimum, the officer of the company that signed the contract and the supervisor shall represent the contractor. The COR shall establish the location, date, and time of the Pre‐ work Conference after consultation with the contractor.
12. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the COR prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer. If the COR determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.
12.1. Names of supervisor and their alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).
12.2. Safety Plan (subparagraph 10.1.).
12.3. Antiterrorism and Operations Security Requirements. The Contractor shall be responsible for ensuring all personnel, to include sub‐contractor personnel, comply with the training requirements and procedures identified on the document titled “Antiterrorism/Operations Security Requirements” in Section H, Special Contract Requirements. When items for which training is identified, the Contractor shall ensure that all personnel complete acknowledgement for the specified training; the Contractor is responsible for ensuring all training acknowledgments, when applicable, are submitted to the COR or Contracting Officer within 10 calendar days of contract award. In no event shall any contractor or sub‐ contractor personnel be On‐site prior to completion of any applicable training and submission of training verification. Training materials and verification forms will be provided by the COR upon written request.
12.4 Pre‐screen candidates using E‐Verify Program. The Contractor must pre‐screen candidates using the E‐verify Program (http://www.dhs.gov//E‐Verify) website to meet the established employment eligibility requirements. The contractor must ensure that the candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible candidates must be provided to the COR no later than 3 business days after the initial contract award.
12.5. Contractor’s agreement with approved disposal site. Contractor must provide copies of any updates to this agreement.
12.6. Exposure reports (submit by 2nd workday of each month) (subparagraph 9.5.).
12.7 Contingency Plan (subparagraph 5.3).
13. BILLING.
13.1. The contractor shall submit the original and two copies of invoices at the end of each month for all completed work.
13.2. Invoices shall be prepared in the format shown at Exhibit 3.
13.3. Invoices and supporting documents shall be delivered or mailed to the USACE, Fall River Project Office, 2453 Lake Road, Fall River, KS 67047.
13.4. All exposure reports shall be submitted before an invoice will be accepted.
14. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustments in contract price will be negotiated at the request of either party, only if a singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $100.
The cost of contractor’s costs for performing the work.
15. WORK SCHEDULES. The contractor shall furnish the Contracting Officer and the COR a schedule for performing all janitorial work that is required at a weekly frequency or less. A revised schedule shall be furnished the Contracting Officer and the COR prior to the contractor changing his mode of operation.
EXHIBIT 1
QUALITY ASSURANCE REPORT
SWT Form 982 Quality Assurance Report is provided in SECTION J as Attachment 1
EXHIBIT 2
PERFORMANCE REQUIREMENTS
SERVICE REQUIREMENTS PR NO. PERFORMANCE STANDARDS
APPENDIX A
Dumpster Maintenance 1 Dumpsters shall have functioning lids. Dumpsters shall have neat and uniform appearance. Free of graffiti.
Clean Dumpsters 2 Dumpsters shall be clean. Odor control applied as necessary to correct visitor complaints.
Refuse Removal 3 Dumpsters shall be totally emptied when serviced. Items placed outside containers within a 6-foot radius shall be picked up.
Refuse Disposal 4 All refuse disposed in approved sanitary landfill or incinerator. All applicable county, State, and Federal regulations are complied with.
EXHIBIT 3
INVOICE FORMAT
BILLING FOR MAINTENANCE CONTRACT
PROJECT: SHEET OF
CONTRACTOR: DATE:
ADDRESS:
CONTRACT NO:
BILLING PERIOD: THRU INVOICE NO:
PAYMENT TERMS: (Payment Discount or N/A)
BID ITEM NO. AMOUNT
PAYMENT REQUESTED:
CONTRACTOR (Signature/Date)
EXHIBIT 4
ACTIVITY HAZARD ANALYSIS
ACTIVITY: Refuse Pickup Fall River Lake
ACTIVITY
HAZARD
ANALYSIS
DATE: January 21, 2016 Revised:
PRINCIPAL STEPS
POTENTIAL
SAFETY/HEALTH
HAZARDS
RECOMMENDED
CONTROLS
1. Removal of refuse from barrels, trash cans or other containers.
1.1. Contact with unknown
materials, i.e., chemicals, poisons, acids.
1.2. Contact with human
blood and body fluids.
Contact with sharp objects, i.e., needles, razor blades, etc.
1.3. Contact with snakes, poisonous plants, insects.
1.4. Being struck by
passing vehicles.
1.5. Strains, sprains, trips
and falls sustained while walking.
1.1.a. Wear appropriate PPE. Be alert and show caution while picking up debris. All unknown substances should be considered dangerous.
1.2.a. Wear appropriate PPE. Be alert and show caution while picking up debris. All unknown substances should be considered dangerous.
1.3.a. Apply insect repellant before starting work.
1.4.a. Always walk facing traffic.
1.5.a. Watch for uneven terrain and holes.
Do not overload trash bag.
Notify COE personnel or law enforcement of any illegal, i.e. drug related, substances. Do not handle any needles, syringes or bloody articles
APPENDIX A
REFUSE COLLECTION
1. FACILITIES TO BE SERVICED. Project Lake Office and all park facilities listed in Table A‐1 and as shown on maps in SCHEDULE J, Attachment 3.
2. FREQUENCIES AND TIMES OF SERVICES. The contractor shall accomplish services in accordance with the following frequencies established for summer and winter periods. Beginning and ending dates for these periods are:
Summer Period: 1 April thru 31 October (PUAs & Project Office)
Winter Period: 1 November thru 31 March (Project Office Only)
2.1. The frequencies are stated as weekly and semiweekly and the contractor shall perform required services on any day, Monday through Friday.
2.1.1. Summer and winter frequencies are weekly.
2.1.2. An additional service will be required in the public use areas on the holiday weekends of Memorial Day, Fourth of July, and Labor Day.
2.2. The contractor shall begin work no earlier than 7:00 a.m. and shall complete work by 5:30 p.m.
3. DESCRIPTION OF WORK.
3.1. The contractor shall furnish dumpsters in accordance with the inventory provided in Table A‐1.
3.2. Exact placement of the dumpsters shall be coordinated with the Contracting Officer's Representative.
3.3. All dumpsters shall have functioning lids and shall be maintained for a neat and uniform appearance by the contractor. All dumpsters shall be prominently identified as to ownership and provider of services.
3.4. Cleanliness and sanitation of the vendor‐owned containers will be the responsibility of the contractor and must comply with all Federal, State, and County regulations.
3.5. Refuse shall be emptied from refuse containers with a truck that is equipped with front‐ or rear‐ load dumping capabilities.
4. PERFORMANCE REQUIREMENTS. The work performed under this appendix shall comply with the PRs given in Exhibit 2.
TABLE A‐1
INVENTORY OF DUMPSTERS
LOCATION INVENTORY
3 CUBIC YARD
CY
INVENTORY
6 CUBIC YARD
CY
MAP #
PROJECT OFFICE 1 1
PUA North Rock
Ridge Cove
PUA Whitehall
Bay
PUA Damsite West
4A
PUA Damsite East
4B
Total Inventory 2 3
Map of all Dumpsters
Section E - Inspection and Acceptance
CLAUSES INCORPORATED BY FULL TEXT
52.246-1 CONTRACTOR INSPECTION REQUIREMENTS (APR 1984)
The Contractor is responsible for performing or having performed all inspections and tests necessary to substantiate that the supplies or services furnished under this contract conform to contract requirements, including any applicable technical requirements for specified manufacturers' parts. This clause takes precedence over any Government inspection and testing required in the contract's specifications, except for specialized inspections or tests specified to be performed solely by the Government.
(End of clause)
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
CLAUSES INCORPORATED BY REFERENCE
52.242-15 Stop-Work Order AUG 1989
Section G - Contract Administration Data
252.201-7000 Contracting Officer's Representative DEC 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
ANTITERRORISM/OPERATIONS SECURITY REQUIREMENTS, Jun 2015
The Contractor shall comply with the following requirements marked with an “X”.
X 1. AT Level I Training. This provision/contract text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum."
X 2. Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204‐9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes."
2a. For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014‐05 and Homeland Security Presidential Directive‐12 (HSPD‐12). Proposed language: “The contractor and all sub‐contractors employees will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on‐site or remotely; (2) Remote access, via logon, to a DoD network using DoD‐approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non‐DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of 6 months or more. At the discretion of the sponsoring activity, an interim CAC may be issued based on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personnel Management.”
X 2b. For contractors who do not require CAC, but require access to a DoD facility or installation.
Proposed language: Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (TSDB) (Army Directive 2014‐05 / AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
3. AT Awareness Training for Contractor Personnel Traveling Overseas. This standard language text required US based contractor employees and associated sub‐contractor employees to make available and to receive government provided area of responsibility (AOR) specific AT awareness training as directed by AR 525‐13 (Antiterrorism). Specific AOR training content is directed by the combatant commander with the unit ATO being the local point of contact. Proposed language: "All US based contractor employees and associated sub‐contractor employees traveling overseas will receive the government provided AOR specific AT awareness training. The documentation of training completion must be provided to the COR prior to departure.”
X 4. Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. Proposed language: "The contractor and all associated sub‐contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training."
5. Contractor Employees Who Require Access to Government Information Systems. This standard language text is for contractor employees with access to government info system. Proposed language: "All contractor employees with access to a government info system must be registered in the Army Training Certification Tracking System (ATCTS) at commencement of services, and must successfully complete the DOD information Assurance Awareness prior to access to the information systems and then annually thereafter in accordance with personnel security standards listed in AR 25‐2 (Information Assurance), an appropriate background investigation will be conducted prior to accessing the government information systems."
6. For Contracts that Require an OPSEC Standing Operating Procedure/Plan. This standard language text is for contractor employees with an area of performance for classified contracts or if the contract employee has access or responsibility to protect critical information. The Contractor, in collaboration with RA OPSEC Officer, shall develop an OPSEC Standard Operating Procedure (SOP)/Plan within 90 calendar days of contract award per AR 530‐1 (Operations Security). Proposed language: "The Contractor shall develop an OPSEC SOP/Plan within 90 days of contract award. The OPSEC SOP/Plan must be reviewed and approved by the RA OPSEC Officer. The SOP/Plan will include the government's critical information, why it needs to be protected, where it is located, who is responsible for it and how to protect it. In addition, the contractor shall identify an individual who will be an OPSEC Coordinator."
7. For Contracts that Require OPSEC Training. Per AR 530‐1, (Operations Security) contractor employees must complete Level I OPSEC Training within 30 calendar days of contract award.
Proposed language: "All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. OPSEC awareness training is available at the following websites: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operations‐security.html; or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum."
8. For Information assurance (IA)/information technology (IT) training. This standard language text is for contract employees who need network access and/or working IA/IT functions. Proposed language: "All contractor employees and associated sub‐contractor employees must complete the DoD IA awareness training before issuance of network access and annually thereafter. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01‐M and AR 25‐2 within six months of employment."
9. For information assurance (IA)/information technology (IT) certification. Per DoD 8570.01‐M , DFARS 252.239.7001 and AR 25‐2, the contractor employees supporting IA/IT functions shall be appropriately certified upon contract award. The baseline certification as stipulated in DoD 8570.01‐ M must be completed upon contract award. Proposed language: "All contractor employees supporting IA/IT functions shall be appropriately certified upon contract IAW DoD 8570.01‐M, DFARS 252.239‐7001 and AR 25‐2. The baseline certification as stipulated in DoD 8570.01‐M must be completed upon contract award."
10. For Contractors Authorized to Accompany the Force. DFARS Clause 252.225‐7040, Contractor Personnel Authorized to Accompany U.S. Armed Forces Deployed Outside the United States. The clause shall be used in solicitations and contracts that authorize contractor personnel to accompany US Armed Forces deployed outside the US in contingency operations; humanitarian or peacekeeping operations; or other military operations or exercises, when designated by the combatant commander. Proposed language: "All contractor employees shall ensure the following AT/OPSEC requirements are met prior to deploying personnel authorized to accompany U.S. Armed Forces outside the United States; to include compliance with laws, regulations, pre‐deployment requirements, and required training in accordance with combatant command guidance."
11. For Contracts Requiring Performance or Delivery in a Foreign Country. DFARS Clause 252.225‐ 7043, Antiterrorism/Force Protection for Defense Contractors Outside the US. The clause shall be used in solicitations and contracts that require performance or delivery in a foreign country. This clause applies to both contingencies and non‐contingency support. Proposed language: "All non‐ local contracting personnel will comply with theater clearance requirements and allows the combatant commander to exercise oversight to ensure the contractor's compliance with combatant commander and subordinate task force commander policies and directives."
12. For Contracts That Require Handling or Access to Classified Information. This clause involves access to classified information, i.e. “Confidential,” “Secret,” or “Top Secret”. Proposed language:
"Contractor shall comply with AR 380‐67 (Personnel Security Program) and Homeland Security Presidential Directive 12 (Policy for a Common Identification Standard for Federal Employees and Contractors) as well as FAR 52.204‐2, Security Requirements. Additionally, Contractors must comply with ‐ (1) The Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22‐M);
any revisions to DOD 5220.22‐M, notice of which has been furnished to the contractor. For classified contracts, the DD Form 254 will be attached with the contract."
X 13. Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required. (Use when security clearances are not required, i.e. facility repair or construction). Proposed language: "All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas."
14. (FOR CLASSIFIED CONTRACTS ONLY) Contractor Company to obtain a Facility Clearance and individual clearances at the appropriate level. Proposed language: "The Prime Contractor Company must have a Facility Clearance (FCL) at the appropriate level (IAW the NISPOM DOD 5220.22‐M and AR 380‐49) prior to the start of the contract awarded period of performance. Contractor personnel performing work under this contract must have the required security clearance, per AR 380‐67, at the appropriate level at the start of the period of performance. Security Clearances and FCL requirements are required to be maintained for the life of the contract IAW the DD Form 254 attached to the contract. If no FCL, the supporting Government Contracting Activity will sponsor the prime contract company in obtaining the FCL."
X 15. Pre‐screen candidates using E‐Verify Program. Proposed language: "The Contractor must pre‐ screen Candidates using the E‐verify Program (http://www.uscis.gov/e‐verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E‐verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I‐9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
16. For contract requiring armed security guards. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. The Physical Security Officer must or will review the PWS/SOW with the Contracting Officer (KO) for accuracy and completeness of AR 190‐11 requirements. Proposed language: "All contractor and all associated sub‐contractors employees shall comply with applicable installation, facility and area commander installation/facility policies and procedures on storing weapons and ammunition IAW AR 190‐11 (provided by government representative)."
X 17. Threat Awareness Reporting Program. For all contractors with security clearances. Per AR 381‐ 12 Threat Awareness and Reporting Program (TARP), contractor employees must receive annual TARP training by a CI agent or other trainer as specified in 2‐4b. Proposed language: "All new contractor employees will complete annual Threat Awareness and Reporting Program (TARP) Training provided by a Counterintelligence Agent, IAW AR 381‐12. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee(s) or a memorandum for the record, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training. Authorized webbased TARP training for CAC card holders is available at the following website: https://www.us.army.mil/suite/page/655474
(END)
Section H - Special Contract Requirements
WAGE RATES
WD 15‐2215 (Rev.‐2) was first posted on www.wdol.gov on 01/05/2016
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015‐2215 Daniel W. Simms Division of | Revision No.: 2 Director Wage Determinations| Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Kansas
Area: Kansas Counties of Allen, Barber, Barton, Bourbon, Chase, Chautauqua, Cherokee, Cheyenne, Clark, Comanche, Cowley, Crawford, Decatur, Edwards, Elk, Ellis, Ellsworth, Finney, Ford, Gove, Graham, Grant, Gray, Greeley, Greenwood, Hamilton, Harper, Haskell, Hodgeman, Jewell, Kearny, Kingman, Kiowa, Labette, Lane, Lincoln, Logan, Marion, McPherson, Meade, Mitchell, Montgomery, Morton, Neosho, Ness, Norton, Osborne, Pawnee, Phillips, Pratt, Rawlins, Reno, Rice, Rooks, Rush, Russell, Scott, Seward, Sheridan, Sherman, Smith, Stafford, Stanton, Stevens, Thomas, Trego, Wallace, Wichita, Wilson, Woodson **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE ‐ TITLE FOOTNOTE RATE
01000 ‐ Administrative Support And Clerical Occupations 01011 ‐ Accounting Clerk I 12.69 01012 ‐ Accounting Clerk II 15.89 01013 ‐ Accounting Clerk III 17.75 01020 ‐ Administrative Assistant 19.09 01035 ‐ Court Reporter 22.72 01051 ‐ Data Entry Operator I 13.80 01052 ‐ Data Entry Operator II 15.07 01060 ‐ Dispatcher, Motor Vehicle 16.19 01070 ‐ Document Preparation Clerk 14.46 01090 ‐ Duplicating Machine Operator 14.47 01111 ‐ General Clerk I 11.59 01112 ‐ General Clerk II 12.65 01113 ‐ General Clerk III 14.20 01120 ‐ Housing Referral Assistant 16.15 01141 ‐ Messenger Courier 12.43 01191 ‐ Order Clerk I 12.48 01192 ‐ Order Clerk II 13.62 01261 ‐ Personnel Assistant (Employment) I 14.14 01262 ‐ Personnel Assistant (Employment) II 15.81 01263 ‐ Personnel Assistant (Employment) III 17.85 01270 ‐ Production Control Clerk 20.84 01290 ‐ Rental Clerk 13.83 01300 ‐ Scheduler, Maintenance 12.55 01311 ‐ Secretary I 12.55 01312 ‐ Secretary II 14.04
01313 ‐ Secretary III 16.15 01320 ‐ Service Order Dispatcher 14.01 01410 ‐…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .