W912BV-16-R-0065.pdf

PDF 6 MB Posted

Attached to
Pre-Solicitation Notice for Services at Kaw Lake, OK
Solicitation number
W912BV-16-R-0065
Issued by

About this file

Solicitation W912BV-16-R-0065 for Mowing Janitorial Parking Cleaning and Herbicide Services at Kaw Lake OK.

View the file

Other files

File Type Posted
W912BV-16-R-0065_0004.pdf PDF
Kaw_Lake_Site_Visit_slides.pdf PDF
W912BV-16-R-0065-0003.pdf PDF
Site_Visit_Sign_in_sheet.pdf PDF
16-R-0065_Amend_0002.pdf PDF
W912BV-16-R-0065-0001.pdf PDF
Synopsis.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912BV-16-R-0065 22-Jan-2016

b. TELEPHONE NUMBER

918.669.4318

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 24 Feb 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912BV9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

VERONICA P FREIRE

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIV

USACE, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$7,500,000.00

NAICS:

561730

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF134

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912BV-16-R-0065

Section B - Supplies or Services and Prices

INSTRUCTIONS TO OFFERORS

Instructions to Offerors

1. PROPOSAL EXPENSES AND PRE-CONTRACT COSTS

This Request for Proposal (RFP) does not commit the Government to pay, as a direct charge, any costs incurred in the preparation and submission of a proposal.

2. SUBMISSION OF OFFERS SUBMITTALS

Submit signed and dated offers to the office and individual specified in this solicitation at or before the exact time specified in this solicitation by electronic means. Electronic/email quotes will be accepted and e-mail is the preferred method of submitting your proposal. Faxed quotes will not be accepted. Hard copy offers must be in sealed envelopes/packages, include CD copy of proposal, marked and addressed as follows:

MARK PACKAGES:

“Response to Solicitation Number: W912BV-16-R-0065, DO NOT OPEN”.

ADDRESS PACKAGES TO:

U.S. Army Corps of Engineers (USACE)

Tulsa District (SWT) Attention: Veronica P. Freire, CESWT-CT-E

1645 S. 101 E. Ave Tulsa, OK 74128-4609

Special Instruction pertaining to Hand Carried Offers: Hand-carried offers must be delivered to the USACE-SWT Contracting Division, Contracting Specialist, at the address shown above prior to the closing time stated in this solicitation. The SWT office is a secure facility. A picture ID must be presented at the gate to gain entrance to the facility. Building security personnel will not deliver proposals to Contracting.

INQUIRIES – OFFEROR’S QUESTIONS AND COMMENTS

USE OF BIDDER’S INQUIRY

Prospective offerors shall submit questions and inquiries related to this solicitation in accordance with the following (no other means of questions or inquiries will be answered except through Bidder Inquiry):

a. For information related to amendments, and the dates set for receipt of proposals, please check http://www.fedbizopps.gov

b. Contractual and Technical inquiries and questions relating to proposal procedures are to be submitted via Bidder Inquiry in ProjNet at https://www.projnet.org/projnet.

1. To submit and review bid inquiry items, offerors will need to be a current registered user or self-register into the system. To self-register go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your e-mail address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

2. From this page you may view all bidder inquiries or add an inquiry.

3. Bidders will receive an acknowledgement of their question via e-mail, followed by an answer to their question after it has been processed.

4. The Solicitation Number: W912BV-16-R-0065

The Bidder Inquiry Key is: W9YAVI-47VUAF

c. The Bidder Inquiry System will be unavailable for new inquiries at 5 days prior to proposal due date in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.

d. Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

e. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

f. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.

g. The point of contact for this solicitation is:

Contract Specialist: Veronica P. Freire Telephone: 918-669-4318 E-MAIL: veronica.p.freire@usace.army.mil

PREPROPOSAL/SITE VISIT CONFERENCE

A Pre-proposal Conference will be held on Tuesday, 9 Febuary 2016 at 10:00 a.m. CST, at the Kaw Lake Project Office located at US Army Corps of Engineers, 9400 Lake Road, Ponca City, OK 74604.

The purpose of the conference will be to familiarize prospective offerors with the extent and nature of the requirement and location of performance. Oral questions pertaining to the Performance Work Statement or other contractual matters will not be answered during the tour of the performance work areas.

This conference is not mandatory for prospective offerors. All prospective offerors are strongly urged to attend the pre-proposal conference and to satisfy themselves as to all general conditions that may affect the cost and schedule of performance of this contract.

Any questions pertaining to past or current contract information for any of the past or current contracts should be submitted to the Office of Counsel, Tulsa District Office in the form of a FOIA (Freedom of Information Act) request. Below is the contact information for the Office of Counsel, Tulsa District.

CESWT-OC

1645 South 101st East Ave

Tulsa, OK 74128-4609 foia-swt@usace.army.mil

Guidance on how to submit a FOIA request can be found at http://www.usace.army.mil/FOIA.aspx.

Please ensure your request is submitted in a timely matter to receive feedback before the solicitation closing date.

PRICING SCHEDULE

Base Year: 1 Mar 16 ‐ 28 Feb 17

ITEM NO SERVICES QUANTITY UNIT

UNIT

PRICE

AMOUNT

TOTAL BY

APPENDIX

Appendix A‐Mowing

Improved Areas:

0001A Coon Creek Cove 6.5 MO _______ _______

0002A Fisherman's Bend 6.5 MO _______ _______

0003A McFadden Cove 6.5 MO _______ _______

0004A Osage Cove 6.5 MO _______ _______

0005A Pionner Park 6.5 MO _______ _______

0006A Sandy Park 6.5 MO _______ _______

0007A Sandy Park Beach (May‐ Sep)

6.5 MO _______ _______

0008A Sarge Creek 6.5 MO _______ _______

0009A Washunga Bay 6.5 MO _______ _______

0010A Embankment 6.5 MO _______ _______

0011A Lake Office/Overlook 6.5 MO _______ _______

0012A West/East Access Roads 6.5 MO _______ _______

TOTAL: Improved Areas _______ Lawn Areas:

0013A Lake Office/Overlook 7.5 MO _______ _______

TOTAL: Lawn Areas _______

Semi‐Improved Area:

0014A Dam Embankment 6.5 MO _______ _______

0015A Coon Creek Oxidation Ponds

6.5 MO _______ _______

0016A Osage Cove Oxidation Ponds

6.5 MO _______ _______

0017A Sarge Creek Oxidation Ponds

6.5 MO _______ _______

TOTAL: Semi‐Improved Areas _______ TOTAL: Appendix A _______

Appendix B‐Janitorial Work

0018B Janitorial Work ‐ Project Office

12 MO _______ _______

TOTAL: Appendix B _______

Appendix C‐Park Cleaning

Spring Period:

0019C Coon Creek 0.5 MO _______ _______

0020C Osage Cove 1 MO _______ _______

0021C Sarge Creek 1 MO _______ _______

0022C Washgunga Bay 1 MO _______ _______

Subtotal: Spring Period _______

Summer Period 1:

0023C Bear Creek 2 MO _______ _______

0024C Coon Creek 2 MO _______ _______

0025C Fisherman's Bend 2 MO _______ _______

0026C McFadden Cove 2 MO _______ _______

0027C Osage Cove 2 MO _______ _______

0028C Overlook 2 MO _______ _______

0029C Pioneer Park 2 MO _______ _______

0030C Sandy Park 2 MO _______ _______

0031C Sarge Creek 2 MO _______ _______

0032C Washgunga Bay 2 MO _______ _______

Subtotal: Summer Period 1 _______

Summer Period 2:

0033C Bear Creek 5 MO _______ _______

0034C Coon Creek 5 MO _______ _______

0035C Fisherman's Bend 5 MO _______ _______

0036C McFadden Cove 5 MO _______ _______

0037C Osage Cove 5 MO _______ _______

0038C Overlook 5 MO _______ _______

0039C Pioneer Park 5 MO _______ _______

0040C Sandy Park 5 MO _______ _______

0041C Sandy Park Beach 5 MO _______ _______

0042C Sarge Creek 5 MO _______ _______

0043C Washgunga Bay 5 MO _______ _______

Subtotal: Summer Period 2 _______

TOTAL: Appendix C _______

Appendix D‐Pesticides/Herbicides

Soil Sterilant

0044D Compounds 6 MO _______ _______

0045D RipRap Areas/Ditches 6 MO _______ _______

0046D Concrete Collector Ditch/Rock Protection

6 MO _______ _______

0047D Boat Ramps/Parking Areas

6 MO _______ _______

TOTAL: Appendix D _______

TOTAL: ALL WORK __________________

Option Year 1: 1 Mar 17 ‐ 28 Feb 18

ITEM NO SERVICES QUANTITY UNIT

UNIT

PRICE

AMOUNT

TOTAL BY

APPENDIX

Appendix A‐Mowing

Improved Areas:

1001A Coon Creek Cove 6.5 MO _______ _______

1002A Fisherman's Bend 6.5 MO _______ _______

1003A McFadden Cove 6.5 MO _______ _______

1004A Osage Cove 6.5 MO _______ _______

1005A Pionner Park 6.5 MO _______ _______

1006A Sandy Park 6.5 MO _______ _______

1007A Sandy Park Beach (May‐ Sep)

6.5 MO _______ _______

1008A Sarge Creek 6.5 MO _______ _______

1009A Washunga Bay 6.5 MO _______ _______

1010A Embankment 6.5 MO _______ _______

1011A Lake Office/Overlook 6.5 MO _______ _______

1012A West/East Access Roads 6.5 MO _______ _______

TOTAL: Improved Areas _______ Lawn Areas:

1013A Lake Office/Overlook 7.5 MO _______ _______

TOTAL: Lawn Areas _______

Semi‐Improved Area:

1014A Dam Embankment 6.5 MO _______ _______

1015A Coon Creek Oxidation Ponds

6.5 MO _______ _______

1016A Osage Cove Oxidation Ponds

6.5 MO _______ _______

1017A Sarge Creek Oxidation Ponds

6.5 MO _______ _______

TOTAL: Semi‐Improved Areas _______ TOTAL: Appendix A _______

Appendix B‐Janitorial Work

1018B Janitorial Work ‐ Project Office

12 MO _______ _______

TOTAL: Appendix B _______

Appendix C‐Park Cleaning

Spring Period:

1019C Coon Creek 0.5 MO _______ _______

1020C Osage Cove 1 MO _______ _______

1021C Sarge Creek 1 MO _______ _______

1022C Washgunga Bay 1 MO _______ _______

Subtotal: Spring Period _______

Summer Period 1:

1023C Bear Creek 2 MO _______ _______

1024C Coon Creek 2 MO _______ _______

1025C Fisherman's Bend 2 MO _______ _______

1026C McFadden Cove 2 MO _______ _______

1027C Osage Cove 2 MO _______ _______

1028C Overlook 2 MO _______ _______

1029C Pioneer Park 2 MO _______ _______

1030C Sandy Park 2 MO _______ _______

1031C Sarge Creek 2 MO _______ _______

1032C Washgunga Bay 2 MO _______ _______

Subtotal: Summer Period 1 _______

Summer Period 2:

1033C Bear Creek 5 MO _______ _______

1034C Coon Creek 5 MO _______ _______

1035C Fisherman's Bend 5 MO _______ _______

1036C McFadden Cove 5 MO _______ _______

1037C Osage Cove 5 MO _______ _______

1038C Overlook 5 MO _______ _______

1039C Pioneer Park 5 MO _______ _______

1040C Sandy Park 5 MO _______ _______

1041C Sandy Park Beach 5 MO _______ _______

1042C Sarge Creek 5 MO _______ _______

1043C Washgunga Bay 5 MO _______ _______

Subtotal: Summer Period 2 _______

TOTAL: Appendix C _______

Appendix D‐Pesticides/Herbicides

Soil Sterilant

1044D Compounds 6 MO _______ _______

1045D RipRap Areas/Ditches 6 MO _______ _______

1046D Concrete Collector Ditch/Rock Protection

6 MO _______ _______

1047D Boat Ramps/Parking Areas

6 MO _______ _______

TOTAL: Appendix D _______

TOTAL: ALL WORK __________________

Option Year 2: 1 Mar 18 ‐ 28 Feb 19

UNIT

PRICE

AMOUNT

TOTAL BY

APPENDIX

Appendix A‐Mowing

Improved Areas:

2001A Coon Creek Cove 6.5 MO _______ _______

2002A Fisherman's Bend 6.5 MO _______ _______

2003A McFadden Cove 6.5 MO _______ _______

2004A Osage Cove 6.5 MO _______ _______

2005A Pionner Park 6.5 MO _______ _______

2006A Sandy Park 6.5 MO _______ _______

2007A Sandy Park Beach (May‐ Sep)

6.5 MO _______ _______

2008A Sarge Creek 6.5 MO _______ _______

2009A Washunga Bay 6.5 MO _______ _______

2010A Embankment 6.5 MO _______ _______

2011A Lake Office/Overlook 6.5 MO _______ _______

2012A West/East Access Roads 6.5 MO _______ _______

TOTAL: Improved Areas _______ Lawn Areas:

2013A Lake Office/Overlook 7.5 MO _______ _______

TOTAL: Lawn Areas _______

2014A Dam Embankment 6.5 MO _______ _______

2015A Coon Creek Oxidation Ponds

6.5 MO _______ _______

2016A Osage Cove Oxidation Ponds

6.5 MO _______ _______

2017A Sarge Creek Oxidation Ponds

6.5 MO _______ _______

TOTAL: Semi‐Improved Areas _______ TOTAL: Appendix A _______

Appendix B‐Janitorial Work

2018B Janitorial Work ‐ Project Office

12 MO _______ _______

TOTAL: Appendix B _______

Appendix C‐Park Cleaning

Spring Period:

2019C Coon Creek 0.5 MO _______ _______

2020C Osage Cove 1 MO _______ _______

2021C Sarge Creek 1 MO _______ _______

2022C Washgunga Bay 1 MO _______ _______

Subtotal: Spring Period _______

Summer Period 1:

2023C Bear Creek 2 MO _______ _______

2024C Coon Creek 2 MO _______ _______

2025C Fisherman's Bend 2 MO _______ _______

2026C McFadden Cove 2 MO _______ _______

2027C Osage Cove 2 MO _______ _______

2028C Overlook 2 MO _______ _______

2029C Pioneer Park 2 MO _______ _______

2030C Sandy Park 2 MO _______ _______

2031C Sarge Creek 2 MO _______ _______

2032C Washgunga Bay 2 MO _______ _______

Subtotal: Summer Period 1 _______

Summer Period 2:

2033C Bear Creek 5 MO _______ _______

2034C Coon Creek 5 MO _______ _______

2035C Fisherman's Bend 5 MO _______ _______

2036C McFadden Cove 5 MO _______ _______

2037C Osage Cove 5 MO _______ _______

2038C Overlook 5 MO _______ _______

2039C Pioneer Park 5 MO _______ _______

2040C Sandy Park 5 MO _______ _______

2041C Sandy Park Beach 5 MO _______ _______

2042C Sarge Creek 5 MO _______ _______

2043C Washgunga Bay 5 MO _______ _______

Subtotal: Summer Period 2 _______

TOTAL: Appendix C _______

Appendix D‐Pesticides/Herbicides

Soil Sterilant

2044D Compounds 6 MO _______ _______

2045D RipRap Areas/Ditches 6 MO _______ _______

2046D Concrete Collector Ditch/Rock Protection

6 MO _______ _______

2047C Boat Ramps/Parking Areas

6 MO _______ _______

TOTAL: Appendix D _______

TOTAL: ALL WORK __________________

Option Year 3: 1 Mar 19‐28 Feb 20

UNIT

PRICE

AMOUNT

TOTAL BY

APPENDIX

Appendix A‐Mowing

Improved Areas:

3001A Coon Creek Cove 6.5 MO _______ _______

3002A Fisherman's Bend 6.5 MO _______ _______

3003A McFadden Cove 6.5 MO _______ _______

3004A Osage Cove 6.5 MO _______ _______

3005A Pionner Park 6.5 MO _______ _______

3006A Sandy Park 6.5 MO _______ _______

3007A Sandy Park Beach (May‐ Sep)

6.5 MO _______ _______

3008A Sarge Creek 6.5 MO _______ _______

3009A Washunga Bay 6.5 MO _______ _______

3010A Embankment 6.5 MO _______ _______

3011A Lake Office/Overlook 6.5 MO _______ _______

3012A West/East Access Roads 6.5 MO _______ _______

TOTAL: Improved Areas _______ Lawn Areas:

3013A Lake Office/Overlook 7.5 MO _______ _______

TOTAL: Lawn Areas _______

Semi‐Improved Area:

3014A Dam Embankment 6.5 MO _______ _______

3015A Coon Creek Oxidation Ponds

6.5 MO _______ _______

3016A Osage Cove Oxidation Ponds

6.5 MO _______ _______

3017A Sarge Creek Oxidation Ponds

6.5 MO _______ _______

TOTAL: Semi‐Improved Areas _______ TOTAL: Appendix A _______

Appendix B‐Janitorial Work

3018B Janitorial Work ‐ Project Office

12 MO _______ _______

TOTAL: Appendix B _______

Appendix C‐Park Cleaning

Spring Period:

3019C Coon Creek 0.5 MO _______ _______

3020C Osage Cove 1 MO _______ _______

3021C Sarge Creek 1 MO _______ _______

3022C Washgunga Bay 1 MO _______ _______

Subtotal: Spring Period _______

3023C Bear Creek 2 MO _______ _______

3024C Coon Creek 2 MO _______ _______

3025C Fisherman's Bend 2 MO _______ _______

3026C McFadden Cove 2 MO _______ _______

3027C Osage Cove 2 MO _______ _______

3028C Overlook 2 MO _______ _______

3029C Pioneer Park 2 MO _______ _______

3030C Sandy Park 2 MO _______ _______

3031C Sarge Creek 2 MO _______ _______

3032C Washgunga Bay 2 MO _______ _______

Subtotal: Summer Period 1 _______

Summer Period 2:

3033C Bear Creek 5 MO _______ _______

3034C Coon Creek 5 MO _______ _______

3035C Fisherman's Bend 5 MO _______ _______

3036C McFadden Cove 5 MO _______ _______

3037C Osage Cove 5 MO _______ _______

3038C Overlook 5 MO _______ _______

3039C Pioneer Park 5 MO _______ _______

3040C Sandy Park 5 MO _______ _______

3041C Sandy Park Beach 5 MO _______ _______

3042C Sarge Creek 5 MO _______ _______

3043C Washgunga Bay 5 MO _______ _______

Subtotal: Summer Period 2 _______

TOTAL: Appendix C _______

Appendix D‐Pesticides/Herbicides

Soil Sterilant

3044D Compounds 6 MO _______ _______

3045D RipRap Areas/Ditches 6 MO _______ _______

3046D Concrete Collector Ditch/Rock Protection

6 MO _______ _______

3047D Boat Ramps/Parking Areas

6 MO _______ _______

TOTAL: Appendix D _______

TOTAL: ALL WORK __________________

Option Year 4: 1 Mar 20 ‐ 28 Feb 21

UNIT

PRICE

AMOUNT

TOTAL BY

APPENDIX

Appendix A‐Mowing

Improved Areas:

4001A Coon Creek Cove 6.5 MO _______ _______

4002A Fisherman's Bend 6.5 MO _______ _______

4003A McFadden Cove 6.5 MO _______ _______

4004A Osage Cove 6.5 MO _______ _______

4005A Pionner Park 6.5 MO _______ _______

4006A Sandy Park 6.5 MO _______ _______

4007A Sandy Park Beach (May‐ Sep)

6.5 MO _______ _______

4008A Sarge Creek 6.5 MO _______ _______

4009A Washunga Bay 6.5 MO _______ _______

4010A Embankment 6.5 MO _______ _______

4011A Lake Office/Overlook 6.5 MO _______ _______

4012A West/East Access Roads 6.5 MO _______ _______

TOTAL: Improved Areas _______ Lawn Areas:

4013A Lake Office/Overlook 7.5 MO _______ _______

TOTAL: Lawn Areas _______

4014A Dam Embankment 6.5 MO _______ _______

4015A Coon Creek Oxidation Ponds

6.5 MO _______ _______

4016A Osage Cove Oxidation Ponds

6.5 MO _______ _______

4017A Sarge Creek Oxidation Ponds

6.5 MO _______ _______

TOTAL: Semi‐Improved Areas _______ TOTAL: Appendix A _______

Appendix B‐Janitorial Work

4018B Janitorial Work ‐ Project Office

12 MO _______ _______

TOTAL: Appendix B _______

Appendix C‐Park Cleaning

Spring Period:

4019C Coon Creek 0.5 MO _______ _______

4020C Osage Cove 1 MO _______ _______

4021C Sarge Creek 1 MO _______ _______

4022C Washgunga Bay 1 MO _______ _______

Subtotal: Spring Period _______

4023C Bear Creek 2 MO _______ _______

4024C Coon Creek 2 MO _______ _______

4025C Fisherman's Bend 2 MO _______ _______

4026C McFadden Cove 2 MO _______ _______

4027C Osage Cove 2 MO _______ _______

4028C Overlook 2 MO _______ _______

4029C Pioneer Park 2 MO _______ _______

4030C Sandy Park 2 MO _______ _______

4031C Sarge Creek 2 MO _______ _______

4032C Washgunga Bay 2 MO _______ _______

Subtotal: Summer Period 1 _______

Summer Period 2:

4033C Bear Creek 5 MO _______ _______

4034C Coon Creek 5 MO _______ _______

4035C Fisherman's Bend 5 MO _______ _______

4036C McFadden Cove 5 MO _______ _______

4037C Osage Cove 5 MO _______ _______

4038C Overlook 5 MO _______ _______

4039C Pioneer Park 5 MO _______ _______

4040C Sandy Park 5 MO _______ _______

4041C Sandy Park Beach 5 MO _______ _______

4042C Sarge Creek 5 MO _______ _______

4043C Washgunga Bay 5 MO _______ _______

Subtotal: Summer Period 2 _______

TOTAL: Appendix C _______

Appendix D‐Pesticides/Herbicides

Soil Sterilant

4044D Compounds 6 MO _______ _______

4045D RipRap Areas/Ditches 6 MO _______ _______

4046D Concrete Collector Ditch/Rock Protection

6 MO _______ _______

4047D Boat Ramps/Parking Areas

6 MO _______ _______

TOTAL: Appendix D _______

TOTAL: ALL WORK __________________

Section C - Descriptions and Specifications

PERFORMANCE WORK STATEMENT

See Section J for Performance Work Statement attachment.

Section E - Inspection and Acceptance

CLAUSES INCORPORATED BY FULL TEXT

52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(a) Definitions. "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may (1) require the Contractor to take necessary action to ensure that future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may (1) by contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service or (2) terminate the contract for default.

(End of clause)

Section F - Deliveries or Performance

52.242-15 STOP-WORK ORDER (AUG 1989)

(a) The Contracting Officer may, at any time, by written order to the Contractor, require the Contractor to stop all, or any part, of the work called for by this contract for a period of 90 days after the order is delivered to the Contractor, and for any further period to which the parties may agree. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stoppage. Within a period of 90 days after a stop-work is delivered to the Contractor, or within any extension of that period to which the parties shall have agreed, the Contracting Officer shall either--

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Default, or the Termination for Convenience of the Government, clause of this contract.

(b) If a stop-work order issued under this clause is canceled or the period of the order or any extension thereof expires, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if--

(1) The stop-work order results in an increase in the time required for, or in the Contractor's cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to the adjustment within 30 days after the end of the period of work stoppage;

provided, that, if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon the claim submitted at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

Section G - Contract Administration Data

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(a) "Definition. Contracting officer's representative" means an individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisition Regulation Supplement and authorized in writing by the contracting officer to perform specific technical or administrative functions.

(b) If the Contracting Officer designates a contracting officer's representative (COR), the Contractor will receive a copy of the written designation. It will specify the extent of the COR's authority to act on behalf of the contracting officer. The COR is not authorized to make any commitments or changes that will affect price, quality, quantity, delivery, or any other term or condition of the contract.

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(JUNE 2012)

(a) Definitions. As used in this clause–

(1) Contract financing payment and invoice payment have the meanings given in section 32.001 of the Federal Acquisition Regulation.

(2) Electronic form means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.

(3) Payment request means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.

(4) Receiving report means the data required by the clause at 252.246-7000, Material Inspection and Receiving Report.

(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/.

(c) The Contractor may submit a payment request and receiving report using other than WAWF only when–

(1) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer's determination with each request for payment;

(2) DoD makes payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System);

(3) DoD makes payment for rendered health care services using the TRICARE Encounter Data System (TEDS) as the electronic format; or

(4) When the Governmentwide commercial purchase card is used as the method of payment, only submission of the receiving report in electronic form is required.

(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.

(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payments requests.

Section H - Special Contract Requirements

WAGE RATES

MOWING, JANITORIAL, PARK CLEANING AND HERBICIDE APPLICATION SERVICES

Solicitation No. W912BV-16-R-0065

Kaw Lake, Oklahoma

APPLICABILITY OF WAGE RATES

Wage Determination No. 05-2433 (Rev.-17) is applicable to service work performed at the site in Kay County, Oklahoma to include all service requirements of this task order.

WD 05‐2433 (Rev.‐17) was first posted on www.wdol.gov on 01/05/2016

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 2005‐2433 Daniel W. Simms Division of | Revision No.: 17 Director Wage Determinations| Date Of Revision: 12/29/2015 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Service Contract Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

State: Oklahoma

Area: Oklahoma Counties of Adair, Cherokee, Choctaw, Craig, Creek, Delaware, Haskell, Kay, Latimer, Le Flore, Mayes, McCurtain, McIntosh, Muskogee, Nowata, Okfuskee, Okmulgee, Osage, Ottawa, Pawnee, Pittsburg, Pushmataha, Rogers, Sequoyah, Tulsa, Wagoner, Washington **Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE ‐ TITLE FOOTNOTE RATE

01000 ‐ Administrative Support And Clerical Occupations 01011 ‐ Accounting Clerk I 12.60 01012 ‐ Accounting Clerk II 15.33 01013 ‐ Accounting Clerk III 17.78 01020 ‐ Administrative Assistant 19.04 01040 ‐ Court Reporter 19.66 01051 ‐ Data Entry Operator I 10.88 01052 ‐ Data Entry Operator II 11.86 01060 ‐ Dispatcher, Motor Vehicle 17.99 01070 ‐ Document Preparation Clerk 12.66 01090 ‐ Duplicating Machine Operator 12.66 01111 ‐ General Clerk I 11.08 01112 ‐ General Clerk II 12.83 01113 ‐ General Clerk III 16.83 01120 ‐ Housing Referral Assistant 15.78 01141 ‐ Messenger Courier 11.72 01191 ‐ Order Clerk I 11.83 01192 ‐ Order Clerk II 13.79 01261 ‐ Personnel Assistant (Employment) I 13.16 01262 ‐ Personnel Assistant (Employment) II 14.43

01263 ‐ Personnel Assistant (Employment) III 17.57 01270 ‐ Production Control Clerk 18.65 01280 ‐ Receptionist 11.23 01290 ‐ Rental Clerk 13.33 01300 ‐ Scheduler, Maintenance 12.39 01311 ‐ Secretary I 12.39 01312 ‐ Secretary II 13.86 01313 ‐ Secretary III 15.78 01320 ‐ Service Order Dispatcher 14.95 01410 ‐ Supply Technician 19.04 01420 ‐ Survey Worker 13.71 01531 ‐ Travel Clerk I 12.32 01532 ‐ Travel Clerk II 13.14 01533 ‐ Travel Clerk III 13.77 01611 ‐ Word Processor I 11.77 01612 ‐ Word Processor II 13.35 01613 ‐ Word Processor III 14.97 05000 ‐ Automotive Service Occupations 05005 ‐ Automobile Body Repairer, Fiberglass 19.15 05010 ‐ Automotive Electrician 18.19 05040 ‐ Automotive Glass Installer 17.24 05070 ‐ Automotive Worker 17.24 05110 ‐ Mobile Equipment Servicer 15.14 05130 ‐ Motor Equipment Metal Mechanic 19.15 05160 ‐ Motor Equipment Metal Worker 17.24 05190 ‐ Motor Vehicle Mechanic 17.91 05220 ‐ Motor Vehicle Mechanic Helper 13.98 05250 ‐ Motor Vehicle Upholstery Worker 16.08 05280 ‐ Motor Vehicle Wrecker 17.19 05310 ‐ Painter, Automotive 18.22 05340 ‐ Radiator Repair Specialist 17.24 05370 ‐ Tire Repairer 13.29 05400 ‐ Transmission Repair Specialist 19.15 07000 ‐ Food Preparation And Service Occupations 07010 ‐ Baker 11.11 07041 ‐ Cook I 9.79 07042 ‐ Cook II 11.11 07070 ‐ Dishwasher 8.05 07130 ‐ Food Service Worker 7.83 07210 ‐ Meat Cutter 12.17 07260 ‐ Waiter/Waitress 8.38 09000 ‐ Furniture Maintenance And Repair Occupations 09010 ‐ Electrostatic Spray Painter 16.54 09040 ‐ Furniture Handler 11.67 09080 ‐ Furniture Refinisher 16.54 09090 ‐ Furniture Refinisher Helper 13.06 09110 ‐ Furniture Repairer, Minor 14.73 09130 ‐ Upholsterer 16.54 11000 ‐ General Services And Support Occupations 11030 ‐ Cleaner, Vehicles 11.50 11060 ‐ Elevator Operator 9.38 11090 ‐ Gardener 12.57 11122 ‐ Housekeeping Aide 9.38 11150 ‐ Janitor 9.38

11210 ‐ Laborer, Grounds Maintenance 10.68 11240 ‐ Maid or Houseman 8.48 11260 ‐ Pruner 10.07 11270 ‐ Tractor Operator 12.41 11330 ‐ Trail Maintenance Worker 10.68 11360 ‐ Window Cleaner 10.05 12000 ‐ Health Occupations 12010 ‐ Ambulance Driver 13.51 12011 ‐ Breath Alcohol Technician 15.83 12012 ‐ Certified Occupational Therapist Assistant 19.42 12015 ‐ Certified Physical Therapist Assistant 21.72 12020 ‐ Dental Assistant 13.38 12025 ‐ Dental Hygienist 31.40 12030 ‐ EKG Technician 18.82 12035 ‐ Electroneurodiagnostic Technologist 18.82 12040 ‐ Emergency Medical Technician 13.51 12071 ‐ Licensed Practical Nurse I 14.15 12072 ‐ Licensed Practical Nurse II 15.83 12073 ‐ Licensed Practical Nurse III 17.66 12100 ‐ Medical Assistant 13.05 12130 ‐ Medical Laboratory Technician 14.15 12160 ‐ Medical Record Clerk 12.54 12190 ‐ Medical Record Technician 14.03 12195 ‐ Medical Transcriptionist 14.83 12210 ‐ Nuclear Medicine Technologist 29.46 12221 ‐ Nursing Assistant I 10.26 12222 ‐ Nursing Assistant II 11.53 12223 ‐ Nursing Assistant III 12.59 12224 ‐ Nursing Assistant IV 14.12 12235 ‐ Optical Dispenser 14.54 12236 ‐ Optical Technician 13.51 12250 ‐ Pharmacy Technician 13.40 12280 ‐ Phlebotomist 13.60 12305 ‐ Radiologic Technologist 21.91 12311 ‐ Registered Nurse I 20.03 12312 ‐ Registered Nurse II 24.51 12313 ‐ Registered Nurse II, Specialist 24.51 12314 ‐ Registered Nurse III 29.66 12315 ‐ Registered Nurse III, Anesthetist 29.66 12316 ‐ Registered Nurse IV 35.55 12317 ‐ Scheduler (Drug and Alcohol Testing) 19.62 13000 ‐ Information And Arts Occupations 13011 ‐ Exhibits Specialist I 18.95 13012 ‐ Exhibits Specialist II 22.25 13013 ‐ Exhibits Specialist III 27.23 13041 ‐ Illustrator I 18.95 13042 ‐ Illustrator II 22.25 13043 ‐ Illustrator III 27.23 13047 ‐ Librarian 20.68 13050 ‐ Library Aide/Clerk 8.51 13054 ‐ Library Information Technology Systems 19.12 Administrator 13058 ‐ Library Technician 13.71 13061 ‐ Media Specialist I 13.50

13062 ‐ Media Specialist II 15.11 13063 ‐ Media Specialist III 16.84 13071 ‐ Photographer I 15.06 13072 ‐ Photographer II 17.50 13073 ‐ Photographer III 20.54 13074 ‐ Photographer IV 25.14 13075 ‐ Photographer V 30.42 13110 ‐ Video Teleconference Technician 15.24 14000 ‐ Information Technology Occupations 14041 ‐ Computer Operator I 14.71 14042 ‐ Computer Operator II 16.45 14043 ‐ Computer Operator III 21.59 14044 ‐ Computer Operator IV 25.11 14045 ‐ Computer Operator V 27.62 14071 ‐ Computer Programmer I 22.27 14072 ‐ Computer Programmer II (see 1) 14073 ‐ Computer Programmer III (see 1) 14074 ‐ Computer Programmer IV (see 1) 14101 ‐ Computer Systems Analyst I (see 1) 14102 ‐ Computer Systems Analyst II (see 1) 14103 ‐ Computer Systems Analyst III (see 1) 14150 ‐ Peripheral Equipment Operator 14.71 14160 ‐ Personal Computer Support Technician 28.80 15000 ‐ Instructional Occupations 15010 ‐ Aircrew Training Devices Instructor (Non‐Rated) 28.14 15020 ‐ Aircrew Training Devices Instructor (Rated) 34.04 15030 ‐ Air Crew Training Devices Instructor (Pilot) 40.79 15050 ‐ Computer Based Training Specialist / Instructor 28.14 15060 ‐ Educational Technologist 23.62 15070 ‐ Flight Instructor (Pilot) 40.79 15080 ‐ Graphic Artist 19.06 15090 ‐ Technical Instructor 18.16 15095 ‐ Technical Instructor/Course Developer 22.74 15110 ‐ Test Proctor 14.65 15120 ‐ Tutor 14.65 16000 ‐ Laundry, Dry‐Cleaning, Pressing And Related Occupations 16010 ‐ Assembler 8.47 16030 ‐ Counter Attendant 8.47 16040 ‐ Dry Cleaner 10.79 16070 ‐ Finisher, Flatwork, Machine 8.47 16090 ‐ Presser, Hand 8.47 16110 ‐ Presser, Machine, Drycleaning 8.47 16130 ‐ Presser, Machine, Shirts 8.47 16160 ‐ Presser, Machine, Wearing Apparel, Laundry 8.47 16190 ‐ Sewing Machine Operator 11.56 16220 ‐ Tailor 12.34 16250 ‐ Washer, Machine 9.27 19000 ‐ Machine Tool Operation And Repair Occupations 19010 ‐ Machine‐Tool Operator (Tool Room) 18.19 19040 ‐ Tool And Die Maker 22.21 21000 ‐ Materials Handling And Packing Occupations 21020 ‐ Forklift Operator 13.47 21030 ‐ Material Coordinator 18.65 21040 ‐ Material Expediter 18.65

21050 ‐ Material Handling Laborer 10.84 21071 ‐ Order Filler 11.20 21080 ‐ Production Line Worker (Food Processing) 13.47 21110 ‐ Shipping Packer 13.44 21130 ‐ Shipping/Receiving Clerk 13.44 21140 ‐ Store Worker I 12.19 21150 ‐ Stock Clerk 16.90 21210 ‐ Tools And Parts Attendant 13.47 21410 ‐ Warehouse Specialist 13.47 23000 ‐ Mechanics And Maintenance And Repair Occupations 23010 ‐ Aerospace Structural Welder 20.96 23021 ‐ Aircraft Mechanic I 19.95 23022 ‐ Aircraft Mechanic II 20.96 23023 ‐ Aircraft Mechanic III 22.00 23040 ‐ Aircraft Mechanic Helper 14.56 23050 ‐ Aircraft, Painter 18.74 23060 ‐ Aircraft Servicer 16.75 23080 ‐ Aircraft Worker 17.96 23110 ‐ Appliance Mechanic 17.65 23120 ‐ Bicycle Repairer 13.29 23125 ‐ Cable Splicer 19.25 23130 ‐ Carpenter, Maintenance 16.54 23140 ‐ Carpet Layer 17.23 23160 ‐ Electrician, Maintenance 21.97 23181 ‐ Electronics Technician Maintenance I 20.84 23182 ‐ Electronics Technician Maintenance II 23.49 23183 ‐ Electronics Technician Maintenance III 27.74 23260 ‐ Fabric Worker 16.31 23290 ‐ Fire Alarm System Mechanic 17.96 23310 ‐ Fire Extinguisher Repairer 15.13 23311 ‐ Fuel Distribution System Mechanic 19.30 23312 ‐ Fuel Distribution System Operator 15.69 23370 ‐ General Maintenance Worker 16.08 23380 ‐ Ground Support Equipment Mechanic 19.95 23381 ‐ Ground Support Equipment Servicer 16.75 23382 ‐ Ground Support Equipment Worker 17.96 23391 ‐ Gunsmith I 15.36 23392 ‐ Gunsmith II 17.13 23393 ‐ Gunsmith III 18.90 23410 ‐ Heating, Ventilation And Air‐Conditioning 18.91 Mechanic 23411 ‐ Heating, Ventilation And Air Contditioning 19.95 Mechanic (Research Facility) 23430 ‐ Heavy Equipment Mechanic 19.75 23440 ‐ Heavy Equipment Operator 17.41 23460 ‐ Instrument Mechanic 18.90 23465 ‐ Laboratory/Shelter Mechanic 18.04 23470 ‐ Laborer 10.84 23510 ‐ Locksmith 18.02 23530 ‐ Machinery Maintenance Mechanic 18.52 23550 ‐ Machinist, Maintenance 17.41 23580 ‐ Maintenance Trades Helper 13.06 23591 ‐ Metrology Technician I 18.90 23592 ‐ Metrology Technician II 19.72

23593 ‐ Metrology Technician III 20.72 23640 ‐ Millwright 24.46 23710 ‐ Office Appliance Repairer 19.68 23760 ‐ Painter, Maintenance 16.48 23790 ‐ Pipefitter, Maintenance 18.93 23810 ‐ Plumber, Maintenance 18.07 23820 ‐ Pneudraulic Systems Mechanic 18.90 23850 ‐ Rigger 20.95 23870 ‐ Scale Mechanic 17.13 23890 ‐ Sheet‐Metal Worker, Maintenance 17.41 23910 ‐ Small Engine Mechanic 15.67 23931 ‐ Telecommunications Mechanic I 25.74 23932 ‐ Telecommunications Mechanic II 27.10 23950 ‐ Telephone Lineman 24.55 23960 ‐ Welder, Combination, Maintenance 17.41 23965 ‐ Well Driller 17.41 23970 ‐ Woodcraft Worker 18.90 23980 ‐ Woodworker 13.97 24000 ‐ Personal Needs Occupations 24570 ‐ Child Care Attendant 10.22 24580 ‐ Child Care Center Clerk 13.07 24610 ‐ Chore Aide 8.34 24620 ‐ Family Readiness And Support Services 14.48 Coordinator 24630 ‐ Homemaker 16.29 25000 ‐ Plant And System Operations Occupations 25010 ‐ Boiler Tender 20.84 25040 ‐ Sewage Plant Operator 16.54 25070 ‐ Stationary Engineer 20.84 25190 ‐ Ventilation Equipment Tender 14.77 25210 ‐ Water Treatment Plant Operator 16.54 27000 ‐ Protective Service Occupations 27004 ‐ Alarm Monitor 13.51 27007 ‐ Baggage Inspector 11.40 27008 ‐ Corrections Officer 12.86 27010 ‐ Court Security Officer 16.43 27030 ‐ Detection Dog Handler 13.80 27040 ‐ Detention Officer 12.86 27070 ‐ Firefighter 19.43 27101 ‐ Guard I 11.40 27102 ‐ Guard II 13.80 27131 ‐ Police Officer I 18.67 27132 ‐ Police Officer II 20.74 28000 ‐ Recreation Occupations 28041 ‐ Carnival Equipment Operator 11.88 28042 ‐ Carnival Equipment Repairer 12.87 28043 ‐ Carnival Equpment Worker 8.97 28210 ‐ Gate Attendant/Gate Tender 14.00 28310 ‐ Lifeguard 11.48 28350 ‐ Park Attendant (Aide) 15.66 28510 ‐ Recreation Aide/Health Facility Attendant 11.44 28515 ‐ Recreation Specialist 17.14 28630 ‐ Sports Official 12.47 28690 ‐ Swimming Pool Operator 15.68

29000 ‐ Stevedoring/Longshoremen Occupational Services 29010 ‐ Blocker And Bracer 17.55 29020 ‐ Hatch Tender 17.55 29030 ‐ Line Handler 17.55 29041 ‐ Stevedore I 16.72 29042 ‐ Stevedore II 18.49 30000 ‐ Technical Occupations 30010 ‐ Air Traffic Control Specialist, Center (HFO) (see 2) 35.77 30011 ‐ Air Traffic Control Specialist, Station (HFO) (see 2) 24.66 30012 ‐ Air Traffic Control Specialist, Terminal (HFO) (see 2) 27.16 30021 ‐ Archeological Technician I 17.97 30022 ‐ Archeological Technician II 20.87 30023 ‐ Archeological Technician III 25.85 30030 ‐ Cartographic Technician 25.85 30040 ‐ Civil Engineering Technician 23.31 30061 ‐ Drafter/CAD Operator I 17.97 30062 ‐ Drafter/CAD Operator II 20.87 30063 ‐ Drafter/CAD Operator III 23.28 30064 ‐ Drafter/CAD Operator IV 28.64 30081 ‐ Engineering Technician I 17.13 30082 ‐ Engineering Technician II 19.23 30083 ‐ Engineering Technician III 21.51 30084 ‐ Engineering Technician IV 26.65 30085 ‐ Engineering Technician V 32.59 30086 ‐ Engineering Technician VI 39.44 30090 ‐ Environmental Technician 19.54 30210 ‐ Laboratory Technician 23.28 30240 ‐ Mathematical Technician 25.85 30361 ‐ Paralegal/Legal Assistant I 18.26 30362 ‐ Paralegal/Legal Assistant II 21.08 30363 ‐ Paralegal/Legal Assistant III 24.49 30364 ‐ Paralegal/Legal Assistant IV 31.22 30390 ‐ Photo‐Optics Technician 25.85 30461 ‐ Technical Writer I 21.14 30462 ‐ Technical Writer II 25.86 30463 ‐ Technical Writer III 31.27 30491 ‐ Unexploded Ordnance (UXO) Technician I 22.74 30492 ‐ Unexploded Ordnance (UXO) Technician II 27.51 30493 ‐ Unexploded Ordnance (UXO) Technician III 32.97 30494 ‐ Unexploded (UXO) Safety Escort 22.74 30495 ‐ Unexploded (UXO) Sweep Personnel 22.74 30620 ‐ Weather Observer, Combined Upper Air Or (see 2) 23.28 Surface Programs 30621 ‐ Weather Observer, Senior (see 2) 25.85 31000 ‐ Transportation/Mobile Equipment Operation Occupations 31020 ‐ Bus Aide 9.70 31030 ‐ Bus Driver 13.09 31043 ‐ Driver Courier 11.85 31260 ‐ Parking and Lot Attendant 8.14 31290 ‐ Shuttle Bus Driver 12.58 31310 ‐ Taxi Driver 9.57 31361 ‐ Truckdriver, Light 12.58 31362 ‐ Truckdriver, Medium 13.35 31363 ‐ Truckdriver, Heavy 18.54

31364 ‐ Truckdriver, Tractor‐Trailer 18.54 99000 ‐ Miscellaneous Occupations 99030 ‐ Cashier 8.02 99050 ‐ Desk Clerk 10.22 99095 ‐ Embalmer 22.74 99251 ‐ Laboratory Animal Caretaker I 9.55 99252 ‐ Laboratory Animal Caretaker II 10.15 99310 ‐ Mortician 22.74 99410 ‐ Pest Controller 14.80 99510 ‐ Photofinishing Worker 10.02 99710 ‐ Recycling Laborer 12.34 99711 ‐ Recycling Specialist 14.05 99730 ‐ Refuse Collector 11.84 99810 ‐ Sales Clerk 12.10 99820 ‐ School Crossing Guard 9.01 99830 ‐ Survey Party Chief 22.23 99831 ‐ Surveying Aide 13.20 99832 ‐ Surveying Technician 20.88 99840 ‐ Vending Machine Attendant 12.74 99841 ‐ Vending Machine Repairer 15.68 99842 ‐ Vending Machine Repairer Helper 12.74

ALL OCCUPATIONS LISTED ABOVE RECEIVE THE FOLLOWING BENEFITS:

HEALTH & WELFARE: $4.27 per hour or $170.80 per week or $740.13 per month

VACATION: 2 weeks paid vacation after 1 year of service with a contractor or successor; 3 weeks after 5 years, and 4 weeks after 15 years. Length of service includes the whole span of continuous service with the present contractor or successor, wherever employed, and with the predecessor contractors in the performance of similar work at the same Federal facility. (Reg. 29 CFR 4.173)

HOLIDAYS: A minimum of ten paid holidays per year, New Year's Day, Martin Luther King Jr's Birthday, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans' Day, Thanksgiving Day, and Christmas Day. (A contractor may substitute for any of the named holidays another day off with pay in accordance with a plan communicated to the employees involved.) (See 29 CFR 4174)

THE OCCUPATIONS WHICH HAVE NUMBERED FOOTNOTES IN PARENTHESES RECEIVE THE FOLLOWING:

1) COMPUTER EMPLOYEES: Under the SCA at section 8(b), this wage determination does not apply to any employee who individually qualifies as a bona fide executive, administrative, or professional employee as defined in 29 C.F.R. Part 541. Because most Computer System Analysts and Computer Programmers who are compensated at a rate not less than $27.63 (or on a salary or fee basis at a rate not less than $455 per week) an hour would likely qualify as exempt computer professionals, (29 C.F.R. 541.

400) wage rates may not be listed on this wage determination for all occupations within those job families. In addition, because this wage determination may not list a wage rate for some or all occupations within those job families if the survey data indicates that the prevailing wage rate for the occupation equals or exceeds $27.63 per hour conformances may be necessary for certain nonexempt employees. For example, if an individual employee is nonexempt but nevertheless performs duties within the scope of one of the Computer Systems Analyst or Computer Programmer occupations for which this wage determination does not specify an SCA wage rate, then the wage rate for that employee must be conformed in accordance with the conformance procedures described in the conformance note included on this wage determination.

Additionally, because job titles vary widely and change quickly in the computer industry, job titles are not determinative of the application of the computer professional exemption. Therefore, the exemption applies only to computer employees who satisfy the compensation requirements and whose primary duty consists of:

(1) The application of systems analysis techniques and procedures, including consulting with users, to determine hardware, software or system functional specifications;

(2) The design, development, documentation, analysis, creation, testing or modification of computer systems or programs, including prototypes, based on and related to user or system design specifications;

(3) The design, documentation, testing, creation or modification of computer programs related to machine operating systems; or

(4) A combination of the aforementioned duties, the performance of which requires the same level of skills. (29 C.F.R. 541.400).

2) AIR TRAFFIC CONTROLLERS AND WEATHER OBSERVERS ‐ NIGHT PAY & SUNDAY PAY: If you work at night as part of a regular tour of duty, you will earn a night differential and receive an additional 10% of basic pay for any hours worked between 6pm and 6am.

If you are a full‐time employed (40 hours a week) and Sunday is part of your regularly scheduled workweek, you are paid at your rate of basic pay plus a Sunday premium of 25% of your basic rate for each hour of Sunday work which is not overtime (i.e. occasional work on Sunday outside the normal tour of duty is considered overtime work).

HAZARDOUS PAY DIFFERENTIAL: An 8 percent differential is applicable to employees employed in a position that represents a high degree of hazard when working with or in close proximity to ordinance, explosives, and incendiary materials. This includes work such as screening, blending, dying, mixing, and pressing of sensitive ordance, explosives, and pyrotechnic compositions such as lead azide, black powder and photoflash powder. All dry‐house activities involving propellants or explosives.

Demilitarization, modification, renovation, demolition, and maintenance operations on sensitive ordnance, explosives and incendiary materials. All operations involving regrading and cleaning of artillery ranges.

A 4 percent differential is applicable to employees employed in a position that represents a low degree of hazard when working with, or in close proximity to ordance, (or employees possibly adjacent to) explosives and incendiary materials which involves potential injury such as laceration of hands, face, or arms of the employee engaged in the operation,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .