W912BV-16-R-0062-0001_-_PCMC_SKIATOOK-BIRCH.pdf
PDF 55 KB Posted
- Solicitation number
- W912BV-16-R-0062
About this file
This amendment is being issued to extend the proposal due date. The due date is changed from to 19 FEB 2016 to 27 FEB 2016. This amendment is also being issued to replace the bid schedule in its entirety. All other terms and conditions remain in effect.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is being issued to extend the proposal due date. The due date is changed from 25 FEB 2016 to 29 FEB 2016. This amendment is also being issued to replace the bid schedule in its entirety. All other terms and conditions remain in effect.
1. CONTRACT ID CODE PAGE OF PAGES
1 22
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 02-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-16-R-0062
X 9B. DATED (SEE ITEM 11)
28-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
02-Feb-2016
CODE
CONTRACTING DIV
USACE, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV-16-R-0062
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
BIDDERS SCHEDULE
BID SCHEDULE
Base Year - 1 Mar 2016 - 28 Feb 2017
SKIATOOK & BIRCH LAKES
CLIN SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
MOWING
IMPROVED AREAS
0001 BLACKDOG 7 MO $_________ $_________
0002 BULL CREEK
PENNSULA
7 MO $_________ $_________
DAM
EMBANKMENT.SPILL
WAY
DAMSITE & ACCESS
RDS
0005 HOMINY LANDING 7 MO $_________ $_________
0006 OSAGE PARK 7 MO $_________ $_________
0007 SKIATOOK POINT 7 MO $_________ $_________
0008 BTALL CHIEF COVE 7 MO $_________ $_________
0009 TWIN POINTS 7 MO $_________ $_________
TOTAL IMPROVED
AREA
LAWN AREAS
SKIATOOK LAKE
OFFICE
SEMI IMPROVED
AREAS
0011 OFFICE/DAMSITE
/ACCESS RDS
DAM EMBANKMENT
TOTAL APPENDIX A $_________
APPENDIX B
JANITORIAL
0013 SKIATOOK LAKE
12 MO $_________ $_________
APPENDIX C
PARK CLEANING
SUMMER PERIOD $
0014 BULL CREEK
PENINSULA
0015 HOMINY LANDING 7 MO $_________ $_________
0016 OSAGE PARK 7 MO $_________ $_________
0017 BLACK DOG 7 MO $_________ $_________
0018 SKIATOOK POINT 7 MO $_________ $_________
0019 TALL CHIEF COVE 7 MO $_________ $_________
0020 TWIN POINTS 7 MO $_________ $_________
TOTAL SUMMER
PERIOD
WINTER PERIOD
BULL CREEK
5 MO $_________ $_________
0022 HOMINY LANDING 5 MO $_________ $_________
0023 OSAGE PARK 5 MO $_________ $_________
0024 SKIATOOK POINT 5 MO $_________ $_________
0025 BLACK DOG 5 MO $_________ $_________
TOTAL WINTER
VAULT & SEPTIC
PUMPING
0026 BLACKDOG 12 MO $_________ $_________
0027 BULL CREEK
PENIDSULA
0028 HOMINY LANDING 12 MO $_________ $_________
0029 OSAGE PARK 12 MO $_________ $_________
0030 SKIATOOK PARK 12 MO $_________ $_________
0031 TALL CHIEF COVE 12 MO $_________ $_________
0032 TWIN POINTS 12 MO $_________ $_________
SUBTOTAL $_________
APPENDIX D
PESTICIDE
HERBICIDE
GUARDRAIL AREA-
EMBANKMENT
0034 PAVED & UNPAVED 7 MO $_________ $_________
RIPRAP AREAS &
CONCRETE LINED
BIRCH LAKE
APPENDIX A
0033 BIRCH COVE 7 MO $_________ $_________
0037 TWIN COVE 7 MO $_________ $_________
SPILLWAY
ABUTMENT ACCESS
RD
LAWN AREAS _
0039 OVERLOOK/OFFICE 7 MO $_________ $_________
0040 BIRCH & LEFT
ABUTMENT
CLEANING OF PARK
SUMMER PERIOD
0041 BIRCH COVE 7 MO $_________ $_________
0042 OVERLOOK 7 MO $_________ $_________
0043 TWIN COVE 7 MO $_________ $_________
VAULT.SEPTIC
0044 BIRCH COVE 12 MO $_________ $_________
0045 OVERLOOK 12 MO $_________ $_________
0046 TWIN COVE 12 MO $_________ $_________
TOTAL APPENDIX C $_________
APLLICATION
HEBICIDE
GUARDRAIL AREAS-
1 MO $_________ $_________
PAVED & UNPAVED
CONCRETE LINED
DITCHES
TOTAL APPENDIX D $_________
TOTAL BASE YEAR $_________
BID SCHEDULE
Option Year 1 - 1 Mar 2017 - 28 Feb 2018
1001 BLACKDOG 7 MO $_________ $_________
1002 BULL CREEK
EMBANKMENT.SPILL
1005 HOMINY LANDING 7 MO $_________ $_________
1006 OSAGE PARK 7 MO $_________ $_________
1007 SKIATOOK POINT 7 MO $_________ $_________
1008 BTALL CHIEF COVE 7 MO $_________ $_________
1009 TWIN POINTS 7 MO $_________ $_________
1011 OFFICE/DAMSITE
1012 DAM EMBANKMENT
1015 HOMINY LANDING 7 MO $_________ $_________
1016 OSAGE PARK 7 MO $_________ $_________
1017 BLACK DOG 7 MO $_________ $_________
1018 SKIATOOK POINT 7 MO $_________ $_________
1019 TALL CHIEF COVE 7 MO $_________ $_________
1020 TWIN POINTS 7 MO $_________ $_________
1021 BULL CREEK
1022 HOMINY LANDING 5 MO $_________ $_________
1023 OSAGE PARK 5 MO $_________ $_________
1024 SKIATOOK POINT 5 MO $_________ $_________
1025 BLACK DOG 5 MO $_________ $_________
1026 BLAC DOG 12 MO $_________ $_________
1028 HOMINY LANDING 12 MO $_________ $_________
1029 OSAGE PARK 12 MO $_________ $_________
1030 SKIATOOK PARK 12 MO $_________ $_________
1031 TALL CHIEF COVE 12 MO $_________ $_________
1032 TWIN POINTS 12 MO $_________ $_________
1033 GUARDRAIL AREA-
1034 PAVED & UNPAVED 7 MO $_________ $_________
CONCRETE LINED
1033 BIRCH COVE 7 MO $_________ $_________
1037 TWIN COVE 7 MO $_________ $_________
ABUTMENT ACCESS
1039 OVERLOOK/OFFICE 7 MO $_________ $_________
1040 BIRCH & LEFT
1041 BIRCH COVE 7 MO $_________ $_________
1042 OVERLOOK 7 MO $_________ $_________
1043 TWIN COVE 7 MO $_________ $_________
1044 BIRCH COVE 12 MO $_________ $_________
1045 OVERLOOK 12 MO $_________ $_________
1046 TWIN COVE 12 MO $_________ $_________
1047 GUARDRAIL AREAS-
PAVED & UNPAVED
CONCRETE LINED
TOTAL OPTION YEAR ONE $_________
Option Year 2 - 1 Mar 2018 - 28 Feb 2019
2001 BLACKDOG 7 MO $_________ $_________
2002 BULL CREEK
EMBANKMENT.SPILL
2005 HOMINY LANDING 7 MO $_________ $_________
2006 OSAGE PARK 7 MO $_________ $_________
2007 SKIATOOK POINT 7 MO $_________ $_________
2008 BTALL CHIEF COVE 7 MO $_________ $_________
2009 TWIN POINTS 7 MO $_________ $_________
2010 SKIATOOK LAKE
2011 OFFICE/DAMSITE
2013 SKIATOOK LAKE
2014 BULL CREEK
2015 HOMINY LANDING 7 MO $_________ $_________
2016 OSAGE PARK 7 MO $_________ $_________
2017 BLACK DOG 7 MO $_________ $_________
2018 SKIATOOK POINT 7 MO $_________ $_________
2019 TALL CHIEF COVE 7 MO $_________ $_________
2020 TWIN POINTS 7 MO $_________ $_________
2022 HOMINY LANDING 5 MO $_________ $_________
2023 OSAGE PARK 5 MO $_________ $_________
2024 SKIATOOK POINT 5 MO $_________ $_________
2025 BLACK DOG 5 MO $_________ $_________
2026 BLACKDOG 12 MO $_________ $_________
2028 HOMINY LANDING 12 MO $_________ $_________
2029 OSAGE PARK 12 MO $_________ $_________
2030 SKIATOOK PARK 12 MO $_________ $_________
2031 TALL CHIEF COVE 12 MO $_________ $_________
2032 TWIN POINTS 12 MO $_________ $_________
2033 GUARDRAIL AREA-
2034 PAVED & UNPAVED 7 MO $_________ $_________
CONCRETE LINED
2033 BIRCH COVE 7 MO $_________ $_________
2037 TWIN COVE 7 MO $_________ $_________
ABUTMENT ACCESS
2039 OVERLOOK/OFFICE 7 MO $_________ $_________
2040 BIRCH & LEFT
2041 BIRCH COVE 7 MO $_________ $_________
2042 OVERLOOK 7 MO $_________ $_________
2043 TWIN COVE 7 MO $_________ $_________
2044 BIRCH COVE 12 MO $_________ $_________
2045 OVERLOOK 12 MO $_________ $_________
2046 TWIN COVE 12 MO $_________ $_________
2047 GUARDRAIL AREAS- 1 MO $_________ $_________
2048 PAVED & UNPAVED
CONCRETE LINED
TOTAL OPTION YEAR TWO $_________
Option Year 3 - 1 Mar 2019 - 28 Feb 2020
3001 BLACKDOG 7 MO $_________ $_________
3002 BULL CREEK
EMBANKMENT.SPILL
3005 HOMINY LANDING 7 MO $_________ $_________
3006 OSAGE PARK 7 MO $_________ $_________
3007 SKIATOOK POINT 7 MO $_________ $_________
3008 BTALL CHIEF COVE 7 MO $_________ $_________
3009 TWIN POINTS 7 MO $_________ $_________
3011 OFFICE/DAMSITE
3012 DAM EMBANKMENT
3013 SKIATOOK LAKE
3015 HOMINY LANDING 7 MO $_________ $_________
3016 OSAGE PARK 7 MO $_________ $_________
3017 BLACK DOG 7 MO $_________ $_________
3018 SKIATOOK POINT 7 MO $_________ $_________
3019 TALL CHIEF COVE 7 MO $_________ $_________
3020 TWIN POINTS 7 MO $_________ $_________
3021 BULL CREEK
3022 HOMINY LANDING 5 MO $_________ $_________
3023 OSAGE PARK 5 MO $_________ $_________
3024 SKIATOOK POINT 5 MO $_________ $_________
3025 BLACK DOG 5 MO $_________ $_________
3026 BLACKDOG 12 MO $_________ $_________
3027 BULL CREEK
3028 HOMINY LANDING 12 MO $_________ $_________
3029 OSAGE PARK 12 MO $_________ $_________
3030 SKIATOOK PARK 12 MO $_________ $_________
3031 TALL CHIEF COVE 12 MO $_________ $_________
3032 TWIN POINTS 12 MO $_________ $_________
3034 PAVED & UNPAVED 7 MO $_________ $_________
CONCRETE LINED
3036 BIRCH COVE 7 MO $_________ $_________
3037 TWIN COVE 7 MO $_________ $_________
ABUTMENT ACCESS
3039 OVERLOOK/OFFICE 7 MO $_________ $_________
3040 BIRCH & LEFT
3041 BIRCH COVE 7 MO $_________ $_________
3042 OVERLOOK 7 MO $_________ $_________
3043 TWIN COVE 7 MO $_________ $_________
3044 BIRCH COVE 12 MO $_________ $_________
3045 OVERLOOK 12 MO $_________ $_________
3046 TWIN COVE 12 MO $_________ $_________
GUARDRAIL AREAS-
3048 PAVED & UNPAVED
CONCRETE LINED
TOTAL OPTION YEAR THREE $_________
Option Year 4 - 1 Mar 2020 - 28 Feb 2021
4001 BLACKDOG 7 MO $_________ $_________
EMBANKMENT.SPILL
4004 DAMSITE & ACCESS
4005 HOMINY LANDING 7 MO $_________ $_________
4006 OSAGE PARK 7 MO $_________ $_________
4007 SKIATOOK POINT 7 MO $_________ $_________
4008 BTALL CHIEF COVE 7 MO $_________ $_________
4009 TWIN POINTS 7 MO $_________ $_________
4011 OFFICE/DAMSITE
4015 HOMINY LANDING 7 MO $_________ $_________
4016 OSAGE PARK 7 MO $_________ $_________
4017 BLACK DOG 7 MO $_________ $_________
4018 SKIATOOK POINT 7 MO $_________ $_________
4019 TALL CHIEF COVE 7 MO $_________ $_________
4020 TWIN POINTS 7 MO $_________ $_________
4021 BULL CREEK
4022 HOMINY LANDING 5 MO $_________ $_________
4023 OSAGE PARK 5 MO $_________ $_________
4024 SKIATOOK POINT 5 MO $_________ $_________
4025 BLACK DOG 5 MO $_________ $_________
4026 BLACKDOG 12 MO $_________ $_________
4027 BULL CREEK
4028 HOMINY LANDING 12 MO $_________ $_________
4029 OSAGE PARK 12 MO $_________ $_________
4030 SKIATOOK PARK 12 MO $_________ $_________
4031 TALL CHIEF COVE 12 MO $_________ $_________
4032 TWIN POINTS 12 MO $_________ $_________
4034 PAVED & UNPAVED 7 MO $_________ $_________
CONCRETE LINED
4033 BIRCH COVE 7 MO $_________ $_________
4037 TWIN COVE 7 MO $_________ $_________
ABUTMENT ACCESS
4039 OVERLOOK/OFFICE 7 MO $_________ $_________
4040 BIRCH & LEFT
4041 BIRCH COVE 7 MO $_________ $_________
4042 OVERLOOK 7 MO $_________ $_________
4043 TWIN COVE 7 MO $_________ $_________
4044 BIRCH COVE 12 MO $_________ $_________
4045 OVERLOOK 12 MO $_________ $_________
4046 TWIN COVE 12 MO $_________ $_________
4047 GUARDRAIL AREAS-
4048 PAVED & UNPAVED
CONCRETE LINED
TOTAL OPTION YEAR FOUR $_________
TOTAL BASE YEAR (CLIN 0001 thru 0049) $_________________ TOTAL OPTION YEAR ONE (1) (CLIN 1001 thru 1049) $_________________ TOTAL OPTION YEAR TWO (2) (CLIN 2001 thru 2049) $_________________
TOTAL OPTION YEAR THREE (3) (CLIN 3001 thru 3049) $_________________ TOTAL OPTION YEAR FOUR (4) (CLIN 4001 thru 4049) $_________________
TOTAL BASE AND ALL OPTIONS $_________________
(End of Summary of Changes)
File details come from the government source that posted it. Updated .