BASE PROPOSAL

Item

Unit

No. Description Qty Unit Price Amount

GATE NO. 2

1. Construct Downstream Stoplog

Brackets Sum Job

2. Install Downstream Stoplog Brackets Sum Job

3. Repair Sill Plate Sum Job

4. Repair Concrete, 0"-4" Depth

SF

5. Repair Concrete, 4"-6" Depth

SF

6. Repair Concrete, 8" Depth

SF

7. Install Bottom Seal Sum Job

8. Replace All Anodes Sum Job

9. Check & Adjust Cable Tension Sum Job

10. Replace U-bolts

EA

TOTAL GATE NO. 2

GATE NO. 3

11. Install Downstream Stoplog Brackets Sum Job

12. Replace Sill Plate Sum Job

13. Repair Concrete, 0"-4" Depth

SF

14. Repair Concrete, 4"-6" Depth

SF

15. Repair Concrete, 8" Depth

SF

16. Install Bottom Seal Sum Job

17. Replace All Anodes Sum Job

18. Check & Adjust Cable Tension Sum Job

19. Replace U-bolts

EA

TOTAL GATE NO. 3

GATE NO. 4

20. Install Downstream Stoplog Brackets Sum Job

21. Replace Sill Plate Sum Job

22. Repair Concrete, 0"-4" Depth

SF

23. Repair Concrete, 4"-6" Depth

SF

24. Repair Concrete, 8" Depth

SF

25. Install Bottom Seal Sum Job

26. Replace All Anodes Sum Job

27. Check & Adjust Cable Tension Sum Job

28. Replace U-bolts

EA

TOTAL GATE NO. 4

GATE NO. 7

29. Install Downstream Stoplog Brackets Sum Job

30. Replace Sill Plate Sum Job

31. Repair Concrete, 0"-4" Depth

SF

32. Repair Concrete, 4"-6" Depth

SF

33. Repair Concrete, 8" Depth

SF

34. Install Bottom Seal Sum Job

35. Replace All Anodes Sum Job

36. Check & Adjust Cable Tension Sum Job

37. Replace U-bolts

EA

TOTAL GATE NO. 7

GATE NO. 8

38. Install Downstream Stoplog Brackets Sum Job

39. Repair Sill Plate Sum Job

40. Repair Concrete, 0"-4" Depth

SF

41. Repair Concrete, 4"-6" Depth

SF

42. Repair Concrete, 8" Depth

SF

43. Install Bottom Seal Sum Job

44. Replace All Anodes Sum Job

45. Check & Adjust Cable Tension Sum Job

46. Replace U-bolts

EA

TOTAL GATE NO. 8

GATE NO. 10

47. Install Downstream Stoplog Brackets Sum Job

48. Repair Sill Plate Sum Job

49. Repair Concrete, 0"-4" Depth

SF

50. Repair Concrete, 4"-6" Depth

SF

51. Repair Concrete, 8" Depth

SF

52. Install Bottom Seal Sum Job

53. Replace All Anodes Sum Job

54. Check & Adjust Cable Tension Sum Job

55. Replace U-bolts

EA

TOTAL GATE NO. 10

GATE NO. 11

56. Install Downstream Stoplog Brackets Sum Job

57. Repair Sill Plate Sum Job

58. Repair Concrete, 0"-4" Depth

SF

59. Repair Concrete, 4"-6" Depth

SF

60. Repair Concrete, 8" Depth

SF

61. Install Bottom Seal Sum Job

62. Replace All Anodes Sum Job

63. Check & Adjust Cable Tension Sum Job

64. Replace U-bolts

EA

TOTAL GATE NO. 11

GATE NO. 12

65. Install Downstream Stoplog Brackets Sum Job

66. Repair Sill Plate Sum Job

67. Repair Concrete, 0"-4" Depth

SF

68. Install Bottom Seal Sum Job

69. Replace All Anodes Sum Job

70. Check & Adjust Cable Tension Sum Job

71. Replace U-bolts

EA

TOTAL GATE NO. 12

TOTAL BASE PROPOSAL

OPTION 1 – REHABILITATE 15 EACH 60-FOOT STOPLOGS

72. Ultrasonic Testing of Full

Penetration Welds on Tension Members

EA

73. Full Penetration Weld Repairs

EA

74. Replace Structural Members

EA

75. Replace Seal Assemblies & Hardware

EA

76. Blast and Paint Stoplogs

EA

TOTAL OPTION 1

OPTION 2 – REPLACE PRIMARY GEARBOXES, MOTORS, & BRAKES

77. Provide and Install Integrated

Primary Gearbox, Motor, and

Disk Brake System

EA

TOTAL OPTION 2

OPTION 3 – LINE SHAFTS

78. Install Line Shafts

EA

79. Paint Line Shafts

EA

TOTAL OPTION 3

OPTION 4 – PAINT TAINTER GATE EQUIPMENT AND PLATFORMS

80. Paint Tainter Gate Equipment and Platforms

EA

TOTAL OPTION 4

OPTION 5 – UPSTREAM CONCRETE REPAIR

81. Repair Concrete, 0"-3" Depth 1,400

SF

82. Repair Concrete, 3"-6" Depth

SF

TOTAL OPTION 5

TOTAL BASE PROPOSAL AND OPTIONS

EA = Each

SF = Square Feet

PROPOSAL SCHEDULE NOTES

1. All costs for items of work which are not listed separately in the Proposal Schedule or specifically mentioned to be included in a particular item price shall be included in the listed item price most closely associated with the work involved.

2. This solicitation requires submission of a proposal on all items. Failure to do so will result in the proposal being rejected without further consideration.

3. All quantities are estimated except where the unit is given as job.

4. Only one contract for the entire schedule will be awarded under this solicitation.

5. Options can be awarded at any time during the life of the contract.

Section 00 2100

CLAUSES INCORPORATED BY REFERENCE

52.204-6
Data Universal Numbering System (DUNS) Number
APR 2008
52.215-13
Subcontractor Cost or Pricing Data--Modifications
OCT 1997

CLAUSES INCORPORATED BY FULL TEXT

52.214-5000 APPARENT CLERICAL MISTAKES (MAR 1995)--EFARS

(a) For the purpose of initial evaluations of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of bidding schedule as submitted by the bidder:

(1) Obviously misplaced decimal points will be corrected;

(2) Discrepancy between unit price and extended price, the unit price will govern;

(3) Apparent errors in extension of unit prices will be corrected;

(4) Apparent errors in addition of lump-sum and extended prices will be corrected.

(b) For the purpose of bid evaluation, the government will proceed on the assumption that the bidder intends his bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.

(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.

(End of statement)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade
Goals for female participation for each trade
5.6
6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Oklahoma, Sequoyah, Sallisaw.

(End of provision)

52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-

(c) The amount of the bid guarantee shall be twenty (20) percent of the bid price or $3,000,000 whichever is less.-

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of clause)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from Contracting Division, 1645 S. 101st East Avenue, Tulsa, OK 74128.

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) A site visit has been scheduled for 16 February 2010 at 10:00 a.m. central, meeting at the W.D. Mayo Lock and Dam, located in Wagoner County, OK. Point of contact for directions, telephone 918-775-2091, or 918-669-7137.

(End of provision)

52.236-28 PREPARATION OF PROPOSALS--CONSTRUCTION (OCT 1997)

(a) Proposals must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a proposal must initial each erasure or change appearing on any proposal form.

(b) The proposal form may require offerors to submit proposed prices for one or more items on various bases, including--

(1) Lump sum price;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of paragraphs (b)(1) through (b)(3) of this provision.

(c) If the solicitation requires submission of a proposal on all items, failure to do so may result in the proposal being rejected without further consideration. If a proposal on all items is not required, offerors should insert the words “no proposal” in the space provided for any item on which no price is submitted.

(d) Alternate proposals will not be considered unless this solicitation authorizes their submission.

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): farsite.hill.af.mil

(End of provision

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria, Basis of Award One-Step-Best Value, Design-Build (Single Award)

EVALUATION CRITERIA

SECTION 00 22 11

CRITERIA FOR SINGLE-PHASE CONSTRUCTION SELECTION PROCESS

PART 1 - PROPOSAL INSTRUCTIONS

1. PROPOSAL SUBMISSION REQUIREMENTS AND INSTRUCTIONS

a. REQUIREMENT FOR SEPARATE PRICE AND TECHNICAL PROPOSALS.

(1) Each Offeror must submit both a Price Proposal and a Technical Proposal. The Price Proposal and the Technical Proposal must be submitted as separate volumes. Ensure that the outside of each separate volume is clearly marked to indicate its contents; and the identity of the offeror. Additionally, clearly identify the “original” cost/price proposal and the “original” technical proposal on the outside cover.

(2) Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals.

(3) No dollar amounts from the Price Proposal are to be included in the Technical Proposal.

(4) All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not merely cross-reference similar material in the Price Proposal, or vice versa. Also, do not include links to websites in lieu of incorporating information into your proposal.

(5) Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal. Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined "unacceptable" and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to submission of the offer. Notwithstanding the above, the Offeror must clearly describe in the Proposal Cover Sheet submitted with the Price Proposal any exceptions to the contractual and/or technical terms and conditions of the solicitation contained in the Offer.

b. DISCUSSIONS. The Government does not intend to enter into discussions with offerors prior to determining those contractors within the competitive range, in accordance with FAR 52.215-1, Instructions to Offerors—Competitive Acquisitions.

c. COST OR PRICING DATA. Offerors are not required to submit certified Cost or Pricing Data with their offers.

d. GENERAL INSTRUCTIONS.

(1) Submit only the hard-copy paper documents and the electronic files specifically authorized and/or required elsewhere in this section. Do not submit excess information, to include audio-visual materials, electronic media, etc.

(2) Use only 8 ½ by 11 inch paper for hard copy submissions, unless another paper size is specifically authorized elsewhere in this section for a particular submission. Do not use fold-outs (e.g., 11” x 14” or 11” x 17” sheets) unless specifically authorized in this section for a particular submission. Do not use a font size smaller than 10, an unusual font style such as script, or condensed print for any submission. All page margins must be at least 1 inch wide, but may include headers and footers.

(3) The preferred method for assembling your proposals is to use three-ring binders; however, the use of pressboard or other report covers with compression or other type fasteners is acceptable. Do not use spring clamps or exceed the recommended capacity of the fastener or binder. Do not use plastic multi-hole/spiral binding systems, heat binding systems, or other systems which do not facilitate the ready insertion of additional pages.

(4) “Confidential” projects cannot be submitted to demonstrate capability unless all of the information required for evaluation as specified herein can be provided to the Government as part of the Offeror’s technical proposal. Offerors that include in their proposals information that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, must be clearly marked in accordance with the instructions at FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition”, paragraph (e), “Restriction on disclosure and use of data”.

(5) In the case of an Offeror that is part of a large, multi-segmented business concern, provide information directly pertaining to the specific segment of the business concern (i.e., the division, group, unit, etc.) that will perform work under the prospective contract.

(6) For submissions with page limitations, the pages will be counted as follows: One side of the paper is one page; information on both the back and front of one sheet of paper will be counted as two pages. Where authorized, fold-out pages (11" x 14" or 11" x 17") will count as one page. Pages furnished for organizational purposes only, such as a “Table of Contents” or divider tabs, are not included in the page limitation.

e. SPECIFIC INSTRUCTIONS FOR THE PRICE PROPOSAL

(1) Number of Sets of the Price Proposal. Submit the ORIGINAL and ONE additional hard copy set of the Price Proposal.

(2) Size Restrictions and Page Limits. Use only 8 ½” x 11” pages. There are no page limits set for the price proposal. However, limit your response to information required by this solicitation. Excess information will not be considered in the Government’s evaluation.

(3) Format and Contents of the Price Proposal and List of Tabs. The Price Proposal shall be appropriately labeled as such and shall be organized as indicated in the following chart. Note: If the Offeror is not required to submit any information under a listed Tab in accordance with the instructions below, that tab can be omitted. However, do not renumber the subsequent tabs.

TAB

CONTENTS OF THE PRICE PROPOSAL

#1
The Proposal Cover Sheet
#2
The SF1442 and Acknowledgement of Amendments
#3
Section 001100, Pricing Schedule
#4
Representations, Certifications, and Other Statements

of Offerors (if the offeror does not have electronic certifications in ORCA)

#5
JV Agreement, if applicable.
#6
Pre-Award Survey

(4) Detailed Submission Instructions for the Price Proposal TAB 1: The proposal cover sheet is required by FAR 52.215-1(2) (c) (i)-(v) and must be submitted by all offerors. This provision, titled “Instructions to Offerors—Competitive Acquisition,” and the format for the proposal cover sheet as shown here:

PROPOSAL COVER SHEET

1. Solicitation Number:

2. The name, address, and telephone and facsimile numbers of the Offeror

(and electronic address if available):

3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item. Statement to include any exceptions in technical or cost/price proposal or exceptions inherent in Offeror’s standard terms and conditions.

4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the Offeror’s behalf with the Government in connection with this solicitation:

5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.

TAB 2: The SF 1442, Solicitation, Offer, and Award is to be completed by all Offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102. All amendments must be acknowledged by all Offerors in accordance with the instructions on the Standard Form 30, Amendment of Solicitation.

TAB 3: Section 001100, Pricing Schedule is to be completed in its entirety by all Offerors. See Section 001100 with attached notes, for further instructions.

TAB 4: All Offerors must have electronically completed the annual representations and certifications on the “Online Representations and Certifications Application” (ORCA) website or respond with the completed representations / certifications found in the solicitation. The offerors are responsible for ensuring that these on-line Representations and Certifications are updated as necessary to reflect changes, but at least annually to ensure that they are kept current, accurate and complete. Additionally, the offeror must also complete and return the “Representations, Certifications, and Other Statements of Offerors” included in the solicitation. If the offeror is a Joint Venture, all participants must separately complete both the ORCA Representations and Certifications.

TAB 5: If the Offeror is a Joint Venture (JV), include a copy of the JV Agreement. If a JV Agreement has not yet been finalized/approved, indicate its status. JV Agreements must clearly indicate the percentages of the JV participants, in particular the percent of the controlling party, and a clear delineation of responsibilities and authorities between the JV parties.

TAB 6: The Pre-Award Survey (found on the following pages) must be completed by all offerors and submitted as part of their price proposal. This document will be used by the Contracting Officer for the Contracting Officer’s Determination of Responsibility done prior to contract award in accordance with FAR Part 9.

CONSTRUCTION CONTRACTOR EXPERIENCE DATA

PRE-AWARD SURVEY INFORMATION

DATE:

Firm Name and Telephone Number
Main Office Address (Street, City, and State)
Branch Offices
Services Rendered

( Construction

( Design

( Consultant

Organization

( Individual ( Joint Venture

( Partnership ( Corporation

Date Organized
Date Incorporated:

State:

Names of Officers and Other Key Personnel

I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)

Partners:

Officers:

Other Key:

Remainder:
Subtotal Permanent:

Maximum Personnel at Any Time:

Date:

Total:

II—EQUIPMENT OWNED
III—FINANCIAL DATA AS OF

(DATE):

Present Value ($)

Current Assets:

Acquisition Cost ($)
Current Liabilities:

Net Worth:

IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST MOST RECENT FIRST)
V—LARGEST JOB EVER

CONTRACTED

(If Other Than in Past Six Years)

$
LARGEST JOB IN PAST 6 YRS
Contract Amount:

Date:

Description:

Owner:

$
Contract Amount:

Date:

Description:

Owner:

Avg. Annual Income

VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES

NAME AND POSITION/TITLE OF PERSON SIGNING

SIGNATURE

NOTE: Use reverse side for explanations or detailed description of item(s) reported above.

SCHEDULE A

EXISTING COMMITMENTS

Contract Number and Total Value
Description of the Work
Project Owner*
Performance Period
% of work subcontracted

* PLEASE PROVIDE NAME OF ORGANIZATION, POINT OF CONTACT, AND TELEPHONE NUMBER FOR CONTACT

SCHEDULE B

EXPERIENCE DATA

List below the principal projects the firm has completed within the past 5 years.

Contract Number and Total Value
Description of the Work
Contact Person for the project and phone number
% of work subcontracted

SCHEDULE C

EQUIPMENT AND PERSONNEL

Provide a detailed statement below as to the availability of specific plant/personnel/equipment needed in order to perform the work in accordance with the contract and schedule requirements of this Request for Proposal and resulting project. Include names of personnel and types of equipment or equipment vendors and availability of each to provide equipment in a timely manner.

f. SPECIFIC INSTRUCTIONS FOR THE TECHNICAL PROPOSAL

(1) Number of Sets of the Technical Proposal. Submit the ORIGINAL and THREE (3) additional sets of the written Technical Proposal, with each set separately packaged.

(2) Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart.

TAB

CONTENTS OF THE TECHNICAL PROPOSAL

Factor #1

EXPERIENCE

Factor #2
PROJECT MANAGEMENT PLAN

Factor #3

PERSONNEL

Factor #4
PAST PERFORMANCE
Factor #5
WORK PLAN

(3) Page Limitations. See paragraphs 1.d.(2) and 1.d.(6) above for format and page count instructions. The following page limitations are established for each factor described above:

· Factor #1, Experience – Limited to 1 Experience Form and 5 pages of representative design/construction information per project. The Offeror may submit a maximum of 10 representative projects under this Factor.

· Factor #2, Project Management Plan – Limited to 6 pages total, not including organizational charts.

· Factor #3, Personnel – Limited to 1 page for each resume provided

· Factor #4, Past Performance – No page limitation

· Factor #5, Work Plan – No page limitation

Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.

(4) Detailed Submission Requirements for the Technical Proposal. The following is a detailed description of the information to be submitted under each TAB.

(i) TAB 1: FACTOR 1, EXPERIENCE: Demonstrate the experience of the Offeror and/or team, including sub-contractors, through submission of experience information for projects same/similar to that described in the solicitation. The projects submitted must have been performed by the Offeror and/or team member(s) who will be providing similar services under the prospective contract.

The Contractor shall provide a minimum of five (5), but no more than ten (10), “Experience Information” forms and supporting documentation as stated in the page limitations in Schedule “C” (f)(3) above in response to this factor. All blocks must be filled in and all data should be accurate, current, and complete. All projects submitted must have been underway or completed with the last 3 years. At least three (3) of the projects provided must be valued at over $4,000,000. For each project that included design, the offer may also submit up to 5 pages of information representative of the design efforts of the project.

The experience information submitted should demonstrate that the Offeror and/or the team have performed a same/similar type of construction as a team on previous projects, and preferably on multiple sites simultaneously.

(SEE EXPERIENCE INFORMATION FORM NEXT PAGE)

EXPERIENCE INFORMATION

(To be completed by Contractor)

1. Contractor:

Name:

Address:

2. Contract /Task Order(TO) /Purchase Order (PO) Number:

3. Contract/TO/PO Dollar Value:

4. Contract/TO /PO Status: FORMCHECKBOX Active FORMCHECKBOX Complete

Completion Date (w/ extensions):

5. Project Title:

Location:

6. Project Description-- to include the role of the contractor on the project and specific responsibilities of the contractor in performance of the effort:

7. Project Owner or Project Manager for the Client – provide:

Name:

Address:

Telephone Number and E-mail:

(ii) TAB 2: FACTOR 2, PROJECT MANAGEMENT PLAN: Provide a narrative discussion that addresses the Offeror's project management plan. The plan must address the following minimum elements:

· Procedures used to manage the project, to include project management, quality control, and safety;

· How the contractor plans to meet major design and construction project milestones in the specifications that reflects completion of all work within the period of contract performance.

· Provide a narrative response that addresses timely delivery and receipt of equipment and materials at the job site which coincides with the major construction project milestones.

The Offeror shall include an organizational chart depicting lines of authority and responsibility for all personnel/entities on the project, including subcontractors, from the lowest level to the corporate level. The organizational chart shall clearly indicate which entity has overall authority for the contract and identify by name and title the single Point of Contact to the Government for all project-related matters.

(iii) TAB 3: FACTOR 3, PERSONNEL: The Offeror must provide resume data for the following key personnel: Project Manager – Design, Project Manager - Construction, Safety Officer, Quality Control Manager, Superintendent, Diving Supervisor, and Senior Engineer.

Resume information to be provided for personnel identified above shall be limited to no more than one (1) page per person and shall include the following information as a minimum:

· Name and title

· Project assignment

· Name of firm with which associated

· Years experience with this firm and with other firms

· Education degree(s), year, specialization, if applicable

· Active professional registration, year first registered, if applicable

· Other experience and qualifications relevant to same/similar work required under this contract

(iv) TAB 4: FACTOR 4, PAST PERFORMANCE: No submission is required for Factor 4, Past Performance. For the projects listed under Factor 1 – Experience, the Government will query the Contractor Performance Assessment Reporting System (to include ACASS, CCASS, and CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate a contractor’s past performance. Firms without a history of past performance will be given a neutral rating.

The Government may contact references provided as part of Factor 1 – Experience, for information regarding the Offeror's past performance on the project and for the purposes of assessing and verifying the scope of the work performed. Offerors should provide accurate, current, and complete contact information for references provided in the project descriptions.

(v) TAB 5: FACTOR 5, WORK PLAN: A comprehensive work plan shall be provided. The work plan shall be in accordance with all specifications and drawings and shall address all aspects of the project. The work plan shall clearly outline and describe the Contractor's approach to the work. The work plan shall include detailed discussions of the work to be performed, all assumptions, a list of specific codes and standards to which the work will adhere, integrated primary gearbox, motor, and disk brake system selection and details, and all conclusions and recommendations. The work plan shall be accompanied by all calculations, load or sizing, software input and output sheets, system alternative considerations, equipment supplier selection data, and other material utilized in arriving at the action recommended. Where necessary or required, structural and load bearing calculations performed by a registered professional engineer shall be utilized and submitted. Manufacturer’s catalog cuts and specifications shall be submitted as required to document the materials to be supplied. Also, manufacturer’s installation procedures or execution specifications shall be included as required to indicate the methods and means of installation of all materials. The Contactor shall use the manufacturer’s data to tie together the shop drawings, catalog cuts, and installation requirements into a comprehensive package that defines the work actions. All equipment provided under the task order shall be standard products of a manufacturer regularly engaged in the manufacturing of such products, which are of similar material, design, and workmanship. The standard products shall be in satisfactory (to the Government) commercial or industrial use for 2 years prior to submission for approval. These standard products must be offered for sale on the commercial market through advertisement, manufacturers’ catalog, or brochures. Drawings with material and equipment schedules plus detailed double-line shop/installation drawings shall be submitted to show the location and relationship of all equipment and material. Single-line drawings shall include, but not limited to, plans, equipment layout drawings, foundation plans, shop drawings, demolitions drawings, and control drawings, as required to completely define the work action when viewed in conjunction with shop drawings, catalog cuts, and manufacturer’s installation requirements. Work actions involving potential life-safety hazards shall be overseen and signed off by a registered professional engineer. A phased demolition plan shall be prepared which designates items, equipment, systems, etc., to be removed and indicates the disposition on all removed material, equipment, and debris. A dive plan shall be prepared and submitted in accordance with EM385-1-1. The Contractor may document any recommended installation alternatives, potential areas of cost reduction, and any recommended changes to the scope of work if the alternatives are documented to be economically feasible and will result in no negative impact to the intended function/appearance of the scope of work. The Contractor shall present economical justification for each installation alternative. The Contractor shall present enough information (manufacturer’s data and/or drawings/sketches) to properly define each alternatives as well as the advantages and disadvantages of each alternative. O&M Manuals, training, and testing shall be in accordance with Division 01.

Part 2. EVALUATION OF OFFEROR PROPOSALS

2. ELIGIBILITY FOR CONTRACT AWARD. In accordance with the FAR, no contract shall be entered into unless the contracting officer ensures that all requirements of law, executive orders, regulations, and all other applicable procedures, including clearances and approvals, have been met. This includes the FAR requirement that no award shall be made unless the contracting officer makes an affirmative determination of responsibility. To be determined responsible, a prospective contractor must meet the general standards in FAR Part 9 and any special standards set forth in the solicitation.

3. SOURCE SELECTION USING THE TRADE-OFF PROCESS . The Government will select the offer that represents the best value to the Government by using the trade-off process described in FAR Part 15. This process permits tradeoffs between cost/price and technical (“non-cost”) factors and allows the Government to accept other than the lowest priced offer. The award decision will be based on a comparative assessment of proposals against all source selection criteria in the solicitation.

4. RELATIVE IMPORTANCE OF PRICE TO THE TECHNICAL EVALUATION FACTORS

All evaluation factors other than cost or price, when combined, are more important than price. The Government is concerned with striking the most advantageous balance between technical merit (“quality”) and price to the Government (i.e., the price). The degree of importance of price could become greater depending upon the equality of the technical proposals. If competing technical proposals are determined to be essentially equal, price could become the controlling factor.

5. EVALUATION OF THE PRICE PROPOSALS

a. Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. The proposed prices will be analyzed for reasonableness. They may also be analyzed to determine whether they are realistic for the work to be performed; reflect a clear understanding of the requirements; and are consistent with the Offeror’s Technical Proposal. Additionally, all offers will be analyzed for unbalanced pricing.

b. The price will be used along with the technical evaluation to make selection for award. Since evaluation of the price proposal will represent a portion of the total evaluation, it is possible that an Offeror might not be selected for award because of unreasonable, unrealistic, or incomplete price proposal information. The Government will evaluate the format and clarity of the price proposal.

c. Other Award Factors: The Contracting Officer shall consider several factors in the selection process which are important, but not quantified, such as:

(1) Agreement by the Offeror to all general and special contract provisions and clauses.

(2) Determination of responsibility of the contractor by the Contracting Officer in accordance with the provisions of the Federal Acquisition Regulation, Part 9.1. In order to be determined responsible, a prospective contractor must:

(a) Have adequate financial resources to perform the contract or the ability to obtain them.

(b) Be able to comply with the required or proposed delivery or performance schedule taking into consideration all existing commercial and Governmental business commitments.;

(c) Have a satisfactory performance record.

(d) Have a satisfactory record of integrity and business ethics.

(e) Have the necessary organization, experience, accounting and operational controls, and technical skills, or the ability to obtain them.

(f) Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them.

(g) Be otherwise qualified and eligible to receive an award under applicable laws and regulations.

6. EVALUATION OF THE TECHNICAL PROPOSAL. The Technical Proposal will be evaluated based on the following evaluation criteria:

a. FACTOR 1: EXPERIENCE: The Government will evaluate the following elements of this factor based on the information on the project experience forms and supporting documentation submitted by the contractor:

· The relevant work experience of the Offeror and the subcontractors on projects same/similar to that described in this solicitation.

· Complexity of past work experience of the Offeror and the subcontractors on projects submitted compared with that included in the solicitation.

· Of the projects submitted, at least three (3) must be valued at over $4,000,000.

· Offerors with experience on same/similar relevant projects (type of services, similar dollar value, complexity, USACE design / construction requirements, and applicable quality standards) may receive a higher rating than those with dissimilar or non-relevant projects.

· Offerors with experience as a team on prior projects same/similar to the requirements of the solicitation may receive a higher rating than those without prior team experience.

b. FACTOR 2, PROJECT MANAGEMENT PLAN: The Government will evaluate the following elements of this factor based on the narrative Responses to this factor will be evaluated for:

· The Offeror's ability to manage the overall project, control quality and safety on site and corporately;

· How the Offeror plans to meet the major design and construction project milestones.

· The Offeror's understanding of the work efforts and its ability to provide quality, responsive, and timely performance over the planned life of the project;

· If the Offeror has a sound plan addressing timely delivery and receipt of equipment and materials at the job site which coincides with the major construction project milestones.

· Management of concurrent work on multiple job sites.

· The organizational chart will be evaluated for a clear depiction of the lines of authority and responsibility for all personnel/entities on the project, including subcontractors, from the lowest level to the corporate level. The organizational chart shall clearly indicate which entity has overall authority for the contract and identify by name and title the single Point of Contact to the Government for all project-related matters.

c. FACTOR 3: PERSONNEL: The Government will evaluate the following elements of key personnel resumes:

· The depth and breadth of personnel experience on same/similar projects as it relates to the responsibilities that person will have on this contract.

· All key personnel shall have a degree in the field of work governed by the position they are assigned to (if appropriate for the position) and a minimum of five (5) years of professional experience in their field. For example, a Civil Engineer must have a degree in Civil Engineering and 5 years of professional civil engineering experience.

d. FACTOR 4: PAST PERFORMANCE: The Government will evaluate past performance information to assess the level of performance risk associated with the Offeror’s likelihood of success in performing the requirements stated in the solicitation. The relevance and current nature of the information (as determined by the Government), the source of the information, context of the data, and general trends in the contractor’s performance may be considered. Information submitted by the Offeror pertaining to recent, relevant contracts will be evaluated as well as data obtained from other sources, including automated databases and questionnaires. References other than those identified by the Offeror may be contacted by the Government. The Government may take into consideration the Offeror's performance of contracts with the agency; other Federal, State, and local government activities; and commercial concerns. The result will be a performance risk rating based on each Offeror’s record of past performance.

For the purpose of the past performance evaluation, offerors shall be defined as business arrangements and relationships, such as Joint Venture participants, teaming partners, and major subcontractors. The past performance record of each firm in the business arrangement may be evaluated by the Government.

In the case of an Offeror without a record of recent, relevant past performance (and for which there is also no recent, relevant past performance information for its predecessor companies or key subcontractors), or for whom information on past performance is not available or cannot be verified, the Offeror will not be evaluated favorably or unfavorably on past performance; a neutral rating will be applied for this factor. This does not preclude the Government from making award to a higher-priced Offeror with a favorable past performance record over a lower-priced Offeror with a neutral past performance rating.

e. FACTOR 5: WORK PLAN: The Government will evaluate the work plan to assess the project's probability of success based on the commencement, prosecution, and completion of work within the specified number of calendar days, maintaining the cost/pricing proposal without cost growth, and meeting the quality of the finished product as required in the specifications, drawings, and all other contract documents.

7. RELATIVE WEIGHTING OF THE TECHNICAL EVALUATION FACTORS. All technical factors are equal in weight and importance.

8. GENERAL TECHNICAL CRITERIA

a. Material omission(s) may cause the technical proposal to be rejected as unacceptable.

b. Technical proposals which do not provide the specified information in the specified location in accordance with the submission instructions may be downgraded. The Government is under no obligation to search for information that is not in the specified location.

c. Proposals which are generic, vague, or lacking in detail may be downgraded or considered unacceptable. The Offeror's failure to include information that the Government has indicated should be included may result in the proposal being downgraded and/or being found deficient if inadequate detail is provided.

d. The Government cannot make award based on a deficient offer. Therefore, receipt of a “NO GO” determination of acceptability for any factor will make the offer ineligible for award, unless the Government elects to enter into discussions with that Offeror and all deficiencies are remedied in a revised proposal.

9. 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

Section 00 45 00 - Representations & Certifications

CLAUSES INCORPORATED BY REFERENCE

52.203-2
Certificate Of Independent Price Determination
APR 1985
52.203-11
Certification And Disclosure Regarding Payments To Influence Certain Federal Transactions
SEP 2007
52.204-3
Taxpayer Identification
OCT 1998
52.209-5
Certification Regarding Responsibility Matters
DEC 2008
52.215-6
Place of Performance
OCT 1997
52.215-20
Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data
OCT 1997
52.219-19
Small Business Concerns Representation For The Small Business Competitiveness Demonstration Program
OCT 2000
52.222-22
Previous Contracts And Compliance Reports
FEB 1999
52.222-38
Compliance With Veterans' Employment Reporting Requirements
DEC 2001
52.223-3
Hazardous Material Identification And Material Safety Data
JAN 1997
52.223-13
Certification of Toxic Chemical Release Reporting
AUG 2003
252.209-7001
Disclosure of Ownership or Control by the Government of a Terrorist Country
JAN 2009
252.225-7031
Secondary Arab Boycott Of Israel
JUN 2005
252.247-7022
Representation Of Extent Of Transportation Of Supplies By Sea
AUG 1992

52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (MAY 2004)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 237990.

(2) The small business size standard is $33.5M.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b) Representations. (1) The offeror represents as part of its offer that it ( ) is, ( ) is not a small business concern.

(2) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents, for general statistical purposes, that it ( ) is, ( ) is not a small disadvantaged business concern as defined in 13 CFR 124.1002.

(3) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a women-owned small business concern.

(4) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a veteran-owned small business concern.

(5) (Complete only if the offeror represented itself as a veteran-owned small business concern in paragraph (b)(4) of this provision.) The offeror represents as part of its offer that it ( ) is, ( ) is not a service-disabled veteran-owned small business concern.

(6) (Complete only if the offeror represented itself as a small business concern in paragraph (b)(1) of this provision.) The offeror represents, as part of its offer, that--

(i) It ( ) is, ( ) is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material change in ownership and control, principal office, or HUBZone employee percentage has occurred since it was certified by the Small Business Administration in accordance with 13 CFR part 126; and

(ii) It ( ) is, ( ) is not a joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (b)(6)(i) of this provision is accurate for the HUBZone small business concern or concerns that are participating in the joint venture. (The offeror shall enter the name or names of the HUBZone small business concern or concerns that are participating in the joint venture:____________.) Each HUBZone small business concern participating in the joint venture shall submit a separate signed copy of the HUBZone representation.

(c) Definitions. As used in this provision--

Service-disabled veteran-owned small business concern--

(1) Means a small business concern--

(i) Not less than 51 percent of which is owned by one or more service-disabled veterans or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more service-disabled veterans; and

(ii) The management and daily business operations of which are controlled by one or more service-disabled veterans or, in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran.

(2) Service-disabled veteran means a veteran, as defined in 38 U.S.C. 101(2), with a disability that is service-connected, as defined in 38 U.S.C. 101(16).

"Small business concern," means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the criteria in 13 CFR Part 121 and the size standard in paragraph (a) of this provision.

Veteran-owned small business concern means a small business concern--

(1) Not less than 51 percent of which is owned by one or more veterans (as defined at 38 U.S.C. 101(2)) or, in the case of any publicly owned business, not less than 51 percent of the stock of which is owned by one or more veterans; and

(2) The management and daily business operations of which are controlled by one or more veterans.

"Women-owned small business concern," means a small business concern --

(1) That is at least 51 percent owned by one or more women; in the…