Am0001.pdf
PDF 40 KB Posted
- Attached to
- REPLACE CONCRETE CAMP PADS, RICHEY COVE, SANTE FE PARK, AND CANNING CREEK PARK, COUNCIL GROVE, KS
- Solicitation number
- W912BV-09-T-1086
About this file
Amendment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 09t1086.pdf | ||
| 09t1086.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE SCHEDULE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
The purpose of this amendment is to incorporate the applicable Davis Bacon Wage Rates.
1. CONTRACT ID CODE PAGE OF PAGES
J
FAR (48 CFR) 53.243
1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-May-2009
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BV-09-T-1086
X 9B. DATED (SEE ITEM 11)
14-May-2009
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-May-2009
CODE
CONTRACTING DIV
USAED, TULSA 1645 S 101 E AVE
TULSA OK 74128-4609
W912BV 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BV-09-T-1086
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 73 46 - WAGE DETERMINATION SCHEDULE
The following have been added by full text:
WAGE DETERMINATION
W44XGQ90515315 & W44XGQ90515316, REPAIR FLOOD DAMAGED PARK FACILITIES, COUNCIL
GROVE LAKE, MORRIS COUNTY, KANSAS
General Decision Number: KS080003 02/08/2008 KS3
Superseded General Decision Number: KS20070004
State: Kansas
Construction Type: Heavy Including Water and Sewer Lines
Counties: Anderson, Atchison, Barber, Barton, Brown, Chase, Chautauqua, Cheyenne, Clark, Clay, Cloud, Coffey, Comanche, Cowley, Decatur, Dickinson, Doniphan, Edwards, Elk, Ellis, Ellsworth, Finney, Ford, Franklin, Gove, Graham, Grant, Gray, Greeley, Greenwood, Hamilton, Harper, Haskell, Hodgeman, Jackson, Jefferson, Jewell, Kearny, Kingman, Kiowa, Lane, Lincoln, Linn, Logan, Lyon, Marion, Marshall, McPherson, Meade, Mitchell, Morris, Morton, Nemaha, Ness, Norton, Osage, Osborne, Ottawa, Pawnee, Phillips, Pottawatomie, Pratt, Rawlins, Reno, Republic, Rice, Rooks, Rush, Russell, Saline, Scott, Seward, Sheridan, Sherman, Smith, Stafford, Stanton, Stevens, Sumner, Thomas, Trego, Wabaunsee, Wallace, Washington and Wichita Counties in Kansas.
Modification Number Publication Date
0 02/08/2008
SUKS2006-002 08/01/2007
Rates Fringes Asphalt paver screed operator....$ 12.50 Asphalt paving machine operator.........................$ 13.50 Asphalt plant operator...........$ 13.75 Asphalt Raker....................$ 9.50 Autograder operator..............$ 13.50 Backhoe operator.................$ 12.50 Batching Plant Scale Operator....$ 9.50 Blower mulcher Seeder operator...$ 10.50 Boring machine Operator..........$ 11.75
Brick, block and stonesetter.....$ 14.00 Bulldozer operator...............$ 12.50 Carpenter (rough)................$ 11.00 Carpenters.......................$ 13.00 Cat mixer/bomag operator.........$ 12.00 Concrete central mix (Plant Operator)........................$ 13.75 Concrete Finisher................$ 12.50 Concrete finishing machine operator.........................$ 13.00 Concrete pump truck operator.....$ 13.00 Concrete saw operator............$ 12.00 Crane Operator...................$ 16.00 Crusher & Screen Plant Operator.........................$ 12.25 Distributor Operator (Bituminous).....................$ 12.25 Drill Operator (DRILLED
SHAFTS)..........................$ 12.75
Drill rig operator...............$ 13.50
ELECTRICIAN......................$ 15.00
Excavator Operator...............$ 13.50 Flagger..........................$ 9.50 Form Liner and Setter............$ 10.50 Front End Loader Operator........$ 12.50 Groundman (Traffic Signals & Lighting)........................$ 12.00 Hydro-demolition operator........$ 12.50 Laborer (Construction)...........$ 9.50 Lineman (Traffic Signals & Lighting)........................$ 14.00 Lineman Operator (Traffic Signals & Lighting)..............$ 12.75 Material transfer vehicle operator.........................$ 12.50
MECHANIC.........................$ 14.50
Mixer operator (Concrete Portable)........................$ 10.75 Motor Grader Operator (Finish)...$ 14.50 Motor Grader Operator (Rough)....$ 12.50 Motor scraper operator...........$ 11.75 PAINTER (Structural Steel & Bridge)..........................$ 14.00 Pavement Breaker Operator (Self Propelled).................$ 11.25 Pavement Marking Truck Operator.........................$ 12.00 Paving Equipment Operator........$ 13.50 Post Driver/Auger Operator.......$ 11.75 Powderman........................$ 12.25 Profile grinder operator.........$ 14.75 Reinforcing Steel Setter.........$ 10.00 Rock drill operator..............$ 11.75 Roller Compactor operator (Self-Propelled)(Asphalt)........$ 11.75
Roller/compactor operator (Self-Propelled).................$ 11.75 Rotary broom operator............$ 10.25 Rotomill Groundman...............$ 11.25 Rotomill operator................$ 13.50 Sandblaster (Structural Steel or Bridge).......................$ 11.50 Serviceman (equipment)...........$ 12.50 Shoulder machine operator........$ 11.50 Skidsteer loader operator........$ 11.00 Slurry machine operator..........$ 12.25 Spreader Box operator (Self-Propelled).................$ 11.50 Steelworker Structural...........$ 11.00 Tractor operator.................$ 10.50 Traffic control service driver...$ 11.00 Trenching machine operator.......$ 11.00 Truck Driver (Heavy Duty Off Road)............................$ 12.00 Truck Driver (Single Axle).......$ 11.00 Truck Driver (Tandem)............$ 12.00 Truck Driver (Triple Axle & Semi)............................$ 12.50
WELDER...........................$ 11.75
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).
In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in he matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
W44XGQ90515315 & W44XGQ90515316, REPAIR FLOOD DAMAGED PARK FACILITIES, COUNCIL
GROVE LAKE, MORRIS COUNTY, KANSAS
(End of Summary of Changes)
File details come from the government source that posted it. Updated .