09t0011.pdf

PDF 2 MB Posted

Attached to
MOWING SERVICES, HUGO LAKE, OKLAHOMA.
Solicitation number
W912BV-09-T-0011
Issued by

About this file

Mowing Services Hugo Lake Oklahoma

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTING DIV

USAED, TULSA 1645 S 101 E AVE

TULSA OK 74128-4609

UNDER DPAS (15 CFR 700)

11. DELIVERY FOR FOB

RFQ

SEE SCHEDULE

14. METHOD OF SOLICITATION

IFB RFP

CODE

SEE ADDENDUM

BLOCK IS MARKED

DESTINATION UNLESS

12. DISCOUNT TERMS

(No Collect Calls)

$7M

13b. RATING

13a. THIS CONTRACT IS A RATED ORDER

X

CODE

W912BV-09-T-0011 23-Jan-2009

b. TELEPHONE NUMBER

918-669-7274

8. OFFER DUE DATE/LOCAL

04:00 PM 23 Feb 2009

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV 3/2005)

Prescribed by GSA

FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY

CODE 10. THIS ACQUISITION IS

UNRESTRICTED

FAX: NAICS

TEL:

CODE 18a. PAYMENT WILL BE MADE BY/OFFEROR

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TEL.

W912BV

SIZE STD:

9. ISSUED BY

FACILITY

COD E

17a.CONTRACTOR

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

15. DELIVER TO CODE M5R0YB 16. ADMINISTERED BY

OD, RRAO, HUGO LAKE OFC

MARK ELLISON

PO BOX 99

SAWYER OK 74756-0159

TEL: 580-326-3345 FAX:

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

BRENDA K ANDERSON

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES

SEE SCHEDULE

561730

TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS

SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS

SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.

SB

HUBZONE SB

SET ASIDE: % FOR

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W44XGQ83397970

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

TEL: EMAIL:

1 COPIES

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. OFFER DATED YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT:

X

8(A)

SVC-DISABLED VET-OWNED SB

EMERGING SB

X

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

SEE SCHEDULE

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT

PAGE 2 OF

23. UNIT PRICE

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINAL PARTIAL COMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT(Location)

42c. DATE (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV 3/2005) BACK

Prescribed by GSA

FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

W912BV-09-T-0011

IMPORTANT INFORMATION

BEFORE YOU CALL, PLEASE MAKE SURE YOU HAVE READ THE FOLLOWING:

Important Information Sheet, Bid Preparation Checklist Sheet, and the Request for Quotations (RFQ)/Solicitation. “PLEASE USE BID PREPARATION CHECKLIST WHILE YOU ARE

COMPLETING THE SOLICITATION.”

IF ALL REQUIRED MATERIALS ARE NOT RECEIVED, YOUR QUOTE WILL NOT BE CONSIDERED.

All questions pertaining to the actual work and the last job’s price should be directed to the Corps POC. You can find the Corps POC and telephone number located on page 6 of the RFQ/Solicitation.

Questions pertaining to completing the Request for Quotations (RFQ)/Solicitation only, contact Ms. Brenda Anderson at 918-669-7274.

For all wage rates questions, call 918-669-4909.

Regular office hours: Monday to Friday, 7:45 a.m. to 4:30 p.m. CST

Fax quotes are acceptable. Fax your quote on or before the date quotations are due. You must complete and fax all required pages. Fax number is 918-669-7495, if unavailable 918- 669-7436. E-mail quotes are not acceptable.

If mailing your quote, mail it early enough so it will arrive on time. Your bid must be received by the closing date stated on Standard Form 18, block 10 or on Standard Form 1449, block 8. Write or type at the bottom left corner of the envelope the solicitation number: If Standard Form 18, see block 1, if Standard Form 1449, see block 5.

RETURN SOLICITATION/QUOTATION TO:

MS. BRENDA ANDERSON, CESWT-CT-C

TULSA DISTRICT, CORPS OF ENGINEERS

1645 SOUTH 101ST EAST AVENUE

TULSA, OK 74128-4609

IN ORDER FOR YOUR QUOTATION TO BE CONSIDERED RESPONSIVE (MAILED OR FAXED), ALL REQUIRED MATERIALS COMPLETED MUST BE RECEIVED IN THE ISSUING OFFICE ON OR BEFORE THE DATE YOUR

QUOTATION IS DUE.

Please wait at least one (1) week from the quotation due date before checking website or calling for results. After the contract is awarded and signed, award information will be posted on our website http://www.swt.usace.army.mil. Click Contracting, click Award Results, choose Solicitation type: Simplified Acquisition, search for solicitation no., click View Bid Results. If you call for results, you will need to provide the request number on Standard Form 18, see block 1 or the solicitation number on Standard Form 1449, see block 5. NO EMAILS PLEASE!

BID PREPARATION CHECKLIST

ALL INFORMATION REQUIRED BY THE TERMS OF THE SOLICITATION MUST BE FURNISHED. MISTAKES OR OMISSIONS CAN BE COSTLY. Important items for you to check are included, but not limited to those listed below. This checklist is furnished only to assist you in submitting a proper quote. PLEASE USE THIS CHECKLIST AS YOU COMPLETE THE RFQ/SOLICITATION!

____ Have you obtained a DUNS number? See Clause 52.204-6, Data Universal Numbering

System (DUNS) Number. Write DUNS number on page 1 along with your name and address.

____ Have you registered in Central Contracting Registration Database (CCR)? See Clause

252.204-7004, Required Central Contractor Registration. If you are not registered, you must begin the process immediately. Complete representations and certifications at https://orca.bpn.gov in conjunction with the CCR database and RFQ/Solicitation.

The name you use to submit a quote must be the exact name you use to register in

CCR.

_____ See Clause 52.204-8, Annual Representations and Certifications. Have you completed the representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at https://orca.bpn.gov?

____ If required, have you entered a unit price for each line item? The amount column is for the total amount. If your price exceeds $2,000 for construction work or $2,500 for services, you will be required to pay employees at least the wage rates specified in the applicable wage decision/determination.

____ Have you considered the amount of labor, equipment, and materials needed to perform all the work required by the specifications? Before entering prices on the bid schedule recheck all working papers. Are your figures legible? Are the extensions of your unit price and your total price correct?

____ If your quote is over $30,000 for construction work only, a 100% payment protection will be required. See Clause 52.228-13, Alternative Payment Protections. If you are the apparent low quoter, you will be notified by letter before award of contract.

____ All erasures and/or corrections must be initialed by the person signing the RFQ.

____ Have you acknowledged all amendments, if any have been issued? Procedure for acknowledgement of amendments is stated in block 11 of the amendment.

____ Fax quotes are acceptable. Fax your quote (all required pages) on or before the date quotations are due. Fax number is 918-669-7495, if unavailable use 918-669- 7436.

____ Have you provided a telephone number you can be reached during the business hours of

7:45 a.m. to 4:30 p.m. CST?

____ Block 12, Discount for Prompt Payment. If you are offering a discount. A prompt payment discount is the amount your invoice will be discounted if the Government pays your bill early. For example: If your invoice is for $100 and you offer a discount of 1% within 20 days, and the Government pays you within 20 days, your payment would be $99.

____ Be sure to properly complete your quotation. Check all appropriate blocks. In order for your quotation to be considered responsive, you must complete and return pages: 1, 6, 7, 66, 67, 68, 69, 70, 71, 72, 73, 74, 75, 76, 77, and 89 of the RFQ/Solicitation, and any amendments (if any were issued).

BID PREPARATION CHECKLIST (CONT)

NOTE: IF ALL OF THE INFORMATION BELOW IS NOT PROVIDED, YOUR QUOTE WILL NOT BE CONSIDERED.

RETURN THE FOLLOWING PAGES WITH INFORMATION PROVIDED:

Page 1: Blocks 12 (if giving a discount), 17a, 30a, 30b, and 30c

Page 6-7: Bid Schedule for Base Year

Page 66: Clause 52.212-2, Evaluation – Commercial Items (Jan 1999)

Page 66-77: Clause 52.212-3, Offeror Representations and Certifications – Commercial Items (Jun 2008) Alternate I (Apr 2002)

Page 89: Clause 252.212-7000, Offeror Representations and Certifications – Commercial Items (June 2005)

NOTE: If you are the successful offeror you must be registered in the Central Contractor Registration (CCR) database before award can be made. If you are not registered in the CCR database you can do so by going to www.ccr.gov.

NOTE: As noted on the face of the SF 1449, this is a Request for Quotation. As such, this procurement is being conducted in accordance with Simplified Acquisition Procedures (SAP) of FAR Part 13. Any reference to offers or bids or offerors or bidders should be substituted with quotations or quoters. All reference to discussions shall not be interpreted under FAR Part 15, but rather indicates that the Government may communicate with quoters as allowed under simplified acquisition procedures.

BID SCHEDULE BASE YR 1 Mar 09 - 28 Feb 10 PROJECT: HUGO LAKE

CONTRACTOR: Contract No.:

ITEM NO SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SCHEDULE I

APPENDIX A

Performance Based Mowing

Improved Areas

1 A Bridgeview 8 MO

2 A Frazier Point 8 MO

3 A Kiamichi Park 8 MO

4 A Rattan Landing 8 MO

5 A Salt Creek Cove 8 MO

6 A Sawyer Bluff 8 MO

7 A Group Camping 8 MO

8 A Virgil Point 8 MO

9 A Wilson Point 8 MO

Total Improved Areas

Lawn Areas

10 A Overlook 8 MO

11 A Project Office 8 MO

Total Lawn Areas

12 A Dam Embankment 8 MO

13 A Utility Lines 5 MO

14 A Hedge Trimming 3 MO

Total Bid Price - Schedule I

OPTION YEARS:

This contract is for 1 year with 4 options to extend. Rather than providing detailed bid schedules for each option year, offerors shall indicate below the percentage of escalation which shall be applied to each item price for each subsequent year.

1st Option Year - __% increase over Base Year

2nd Option Year - __% increase over 1st Option Year

3rd Option Year - __% increase over 2nd Option Year

4th Option Year - __% increase over 3rd Option Year

ACRONYMS: MO - Month MW - Mowing TM - Time

(1) Bidders are required to bid on both base bid schedule and option years or their bid will be rejected as nonresponsive. Any offers which contain any exceptions to, or qualification of solicitation conditions and documents may be disqualified as nonresponsive and not considered for award.

(2) The Government may reject an offer as nonresponsive if it is materially unbalanced. An offer is considered unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.

CORPS OF ENGINEERS POC: MR. CHRIS LYNCH, 580-326-3345

S P E C I F I C A T I O N S

HUGO LAKE

OKLAHOMA

MAINTENANCE CONTRACT

FOR

MOWING

ORGANIZATION OF SPECIFICATIONS

This specification consists of a general section supplemented by exhibits and appendices.

A Table of Contents is provided on the following page.

The general section contains requirements that apply to all work to be performed under the provisions of this specification. The exhibits contain detailed listings or examples referred to in the general section and the Performance Requirements. The appendices contain a description of the facilities to be serviced and the work to be performed.

Any reference to paragraphs or subparagraphs in this specification will refer to those in the general section unless otherwise noted.

TABLE OF CONTENTS

Para.

No. Paragraph Title

1 Scope of Work

2 Definitions

3 References

4 Initiation, Execution, & Acceptance of Work

5 Personnel

6 Equipment

7 Performance Requirements

8 Contractor Quality Control

9 Deductions for Deficient Work

10 Safety

11 Reporting Defective Facilities

12 Prework Conference

13 Contractor Submittals

14 Billing

15 Changes in Amount of Facilities Serviced

EXHIBITS

No. TITLE

1 Performance Requirements Table

2 Quality Assurance Report

3 Quality Control Inspection Log

4 Example of Job Hazard Analysis

5 Invoice Format

APPENDICES

Appendix Title

A Mowing - Performance Based

Facilities Inventory & Mowing Maps

1. SCOPE OF WORK. The work required under this specification provides for the mowing, trimming, and edging of public use areas, the dam embankment, and other project lands at Hugo Lake.

2. DEFINITIONS.

2.1. Contractor Quality Control (CQC). The contractor's system of controlling the quality of services provided under the provisions of the contract.

2.2. Deficient Service. Any service provided by the contractor that does not meet the Performance Standards specified in the Performance Requirements given in Exhibit 1.

2.3. Government. The term "Government" as used herein means the United States of America.

2.4. Performance Requirement (PR). The Government's requirement for each service provided under the contract. The requirements are stated as Performance Standards (PStd), and specify the minimum standard (quality) for each service provided under the contract.

2.5. Project. The term "project" as used herein means all Government property and easements at Hugo Lake.

2.6. Public Use Area (PUA). Parks as well as overlooks, nature and hiking trails, access points, and other areas used by the public for recreation.

2.7. Quality. Conformance with the contract specification.

2.8. Quality Assurance (QA). The procedure by which the Government determines CQC is functioning effectively.

2.9. Regulations. The term "regulations" refers to any local, state, or Federal law or regulation applicable to operation or maintenance of the project.

2.10. Workday. Any day, Monday through Friday, exclusive of Federal holidays. This definition should not be interpreted to mean work is not required by this specification on other days.

3. REFERENCES. Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, dated September 1996) is hereby incorporated into this specification. The Contracting Officer will furnish EM 385-1-1 to the contractor after contract award.

4. INITIATION, EXECUTION, AND ACCEPTANCE OF WORK.

4.1. Initiation and execution of work. Work shall be performed as needed to comply with the performance standards (Performance Requirements Table, Exhibit 1). It is the contractor’s responsibility to determine mowing frequency and perform the mowing without work orders from the Contracting Officer. Work will be accepted based on compliance with performance requirements. Refer to Paragraph 7. for inspection criteria and contractor performance evaluation.

4.2. Acceptance of work. The Government shall accept work unless the Contracting Officer notifies the contractor of deficient services.

4.2.1. Initial notification of deficiencies may be written or oral; however, all oral notification shall be confirmed by the Contracting Officer in writing within two (2) workdays. Written notification shall be provided by completing Parts I, II, and III of a Quality Assurance (QA) Report (SWT Form 982, Exhibit 2).

4.2.2. If the Contracting Officer notifies the contractor of deficient work the contractor shall initiate action to accomplish corrective work. Work performed on a daily schedule shall be reperformed the same day. Work performed on less than a daily schedule shall be reperformed not later than the following day. Refer to paragraph 10 for deficient work not reperformed.

4.2.3. The contractor shall notify the Contracting Officer when corrective work is completed. Notification shall be made by completing Part IV of the QA Report provided it has been furnished the contractor. If not, notification shall be made orally. When work has been corrected, the Contracting Officer shall take necessary action to complete Part V of the QA Report and provide a copy to the contractor.

5. PERSONNEL. The contractor shall provide personnel necessary to accomplish all work required by this specification within specified time limits.

5.1. Experience and Skills. The contractor shall provide personnel that are experienced and demonstrate proficiency in the skills required performing the various types of work specified.

5.2. Supervision.

5.2.1. The contractor shall provide one supervisor on the project who shall have full authority to direct any work required. This supervisor and alternates, who shall have full authority to execute work during his absence, shall be designated in writing.

5.2.2. The contractor shall provide the Contracting Officer a local or toll-free telephone number at or through which the supervisor can be reached between 8:00 a.m. and 4:30 p.m. on all days work is being performed. Use of a cellular-type phone is acceptable.

6. EQUIPMENT. The contractor shall furnish equipment necessary to accomplish work required performing the various types of work specified.

6.1. Equipment Inspections. Upon request, the contractor shall present equipment to the Contracting Officer for inspection. The contractor shall not use equipment until it has passed inspection by the Contracting Officer. The Contracting Officer shall establish the time and location for these inspections.

6.2. Equipment Requirements. All equipment used to perform work under this specification must be in good operating and mechanical condition and shall comply with EM 385-1-1.

6.2.1. Tractors shall be equipped and operated in accordance with the following:

6.2.1.1. Power take offs on tractors shall operate at a minimum of 540 rpm during mowing operations.

6.2.1.2. Seat belts shall be worn at all times by tractor operators. Refer to subparagraph 16.B.08. of EM 385-1-1.

6.2.1.3. A substantial guard or shield shall be installed on the tractor to protect the operator from flying objects during mowing. The guard or shield shall be covered with not less than 1/4-inch woven wire mesh or expanded metal with openings no greater than one inch. Refer to subparagraph 16.B.03.a. and 16.B.11.a of EM 385-1-1.

6.2.1.4. Rollover protection shall be provided. If the structure is not designed and installed by the manufacturer of the tractor, the contractor shall furnish a certificate from a registered professional engineer that the rollover protection is structurally safe for its intended purpose. Refer to subparagraph 16.B.12. of EM 385-1-1.

6.2.2. Mowers shall be rotary-type or flail-type and shall meet the following requirements:

6.2.2.1. Mowers shall be equipped with safety chains or other protective devices to prevent flying objects from injuring people or damaging property.

6.2.2.2. Mowers shall be equipped with slides and wheels.

6.2.2.3. Brush hogs shall not be used on the slopes of dikes around oxidation ponds.

6.2.2.4. Mowers used on the embankment of the dam shall have a minimum cutting width of 7 feet.

6.2.2.5. Mulching mowers shall not be used.

6.2.2.6. Brush hogs shall not be used when mowing within 10 feet of facilities in improved areas.

6.2.2.7. All safety devices provided by the manufacturers of push and riding mowers shall function as designed.

6.2.3. Edgers shall be equipped with a rotary blade in an upright position. A protective guard for the blade shall be provided.

6.2.4. Signs located on each side of the vehicles shall mark all sedans and trucks used by the contractor to perform work under this specification. Signs may be painted on the doors or magnetic signs may be attached to the doors. Magnetic signs shall not be removed at any time vehicles are at the project. Lettering shall be at least 2 inches high. Each sign shall contain the following:

MOWING SERVICES

PROVIDED BY

(Contractor's Name)

6.3. Equipment Operation.

6.3.1. Mowing equipment shall be operated in a manner that will allow for discharge of grass clippings away from roads, ponds, facilities, etc., and prevent damage to turf.

6.3.2. Power operated trimming equipment shall not be used around any shrubs or trees with a diameter less than 3 inches at breast height.

6.4. Vehicle Operation and Parking. While performing work under this contract, vehicles shall be operated and parked only on roads, parking areas, or pullouts unless the Contracting Officer approves use of other areas.

7. PERFORMANCE REQUIREMENTS. PRs for work performed under this specification are given in Exhibit 1. The contractor's performance will be evaluated using these PRs as follows:

7.1. Services provided by the contractor will be inspected for compliance with PStds.

Those not meeting PStds shall be considered deficient. Major or recurring minor deficiencies will result in a letter of correction being issued by the Contracting Officer's Representative.

7.2. Deficient services are determined during initial QA inspections since the purpose of QA is to determine how well CQC is functioning. The results of inspections are not changed as a result of satisfactory reperformance.

8. CONTRACTOR QUALITY CONTROL. The contractor shall establish and execute a CQC Program in accordance with clause 52.246-4 “Inspection of Services” to assure that all work required by this specification is completed on schedule and in accordance with the PRs in Exhibit 1.

8.1. The results of all quality control inspections conducted by the contractor shall be entered on the Quality Control Inspection Log (SWT Form 990, Exhibit 3). A copy of completed inspection logs shall be furnished the Contracting Officer weekly.

8.2. The Contracting Officer may waive the requirements in subparagraph 8.1. if he determines proper CQC can be achieved without the required submissions. The Contracting Officer will normally make this determination on the basis of actual performance by the contractor.

9. DEDUCTIONS FOR DEFICIENT WORK. Deductions from the contractor's scheduled earnings shall be made for services that do not meet the PStds in Exhibit 1. Deductions for documented defects will be made in accordance with the following procedures:

9.1. Each service found deficient and reperformed by the contractor: No deduction.

9.2. Each service found deficient and performed by the Government: Deduction for loss in value shall be based on the Government's cost for performing the work.

9.3. Each service found deficient and performed by another contractor: Deduction is the contract price paid the other contractor to perform the work.

9.4. Each service found deficient and not reperformed by anyone, or work not performed at all: Deduction for loss in value shall be based on estimates of the contractor's cost for performing the work, i.e., labor, materials, equipment costs, work schedules, etc. Loss in value shall be based on the contract bid price or applicable portion thereof.

10. SAFETY.

10.1. Safety Plan. The contractor shall furnish the Contracting Officer a safety plan to implement the general policies and procedures for safe operation and maintenance of the project in accordance with EM 385-1-1. The safety plan shall include, but not be limited to the following:

10.1.1. Procedures for training employees in responsibilities for safety of others, including the general public.

10.1.2. Requirements for wearing or utilizing personal safety equipment and apparel.

10.1.3. Procedures for handling, reporting, and correcting unsafe conditions, practices, and safety violations.

10.1.4. Procedures for treating and transporting injured persons to medical facilities.

10.1.5. Fire prevention plans.

10.1.6. Job hazard analyses shall include an evaluation of hazards that might be encountered for an operation, and proposed methods and techniques for accomplishing each job in a safe manner. Contractor personnel shall be thoroughly indoctrinated with job hazard analyses, especially at the start of a major job. Initially, the safety plan shall include, but not be limited to, job hazard analyses for the jobs listed below. However, the contractor shall prepare additional analyses as the need arises and/or the Contracting Officer directs. Job hazard analysis directed by the Contracting Officer shall be submitted for approval within one (1) week. An example of a job hazard analysis is given in Exhibit 4.

10.1.6.1. Loading and unloading of equipment (analysis for each type of equipment to be used to perform services required by this specification).

10.1.6.2. Equipment operation and maintenance (for each type of equipment).

10.1.6.3. Vehicle operation and maintenance.

10.2. Safety Violations. If a contractor's employee persists in not following the safety requirements of this specification or the contractor's safety plan, the employee shall be permanently discharged upon the request of the Contracting Officer.

10.3. Personal Clothing and Safety Apparel. Contractor personnel shall wear clothing suitable for the weather and working conditions. The minimum shall be short-sleeve shirt and long trousers (no sleeveless shirts or tank tops, or shorts). Clothing shall be in good repair. Personnel will wear additional protective apparel when required by Section

5, EM 385-1-1.

10.4. Accident Reports.

10.4.1. The contractor shall immediately notify the Contracting Officer of all known accidents that occur at the project and result in death or serious injury.

10.4.2. The contractor shall investigate all accidents involving contractor or subcontractor employees that result in death, traumatic injury, occupational disease, or damage to property, materials, supplies and equipment incidental to work performed under this specification. The results of investigations shall be reported to the Contracting Officer immediately, and in writing on ENG Form 3394, Accident Investigation Report, within one (1) workday following the accident.

10.5. Exposure Reports. The contractor shall maintain an accurate record of exposure data (man-hours worked) and submit the figure in writing monthly by the 2nd workday of the following month.

11. REPORTING DEFECTIVE FACILITIES. While performing work, contractor personnel shall observe the condition of Government facilities. Damaged, defective, and/or inoperative facilities shall be reported to the Contracting Officer each workday.

12. PREWORK CONFERENCE. The Contracting Officer shall conduct a Prework Conference with the contractor to discuss the provisions of this specification and the contractor's submittals listed in paragraph 13 below. As a minimum, the officer of the company that signed the contract and the on-site supervisor shall represent the contractor. The Contracting Officer shall establish the location, date, and time of the Prework Conference after consultation with the contractor.

13. CONTRACTOR SUBMITTALS. Unless otherwise noted, the contractor shall submit the documents listed below to the Contracting Officer prior to starting work. All submittals, other than copies of contracts, shall be typed and the original and one copy shall be furnished the Contracting Officer. If the Contracting Officer determines any of the submittals do not comply with this specification, the contractor shall resubmit these documents within one (1) week.

13.1. Names of on-site supervisor and his alternate (submit prior to initiation of work and prior to changing designated employees) (subparagraph 5.2.1.).

13.2. Safety Plan (subparagraph 10.1.).

13.3. Job Hazard Analysis (subparagraph 10.1.6.)

13.4. Exposure reports (submit by 2nd workday of each month) (subparagraph 10.5.).

14. BILLING.

14.1. The contractor shall submit an original and two copies of invoices when work is completed at the end of each month.

14.2. Invoices shall be prepared in the format shown at

Exhibit 5.

14.3. All exposure reports shall be submitted before an invoice will be accepted.

14.4. Invoices and supporting documents shall be delivered or mailed to the Lake Manager, Hugo Lake Office, PO Box 99, Sawyer, OK 74756-0099.

15. CHANGES IN AMOUNT OF FACILITIES SERVICED. Adjustment in contract price will be negotiated at the request of either party, only if either or both of the following conditions occur.

15.1. Services required are deleted for a period of one (1) month or longer in an entire park.

15.2. A singular change in the amount of project facilities to be serviced is made and the change results in an annual increase or decrease in the cost of work that exceeds $300. The cost of increases or decreases shall be based upon estimates of the contractor's costs for performing the work.

EXHIBIT 1

PERFORMANCE REQUIREMENTS

PERFORMANCE REQUIREMENTS

SERVICE REQUIREMENT PR NO. PERFORMANCE STANDARDS

APPENDIX A

Improved areas 1 Smooth cut. 1Height of cut grass does not exceed ±1/2 inch from that specified. No uncut vegetation.

Lawn areas 2 Smooth cut. 1Height of cut grass does not exceed ±1/2 inch from that specified. No uncut vegetation.

Embankment area 3 Smooth cut. 1Height of cut grass does not exceed ±1 inch from that specified.

2No uncut vegetation.

Utility Lines 4 Smooth cut. 1Height of cut grass does not exceed ±1 inch from that specified.

2No uncut vegetation.

Trimming 5 Uniform cut with no scalping of grass.

No damage to trees or shrubs.

Edging 6 Edge of grass is a uniform vertical cut with no runners extending beyond vertical face.

Clean designated areas after mowing

No vegetation or debris left on paved surfaces.

1. Conformance with height requirement shall be determined by measuring the height of cut grass on smooth ground.

2. The Contracting Officer will relax this requirement to a degree when the height of grass prior to mowing is excessive. The Contracting Officer shall make the determination of excessive grass height unilaterally.

EXHIBIT 2

QUALITY ASSURANCE REPORT

EXHIBIT 3

QUALITY CONTROL INSPECTION LOG

EXHIBIT 4

EXAMPLE OF JOB HAZARD INSPECTION LOG

ACCIDENT PREVENTION PROGRAM

JOB HAZARD ANALYSIS

1. _________________________________________ 2. ___________________________________ 3. ____________________

PROJECT CONTRACTOR DATE

4. _________________________________________ 5. ___________________________________ 6. ____________________

LOCATION CONTRACT NO. START DATE

7. PHASE OF WORK 8. SAFETY HAZARD 9. PRECAUTIONARY ACTION TAKEN

Mowing Equipment hauling, loading/unloading

Operators must be experienced, qualified, and trained to operate the equipment. A signal person on the ground will be used during loading/unloading. Equipment will be equipped with rollover protective structures. Operators will wear their seat belts at all times during operation of equipment. Trailer safety chains will be properly placed on towing vehicle when transporting equipment. Assure equipment trailer is level and truck and trailer brakes are set.

Check for overhead clearances (power lines, tree limbs, etc.). Check for objects or obstacles behind equipment before backing. Trailer bed and ramps shall be clean of oil, gravel, dirt, or materials that could become slippery or cause the equipment being unloaded to lose traction. Equipment will be lined up with trailer so it can be loaded with a minimum amount of adjustment when on the ramp or trailer.

Getting on/off equipment

Prevent injuries from slipping by maintaining 3-point contact with grab handles and steps. Never jump from equipment. Keep steps and decks free of mud, oil, and grease.

Equipment Inspection No vehicle will be placed into service until an inspection is performed and any deficiencies are corrected. Vehicles will be inspected prior to start of work each workday.

Equipment Fueling Equipment shall not be allowed to run during refueling. An operable fire extinguisher shall be available during refueling.

Equipment Maintenance Required maintenance will be performed at a location that will provide protection from traffic for maintenance personnel. Preventive maintenance procedures recommended by the manufacturer will be followed.

7. PHASE OF WORK 8. SAFETY HAZARD 9. PRECAUTIONARY ACTION TAKEN

Trimming/Edging Equipment

Operators will wear personal protective equipment at all times while using power trimming/edging equipment. Operators will follow manufacturer instructions while performing maintenance such as blade sharpening, carburetor adjustments, and spark plug maintenance.

Operation of equipment Proper clothing shall be worn at all times (long trousers, minimum of short sleeve shirt, hard hats, safety toe shoes, safety goggles, ear protection, etc.). Seat belts shall be secured at all times. No passengers will be allowed on equipment while in operation. Brakes shall be applied when equipment is stopped. Safety guards will remain installed and properly used. Equipment will not be left unattended while engine is operating. Personnel will not approach any equipment until power take off (PTO) shaft has come to a complete stop. Exit or entrance to vehicles is prohibited while equipment is in motion.

Mowers and tractors will be operated to keep a safe distance from electrical outlet boxes, conduit, water faucets, sign or gateposts, and other obstacles. Equipment will be operated in a safe manner and under control at all times.

Terrain Prior to mowing, all slopes will be thoroughly inspected for washes, potholes or other surface irregularities that could cause a mower to overturn. Operators will be particularly watchful of soft areas or areas that may be undercut.

Traffic Hazard warning lights on all mechanized equipment will be in operation while mowing, transporting, or when equipment is parked along the roadside. Slow moving vehicle (SMV) emblems will be installed on every tractor used alongside or transported on any roadway. Extreme caution will be observed to prevent accidents when driving equipment onto access roads from connecting roads or mowing areas. Practice defensive driving techniques. Properly position mirrors for turning and backing. All vehicles will stop at railroad crossings and determine if a train is approaching before proceeding. Care shall be used in entering access or primary roads. All appropriate State Motor Vehicle Operating laws will always be observed.

Rocks and debris Rocks that can be thrown by mowers, and debris such as bottles, cans, tree limbs and other foreign matter shall be picked up before mowing operations begin.

7. PHASE OF WORK 8. SAFETY HAZARD 9. PRECAUTIONARY ACTION TAKEN

Weather If lightning is present, all mowing operations will cease. Personnel will move to a clear area away from trees and equipment and will remain there until the danger passes or if the Foreman directs them to another location.

Lifting Always use proper lifting techniques. Use adequate manpower or mechanical assistance.

10. ___________________________________________________________________________ DISCUSSED WITH CONTRACTOR/ON-SITE SUPERVISOR (Signature/Date)

11. ___________________________________________________________________________ CONTRACTING OFFICER or REPRESENTATIVE (Signature/Date)

EXHIBIT 5

INVOICE FORMAT

BILLING FOR

MAINTENANCE CONTRACT

PROJECT: ________________________________ SHEET ___ OF ___

CONTRACTOR: _____________________________ DATE: ___________

ADDRESS: ________________________________ CONTRACT NO: W912BV-__-_-____

BILLING PERIOD: ________ THRU __________ INVOICE NO: __________

PAYMENT TERMS: ____________________________

(Payment Discount or N/A)

IWO OR

BID ITEM

NO. DEDUCTION AMOUNT TOTAL

PAYMENT REQUESTED: ______________

CONTRACTOR (Signature/Date)

APPENDIX A

PERFORMANCE BASED MOWING

1. FACILITIES TO BE SERVICED. Public use areas, Lake Office complex, dam embankment, utility lines, and other project lands. An inventory of mowing areas is given in Table A.

All mowing maps are at the end of this appendix.

2. FREQUENCIES AND TIMES OF SERVICE.

2.1. Work in parks shall be performed between 7:00 a.m. and 8:00 p.m.

2.2. Mowing shall be performed 15 March through 30 September.

2.3. Mowing of PUAs shall not be accomplished on Saturdays, Sundays, Federal holidays, or one workday before Federal holidays.

2.4. The contractor shall not start work unless the grass and ground are dry enough for smooth cutting and equipment will not cause rutting of the ground. The contractor shall use good judgment in determining whether conditions are suitable for mowing operations.

In cases where the contractor and the Contracting Officer disagree about the suitability of conditions for mowing operations, the Contracting Officer will determine whether work shall progress or stop. Areas excluded by these conditions will also be excluded in the inspections.

3. DESCRIPTION OF WORK. The contractor shall perform the following work as directed.

3.1. Mowing shall be performed in the following areas:

3.1.1. Improved Areas shall be maintained between a minimum height of 1½ inches and a maximum height of 5 inches. These areas shall include: campsites and the area within 25 feet of the tables and pullouts.

3.1.1.1. Areas adjacent to all roads and parking areas shall be mowed to the top of the back slope of ditches. If ditches do not exist, mowing shall be accomplished for a distance of 15 feet from each edge of the road or parking area or to the tree line, whichever is closer. The limits of mowing at intersections shall be determined by the Contracting Officer to provide a safe viewing distance for vehicles approaching the intersections.

3.1.1.2. Areas around park and lake entrance signs. Park entrance signs are located beside roads shown on the attached maps. A triangular shaped area shall be mowed around these signs. This area shall extend from the edge of the roadway to a point 10 feet on the other side of the sign at its widest point. It shall extend 10 feet behind the sign and shall provide a clear view of the front of the sign from vehicles using the adjacent roadway. The Contracting Officer will determine the length of the area to be mowed in front of these signs.

3.1.1.3. Areas around toilets located outside the limits of improved areas shown on the attached maps shall be mowed for a distance of 10 feet from the back and sides of toilets.

The area between the nearby road or parking area and the toilet shall be mowed. In addition, the area between pairs of toilets shall be mowed.

3.1.2. Lawn areas shall be maintained between a minimum height of 1 inch and a maximum height of 3 inches. The limits of these areas are shown on the attached maps.

3.1.3. Dam Embankment area shall be maintained between a minimum height of 4 inches and a maximum height of 10 inches. The limits of these areas are shown on the attached maps.

3.1.4. Utility lines shall be mowed to a height of 4 inches, once a month during the months of April, May, June, July and September. Cutting of woody growth up to 1 inch in diameter will be required. While terrain may be rough, it is suitable for operation of a brush hog. The width of mowing in these areas shall be 10 feet. The locations and lengths of utility lines are:

Number of Stations Location (Station = 100 Ft) Kiamichi Park 150 Sawyer Bluff 12 Twin Coves Group Camping 27 Virgil Point 20 Wilson Point 40

TOTAL 249

3.2. Trimming.

3.2.1. Trimming shall be maintained around all vertical objects protruding from the ground, including under guardrails within the limits of these areas. This includes trimming along railroad ties delineating pullouts.

3.2.2. Every time the embankment is mowed trimming shall be accomplished around piezometers, staff gauges, relief wells, manholes, guard posts, and buildings located on the embankment; along the edge of the embankment riprap; and around guardrail and signposts on both sides of the embankment road.

3.2.3. Edging shall be accomplished along all concrete walkways and curbs that are flush with the ground each time areas are mowed.

3.2.4. The contractor may apply approved herbicides in lieu of trimming. The Project Manager must approve use of chemicals. The contractor shall submit a list of proposed products with manufacturers data sheets (MDS) for review. All herbicides shall be applied by a certified applicator. Proof of certification shall be provided before application of any herbicides. The contractor shall submit an application report each time herbicides are applied. The Contracting Officer shall furnish the forms.

3.2.5. Hedge trimming of shrubs at the project office and overlook will be performed once each month during the months of May, July, and September. See Table A.

3.3. Cleanup. Prior to mowing, the contractor shall remove rocks and debris that are likely to damage equipment or be thrown by the mower. After mowing is accomplished, the contractor shall remove vegetation and debris from parking lots, paved walkways and pullouts, and table and picnic shelter slabs.

3.4. Flowerbeds. Each time mowing is accomplished weeds, grass, debris, and litter shall be removed from flower and shrub beds. Beds shall be thoroughly watered if necessary.

The number and size of flower and shrub beds is as follows:

Location Number Size (SF) Project Office 4 492

TABLE A

INVENTORY OF MOWING AREAS

IMPROVED LAWN EMBANKMENT

AREAS AREAS AREAS PLAYGROUNDS TOILETS SHELTERS SHRUBS

LOCATION (AC) (AC) (AC) (NO) (NO) (NO) (LF)

Bridgeview 10.5 1

Frazier Point 3.2

Kiamichi Park 62.5 1 12 2

Rattan Landing 15.5 2

Salt Creek Cove 4.6 1

Sawyer Bluff 3.2 1

Twin Coves Group Camping 13.5 1 9 4

Virgil Point 16.0 2

Wilson Point 16.5 1 2 1

Overlook 2.4 1 700

Project Office 12.0 100

Dam Embankment 31

TOTAL 145.5 14.4 31 3 31 7 800

AC = Acres NO = Number LF = Linear Feet

APPLICABILITY OF WAGE RATES

CHOCTAW AND PUSHMATAHA COUNTIES, OKLAHOMA

Wage Determination 05-2433 (Rev. 06) will be applicable to this Contract.

MOWING SERVICES

The following classification will be utilized for Mowing Services:

Laborer, Grounds Maintenance will be utilized for cutting grass using walking-type or riding mowers (less than 2000 lbs); for trimming hedges and edges around walks, flower beds, and wells using hedge trimmers, clippers, and edging tools; and for pruning shrubs and trees, as required.

Tractor Operator will be utilized when using a gasoline or diesel powered tractor with mowing attachments (over 2000 lbs).

WD 05-2433 (Rev.-6) was first posted on www.wdol.gov on 06/17/2008

REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary of Labor | WAGE AND HOUR DIVISION

| WASHINGTON D.C. 20210

| Wage Determination No.: 05-2433 Shirley F. Ebbesen Division of | Revision No.: 6 Director Wage Determinations| Date Of Revision: 06/09/2008 State: Oklahoma

Area: Oklahoma Counties of Adair, Cherokee, Choctaw, Craig, Creek, Delaware, Haskell, Kay, Latimer, Le Flore, Mayes, McCurtain, McIntosh, Muskogee, Nowata, Okfuskee, Okmulgee, Osage, Ottawa, Pawnee, Pittsburg, Pushmataha, Rogers, Sequoyah, Tulsa, Wagoner, Washington

**Fringe Benefits Required Follow the Occupational Listing**

OCCUPATION CODE - TITLE MINIMUM WAGE RATE

01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 12.60 01012 - Accounting Clerk II 15.33 01013 - Accounting Clerk III 17.78 01020 - Administrative Assistant 19.04 01040 - Court Reporter 16.25 01051 - Data Entry Operator I 10.88 01052 - Data Entry Operator II 11.86 01060 - Dispatcher, Motor Vehicle 17.99 01070 - Document Preparation Clerk 12.66 01090 - Duplicating Machine Operator 12.66 01111 - General Clerk I 10.89 01112 - General Clerk II 12.83 01113 - General Clerk III 16.83 01120 - Housing Referral Assistant 15.78 01141 - Messenger Courier 11.15 01191 - Order Clerk I 11.38 01192 - Order Clerk II 13.79 01261 - Personnel Assistant (Employment) I 13.16 01262 - Personnel Assistant (Employment) II 14.43 01263 - Personnel Assistant (Employment) III 16.82 01270 - Production Control Clerk 18.65 01280 - Receptionist 10.44 01290 - Rental Clerk 11.93 01300 - Scheduler, Maintenance 11.33 01311 - Secretary I 11.33 01312 - Secretary II 13.63 01313 - Secretary III 15.78 01320 - Service Order Dispatcher 14.95 01410 - Supply Technician 19.04 01420 - Survey Worker 12.46 01531 - Travel Clerk I 11.68 01532 - Travel Clerk II 12.36 01533 - Travel Clerk III 12.96 01611 - Word Processor I 11.75 01612 - Word Processor II 13.35 01613 - Word Processor III 14.97 05000 - Automotive Service Occupations

05005 - Automobile Body Repairer, Fiberglass 17.41 05010 - Automotive Electrician 16.54 05040 - Automotive Glass Installer 15.67 05070 - Automotive Worker 15.67 05110 - Mobile Equipment Servicer 13.76 05130 - Motor Equipment Metal Mechanic 17.41 05160 - Motor Equipment Metal Worker 15.67 05190 - Motor Vehicle Mechanic 16.28 05220 - Motor Vehicle Mechanic Helper 12.71 05250 - Motor Vehicle Upholstery Worker 14.62 05280 - Motor Vehicle Wrecker 15.63 05310 - Painter, Automotive 16.56 05340 - Radiator Repair Specialist 15.67 05370 - Tire Repairer 13.29 05400 - Transmission Repair Specialist 17.41 07000 - Food Preparation And Service Occupations 07010 - Baker 10.61 07041 - Cook I 9.35 07042 - Cook II 10.61 07070 - Dishwasher 7.69 07130 - Food Service Worker 7.48 07210 - Meat Cutter 11.63 07260 - Waiter/Waitress 7.51 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 16.54 09040 - Furniture Handler 10.62 09080 - Furniture Refinisher 16.54 09090 - Furniture Refinisher Helper 12.71 09110 - Furniture Repairer, Minor 14.62 09130 - Upholsterer 16.54 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.95 11060 - Elevator Operator 8.76 11090 - Gardener 12.27 11122 - Housekeeping Aide 8.94 11150 - Janitor 8.76 11210 - Laborer, Grounds Maintenance 10.43 11240 - Maid or Houseman 7.76 11260 - Pruner 9.89 11270 - Tractor Operator 12.15 11330 - Trail Maintenance Worker 10.43 11360 - Window Cleaner 9.69 12000 - Health Occupations 12010 - Ambulance Driver 11.57 12011 - Breath Alcohol Technician 15.17 12012 - Certified Occupational Therapist Assistant 17.66 12015 - Certified Physical Therapist Assistant 19.82 12020 - Dental Assistant 13.16 12025 - Dental Hygienist 29.89 12030 - EKG Technician 16.06 12035 - Electroneurodiagnostic Technologist 16.06 12040 - Emergency Medical Technician 11.57 12071 - Licensed Practical Nurse I 12.54 12072 - Licensed Practical Nurse II 14.06 12073 - Licensed Practical Nurse III 15.72 12100 - Medical Assistant 11.92 12130 - Medical Laboratory Technician 13.58 12160 - Medical Record Clerk 11.64 12190 - Medical Record Technician 13.54 12195 - Medical Transcriptionist 13.84 12210 - Nuclear Medicine Technologist 27.12 12221 - Nursing Assistant I 8.96

12222 - Nursing Assistant II 10.07 12223 - Nursing Assistant III 11.00 12224 - Nursing Assistant IV 12.33 12235 - Optical Dispenser 12.02 12236 - Optical Technician 12.63 12250 - Pharmacy Technician 12.18 12280 - Phlebotomist 12.36 12305 - Radiologic Technologist 21.14 12311 - Registered Nurse I 19.54 12312 - Registered Nurse II 23.91 12313 - Registered Nurse II, Specialist 23.91 12314 - Registered Nurse III 28.93 12315 - Registered Nurse III, Anesthetist 28.93 12316 - Registered Nurse IV 34.65 12317 - Scheduler (Drug and Alcohol Testing) 18.73 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 18.95 13012 - Exhibits Specialist II 22.25 13013 - Exhibits Specialist III 27.23 13041 - Illustrator I 18.95 13042 - Illustrator II 22.25 13043 - Illustrator III 27.23 13047 - Librarian 18.11 13050 - Library Aide/Clerk 7.64 13054 - Library Information Technology Systems Administrator 19.12 13058 - Library Technician 12.46 13061 - Media Specialist I 13.50 13062 - Media Specialist II 15.11 13063 - Media Specialist III 16.84 13071 - Photographer I 15.06 13072 - Photographer II 17.50 13073 - Photographer III 20.54 13074 - Photographer IV 25.14 13075 - Photographer V 30.42 13110 - Video Teleconference Technician 15.24 14000 - Information Technology Occupations 14041 - Computer Operator I 14.67 14042 - Computer Operator II 16.44 14043 - Computer Operator III 21.59 14044 - Computer Operator IV 25.11 14045 - Computer Operator V 27.62 14071 - Computer Programmer I (1) 21.63 14072 - Computer Programmer II (1) 26.73 14073 - Computer Programmer III (1) 27.62 14074 - Computer Programmer IV (1) 27.62 14101 - Computer Systems Analyst I (1) 27.62 14102 - Computer Systems Analyst II (1) 27.62 14103 - Computer Systems Analyst III (1) 27.62 14150 - Peripheral Equipment Operator 14.67 14160 - Personal Computer Support Technician 28.80 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 25.20 15020 - Aircrew Training Devices Instructor (Rated) 33.42 15030 - Air Crew Training Devices Instructor (Pilot) 36.76 15050 - Computer Based Training Specialist / Instructor 27.62 15060 - Educational Technologist 21.47 15070 - Flight Instructor (Pilot) 36.76 15080 - Graphic Artist 19.06 15090 - Technical Instructor 16.90 15095 - Technical Instructor/Course Developer 20.67 15110 - Test Proctor 13.64 15120 - Tutor 13.64

16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 8.03 16030 - Counter Attendant 8.03 16040 - Dry Cleaner 10.23 16070 - Finisher, Flatwork, Machine 8.03 16090 - Presser, Hand 8.03 16110 - Presser, Machine, Drycleaning 8.03 16130 - Presser, Machine, Shirts 8.03 16160 - Presser, Machine, Wearing Apparel, Laundry 8.03 16190 - Sewing Machine Operator 10.96 16220 - Tailor 11.70 16250 - Washer, Machine 8.79 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .