AMENDMENT NO. 0004 Rehabilitation and Painting Tainter Gates W912BV-09-R-1010 Fall River Dam, Kansas
AMENDMENT OF SOLICITATION
1. CONTRACT ID
CODE
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE
DATE
8 May 2009
4. REQUISITION/PURCHASE REQ. NO.
N/A
5. PROJECT NO. (if applicable) N/A
6. ISSUED BY CODE 7. ADMINISTERED BY (if other than Item 6)
CODE
DISTRICT ENGINEER
TULSA DISTRICT, CORPS OF ENGINEERS
1645 SOUTH 101ST EAST AVENUE
TULSA, OK 74128-4609
N/A
9A. AMENDMENT OF SOLICITATION NO.
W912BV-09-R-1010
9B. DATED (SEE ITEM 11)
23 March 2009
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A.
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE FACILITY CODE
10B. DATED (SEE ITEM 11)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
The Proposal Due Date is hereby changed to 22 May 2009, 4:00 p.m. local time
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning __1____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required) N/A
N/A 13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _________ copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
SEE ATTACHED CONTINUATION SHEET.
NOTE: IN THIS AMENDMENT “SOLICITATION NO.”, “OFFER”, AND “OFFEROR” MEAN “INVITATION NO.”, “BID”, AND “BIDDER”, RESPECTIVELY Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
N/A
(Signature of Contracting Officer)
16C. DATE SIGNED
NSN 7540-01-162-8070 30-105-02 STANDARD FORM 30 (REV. 10-8)
PREVIOUS EDITION UNUSABLE Prescribed by GSA
AMENDMENT 0004
RFP No. W912BV-09-1010
REHABILITATION AND PAINTING TAINTER GATES
FALL RIVER DAM, KANSAS
The proposal documents are revised as follows:
PROPOSAL REQUIREMENTS, CONTRACT FORMS,
AND CONDITIONS OF THE CONTRACT
Section 00700: Delete Section 00700 in its entirety. Replace with attached Section 00700.
INTITAL TASK ORDER
Page 4 of 24 Addition to Clauses: Change “SECTION 00800” in the title beginning “THE FOLLOWING PARAGRAPHS…” to read “SECTION 00100.”
SECTION 01 27 00: Delete the following title of SECTION 01 27 00 of the Initial Task Order, Rehabilitation and Painting Tainter Gates, dated April 2009:
MEASUREMENT AND PAYMENT FOR INITIAL TASK ORDER
PAINT TAINTER GATE #1 AT
Replace with the following title:
MEASUREMENT AND PAYMENT FOR INITIAL TASK ORDER
REHABILITATION AND PAINTING TAINTER GATES AT
ADDITIONAL INFORMATION
Display the American Recovery and Reinvestment emblem on the project bulletin board (see attached guidance).
The Primary Emblem should not be displayed at a size less than 6 inches in diameter.
A ZIP file containing high resolution images of the emblem may be downloaded from http://www.recovery.gov/?q=content/president-and-vice-president-unveil-new-recovery-emblem-download-available
00700-1 W912BV-09-R-1010
SECTION 00700
CONTRACT CLAUSES
CLAUSES INCORPORATED BY REFERENCE
1. 52.202-1 Definitions JUL 2004
2. 52.203-3 Gratuities APR 1984
3. 52.203-5 Covenant Against Contingent Fees APR 1984
4. 52.203-6 Restrictions On Subcontractor Sales To The Government
SEP 2006
5. 52.203-7 Anti-Kickback Procedures JUL 1995
6. 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity JAN 1997
7. 52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity
JAN 1997
8. 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions SEP 2007
9. 52.204-4 Printed or Copied Double-Sided on Recycled Paper AUG 2000
10. 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
SEP 2006
11. 52.211-18 Variation in Estimated Quantity APR 1984
12. 52.215-2 Audit and Records--Negotiation JUN 1999
13. 52.215-11 Price Reduction for Defective Cost or Pricing Data--
Modifications OCT 1997
14. 52.215-12 Subcontractor Cost or Pricing Data OCT 1997
15. 52.215-13 Subcontractor Cost or Pricing Data--Modifications OCT 1997
16. 52.215-15 Pension Adjustments and Asset Reversions OCT 2004
17. 52.215-19 Notification of Ownership Changes OCT 1997
18. 52.215-21 Requirements for Cost or Pricing Data or Information Other Than Cost or Pricing Data--Modifications OCT 1997
19. 52.219-8 Utilization of Small Business Concerns MAY 2004
20. 52.219-9 Small Business Subcontracting Plan APR 2008
21. 52.219-14 Limitations On Subcontracting DEC 1996
22. 52.219-16 Liquidated Damages-Subcontracting Plan JAN 1999
23. 52.219-25 Small Disadvantaged Business Participation Program--
Disadvantaged Status and Reporting APR 2008
24. 52.222-3 Convict Labor JUN 2003
25. 52.222-4 Contract Work Hours and Safety Standards Act - Overtime Compensation JUL 2005
00700-2 W912BV-09-R-1010
26. 52.222-6 Davis Bacon Act JUL 2005
27. 52.222-7 Withholding of Funds FEB 1988
28. 52.222-8 Payrolls and Basic Records FEB 1988
29. 52.222-9 Apprentices and Trainees JUL 2005
30. 52.222-10 Compliance with Copeland Act Requirements FEB 1988
31. 52.222-11 Subcontracts (Labor Standards) JUL 2005
32. 52.222-12 Contract Termination-Debarment FEB 1988
33. 52.222-13 Compliance with Davis-Bacon and Related Act Regulations
FEB 1988
34. 52.222-14 Disputes Concerning Labor Standards FEB 1988
35. 52.222-15 Certification of Eligibility FEB 1988
36. 52.222-21 Prohibition Of Segregated Facilities FEB 1999
37. 52.222-26 Equal Opportunity MAR 2007
38. 52.222-27 Affirmative Action Compliance Requirements for Construction
FEB 1999
39. 52.222-35 Equal Opportunity For Special Disabled Veterans, Veterans of the Vietnam Era, and Other Eligible Veterans SEP 2006
40. 52.222-36 Affirmative Action For Workers With Disabilities JUN 1998
41. 52.222-37 Employment Reports On Special Disabled Veterans, Veterans of
The Vietnam Era, and Other Eligible Veterans SEP 2006
42. 52.222-38 Compliance With Veterans' Employment Reporting Requirements
DEC 2001
43. 52.222-50 Combating Trafficking in Persons FEB 2009
44. 52.223-5 Pollution Prevention and Right-to-Know Information AUG 2003
45. 52.223-6 Drug-Free Workplace MAY 2001
46. 52.223-14 Toxic Chemical Release Reporting AUG 2003
47. 52.227-1 Authorization and Consent DEC 2007
48. 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement DEC 2007
49. 52.227-4 Patent Indemnity-Construction Contracts DEC 2007
50. 52.228-2 Additional Bond Security OCT 1997
51. 52.228-5 Insurance - Work On A Government Installation JAN 1997
52. 52.228-11 Pledges Of Assets FEB 1992
53. 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
54. 52.229-3 Federal, State And Local Taxes APR 2003
55. 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002
00700-3 W912BV-09-R-1010
56. 52.232-17 Interest OCT 2008
57. 52.232-18 Availability Of Funds APR 1984
58. 52.232-23 Assignment Of Claims JAN 1986
59. 52.232-27 Prompt Payment for Construction Contracts OCT 2008
60. 52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration OCT 2003
61. 52.233-1 Disputes JUL 2002
62. 52.233-3 Protest After Award AUG 1996
63. 52.236-2 Differing Site Conditions APR 1984
64. 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984
65. 52.236-5 Material and Workmanship APR 1984
66. 52.236-6 Superintendence by the Contractor APR 1984
67. 52.236-7 Permits and Responsibilities NOV 1991
68. 52.236-8 Other Contracts APR 1984
69. 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements APR 1984
70. 52.236-10 Operations and Storage Areas APR 1984
71. 52.236-11 Use and Possession Prior to Completion APR 1984
72. 52.236-12 Cleaning Up APR 1984
73. 52.236-13 Accident Prevention NOV 1991
74. 52.236-15 Schedules for Construction Contracts APR 1984
75. 52.236-21 Specifications and Drawings for Construction FEB 1997
76. 52.236-26 Preconstruction Conference FEB 1995
77. 52.242-13 Bankruptcy JUL 1995
78. 52.242-14 Suspension of Work APR 1984
79. 52.243-4 Changes JUN 2007
80. 52.244-5 Competition In Subcontracting DEC 1996
81. 52.246-12 Inspection of Construction AUG 1996
82. 52.247-34 F.O.B. Destination NOV 1991
83. 52.248-3 Value Engineering-Construction SEP 2006
84. 52.249-2 Termination For Convenience Of The Government (Fixed-Price)
MAY 2004
85. 52.249-10 Default (Fixed-Price Construction) APR 1984
86. 52.253-1 Computer Generated Forms JAN 1991
00700-4 W912BV-09-R-1010
87. 252.201-7000 Contracting Officer's Representative DEC 1991
88. 252.203-7000 Requirements Relating to Compensation of Former DoD Officials
JAN 2009
89. 252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense-
Contract-Related Felonies DEC 2008
90. 252.203-7002 Requirement to Inform Employees of Whistleblower Rights
JAN 2009
91. 252.204-7003 Control Of Government Personnel Work Product APR 1992
92. 252.209-7001 Disclosure of Ownership or Control by the Government of a
Terrorist Country JAN 2009
93. 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By The Government of a Terrorist Country DEC 2006
94. 252.215-7000 Pricing Adjustments DEC 1991
95. 252.219-7004 Small Business Subcontracting Plan (Test Program) AUG 2008
96. 252.223-7004 Drug Free Work Force SEP 1988
97. 252.225-7012 Preference For Certain Domestic Commodities DEC 2008
98. 252.226-7001 Utilization of Indian Organizations and Indian-Owned Economic
Enterprises, and Native Hawaiian Small Business Concerns
SEP 2004
99. 252.227-7022 Government Rights (Unlimited) MAR 1979
100. 252.227-7033 Rights in Shop Drawings APR 1966
101. 252.231-7000 Supplemental Cost Principles DEC 1991
102. 252.236-7000 Modification Proposals-Price Breakdown DEC 1991
103. 252.236-7006 Cost Limitation JAN 1997
104. 252.236-7008 Contract Prices-Bidding Schedules DEC 1991
105. 252.236-7013 Requirement for Competition Opportunity for American Steel
Producers, Fabricators, and Manufacturers JAN 2009
106. 252.243-7001 Pricing Of Contract Modifications DEC 1991
107. 252.243-7002 Requests for Equitable Adjustment MAR 1998
108. 252.246-7000 Material Inspection And Receiving Report MAR 2008
109. 252.247-7023 Transportation of Supplies by Sea MAY 2002
110. 252.247-7024 Notification Of Transportation Of Supplies By Sea MAR 2000
CLAUSES INCORPORATED BY FULL TEXT
111. 52.225-9 BUY AMERICAN ACT-CONSTRUCTION MATERIALS (FEB 2009)
(a) Definitions. As used in this clause--
Commercially available off-the-shelf (COTS) item-
00700-5 W912BV-09-R-1010
(1) Means any item of supply (including construction material) that is--
(i) A commercial item (as defined in paragraph (1) of the definition at
FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 (46 U.S.C. App. 1702), such as agricultural products and petroleum products.
Component means an article, material, or supply incorporated directly into a construction material.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means--
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means--
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if--
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components.
Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a-10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The
00700-6 W912BV-09-R-1010
Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to the construction material or components listed by the Government as follows: none.
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that
(i) The cost of domestic construction material would be unreasonable.
The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including--
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
00700-7 W912BV-09-R-1010
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure
Quantity Price (dollars)+
Item 1:
Foreign construction material Domestic construction material Item 2:
Foreign construction material Domestic construction material
List name, address, telephone number, and contact for suppliers surveyed.
Attach copy of response; if oral, attach summary. Include other applicable supporting information.
+Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
(End of clause)
112. 52.231-5000 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE MAR 1995
-- EFARS
(a) This clause does not apply to terminations. See 52.249-5000, Basis for Settlement of Proposals and FAR Part 49.
(b) Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of EP 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region VI. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
(c) Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
(d) When actual equipment costs are proposed and the total amount of the pricing action exceeds the small purchase threshold, the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet.
(End of clause)
00700-8 W912BV-09-R-1010
113. 52.244-2 SUBCONTRACTS (JUN 2007)
(a) Definitions. As used in this clause--
Approved purchasing system means a Contractor's purchasing system that has been reviewed and approved in accordance with Part 44 of the Federal Acquisition Regulation (FAR).
Consent to subcontract means the Contracting Officer's written consent for the Contractor to enter into a particular subcontract.
Subcontract means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.
purchase orders.
(b) When this clause is included in a fixed-price type contract, consent to subcontract is required only on unpriced contract actions (including unpriced modifications or unpriced delivery orders), and only if required in accordance with paragraph (c) or (d) of this clause.
(c) If the Contractor does not have an approved purchasing system, consent to subcontract is required for any subcontract that-
(1) Is of the cost-reimbursement, time-and-materials, or labor-hour type;
or
(2) Is fixed-price and exceeds-
(i) For a contract awarded by the Department of Defense, the Coast Guard, or the National Aeronautics and Space Administration, the greater of the simplified acquisition threshold or 5 percent of the total estimated cost of the contract; or
(ii) For a contract awarded by a civilian agency other than the Coast Guard and the National Aeronautics and Space Administration, either the simplified acquisition threshold or 5 percent of the total estimated cost of the contract.
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts: N/A.
(e)(1) The Contractor shall notify the Contracting Officer reasonably in advance of placing any subcontract or modification thereof for which consent is required under paragraph (b), (c), or (d) of this clause, including the following information:
(i) A description of the supplies or services to be subcontracted.
(ii) Identification of the type of subcontract to be used.
(iii) Identification of the proposed subcontractor.
(iv) The proposed subcontract price.
(v) The subcontractor's current, complete, and accurate cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions.
(vi) The subcontractor's Disclosure Statement or Certificate relating to Cost Accounting Standards when such data are required by other provisions of this contract.
00700-9 W912BV-09-R-1010
(vii) A negotiation memorandum reflecting-
(A) The principal elements of the subcontract price negotiations;
(B) The most significant considerations controlling establishment of initial or revised prices;
(C) The reason cost or pricing data were or were not required;
(D) The extent, if any, to which the Contractor did not rely on the subcontractor's cost or pricing data in determining the price objective and in negotiating the final price;
(E) The extent to which it was recognized in the negotiation that the subcontractor's cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;
(F) The reasons for any significant difference between the Contractor's price objective and the price negotiated; and
(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.
(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract for which consent is not required under paragraph (c), (d), or (e) of this clause.
(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to any subcontract nor approval of the Contractor's purchasing system shall constitute a determination-
(1) Of the acceptability of any subcontract terms or conditions;
(2) Of the allowability of any cost under this contract; or
(3) To relieve the Contractor of any responsibility for performing this contract.
(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a-percentage-of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the fee limitations in FAR 15.404-4(c)(4)(i).
(h) The Contractor shall give the Contracting Officer immediate written notice of any action or suit filed and prompt notice of any claim made against the Contractor by any subcontractor or vendor that, in the opinion of the Contractor, may result in litigation related in any way to this contract, with respect to which the Contractor may be entitled to reimbursement from the Government.
(i) The Government reserves the right to review the Contractor's purchasing system as set forth in FAR Subpart 44.3.
(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:
00700-10Revised by AM 0004
114. 52.203-15 WHISTLEBLOWER PROTECTIONS UNDER THE AMERICAN RECOVERY AND
REINVESTMENT ACT OF 2009 (MAR 2009)
(a) The Contractor shall post notice of employees rights and remedies for whistleblower protections provided under section 1553 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5).
(b) The Contractor shall include the substance of this clause including this paragraph (b) in all subcontracts.
(End of clause)
115. 52.225-22 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER
MANUFACTURED GOODS-BUY AMERICAN ACT-CONSTRUCTION MATERIALS
(MAR 2009)
(a) Definitions. "Construction material," "domestic construction material," "foreign construction material," "manufactured construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Other Manufactured Goods-Buy American Act-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-21).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-21 in the request. If an offeror has not requested a determination regarding the inapplicability of 1605 of the Recovery Act or the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract-
(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and (ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.
(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-21, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
00700-11Revised by AM 0004
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-21 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-21 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations. (End of provision)
116. 52.225-23 REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER MANUFACTURED
GOODS-BUY AMERICAN ACT-CONSTRUCTION MATERIALS UNDER TRADE
AGREEMENTS (MAR 2009)
(a) Definitions. As used in this clause-
Construction material means an article, material, or supply brought to the construction site by the Contractor or subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Domestic construction material means-
(1) An unmanufactured construction material mined or produced in the United States; or
(2) A construction material manufactured in the United States.
Foreign construction material means a construction material other than a domestic construction material.
Free trade agreement (FTA) country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of an FTA country;
or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in an FTA country into a new and different construction material distinct from the materials from which it was transformed.
Least developed country construction material means a construction material that-
00700-12Revised by AM 0004
(1) Is wholly the growth, product, or manufacture of a least developed country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a least developed country into a new and different construction material distinct from the materials from which it was transformed.
Manufactured construction material means any construction material that is not unmanufactured construction material.
Recovery Act designated country means any of the following countries:
(1) A World Trade Organization Government Procurement Agreement (WTO GPA) country (Aruba, Austria, Belgium, Bulgaria, Canada, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, or United Kingdom);
(2) A Free Trade Agreement country (FTA)(Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, Israel, Mexico, Morocco, Nicaragua, Oman, Peru, or Singapore); or
(3) A least developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan, Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros, Democratic Republic of Congo, Djibouti, East Timor, Equatorial Guinea, Eritrea, Ethiopia, Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia, Madagascar, Malawi, Maldives, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa, Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, Tanzania, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia).
Recovery Act designated country construction material means a construction material that is a WTO GPA country construction material, an FTA country construction material, or a least developed country construction material.
Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements.
United States means the 50 States, the District of Columbia, and outlying areas.
Unmanufactured construction material means raw material brought to the construction site for incorporation into the building or work that has not been-
(1) Processed into a specific form and shape; or
(2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials.
WTO GPA country construction material means a construction material that-
(1) Is wholly the growth, product, or manufacture of a WTO GPA country; or
(2) In the case of a construction material that consists in whole or in part of materials from another country, has been substantially transformed in a WTO GPA country into a new and different construction material distinct from the materials from which it was transformed.
00700-13Revised by AM 0004
(b) Construction materials. (1) The restrictions of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) and the Buy American Act (41 U.S.C. 10a -lOd) do not apply to Recovery Act designated country construction material. Consistent with U.S.
obligations under international agreements, this clause implements-
(i) Section 1605 of the Recovery Act by requiring, unless an exception applies, that all iron, steel, and other manufactured goods used as construction material in the project are produced in the United States;
and
(ii) The Buy American Act by providing a preference for unmanufactured domestic construction material.
(2) The Contractor shall use only domestic or Recovery Act designated country construction material in performing this contract, except as provided in paragraphs (b)(3) and (b)(4) of this clause.
(3) The requirement in paragraph (b)(2) of this clause does not apply to the construction materials or components listed by the Government as follows: none
(4) The Contracting Officer may add other construction material to the list in paragraph (b)(3) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) The cost of domestic iron, steel, or other manufactured goods used as construction material is unreasonable when the cumulative cost of such material will increase the overall cost of the contract by more than 25 percent;
(B) The cost of unmanufactured construction material is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or
(iii) The application of the restriction of section 1605 of the Recovery Act or the Buy American Act to a particular construction material would be inconsistent with the public interest.
(c) Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act.
(l)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(4) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Cost;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
00700-14Revised by AM 0004
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(4) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph (d) of this clause.
(iii) The cost of construction material shall include all delivery costs to the construction site and any applicable duty.
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to section 1605 of the Recovery Act or the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable cost of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(4)(i) of this clause.
(3) Unless the Government determines that an exception to the section 1605 of the Recovery Act or the Buy American Act applies, use of foreign construction material other than that covered by trade agreements is noncompliant with the applicable Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of Measure
Quantity Price (dollars)+
Item 1:
Foreign construction material Domestic construction material Item 2:
Foreign construction material Domestic construction material
List name, address, telephone number, and contact for suppliers surveyed.
Attach copy of response; if oral, attach summary. Include other applicable supporting information.
+Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
00700-15Revised by AM 0004
117. 52.225-24 NOTICE OF REQUIRED USE OF AMERICAN IRON, STEEL, AND OTHER
MANUFACTURED GOODS-BUY AMERICAN ACT-CONSTRUCTION MATERIALS
UNDER TRADE AGREEMENTS (MAR 2009)
(a) Definitions.
"Construction material," "domestic construction material," "foreign construction material," "manufactured construction material," "Recovery Act designated country construction material," "steel," and "unmanufactured construction material," as used in this provision, are defined in the clause of this solicitation entitled "Required Use of Iron, Steel, and Other Manufactured Goods-Buy American Act- Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-23).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of section 1605 of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111-5) (Recovery Act) or the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-23 in the request.
If an offeror has not requested a determination regarding the inapplicability of section 1605 of the Recovery Act or the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) If the Government determines that an exception based on unreasonable cost of domestic construction material applies, the Government will evaluate an offer requesting exception to the requirements of section 1605 of the Recovery Act or the Buy American Act by adding to the offered price of the contract-
(i) 25 percent of the offered price of the contract, if foreign iron, steel, or other manufactured goods are used as construction material based on unreasonable cost of comparable manufactured domestic construction material; and
(ii) 6 percent of the cost of foreign unmanufactured construction material included in the offer based on unreasonable cost of comparable domestic unmanufactured construction material.
(2) If two or more offers are equal in price, the Contracting Officer will give preference to an offer that does not include foreign construction material excepted at the request of the offeror on the basis of unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, other than Recovery Act designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-23, the offeror also may submit an alternate offer based on use of equivalent domestic or Recovery Act designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer and a separate cost comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-23 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
00700-16Revised by AM 0004
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-23 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or Recovery Act designated country construction material, and the offeror shall be required to furnish such domestic or Recovery Act designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or (ii) May be accepted if revised during negotiations.
(End of provision)
118. 52.204-11 AMERICAN RECOVERY AND REINVESTMENT ACT-REPORTING REQUIREMENTS
(MAR 2009)
(a) Definitions. As used in this clause—
Contract, as defined in FAR 2.101, means a mutually binding legal relationship obligating the seller to furnish the supplies or services (including construction) and the buyer to pay for them. It includes all types of commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. In addition to bilateral instruments, contracts include (but are not limited to) awards and notices of awards; job orders or task letters issued under basic ordering agreements; letter contracts; orders, such as purchase orders, under which the contract becomes effective by written acceptance or performance; and bilateral contract modifications. Contracts do not include grants and cooperative agreements covered by 31 U.S.C. 6301, et seg. For discussion of various types of contracts, see FAR Part 16.
First-tier subcontract means a subcontract awarded directly by a Federal Government prime contractor whose contract is funded by the Recovery Act.
Jobs created means an estimate of those new positions created and filled, or previously existing unfilled positions that are filled, as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
Jobs retained means an estimate of those previously existing filled positions that are retained as a result of funding by the American Recovery and Reinvestment Act of 2009 (Recovery Act). This definition covers only prime contractor positions established in the United States and outlying areas (see definition in FAR 2.101). The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full-time schedule, as defined by the contractor. For instance, two full-time employees and one part-time employee working half days would be reported as 2.5 FTE in each calendar quarter.
Total compensation means the cash and noncash dollar value earned by the executive during the contractor's past fiscal year of the following (for more information see 17 CFR 229.402(c)(2)):
(1) Salary and bonus.
(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with
00700-17Revised by AM 0004 respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) ( FAS 123R), Shared Based Payments.
(3) Earnings for services under non-equity incentive plans. Does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.
(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.
(5) Above-market earnings on deferred compensation which is not tax-qualified.
(6) Other compensation. For example, severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property if the value for the executive exceeds $10,000.
(b) This contract requires the contractor to provide products and/or services that are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act). Section 1512(c) of the Recovery Act requires each contractor to report on its use of Recovery Act funds under this contract.
These reports will be made available to the public.
(c) Reports from contractors for all work funded, in whole or in part, by the Recovery Act, and for which an invoice is submitted prior to June 30, 2009, are due no later than July 10, 2009. Thereafter, reports shall be submitted no later than the 10th day after the end of each calendar quarter.
(d) The Contractor shall report the following information, using the online reporting tool available at www.FederalReporting.gov.
(1) The Government contract and order number, as applicable.
(2) The amount of Recovery Act funds invoiced by the contractor for the reporting period. A cumulative amount from all the reports submitted for this action will be maintained by the government's on-line reporting tool.
(3) A list of all significant services performed or supplies delivered, including construction, for which the contractor invoiced in this calendar quarter.
(4) Program or project title, if any.
(5) A description of the overall purpose and expected outcomes or results of the contract, including significant deliverables and, if appropriate, associated units of measure.
(6) An assessment of the contractor's progress towards the completion of the overall purpose and expected outcomes or results of the contract (Le., not started, less than 50 percent completed, completed 50 percent or more, or fully completed). This covers the contract (or portion thereof) funded by the Recovery Act.
(7) A narrative description of the employment impact of work funded by the Recovery Act.