12-T-0014 Amendment 3.pdf

PDF 6 MB Posted

Attached to
Soil Vapor Extraction and Monitor Well Installation at Lipari Landfill Superfund Site
Solicitation number
W912BU-T-0014
Issued by

About this file

Amendment 3 Changes to SOW (entire document included with changes in red) Table 1 and 2 corrections Correct date on Synopsis (due date 27 February 2012 2PM EST) Added site maps Photo of booted well Questions and Answers form site visit HASP documents

View the file

Other files

File Type Posted
12-T-0014 Amend 0002.pdf PDF
12-T-0014 Amend 0001.pdf PDF
Solicitation 12-T-0014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W25PHS13570560

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Answ er Questions.

Correct date due on synopsis. 27 February 2012 Changes to the SOW (included) in Red on document.

Table 1 and Table 2 corrections - included Site Map Photo of Booted Well Questions and Answ ers from site visit HASP Documents

1. CONTRACT ID CODE PAGE OF PAGES

J 1 44

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Feb-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-12-T-0014

X 9B. DATED (SEE ITEM 11)

30-Jan-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Feb-2012

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU-12-T-0014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

SOW

SCOPE OF WORK

SOIL VAPOR EXTRACTION WELL AND MONITOR WELL INSTALLATION

LIPARI LANDFILL SUPERFUND SITE

Mantua Township, Gloucester County, New Jersey

INDEX

SECTION 1 TECHNICAL SCOPE

PART 1 GENERAL

PART 2 PRODUCTS

PART 3 EXECUTION

SECTION 2 SPECIAL CONTRACT REQUIREMENTS

SECTION 3 PERIOD OF PERFORMANCE

SECTION 4 CONTRACT BID SUBMITTAL FORM

SECTION 5 ATTACHMENTS

SECTION 1 TECHNICAL SCOPE

PART 1 GENERAL

1.1 PROJECT OVERVIEW

The U.S. Army Corps of Engineers (USACE), Philadelphia District, has been tasked with providing support to U.S. Environmental Agency (USEPA) Region 2 during on-site remediation activity at the Lipari Landfill Superfund Site (Lipari) located on Route 322 in Mantua Township, Gloucester County, New Jersey. Included in the remedial activities at the Lipari site is a slurry wall surrounding a major portion of the landfill, as well as a soil vapor extraction (SVE) system to collect landfill gas.

USACE Philadelphia District is in the process of expanding a portion of the slurry wall to encompass additional landfill materials that are presently outside of the slurry wall. As part of this construction work, USACE will need to perform borings and install additional SVE wells and monitor wells at Lipari. The location of the site is shown on Figure 1.

This work will require the services of a drilling Contractor to drill borings, collect continuous core barrel soil samples using sonic drilling techniques, and install wells. The drilling Contractor is required to perform all work in accordance with the procedures and schedules approved by the government. All pilot borings and well installation, as well as all other work items in this contract shall be performed in accordance with all local, State/NJDEP, and Federal regulations and guidance. The prime contractor must have a representative on site whenever field work of any type is being performed under this contract.

The Contractor shall provide qualified personnel to complete the following major work items under the base contract:

Install 7 soil vapor extraction wells Install 2 single cased monitor wells

Three options are also included in this contract. These options, if exercised, would require the Contractor to complete the following major work items:

Option A - Install 2 single cased monitor wells Option B – Install 1 double cased monitor well Option C – Install 1 additional double cased monitor well

The work under this contract consists of furnishing all plant, labor, materials, supplies, and accessories required to accomplish the pilot borings, obtain the required soil samples and install the monitoring wells, together with all other operations incidental to the work, which shall be performed in strict accordance with these specifications and the applicable plans and drawings, subject to the terms and conditions of the contract. The drillers shall have a copy of these specifications with them on the site at all times and shall be familiar with the applicable provisions of the specifications governing the contract work.

Drilling and installation of all wells in this contract (7 SVE wells and up to 6 monitor wells) will be performed using sonic drilling techniques with soil samples collected directly from the sonic casing during drilling.

Soil core barrel samples will be collected continuously in all borings for both SVE wells and monitor wells and the recovered soil samples will be transferred directly to USACE representatives for identification and processing. The soil samples obtained from the sonic borings will be produced by the driller in polyethylene tubes and properly sealed and labeled before transfer to the on-site USACE representative. These soil core samples will be used to determine the type, nature, and characteristics of the subsurface materials encountered and the extent and conditions of the various materials as they exist to the depths and at the locations specified.

Cuttings from the borings and well installations shall be placed in 55-gallon drums provided by the drilling Contractor and sealed with secure lids overnight and when not in use. The drums will be transported by the Contractor to a designated rolloff container within the landfill site for subsequent disposal.

1.1.1 Base Contract

As part of this contract package, USACE will provide a set of site drawings, including design and construction details of the SVE and monitor wells and other related items. These drawings are included by reference into this contract and will be required in order to effectively complete the work in the base contract as well as the optional contract work items. USACE will physically mark and label the locations of all SVE and monitor wells to be installed at the work site in this contract, including all optional wells.

At all of the SVE well locations, USACE expects that landfill materials will be encountered. Based on previous experience, these materials include trash items such as newspaper, plastic sheets, bottle caps, tree stumps, etc.

These materials are expected to be contaminated with solvents as well.

USACE does not expect that trash, wood, or other trash materials will be encountered at the monitor well locations outside of the slurry wall. At these locations no contamination is expected.

SVE Wells

The Contractor shall install seven SVE wells including drilling, casing, well screen, filter packing, grouting, development, and incidental related work complete and ready for operation. Note: Connection of the SVE wells to the SVE system piping will be performed by others.

Each SVE well, including materials, installation, and performance, shall be in accordance with local, State, and Federal regulations, ASTM D 5092, and EPA-4-89—034 except as modified herein.

The project area for SVE well installation is a 360-foot section of the Rabbit Run area located at the north end of the site. Table 1 contains a summary of the SVE wells to be installed. Figure 1 shows a site plan view and the locations of these SVE wells.

Prior to the initiation of installation of each of the SVE wells to be installed inside the slurry wall in the Rabbit Run area, the Contractor will carefully excavate an access pit in the proposed well location down to the landfill cap membrane level, approximately 2 to 2.5 feet below the ground surface. This membrane consists of either a 40-mil black HDPE liner or a geosynthetic clay liner (GCL). In order to prevent harming the landfill liner with an excavator or backhoe, the Contractor shall employ hand digging when the excavation is within 6 inches of the landfill liner. Note: SVE wells C-74 and C-76 will require a larger excavation area at the liner due to the presence of a horizontal drainage pipe attachment that will be installed as part of these wells, as discussed below.

The Contractor will install temporary wood shoring with areal dimensions of approximately 3 feet X 3 feet in this excavation to prevent excavated soil from falling back into the exposed work area. The Contractor shall then cut a suitably sized hole in the exposed landfill cap HDPE membrane or GCL prior to drilling to permit the drilling and well installation operations to proceed without damaging the landfill cap. The Contractor shall not use the drill rig to cut a hole in the liner. The Contractor will also construct a wooden platform over each well location to cover the open area excavated down to the landfill cap liner. SVE wells C-74 and C-76 will likely require a larger wooden shoring structure to allow the installation of the horizontal drainage pipe attachment, discussed below.

Each SVE well shall be of 304 stainless steel construction and will be installed as described in Part 2 and in Figure M-4. Additionally, Table 1 contains a summary of the SVE wells to be installed under the base contract.

Each of the seven SVE wells shall be finished to the extent that the well casing will extend 2 feet above ground and will be left cut square. This will leave the SVE wells ready for future attachment of connections/fittings to be performed by others. Following the completion of the work in this scope, the wood shoring will be left in place. Note: for SVE wells C-74 and C-76, the drilling contractor shall install a 304 Stainless steel horizontal 2-foot long, 2-inch diameter draininag pipe at a depth of 28 inches bgs (see Drawing M-4). This pipe shall extend out perpendicularly from the 4-inch diameter well riser. The horizontal drain pipe shall terminate with a 2-inch flange attachment (CL-150, RF-WN, 304 SS).

All SVE wells will be grouted and completed up to 2 feet above ground surface. All SVE wells will have filter pack up to 2 feet above the top of the screen, with a 2-foot layer of bentonite seal above the filter pack.

Above the bentonite seal will be grouted up to a level of 1 foot above ground surface. A section of Sonotube will be placed in the borehole to allow the grout to be added to this height. The 4-inch diameter riser pipe will extend 2 feet above ground surface.

No concrete slabs shall be required for the SVE wells.

Following the installation of the SVE wells, the wood shoring structures shall remain in place to allow others to perform the liner seal, booting, and completion of the wells.

Monitor Wells

Two single cased monitor wells (C-100 and C-101) shall be installed in the Rabbit Run area, in the Cohansey aquifer at a depth of approximately 30 feet.

Both monitor wells will be single cased 4-inch diameter PVC and be screened from 20 to 30 feet bgs. Each monitor well will be a stickup type monitor well, and have a protective steel cover with locking cap. These 2 Cohansey monitor wells will be located adjacent to the point where the new slurry wall is tied in at its south end to the original slurry wall. One of these monitor wells (C-100) will be located inside the new slurry wall section near its tie-in with the original slurry wall, while the other well will be located outside the slurry wall (C-101). These 2 monitor wells will be installed directly across from each other on either side of the slurry wall.

Table 2 contains a summary of the monitor wells to be installed, including those contained in the Options. Note: The Contractor shall collect a total of 2 Hydropunch groundwater samples while installing these or other wells in this scope of work. USACE will determine which wells and at what depth the Hydropunch samples shall be collected.

C-100: Prior to the initiation of installation of monitor well C-100, the Contractor will excavate at the proposed well location down to the landfill cap membrane level, which is located approximately 2 to 2.5 feet below the surface. The Contractor will install temporary wood shoring with areal dimensions of approximately 3 feet X 3 feet in this excavation to prevent excavated soil from falling back into the exposed work area. The Contractor shall then cut a suitably sized hole in the membrane prior to drilling to permit the drilling and well installation operations to proceed. The drilling Contractor will also construct a wooden platform over each well location to cover the open area excavated down to the landfill cap liner.

The drilling Contractor shall complete MW C-100 within the excavated area, including placing the protective cover with locking cap and grouting it to its final level, i.e., grouting the well riser and protective cover in place.

The protective cover must be placed 3 feet bgs in the ground so that it penetrates through the landfill liner.

No concrete slab or protective bollards shall be required for MW C-100. C- 100 shall also be painted fluorescent orange.

Following the installation and grouting of MW C-100, the wood shoring structure shall remain in place to allow others to perform the liner seal and booting of the well.

C-101: Monitor well C-101 will be located outside of the slurry wall and landfill liner so no special considerations are needed for installation, i.e., no pre-excavation, shoring, etc. is required.

C-101 shall be set in a square concrete pad having a minimum 4-inch thickness and measuring 3 feet x 3 feet in area. The four bollards shall be painted fluorescent orange and installed at each corner of the concrete pad that the monitor well shall be set in. C-101 shall also be painted fluorescent orange.

1.1.2 Contract Options

Option A – Install 2 single cased monitor wells

These two optional single cased monitor wells (C-102 and C-103), if installed, will be screened in the Cohansey aquifer at the Rabbit Run area in a similar manner as the 2 single cased Cohansey wells in the base contract, at another location along the new slurry wall section. C-102 and C-103 will located inside and outside of the slurry wall, respectively. Both monitor wells will be single cased 4-inch diameter PVC and be screened from 20 to 30 feet bgs. Each monitor well will be a stickup type monitor well, and have a protective steel cover with locking cap. Table 2 contains a summary of the monitor wells to be installed, including those contained in the Options.

C-102: Prior to the initiation of installation of monitor well C-102, the Contractor will excavate in the proposed well location down to the landfill cap membrane level, which is located approximately 2 feet below the surface.

The Contractor will install temporary wood shoring with areal dimensions of approximately 3 feet X 3 feet to prevent excavated soil from falling back into the exposed work area. The Contractor shall then cut a suitably sized hole in the membrane prior to drilling to permit the drilling and well installation operations to proceed. The Contractor will also construct a wooden platform over each well location to cover the open area excavated down to the landfill cap liner.

The drilling Contractor shall complete MW C-102 within the excavated area, including placing the protective cover with locking cap and grouting it to its final level, i.e., grouting the well riser and protective cover in place.

The protective cover must be placed 3 feet bgs in the ground so that it penetrates through the landfill liner.

No concrete slab or protective bollards shall be required for MW C-102. MW C-102 shall also be painted fluorescent orange.

Following the installation and grouting of MW C-102, the wood shoring structure shall remain in place to allow others to perform the liner seal and booting of the well.

C-103: Monitor well C-103 will be located outside of the slurry wall and landfill liner so no special considerations are needed for installation, i.e., no pre-excavation, shoring, etc is required.

C-103 shall be set in a square concrete pad having a minimum 4-inch thickness and measuring 3 feet x 3 feet in area. The bollards shall be painted fluorescent orange and installed at each corner of the concrete pad that the monitor well shall be set in. C-103 shall also be painted fluorescent orange.

Option B – Install 1 double cased monitor well

This double cased monitor well (V-8), if installed, will be screened in the Vincentown aquifer. MW V-8 will be located in the driveway next to the water treatment plant area (see Figure 1). This double cased monitor well will be constructed using a 8-inch steel outer casing which will be set at a depth of approximately 47-50 feet bgs and placed a minimum of 2 feet into a confining layer (Kirkwood Formation, expected to be encountered approximately 43 feet bgs in this area). The inner casing will consist of 4-inch PVC, which will be screened from approximately 115 to 120 feet bgs. This monitor well will be a flush mount type well due to its location in a paved area. Data for this monitor well is also summarized in Table 2.

Following installation of the outer casing for monitor well V-8, the Contractor shall fill the outer casing to the top with water and allow it to sit undisturbed overnight to verify that the water level does not change, i.e., that the outer casing has no leakage.

Option C – Install 1 additional double cased monitor well

This double cased monitor well (V-9), if installed, will be screened in the Vincentown aquifer. MW V-9 will be located at the eastern edge of the Lipari site (see Figure 1 for location). This double cased monitor well will be constructed in a similar manner as the double cased monitor well V-8 described in Option B. The outer casing shall be set at a depth of approximately 33 feet bgs and placed a minimum of 2 feet into the Kirkwood confining layer. See Table 2 for monitor well data.

Following installation of the outer casing for MW V-9, the Contractor shall fill the outer casing to the top with water and allow it to sit undisturbed overnight to verify that the water level does not change, i.e., that the outer casing has no leakage.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. The latest versions of these documents shall be utilized.

ASTM INTERNATIONAL (ASTM)

ASTM D 6914 Standard Practice for Sonic Drilling for Site

Characterization and the Installation of Subsurface Monitoring Devices.

ASTM A 312/A 312M Seamless, Welded, and Heavily Cold Worked Austenitic

Stainless Steel Pipes

ASTM C 136 Sieve Analysis of Fine and Coarse Aggregates

ASTM C 150 Portland Cement

ASTM C 387 Packaged, Dry, Combined Materials for Mortar and Concrete

ASTM D 1586 (1999) Penetration Test and Split-Barrel Sampling of Soils

ASTM D 1587 Thin-Walled Tube Sampling of Soils for Geotechnical

Purposes

ASTM D 1785 Poly Vinyl Chloride (PVC) Plastic Pipe, Schedules 40, 80, and 120

ASTM D 2487 Classification of Soils for Engineering Purposes (Unified

Soil Classification System)

ASTM D 2488 Description and Identification of Soils (Visual-Manual

Procedure)

ASTM D 3550 Thick Wall, Ring-Lined, Split barrel, Drive Sampling of

Soils

ASTM D 4750 Determining Subsurface Liquid Levels in a

Borehole or Monitoring Well (Observation Well)

ASTM D 5088 Decontamination of Field Equipment Used at Waste

Sites

ASTM D 5092 Design and Installation of Ground Water Monitoring

Wells in Aquifers

ASTM D 5092 Design and Installation of Ground Water Monitoring Wells in

Aquifers

ASTM D 5521 Development of Ground-Water Monitoring Wells in Granular

Aquifers

ASTM D 6151 Using Hollow Stem Augers for Geotechnical Exploration and

Soil Sampling.

ASTM F 480 Thermoplastic Well Casing Pipe and Couplings Made in

Standard Dimension Ratios (SDR), SCH 40 and SCH 80

NSF INTERNATIONAL (NSF)

NSF 14 Plastics Piping System Components and Related Materials

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 and 29 CFR 1926 (Occupational Safety and Health Administration

(OSHA) standards)

49 CFR 172 Hazardous Materials Table, Special Provisions, Hazardous

Materials Communications, Emergency Response Information, and Training Requirements

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (Latest Revision) Safety and Health Requirements Manual

NEW JERSEY ADMINISTRATIVE CODE

N.J.A.C. 7.9D-Chapter 9D; Well Construction, Maintenance and Sealing of

Abandoned Wells

AMERICAN WATER WORKS ASSOCIATION

ANSI/AWWA A100-90 AWWA Standards for Water Wells

1.3 DEFINITIONS

1.3.1 Drive Sample Borings and Sampling

A drive sample boring is a boring made through unconsolidated or partly consolidated sediments by means of a mechanically driven sampler. The purpose of this type of boring is to obtain knowledge of the composition, the thickness, the depth, the sequence, the structure, and the pertinent physical and chemical properties of subsurface materials present. The boring will also determine the location of the groundwater table, if encountered.

1.3.2 Sample Borings and Sampling

In this contract, the Contractor shall be required to collect and provide core barrel soil samples from sonic drilling at each boring location. The core barrel soil samples shall be encased or wrapped in tubular polyethylene or poly sheeting to permit easier handling of the sample as well as maintain the soil sample in a relatively undisturbed condition. This will allow inspection and evaluation of subsurface conditions.

USACE will have a sample processing/logging area established near the drilling work area. The driller shall bring the poly wrapped core barrel soil samples to this area for inspection/logging by USACE personnel.

1.3.3 Sonic Borings and Sampling

A sonic boring is a boring advanced through unconsolidated or partly consolidated sediments by means of a hydraulically advanced vibratory driven casing, which also serves as the sampler. Like the drive sample boring, the purpose of this type of boring is to obtain knowledge of the composition, the thickness, the depth, the sequence, the structure, and the pertinent physical and chemical properties of subsurface materials present. The boring will also determine the location of the groundwater table, if encountered. The sonic drill rig is more precisely identified as a rotary-vibratory drill. The sonic drill head must contain the mechanism necessary for rotary motion, as well as an oscillator, which causes a high frequency force to be superimposed on the drill string. The drill bit is physically vibrating up and down in addition to being pushed down and rotated. The frequency can be varied to suit operating conditions and is generally between 50 and 120 hertz. Core barrel samples are obtained in long continuous lengths ranging from 5 to 20-feet long, which are removed from the sonic drive casing after it is extracted from the ground. Sonic drilling shall be performed in accordance with these specifications, and as directed by the Contracting Officer.

1.4 BID REQUIREMENTS

As part of the bid package, the primary Contractor firm shall include the items listed below. These items will be used to assess the qualifications of the bidders.

The primary Contractor firm shall have a minimum of 10 years of well installation experience, including 5 years experience using sonic methods.

The Contractor's staff shall also have appropriate health and safety personnel as specified herein.

a. The Contractor shall be able to provide a qualified New Jersey-licensed Well Driller experienced in drilling and monitoring well installation operations to oversee all field operations. This individual shall be responsible for the preparation of field logs and well installation reports and records and associated data for each boring/well. This individual shall be responsible for the acquisition and transfer of all samples for delivery to the USACE representative.

b. The well driller/installer must have a current well driller’s license from the State of New Jersey, with a minimum 5 years of experience using sonic methods, installing the types of wells required for this project. The well driller/installer shall actively participate in the securing of well permits and be present on-site during the performance of all well drilling and well installation operations.

c. The Contractor will provide qualified personnel to conduct and support the required tasks. All field personnel shall participate in a Yearly Medical Monitoring Program and have completed a 40-Hour OSHA Hazardous Waste Operations and Emergency Response (HAZWOPER) training program and have completed current annual eight-hour refresher training.

d. The Contractor shall be registered with the Central Contractor Registration (CCR) Program.

e. The pilot borings will be converted to permanent wells in accordance with this specification. If due to Contractor error, the pilot boring hole is not, or can not be used for the permanent well, the test hole shall be abandoned as specified by NJDEP regulations.

f. The Contractor shall provide documentation containing examples of projects similar in scope and complexity, completed within the past 5 years, using sonic drilling methods required in this contract.

g. The contractor shall own, and be able to provide, and mobilize, equipment suitable for safely performing the work and installing all of the SVE and monitor wells in this contract under the field conditions experienced.

h. The USACE geologist will be responsible for sample classification and the driller shall prepare a driller’s field log for each boring performed.

i. The presence of a Government representative or the keeping of separate drilling records by the Contracting Officer or representative shall not relieve the Contractor of the responsibility for the work specified in this specification.

1.5 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only or as otherwise designated. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government (e.g.

CO=Contracting Office, DO=Design Office, etc.).

NOTE: Any submittals classified as "SD-01 Preconstruction Submittals" require approval prior to mobilization to the contract work site. All other submittals classified as "SD-02" or higher require approval prior to commencing the particular task to which the submittal is associated. The following shall be submitted as specified:

SD-01 Preconstruction Submittals

Drilling, Soil Sampling, and Well Installation Plan: G; CO, DO

Prior to starting work, the Contractor shall submit a plan and schedule for drilling, well installation and safety. The plan shall include, but shall not be limited to, the proposed method of drilling and soil sampling including a description of the equipment and sampling tools that will be used and a description of all methods and procedures that will be utilized to insure a safe operation and to protect the environment. A description of the proposed well installation procedures to be utilized should also be included in this submittal.

The following information shall also be incorporated into the Contractor's Drilling, Soil Sampling, and Well Installation Plan and followed in the field. The plan shall include, but shall not be limited to, a discussion of the following:

a. Description of proposed equipment and methods for drilling pilot borings and obtaining continuous samples.

b. Description of well drilling methods, and installation procedures, including any temporary casing if planned to be used, placement of filter pack, bentonite and grout seals, etc.

c. Descriptions of the procedures to be followed to avoid vapor hazards and verification that the onsite health and safety plans will be followed during the drilling and well installation operations.

d. Description of well construction materials, including well screen, riser pipe, centralizers, air line and gauge, tailpiece (if used), filter pack and filter pack gradation, bentonite or drilling mud, drilling fluid additives (if used), drilling water, cement, and well protection measures.

e. Description of quality control procedures to be used for placement of filter pack and seals in wells, including method of depth measurements.

f. Sample forms to be used for written installation diagrams of wells, state well registration forms, and all related well records.

g. Description of contamination prevention methods and well materials and equipment decontamination procedures.

h. List of personnel assignments for this project, and personnel qualifications.

This submittal shall also include a statement of the prior experience in the type of work described in these specifications. No work shall be performed until this plan has been approved and no deviation from the approved plan will be permitted without prior approval by the Contracting Officer.

Implementation Schedule: G; CO, DO

A schedule of implementation for all work specified herein shall be submitted. The schedule shall address all key elements of the work and provide a start and finish date for each element. At a minimum, the implementation schedule shall address the following items:

a. Mobilization

b. Set up for Drilling

c. Pilot Boring Drilling and Core Barrel Sampling

d. Well Installation

e. Well Completion and Cleanup

f. Demobilization and Close-Out Report

Permits, Certifications, and Licenses: G; CO, DO

The Contractor shall comply with all Federal, State and local laws, regulations and ordinances relating to the performance of this work. The Contractor shall, at his own expense, procure all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work. Copies of all such documents, including copies of the drilling Contractor personnel’s drilling licenses, verification of medical monitoring of field personnel, copies of certification and verification that all personnel that will be on the project site have completed 40-Hour Hazwoper Training and have completed a current 8-Hour refresher, shall be submitted and approved by the Contracting Officer (CO) prior to starting work.

Copies of the NJDEP Well Permit Application shall be submitted to USACE at the same time it is submitted to the State of New Jersey, and copies of the approved Well Drilling Permits shall be submitted to USACE immediately upon receipt by the Contractor prior to starting work.

The Contractor shall provide verification that they are registered with the Central Contractor Registration (CCR) Program [http://www.ccr.gov].

A written verification that these requirements have been fulfilled must be submitted to the Contracting Officer.

Driller Qualifications: G; CO, DO

A verification statement shall be submitted that certifies that the proposed driller will be cognizant of the requirements of these specifications, present on-site during all drilling activities and has at least 5 years of experience drilling borings and installing monitoring wells similar to those planned for this project.

Accident Prevention Plan: G; CO

The Contractor shall submit an Accident Prevention Plan at least two days prior to mobilization to the site and participate in an on-site safety meeting and equipment inspection upon mobilization. The Contractor shall perform all site work in accordance with the USACE Operations and Maintenance Contractor site-specific Health and Safety Plan.

SD-02 Drilling Data Submittals

Drilling Log: G; CO, DO

The Contractor shall submit complete, legible copies of the driller’s Field Boring Logs and drilling records to the USACE throughout the drilling operation within 24 hours after each well boring has been completed.

Soil Samples: G; CO, DO

Poly-wrapped core barrel soil samples recovered from the well borings are to be provided to the USACE representative on site immediately upon boring completion. Due to the potential of contamination being present in the material, the soil samples shall not be removed from the Lipari Landfill Site.

SD-03 SVE and Monitoring Well Data Submittals

Well Construction Materials: G, CO, DO

A detailed description, literature and certified test data, if available, shall be submitted for each different material proposed for use in the construction of the wells. Submit catalog data for monitoring well screens (to include the screen slot size), casing, riser pipe, filter pack material, bentonite, cement, centralizers, surface protective covers, concrete, locking caps and locks for review. Catalog data shall include any information, written or otherwise, supplied by the manufacturers or suppliers of the above listed items.

SVE and Monitoring Well Records: G; CO, DO

Copies of all SVE well and monitoring well records that will be submitted to NJDEP upon completion of the well installation operations shall be submitted to USACE within two weeks of the completion of the well installation. Copies of any correspondence from NJDEP related to the well installation and well record submittal (including any verification of submittal, violation notice or approval letters) shall also be submitted to USACE upon receipt by the Contractor.

Installation Diagrams (As-built Drawing): G, CO, DO

Well Construction Diagrams presenting each well’s construction details, including a complete description of all material utilized and quantities incorporated into the new well’s construction, shall be submitted to USACE within two weeks of the completion of the well installation.

1.6 CARE AND DELIVERY OF CORE BARREL SAMPLES

1.6.1 General

The Contractor shall be solely responsible for preserving all core barrel soil samples in good condition until submittal to USACE. Samples shall be kept from freezing and from undue exposure to the weather. Except as otherwise specified, the Contractor shall transfer the samples directly to the USACE on-site representative immediately upon completion of each well’s boring.

1.7 ENVIRONMENTAL and HEALTH AND SAFETY CONDITIONS AND REQUIREMENTS

Because the Lipari Landfill is currently a Superfund Site that the USACE, in conjunction with the United States Environmental Protection Agency (USEPA), is in the process of remediating, there is a potential that some contamination will be encountered during the drilling and well installation operations.

The contamination in the soil and groundwater may include volatile and semi-volatile organic compounds, chlorinated solvents, heavy metals, hydrocarbons and other contaminants, which may be encountered during the drilling operations.

All drilling and well installation work will be performed by personnel that participate in a Yearly Medical Monitoring Program and have completed a 40- Hour Hazwoper Training and current yearly refresher training, as discussed above.

USACE expects that the following PPE levels will be required for the site work:

SVE wells in Rabbit Run – Level C Single cased monitor well(s) inside of slurry wall in Rabbit Run –

Level C Single cased monitor well(s) outside of slurry wall in Rabbit Run –

Level D Double cased monitor well in Vincentown – Level D

The proposed drilling and SVE/monitor well construction work to be performed in the Rabbit Run area of the Lipari landfill is expected to encounter contamination, with the exception of monitor wells installed outside the slurry wall. This area of the site contains buried trash, including chemical contamination by solvents and other materials. The drilling and well installation work in this area shall be performed using Level C PPE. In this area all work operations shall be monitored on a full time basis by personnel to be provided by USACE. Installation of monitor wells outside the slurry wall shall be done using level D PPE.

The proposed drilling and Vincentown monitor well installation work adjacent to the plant building and at the eastern edge of the Lipari site is not expected to encounter contamination. Therefore, this work shall be performed using Level ”D” health and safety protection, with the operations monitored on a full-time basis by an Environmental Technician that will be provided by the USACE. The drilling Contractor shall be prepared to upgrade to Level “C” protection, if required.

In order to prevent and to provide for abatement and control of any environmental pollution arising from Contractor activities in the performance of this contract, the Contractor shall comply with all applicable Federal, State, and local laws, regulations, and ordinances concerning environmental pollution control and abatement. This includes, but is not limited to the following:

a. The Contractor shall be responsible for keeping informed of all updates and changes in all applicable laws, regulations, and ordinances.

b. The Contractor shall not pollute lakes, ditches, rivers, springs, canals, waterways, groundwater, or reservoirs with drill fluids, fuels, oils, bitumen, calcium chloride, insecticides, herbicides, or other materials that may be harmful to the environment or a detriment to outdoor recreation.

c. All drilling and sampling equipment shall arrive on the site having been previously cleaned and decontaminated. The equipment must also be decontaminated between each well location and at the completion of the project prior to leaving the site. The decontamination operations will be performed at the on-site decontamination pad adjacent to the treatment plant on the site. Water is available at the decontamination pad for the Contractor to use in cleaning and decontaminating the drilling equipment. The drilling Contractor will be required to provide a pressure-washer, or steam cleaner to facilitate the cleaning operations.

1.8 BORING/WELL LOCATIONS AND ACCESSIBILITY

The actual locations will be established and marked in the field by the USACE prior to the start of work. The elevations of the established and marked out locations will also be obtained by the Contracting Officer. The Contractor will provide access to the locations as necessary for the performance of the work. Since no separate payment will be made for access construction, all costs associated with accessing the drilling locations shall be included in the cost of setup, drilling and well installation.

It is possible that all drilling locations in the Rabbit Run area will only be accessible using track or ATV-mounted drilling equipment. The drilling location in the area of the Lipari water treatment plant (near the location of monitor well V-8) is expected to be accessible to truck-mounted drilling equipment, since this consists of a paved parking lot. The drilling location for V-9 near the eastern part of the Lipari site is on a hilly area and will require a vehicle/equipment able to go up a moderately sloped grassy area.

Wood and fiberglass mats have been used in the past to access soft, wet surface areas in certain portions of the site. It is possible that the sonic drill rig and support truck may not be able to be set up back to back, due to local space and/or topography conditions, depending on the location of each boring. The Contractor is advised to visit and inspect the proposed drilling areas to determine the optimum equipment to use in these areas.

1.9 SEQUENCING AND SCHEDULING

1.9.1 Schedule of Drilling and Well Installation

Drilling, sampling and well installation shall be performed in accordance with the following boring/well schedule of drilling footage:

Contract Section

Well Type Wells Depth (ft) Total Footage (ft)

C-70 22 C-71 22 C-72 20 C-73 18 C-74 20 C-75 16

SVE

C-76 20

C-100 30

Base Contract

Monitor C-101 30

C-102 30 Option A Monitor C-103 30

Option B Monitor V-8 120 120 Option C Monitor V-9 120 120

1.9.2 Order of Drilling Work

Under the base contract, the seven SVE wells will be installed in the Rabbit Run area first, followed by the two single cased monitor wells in the Rabbit Run area. Monitor wells to be installed under Options A, B and C will be scheduled if and when these options are exercised.

1.10 DELIVERY, STORAGE, AND HANDLING OF MATERIALS

Monitoring well components and associated materials shall be stored and maintained on-site in a clean, uncontaminated condition throughout the course of the project. The on-site O&M Contractor will provide a location on the site to store materials upon delivery and provide a staging area for the well installation operations. The designated storage area must be restored to its original condition by the drilling Contractor upon completion of the work and demobilization from the site.

1.11 GOVERNMENT FURNISHED EQUIPMENT

It will not be necessary for the Government to furnish any equipment directly for this project. The Government, through the on-site O&M Contractor will provide the necessary support services to complete the well installations.

These support services are described in Section ON-SITE O&M CONTRACTOR below.

1.12 SITE VISIT

Contractors are strongly advised to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. The Government Point-of Contact and on-site O&M Contractor will set up and coordinate this site visit.

In no event shall failure to inspect the site constitute grounds for a claim after contract award.

This site visit can be conducted at the time of the pre-bid meeting discussed in the following section of these specifications.

1.13 PRE-BID MEETING

All potential Contractors are encouraged to attend a pre-bid meeting, which will be held at the site. This meeting will ensure that all Contractors understand the scope of work required and provide the potential Contractors with the opportunity to examine the proposed well locations and evaluate any potential access problems. All interested Contractors are required to contact Daniel M. Sirkis the Government Point-of-Contact at 215-656-6666 within one week of the date of issuance of this request for proposal to determine the date, time and directions for this pre-bid meeting.

1.14 PERMITS, CERTIFICATIONS, AND LICENSES

The Contractor shall comply with all Federal, State and local laws, regulations and ordinances relating to the performance of this work. The Contractor shall procure all required permits, certifications and licenses required by Federal, State, and local law for the execution of this work.

The driller(s) shall be licensed Well Driller(s) in the State of New Jersey, with at least 5 years of experience drilling and installing the types of monitoring wells that are being utilized for this project.

Submittal of the required permits, certifications, and licenses are delineated in the SUBMITTALS section of these specifications.

1.15 NOTIFICATION OF COMMEMCEMENT OF WORK

The Contractor shall notify the Government Point-of-Contact and on-site O&M Contractor no less than five (5) working days prior to the commencement of the drilling operations.

1.16 GOVERNMENT POINT-OF-CONTACT

United States Army Corps of Engineers Daniel M. Sirkis, P.G.

CENAP-EC-DG

TELEPHONE (215) 656-6666

FAX (215) 656-6797

EMAIL Daniel.m.sirkis@usace.army.mil

1.17 ON-SITE O&M CONTRACTOR

Sevenson Environmental Services, Incorporated Lipari Landfill 743 Mullica Hill Road Glassboro, NJ 08062

The on-site O&M Contractor will provide limited support during the drilling and well installation operations. Sevenson will provide access into the landfill site for support services, including use of the decontamination pad, provision of potable and decontamination wash water, restroom facilities, Health & Safety support and security for the drilling equipment when brought into the landfill site in the evenings and on weekends. Sevenson will also provide disposal of the drill cuttings and waste generated by the drilling operations, which the Contractor has to place in approved 55-gallon drums.

The Contractor shall be required to provide 55-gallon drums with lids for storage of cuttings and drilling IDW. All drums containing cuttings and other IDW must be securely covered overnight or when not in use. The Contractor shall transport the filled drums or other containers to the location of the on-site roll-off container provided by Sevenson and empty the drums into the roll-off. The Contractor shall remove the drums from the Lipari site at the completion of the job.

PART 2 PRODUCTS

2.1 EQUIPMENT

All equipment shall be maintained in good and safe operating condition. Any equipment, which is unsatisfactory or unsafe, in the opinion of the Contracting Officer, shall be immediately replaced or repaired. The drill rig shall be free from leaks of fuel, hydraulic fluid, and oil which may contaminate the borehole, ground surface or drill tools.

2.1.1 Pilot Boring Equipment

The sonic borings will be advanced using a 4-inch pilot casing to obtain continuous core barrel soil samples. However, installation of the SVE wells and monitor wells will require the Contractor to widen the borings to accommodate the wells to be installed, in accordance with NJDEP regulations.

Therefore, the original SVE well pilot borings shall be enlarged to a diameter of at least 10 inches using a larger sonic casing in order to install the wells and the filter pack required for these wells. The monitor well pilot borings for the Cohansey monitor wells (C-100, C-101, C-102, and C-103) shall be enlarged to a diameter of at least 8 inches, while those for the Vincentown monitor wells (V-8 and V-9) shall be enlarged to a diameter of at least 10 inches.

Tables 1 and 2 contain well information for both the SVE wells and monitor wells.

Core barrel soil samples obtained from the pilot borings will be extracted from the sampling equipment on site and taken to a designated Soil Sample Processing area that will be assembled by USACE adjacent to the each drilling location.

2.1.2 Soil Sample Processing Area

The Contractor will provide a work table to be used by USACE at the Soil Sample Processing location which is capable of holding the soil samples until they are retrieved and processed by the USACE representative. The table shall consist of a 4-foot x 8-foot plywood surface with legs. Two 8-foot sections of 8-inch diameter PVC pipe shall be cut in half lengthwise. Each of the resulting 4 half-pipes shall be bolted to the table top, along its long axis, parallel to each other. These half-pipes will be used to hold the soil cores during logging and processing.

The Contractor shall mark each end of the poly-wrapped core barrel soil samples with the corresponding depths from which it was collected. A portable canopy will be provided in this area by the on-site O&M Contractor, if needed. This canopy will provide shade and help to prevent precipitation from disturbing the soil samples during examination and processing.

2.1.3 Drilling Equipment for Wells

The sonic drill rig must be capable of drilling the required diameter boreholes for the SVE wells to maximum depths of up to approximately 22 feet bgs. For the four single cased monitor wells (including the 2 optional wells), a borehole depth of approximately 30 feet bgs will be required. For the double cased monitor wells, a borehole depth of approximately 120 feet bgs will be required. The Contractor will be required to have the drill rig available for inspection prior to beginning any work. A U.S. government representative will inspect the equipment to verify its condition, capability and operation of all required safety features.

2.1.4 Pumping and Bailing Equipment

All bailers and pumps necessary to complete the work shall be furnished by the Contractor and decontaminated prior to use.

2.2 SAMPLE CONTAINERS

Soil samples obtained from the sonic borings will be placed in polyethylene tubes for submittal to the USACE representative.

2.2.1 Sonic Drilling Sampling Tubes

Soil core barrel samples obtained from the sonic borings will be placed in polyethylene tubes that are sealed at one end to serve as sample holding bags to store and transport the samples after recovery.