Bid_Abstract_-_Solicitation_W912BU26BA031 Ko signed.pdf

PDF 501 KB Posted

Attached to
99th Program Stormwater Sampling
Solicitation number
W912BU26BA031
Issued by

About this file

This is an Abstract of Bids for a Firm-Fixed-Price federal contract solicitation issued by the U.S. Army Corps of Engineers (USACE), Philadelphia District. Solicitation number W912BU26BA031 covers the Stormwater Compliance Project Sampling and Monitoring for the 99th Readiness Division, with bids opened on July 27, 2026, at 3:30 PM EDT.

The contract includes one base task and four optional tasks. Task 1 (CLIN 0001), the base work, requires stormwater sampling services valued between $57,593.00 and $306,452.00 depending on bidder. The optional tasks include a hydraulic survey at NY116 (Task 2), hydrojet/vac services at NY023 (Task 3), PFAS sampling for Region 1 (Task 4), and PFAS drinking water sampling (Task 5), with individual option prices ranging from $2,348.15 to $203,669.68. Three vendors submitted bids: SaLUT (Soil & Land Use) with a total evaluated bid of $95,313.00, Mabbett & Associates, Inc. (SDVOSB) with $163,450.00, and KOMAN Eco Services, LLC (8(a)/ANC) with $339,353.04. SaLUT was designated the apparent low bidder and ranked first, while all three bidders passed compliance review. The contract was set aside for small business (100% set-aside), and all evaluated pricing includes the base requirement plus all optional tasks per FAR 52.217-5. Contracting Officer Williams certified the abstract on July 27, 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF BIDS (FAR PART 14)

Solicitation Number: W912BU26BA031

Project Title: Stormwater Compliance Project Sampling and Monitoring (99th Readiness Division)

Issuing Office: U.S. Army Corps of Engineers (USACE), Philadelphia District

(W912BU)

Date & Time of Bid Opening: July 27, 2026, at 3:30 PM EDT

Contract Type: Firm-Fixed-Price (FFP)

BID SCHEDULE ABSTRACT

Item / CLIN Description Qty Unit SaLUT (Soil & Land Use)

Mabbett & Associates, Inc.

KOMAN Eco Services, LLC

Independent Government Estimate

Task 1

(CLIN 0001)

Stormwater Sampling (Base Work)

1 Job $57,593.00 $78,950.00 $135,683.37 $306,452.00

Task 2

(CLIN 0002)

Option 1:

Hydraulic Survey at

NY116

1 Job $7,700.00 $25,500.00 $66,945.10 $72,074.37

Task 3

(CLIN 0003)

Option 2:

Hydrojet/Vac at NY023

1 EA $14,760.00 $37,750.00 $127,279.46 $16,000.00

Task 4

(CLIN 0004)

Option 3:

PFAS

Sampling (Region 1)

1 EA $12,100.00 $17,750.00 $7,096.97 $44,880.00

Task 5 (CLIN 0005)

Option 4:

PFAS

Drinking Water

1 EA $3,160.00 $3,500.00 $2,348.15 $11,807.50

Values represent the Firm-Fixed-Price bid for each scheduled line item.

EVALUATION SUMMARY & RANKINGS

Pursuant to FAR 52.217-5 (Evaluation of Options), evaluated prices include the base requirement plus all options.

Metric / Criteria SaLUT Mabbett & Associates

KOMAN Eco Services

Base Bid Only $57,593.00 $78,950.00 $135,683.37

Total Evaluated Bid $95,313.00 $163,450.00 $339,353.04

Socio-Economic Set- Aside Status

Small Business (100% Set-Aside)

SDVOSB 8(a) / ANC

Compliance Review Complete & Responsive

Complete & Responsive

Complete & Responsive

Final Evaluated Ranking 1st (Apparent Low Bidder)

2nd 3rd

(Muddy Creek)

SUBTOTAL Sum of Evaluated Options (Tasks 2–5)

$37,720.00 $84,500.00 $203,669.68 $144,761.87

TOTAL

EVALUATED

PRICE

Base (Task

1) + All Options (Tasks 1–5)

$95,313.00 $163,450.00 $339,353.05 451,213.87

Government Certification:

I hereby certify that this is a true and accurate abstract of the electronic bids received and opened in response to the subject solicitation at the designated date and time.

Contracting Officer: ____________________________

Date of Certification: _________________

2026-07-27T16:20:30-0400
WILLIAMS.CHERITA.L.1108163697

File details come from the government source that posted it. Updated .