Amendment 0001.pdf

PDF 211 KB Posted

Attached to
Chain Link Fence Installation Federal contract opportunity
Solicitation number
W912BU25R0009
Issued by
Department of the Army Corps of Engineers Engineering District Philadeplhia

About this file

This is Amendment 0001 to solicitation W912BU25R0009 issued by the U.S. Army Corps of Engineers Philadelphia District. The amendment provides responses to RFIs and extends the proposal due date from December 11, 2024 at 12:00 PM to December 12, 2024 at 4:00 PM.

Key clarifications from the RFI responses include: no drawings are available for the fence layout but a site visit was conducted; concrete for fence posts should be 3000 PSI (correcting a typo that stated 300 PSI); the fence is for the compound area, not the operating tower; the fence terminates in 6 different spots and has two 90-degree turns; budgetary information cannot be disclosed; and post holes must be 3ft below existing asphalt with diameter four times the post OD (except cantilever gate posts which require 3.5ft depth and 16" minimum diameter).

View the file

Other files for this federal contract opportunity

Other files attached to Chain Link Fence Installation, newest first.
File Type Posted
Fully Executed Solicitation-W912BU25R0009.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0001 is hereby issued for the follow ings:

1) Respond to RFIs.

2) Extend the proposal due date from 11 December 2024 at 12pm to 12 December 2024 at 4pm.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU25R0009

X 9B. DATED (SEE ITEM 11)

27-Nov-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION

NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Dec-2024

CODE

U.S. ARMY CORPS OF ENGINEER - PHILA

1650 ARCH STREET

PHILADELPHIA PA 19103

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU25R0009

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI RESPONSES

1. I am interested in bidding this project and was wondering if there are any drawings showing where the fence would be located as I need to know how many ends and corners to accurately estimate my materials and labor.

A. There are no drawings available. A site visit was conducted.

2. We are highly interested in submitting a proposal for this subject project. Can you please extend the bid due date to give our company more time to prepare this proposal for this solicitation?

A. The RFP due date has been extended.

3. Section 3.4 of the Performance Requirements states:

4 All posts shall be set in 300PSI concrete. The hole for all fence posts with the exception of the cantilever gate posts, shall be a minimum of 3ft below existing asphalt with a diameter four times the size of the OD of the post. The cantilever gate posts shall be set at a minimum of 3.5ft below the asphalt with a minimum diameter of 16". All existing posts with asphalt over concrete foundation are to be cut to grade, parged, and coated with an asphalt sealer acceptable to the authorized representative of the contracting officer.

Our question - Should the post be set in 3000 PSI as opposed to the stated 300 PSI?

A. Yes, 3000PSI is correct. This was a typo.

4. What is the magnitude of construction range for this project?

A. Budgetary information can not be disclosed.

5. Would it be possible to provide a layout drawing for the location where this is to be installed?

I reviewed the site on Google Maps and noticed that the only existing fence appears to be on the pier above the dam, extending over the water.

If this is indeed the intended location, we’ll need additional details to proceed effectively.

Specifically:

1. How should this be anchored?

2. What elements, if any, need to be removed, considering the current railing present on most of the pier?

A. No drawings are available for this project. N/A. This is for the compound fence, not the fence on the operating tower.

W912BU25R0009

6. Is it possible to have a lay-out of the fence showing corners and gate placement uploaded in Sam.gov?

A. See answer for question 1.

7. Do you have a diagram or pic of the layout for the fence?

A. See answer for question 1

8. Is there a budget for this project? If so, what is it?

A. See answer for question 4.

9. How many times does the fence stop and turn?

A. It terminates 6 different spots and two 90-degrees.

(End of Summary of Changes)