This is Amendment 0003 to solicitation W912BU25B0016 for Chesapeake and Delaware Canal Maintenance Dredging, issued by the US Army Corps of Engineers Philadelphia District on December 5, 2024. The amendment provides answers to remaining RFI questions without changing the bid closing date.

Key details from the Q&A include: contractors may use two unloaders working concurrently at the Pearce Creek Disposal Area; pipeline laying is permitted on the bay bottom outside federal navigation channels; ship traffic may cause temporary work suspensions; the Notice to Proceed will be issued after contract award and receipt of performance bond; the period of performance is 120 days with work to be completed by June 30 and dredging only permitted between October 1 and March 31; minor debris removal should be included in dredging rates while excessive debris would be considered a differing site condition. The amendment specifies that acceptance sections were previously provided in Amendment 0001 and any changes to the environmental window timing will be addressed post-award.

View the file

Other files

File Type Posted
Bid Abstract-W912BU25B0016-C and D Maintenance.pdf PDF
Amendment 0001 Specs----.pdf PDF
Amendment 0001----.pdf PDF
Amendment 0002.pdf PDF
W912BU25B0016---Specs---.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU25B0016

X 9B. DATED (SEE ITEM 11)

29-Oct-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this amendment is to address the remaining RFI questions. The bid closing date remains unchanged. Please indicate receipt of this amendment on the Standard Form 1442, Solicitation, Offer, and Award as Amendment 0003. Failure to acknowledge all amendments may be cause for rejection of the bid. With this amendment, this solicitation is considered to be clear.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION

NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE

DATE

05 Dec-2024

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC: MOLLY GALLAGHER, CONTRACTING DIVISION, 1

TREET, 4TH FLOOR MAIL ROOM.

PHILADELPHIA PA 19103-2004

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

************************************THIS DOES NOT EXTEND THE BID OPENING DUE DATE***************************************

W912BU25B0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The following have been added by full text:

RFI QUESTIONS/ANSWERS PART II

RFI Questions/Answers Part II

• Q4: Will the Corps allow the Contractor to utilize (2) unloaders working concurrently at the Pearce Creek Disposal Area?

A4: The use of 2 unloaders is permissible.

• Q5: Is the contractor permitted to lay the pipeline on the bay bottom between the unloader(s) and the disposal site?

A5: Contractor is permitted to lay the pipeline on the bay bottom outside of the federal navigation channel.

• Q6: To what extent if any does ship traffic cause temporary suspensions to the dredging operation?

A6: Per the specifications section 01 30 00 D/F in the solicitation-Traffic in the work area consists of ocean going and coastwise vessels, tugs and barges, and pleasure craft.

Passing vessels may interfere with dredging operations. The Contractor is required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage.

• Q7: When does the Corps plan to issue the NTP?

A7: The NTP will be issued after the contract is awarded and performance bond is received.

• Q8: Could the government provide more information on the "covered area" and specific details on the number of Acceptance Sections, stationing of each section, channel side (red / green) for each section and approximate quantities of material in each section?

A8: Acceptance sections were provided in Amendment 0001.

• Q9: Per the specifications, “All work must be completed within 120 days. All work under this contract must be completed no later than 30 June. Dredging shall only be performed between 1 October through 31 March.” Assuming the NTP is issued mid- December, at the earliest, only 107 days of dredging will be available before the

W912BU25B0016

moratorium. Will this 120-day period of performance pause outside of the environmental window, allowing the contractor to return and utilize the remaining ~13 days if needed?

Will any extensions to the environmental window be pursued by the government, or granted by relevant agencies?

A9: The period of performance is 120 days as stated in the solicitation and Amendment 0001. Any changes will be addressed once the contract is awarded.

• Q10: Shall the Contractor include the cost to remove and dispose of debris encountered within the dredge prism in the dredging unit rate or will this be billed at a post award negotiated rate or handled by a third party USACE subcontractor?

A10: Minor debris is expected in dredging. If excessive debris is encountered, this would be considered a differing site condition. This has historically not been an issue on the project.

(End of Summary of Changes)