This document is an Abstract of Offers for a construction solicitation for the Blue Marsh Lake Paving project, Solicitation Number W912BU24B0011. The project requires demolishing and reconstructing the existing parking lot and roadway, including the removal and replacement of unstable materials, as well as painting lines on the reconstructed areas. The solicitation was issued by the U.S. Army Corps of Engineers, Philadelphia District, and 6 offers were received. The document details the unit prices and estimated amounts for various line items such as demolition, paving, and removal/replacement of unstable materials. The total base bid amounts from the offerors range from $2,072,574 to $3,215,919. The document also includes option pricing for additional work. No other details about the contract award or set-asides are provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CC.04.01 - Informal Abstract_06.17.xlsx | XLSX spreadsheet | |
| W912BU24B0011-Dwgs.pdf | ||
| W912BU24B0011-Dwgs (1).docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OFFERS
NO.: 1 NO.: 2 NO: 3 NO: 4 NO: 5 NO: 6
A. C. D. E. F. H J L N P R ITEM EST. UNIT UNIT ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED No. QUANTITY PRICE AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT AMOUNT
0001 1 JOB 497,059.00$ $497,059.00 $580,182.00 $450,123.51 542,434.87$ 702,431.00$ 646,272.65$ 691,680.00$ 0002 1 JOB 562,374.00$ $562,374.00 $518,696.00 $508,431.28 500,859.69$ 781,356.00$ 629,547.57$ 655,000.00$ 0003 400 CY 110.00$ $44,000.00 $44,000.00 $54,336.00 93,268.39$ 42,059.60$ 54,900.00$ 72,312.00$
$1,142,878.00 $1,012,890.79 1,136,562.95$ 1,525,846.60$ 1,330,720.22$ 1,418,992.00$ 0004 1 JOB 249,108.00$ $249,108.00 $192,988.00 $253,494.54 290,987.56$ 299,574.00$ 343,837.52$ 360,250.00$ 0005 200 CY 110.00$ $22,000.00 $22,000.00 $27,390.00 11,536.67$ 21,029.00$ 28,480.00$ 36,156.00$
$214,988.00 $280,884.54 302,524.23$ 320,603.00$ 372,317.52$ 396,406.00$ 0006 1 JOB 196,383.00$ $196,383.00 $116,995.00 $140,561.06 163,219.32$ 182,384.00$ 205,847.47$ 220,080.00$ 0007 100 CY 110.00$ $11,000.00 $11,000.00 $17,565.00 10,420.22$ 10,514.00$ 13,886.00$ 18,078.00$
$127,995.00 $158,126.06 173,639.54$ 192,898.00$ 219,733.47$ 238,158.00$ 0008 1 JOB 319,175.00$ $319,175.00 $160,387.00 $254,330.65 215,841.42$ 350,447.00$ 397,466.20$ 351,080.00$ 0009 300 CY 110.00$ $33,000.00 $33,000.00 $44,340.00 63,265.61$ 31,544.00$ 41,658.00$ 54,234.00$
$193,387.00 $298,670.65 279,107.03$ 381,991.00$ 439,124.20$ 405,314.00$ 0010 1 JOB 192,822.00$ $192,822.00 $113,311.00 $135,725.63 196,229.08$ 209,801.00$ 223,318.08$ 220,080.00$ 0011 200 CY 110.00$ $22,000.00 $22,000.00 $27,390.00 9,675.92$ 21,029.00$ 27,772.00$ 36,156.00$
$135,311.00 $163,115.63 205,905.00$ 230,830.00$ 251,090.08$ 256,236.00$ 0012 1 JOB 143,409.00$ $143,409.00 $84,846.00 $122,248.58 131,646.06$ 162,576.00$ 177,051.00$ 180,780.00$ 0013 100 CY 110.00$ $11,000.00 $11,000.00 $17,565.00 8,187.31$ 10,514.00$ 13,886.00$ 18,078.00$
$95,846.00 $139,813.58 139,833.37$ 173,090.00$ 190,937.00$ 198,858.00$ 0014 1 JOB 178,639.00$ $178,639.00 $104,394.00 $130,114.57 156,085.93$ 182,862.00$ 208,060.47$ 193,880.00$ 0015 200 CY 110.00$ $22,000.00 $22,000.00 $27,390.00 8,559.46$ 21,029.00$ 27,772.00$ 36,156.00$
$126,394.00 $157,504.57 164,645.39$ 203,891.00$ 235,832.47$ 230,036.00$ 0016 1 JOB 49,817.00$ $49,817.00 $30,275.00 $47,588.72 51,915.01$ 63,323.00$ 80,902.99$ 62,880.00$ 0017 50 CY 110.00$ $5,500.00 $5,500.00 $9,176.00 7,070.86$ 5,256.00$ 6,943.00$ 9,039.00$
$35,775.00 $56,764.72 58,985.87$ 68,579.00$ 87,845.99$ 71,919.00$
$2,559,286.00 $2,072,574.00 $2,267,770.54 2,461,203.38$ * Amount was incorrect total 3,097,728.60$ 3,127,600.95$ 3,215,919.00$ in bid
TOTAL OPTION 7
48.38$
TOTAL OPTION 4
131,646.06$ 81.87$
TOTAL OPTION 5
156,085.93$
42.80$
TOTAL OPTION 6
51,915.01$
TOTAL OPTION 1
163,219.32$
104.20$
TOTAL OPTION 2
215,841.42$ 210.89$
TOTAL OPTION 3
196,229.08$
141.42$
F: OFFEROR
BINARY EXCHANGE TECHNOLOGIES
19020 Peronne Drive Germantown, MD 20874
Amendments Acknowledged: Yes
Q
UNIT
PRICE
691,680.00$ 655,000.00$
180.78$
360,250.00$ 180.78$
TOTAL
220,080.00$
180.78$
TOTAL
351,080.00$ 180.78$
E. OFFEROR
BARWYS Construction LLC 30 Ridgeway Road Birdsboro, PA 19508
Amendments Acknowledged: Yes
O
UNIT
PRICE
646,272.65$ 629,547.57$
137.25$
343,837.52$ 142.40$
138.86$
TOTAL OPTION 7
TOTAL BASE BID
D. OFFEROR
Fiber Business Solutions Group DBA G Force 3019 West Germantown Pike Norristown, PA 19403
Amendments Acknowledged: Yes
M
UNIT
PRICE
702,431.00$ 781,356.00$
105.15$
299,574.00$ 105.15$
TOTAL BASE BID
TOTAL OPTION 1
182,384.00$
105.14$
TOTAL OPTION 2
350,447.00$
UNIT
PRICE
542,434.87$ 500,859.69$
233.17$
290,987.56$ 57.68$
C. OFFEROR
AACON GENERAL CONTRACTORS
304 Gaile Drive Covington, LA 70433
Amendments Acknowledged: Yes
K
TOTAL BASE BID
Grand Total
TOTAL BASE BID
TOTAL OPTION 1
TOTAL OPTION 2
TOTAL OPTION 3
TOTAL OPTION 5
TOTAL BASE BID
TOTAL OPTION 1
TOTAL OPTION 2
TOTAL OPTION 3
TOTAL OPTION 5
TOTAL BASE BID
TOTAL OPTION 1
254,330.65$
TOTAL OPTION 3
TOTAL OPTION 5
TOTAL OPTION 7 TOTAL OPTION 7 TOTAL OPTION 7
TOTAL OPTION 6 TOTAL OPTION 6 TOTAL OPTION 6
47,588.72$
Removal and Replacement of Unstable Materials 183.52$ 110.00$
ADA Accessible Crossovers 104,394.00$ 130,114.57$ Removal and Replacement of Unstable Materials 110.00$ 136.95$
Post and Rail Fence 30,275.00$
TOTAL OPTION 4 TOTAL OPTION 4 TOTAL OPTION 4
Structures Monitoring 84,846.00$ 122,248.58$ Removal and Replacement of Unstable Materials 110.00$ 175.65$
Removal and Replacement of Unstable Materials 110.00$ 147.80$
Post and Rail Fence 113,311.00$ 135,725.63$ Removal and Replacement of Unstable Materials 110.00$ 136.95$
Demolition and Reconstruction of Parking Lot E 116,995.00$ 140,561.06$ Removal and Replacement of Unstable Materials 110.00$ 175.65$
Demolition and Reconstruction of ABC Road 160,387.00$
TOTAL OPTION 2
Removal and Replacement of Unstable Materials 110.00$ 135.84$
Demolition and Reconstruction of Parking Lot D 192,988.00$ 253,494.54$ Removal and Replacement of Unstable Materials 110.00$ 136.95$
450,123.51$ 508,431.28$ Demolition and Reconstruction of Roadway(Stilling Basin 518,696.00$
DESCRIPTION OF OFFERED ITEM UNIT UNIT
PRICE PRICE
BASE BID (Visitor Center and Admin Building)
Philadelphia, PA 19103-2004
PROJECT TITLE 6
GOVERNMENT
A. OFFEROR B. OFFEROR
GAVER DBA BARKER AND BARKER LLC GORECON, INC
Blue Marsh Lake, 1268 Palisades Drive Barker and Barker Paving 3240 Bristol Road Leesport, PA 19553 910 14th Avenue Chalfont, PA 18919
Bethlehem, PA 18018-2200
Building, Room 434 recorded on this abstract all offers Date Signed
1650 Arch Street received in response to this solicitation.
NUMBER OF AMENDMENTS ISSUED Amendments Acknowledged: Yes Amendments Acknowledged: Yes
B. G I.
Demolition and Reconstruction of Roadway 580,182.00$
209,801.00$ 105.15$
TOTAL OPTION 4
162,576.00$
105.14$
TOTAL OPTION 5
182,862.00$
ABSTRACT OF OFFERS - CONSTRUCTION SOLICITATION NUMBER DATE ISSUED DATE OPENED
W912BU24B0011 18-Mar-2024
ISSUING OFFICE Name and title of Certifying Official US Army Corps of Engineers, Philadelphia, PA I CERTIFY that I have opened, read, and Cherita Williams
105.15$
TOTAL OPTION 6
63,323.00$ 105.12$
TOTAL OPTION 7
TOTAL OPTION 1
205,847.47$
138.86$
TOTAL OPTION 2
397,466.20$ 138.86$
TOTAL OPTION 3
223,318.08$
138.86$
TOTAL OPTION 4
177,051.00$ 138.86$
TOTAL OPTION 5
208,060.47$
138.86$
TOTAL OPTION 6
80,902.99$
105.15$
TOTAL OPTION 3
TOTAL
62,880.00$
180.78$
TOTAL
TOTAL BASE
TOTAL
220,080.00$
180.78$
TOTAL
180,780.00$ 180.78$