This is a solicitation for beach nourishment services along the Atlantic coast of New Jersey. The U.S. Army Corps of Engineers, Philadelphia District is seeking a firm fixed-price contract to place approximately 517,000 cubic yards of sand from offshore borrow areas onto beaches in Cape May, New Jersey. The contractor will conduct pre-placement surveys and pump sand onto two beach locations, with options to place additional quantities. Bids are due by July 6, 2023, with work to be completed by March 1, 2024. The contract is valued between $10-25 million. Prospective contractors may submit questions by June 16, and the awarded contract will contain liquidated damages provisions. The solicitation provides borrow area survey data, borrow area restrictions, and details pre-placement and post-placement survey requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 is hereby issued to provide answ ers to RFIs, provide a new Section 01 71 23 - Survey Requirements section, provide a new Contract draw ing sheet C-401, and make other minor administrative and clause revisions. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER AND AWARD) as Amendment No. 0001. Failure to acknow ledge all amendments may be cause for rejection of the bid.
**********************************THIS AMENDMENT DOES NOT EXTEND THE BID OPENING DATE*****************************
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU23B0011
X 9B. DATED (SEE ITEM 11)
02-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Jun-2023
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
1650 ARCH STREET, 4TH FLOOR (ROOM 419)
PHILADELPHIA PA 19103-2004
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU23B0011
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The Issued By organization has changed from
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION 100 SOUTH INDEPENDENCE M
2ND FLOOR
PHILADELPHIA PA 19106-3400
to
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION 1650 ARCH STREET, 4TH FL
PHILADELPHIA PA 19103-2004
The description of performance has changed from 52.210-11 to 52.211-10.
SECTION 00 72 00 - GENERAL CONDITIONS
The following have been deleted:
52.217-4 Evaluation Of Options Exercised At The Time Of Contract
Award
JUN 1988
(End of Summary of Changes)
Amendment No. 0001
W912BU23B0011
Requests for Information and Responses
1. Section 01 11 00, 1.1 Work Covered by Contract Documents state that the US Coast Guard Training Center (Area 1) is to be completed prior to mobilizing to Wilmington Ave (Area 2). Will the contract be allowed to mobilize Wilmington Ave. while they place material on to Area 1? For example: Complete beach fill placement of material on Area 1 before beach fill placement on Area 2.
Answer: Yes, the contractor will be permitted to mobilize in Area 2 while work in Area 1 is ongoing.
2. Will the contractor be allowed to remove material from any of the 5 available borrow areas of their choice without any restrictions?
Answer: No, conform with all restrictions contained in the contract documents. Specification section 35 31 00 paragraph 1.9.2 and drawing sheet
C-401 describe some of the restrictions required.
3. In regard to the Before- and After-Beachfill Surveys, in the specifications, it states "Take surveys profiles at 100-foot intervals at the locations as listed in the tables on the drawings. Survey lines for quantity surveys shall be perpendicular to the seaward edge of berm referenced to the survey baseline." Can you please clarify if the surveys shall be taken at the locations listed in the drawings or perpendicular to the edge of berm.
Answer: The intent is to take survey profiles as they appear on the Before and After Beachfill Cross Sections which are not necessarily perpendicular to the survey baseline. The specifications have been revised to clarify this requirement. See Amendment No. 0001 Paragraph 3.8.2 of Section 01 71 26.
4. Can you please provide the coordinates of the 4 corners of Borrow Area K2?
The drawings show K2 delineated from Borrow Areas K1 and K3, but no coordinates are given. See image below from the project drawings.
Answer: The coordinates for the corners of Borrow Area K2 have been added to the Borrow Area Plan. See Amendment No. 0001 Sheet C-401.
5. In the specifications it states "obtain samples of beachfill material from the finished beach at each project profile line following placement and final grading of beachfill and have them tested for grain size distribution in accordance with ASTM D422." Does project profile refer to the pre- and post-placement survey lines or the Before and After Survey lines?
Answer: This specification refers to the pre- and post-placement survey lines.
6. Clause 52.217-4 and 52.217-5 have conflicting bid evaluation. Please clarify whether the Government intends to evaluate the bids on a Total Base + Option basis or Total Base basis.
Answer: FAR 52.217-4 has been removed from the solicitation. Please see 52.217-5 in the solicitation for bid evaluation.
This page was intentionally left blank for duplex printing.
IFB W912BU23B0011
SECTION 01 71 23
SURVEY REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE OF SECTION
The work covered by this section consists of furnishing all labor, materials, plant and equipment, and performing all operations required in conducting staking and flagging, pre-placement and post-placement condition surveys, before- and after-beachfill placement surveys, and before- and after-dredging surveys of the borrow area.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 1110-2-1003 (2013) Hydrographic Surveying
EM 1110-1-1005 (2007) Engineering and Design - Control and Topographic Surveying
ER 1110-2-8164 (2017) Engineering and Design - Policies, Guidance, and Requirements for Hydrographic Surveying and Mapping Digital Products
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Qualifications; G,DO Certified Lifeguards; G,DO Surveying Procedures and Equipment; G,DO
Section 01 71 23 Page 1
SD-07 Certificates
Swimming Hazard Assessment; G,DO Location of Survey Lines; G,DO Pre-Project Survey; G,DO Pre-Placement Condition Surveys; G,DO Before-Dredging Borrow Area Surveys; G,DO After-Dredging Borrow Area Surveys; G,DO Before-Beachfill Surveys; G,DO After-Beachfill Surveys; G,DO Post-Placement Condition Surveys; G,DO Photographic Documentation of Surveys Survey Logs DGPS Positioning Metadata; G,DO
1.4 DIFFERENTIAL GLOBAL POSITIONING SYSTEM (DGPS) EQUIPMENT
The Contractor must have a differential GPS, and shall conduct his survey work in accordance with the U.S. Army Corps of Engineers Hydrographic Surveying Manual EM 1110-2-1003. Provide real time positioning and elevation of the dredge's draghead or cutterhead on a computer screen, during dredging, and have the capability of playback in 15 minute intervals. Record DGPS positioning of the dredge on a disk every 15 minutes and submit recorded dredge position data to the Contracting Officer on a daily basis. Submit maps and geospatial data specified for submission in Section 35 31 00 BEACHFILL in ESRI ArcGIS 10.x shape file format, including all components and extensions, or in a Spatial Data Standard compliant geodatabase. All real time positioning data must include northing, easting, elevation, date and time of information.
1.5 HYDROGRAPHIC SURVEYS
Conduct hydrographic surveys in accordance with USACE Performance Standards as defined in the Hydrographic Surveying Manual EM 1110-2-1003. Perform surveys using single transducer sounding techniques, multi-beam sweep type surveys or both. Obtain bottom soundings using a single beam fathometer operating at a frequency ranging from 190 to 210 Khz. When utilizing multi-beam technology, the operating frequency shall range from 180 to 250 Khz. Calibrate all fathometers in accordance with the procedures outlined in EM 1110-2-1003. Include raw data with submittals.
1.6 TOPOGRAPHIC SURVEYS
a. Perform all topographic surveys in accordance with EM 1110-1-1005.
Conduct all topographic and wading surveys utilizing real time kinematic GPS or an electronic total station with a data collector. Record a three-dimensional raw electronic position for each data point. Include raw data with submittals.
b. A minimum of 2 personnel shall be present while conducting topographic surveys in the active work zone to ensure a proper lookout for moving equipment.
1.7 SURVEYING RESTRICTIONS
1.7.1 Swimming
a. Swimming is an acceptable survey method in the surf zone for this
Section 01 71 23 Page 2 contract provided the following conditions are met:
(1) No swimmer shall enter the water if the wave heights exceeding 6 feet or any other condition or combination of conditions exist that the certified lifeguard, SSHO, COR or Survey POC deem unsafe.
(2) Two certified lifeguards (certified by the Red Cross or United States Lifesaving Association) with experience in coastal environments shall be present for all data acquisition by a swimmer. One lifeguard shall swim to acquire survey data and the other lifeguard shall serve as an observer. The survey swimmer shall enter the water with a survey rod or light survey equipment and the other swimmer (observing lifeguard) shall remain onshore, directing the survey swimmer and observing them at all times for signs of distress or danger. The standby swimmer shall be equipped for immediate entry into the water and shall move parallel to shore and maintain visible contact with the survey swimmer to ensure the shortest distance to the survey swimmer at all times.
(3) Methods "c.(1)(b)" and "c.(1)(c)" in Section 5 of ER 1110-2-8164 will not be permitted for volume computation (AD/BD) or pre-placement or post-placement surveys.
b. Submit qualifications of the certified lifeguards with experience in coastal environments to the District Safety Office, prior to commencing survey work. This shall include First Aid/CPR certifications. The certifications shall be producible to the GDA at all times.
1.7.2 Surf Zone Data Collection
In order to ensure proper data overlap and full profiles without the use of swimmers, a device may be used for the surf zone data collection such as a sea sled or CRAB. The device shall utilize direct measurement with real time kinematic GPS or an electronic total station/prism with data collector. The device will be considered a method of hydrographic surveying and will be held to the same time restraints and tolerances.
1.8 SURVEYING PROCEDURES AND EQUIPMENT
Submit all surveying procedures, methods, and equipment for topographic surveys, hydrographic surveys, and tidal monitoring, to the Government Survey Point of Contact, prior to the start of any surveying work. All survey equipment, including vessels, shall be owned or leased by an independent survey company, unless otherwise approved by the Government.
1.9 QUALIFICATIONS
Perform all surveys using an independent survey company, and all surveys (topographic, wading and hydrographic) shall be performed by the same company. Perform all topographic surveys under the direction and supervision of a Professional Licensed Surveyor with a minimum 5 years current experience in beach profiling. Conduct all hydrographic surveys under the direction and supervision of an NSPS-THSOA Certified Hydrographer, or by a Professional Licensed Surveyor with a minimum of 5 years documented experience in a hydrographic surveying environment similar in nature to the surveys required under this Contract. Surveyors shall be State of New Jersey licensed surveyors. The licensed surveyors shall be onsite a minimum of 10 percent of the onsite survey time. Submit qualifications of the independent licensed surveyor(s) for topographic and hydrographic surveying to the Government Survey Point of Contact prior to commencing any
Section 01 71 23 Page 3 survey work.
1.10 QUALITY ASSURANCE
Quality assurance will be conducted by the District Survey Office on a minimum of 10 percent of the Contractor's survey work. To accomplish this, the District survey office will either re-survey areas or observe the Contractor in conducting their surveys or inspect submitted raw and processed data.
PART 2 PRODUCTS (Not Applicable)
PART 3 EXECUTION
3.1 SWIMMING HAZARD ASSESSMENT
When swimming is required, perform a swimming hazard assessment by a minimum of the SSHO, swimmers, and the Contractor's survey supervisor.
After all are in agreement that conditions are safe, swimming surveys may be performed. Record the swimming hazard assessment and submit with the daily QC report. Include in the assessment existing water conditions, hand signals, and emergency procedures.
3.2 GENERAL SURVEY REQUIREMENTS
Conduct all surveys required to demonstrate that the construction is in compliance with the specified placement tolerances and the lines, grades, and elevations shown on the drawings. Conduct all surveys for payment purposes as specified in Contract Clause QUANTITY SURVEYS.
Submit data in the formats specified herein. Include the photographic documentation of the surveys, as specified herein.
3.2.1 Hydrographic Surveying Techniques
Survey hydrographic or offshore portions of beach profile lines using a towed sea sled, direct measurement methodologies, or hydrographic techniques with Real Time Kinematic capabilities. If a towed sea sled method is used, obtain horizontal and vertical positioning utilizing RTK/GPS capabilities to obtain orthometric heights in the required datum, NAVD88. Use the latest NGS separation model to ensure accuracy levels are met. Update rates from the GPS receiver to the data collection processor, shall be collected at a minimum interval of 5 Hz. to a maximum interval of 20 Hz, to minimize the latency error. Augment RTK data with heave information to smooth the vertical position in the post-processing of the data. Locate the GPS base station within 6.2 miles (10 km) of the hydrographic line being surveyed. Conduct topographic and hydrographic portions of the survey at tidal stages to ensure overlap is obtained.
3.2.2 Location of Survey Lines
Submit the locations of the survey lines, in .lnw and .dxf format, prior to any data collection for before- and after-dredging borrow area surveys, before- and after-sand grading surveys, and before- and after-beachfill surveys.
Section 01 71 23 Page 4
3.2.3 Vertical and Horizontal Datums
Utilize North American Vertical Datum (NAVD) 1988 Geoid 12b as the vertical datum for elevation and depth references for all surveys. Utilize New Jersey's State Plane Coordinate System (NAD 1983) as the horizontal reference datum.
3.2.4 Tolerances
Conduct topographic surveys utilizing procedures and methodology that meet or exceed accuracy tolerances of +/- 0.20 feet in the vertical and +/- 1.0 feet in the horizontal. Conduct hydrographic surveys utilizing procedures and methodology that meet or exceed accuracy tolerances of +/- 0.20 feet in the vertical and +/- 3.0 feet in the horizontal. Horizontally, keep the vessel within +/- 25 ft of the profile line. Take complete notes in areas where obstructions are present, explaining the offset.
3.2.5 Overlap of Survey Techniques
Survey lines requiring multiple collection methods shall have a minimum of 25 feet of overlap and 10 points recorded in each method recorded. Include all recorded points in the final submittal with attributes indicating the recording method attached. Survey points shall be within 25 feet lateral distance of the planned profile line and overlap points shall be within 25 feet lateral distance of the adjoining overlap point.
3.2.5.1 Pre-Placement and Post-Placement Condition Surveys
Schedule the hydrographic/wading/topographic portions of the survey profiles so that a minimum amount of time transpires between data collection of each portion of the survey lines. Survey the hydrographic and wading segments within a maximum time period of 2 days for each profile line. If topographic surveys of the upper beach profile are performed separate from the nearshore wading surveys, survey topographic and wading segments within a maximum time period of 5 days for each profile line. For the purpose of this contract, the "Upper Beach" is defined as +6 feet NAVD88 and above. If topographic surveys are performed separate from wading surveys, develop the composite profile from the wading survey in the region of overlap. If significant differences in elevation between survey segments are observed at locations where segments overlap, submit such information to the District Office for assessment, while still at the site. Significant differences between segments shall be defined as elevation differences greater than 1 foot over a distance of 10 feet or greater along a profile line, and occurring on two or more adjacent profile lines.
3.2.5.2 Before- and After-Beachfill Surveys
Schedule the hydrographic/wading/topographic portions of the survey cross sections so that a minimum amount of time transpires between data collection of each portion of the survey lines. Survey the hydrographic, wading and topographic segments within a maximum time period of 48 hours for each line. If topographic surveys are performed separate from wading surveys, develop the composite profile from the wading survey in the region of overlap. If significant differences in elevation between survey segments are observed at locations where segments overlap, submit such information to the District Office for assessment, while still at the site. Significant differences between segments shall be defined as elevation differences greater than 1 foot over a distance of 10 feet or
Section 01 71 23 Page 5 greater along a profile line, and occurring on two or more adjacent profile lines.
3.3 SURVEY CONTROL
a. Survey control descriptions are provided in Appendix A30 and https://rsgisias.crrel.usace.army.mil/apexcrrel/f?p=493:4. Survey the control network utilizing surveying procedures and methodology that meet or exceed accuracy tolerances of +/- 0.10 feet in the vertical and +/- 0.10 feet in the horizontal.
b. USACE-NAP survey control networks are periodically adjusted and updated. This process results in changes to control monuments and coordinates. It does not change the coordinates of the survey baseline.
The survey baseline coordinates and the coordinates of the physical monument may vary. It should be assumed that the survey control network and the survey baseline are independent entities. The physical monument may or may not be on the survey baseline. Establish the relationship between the supplied physical monumentation and the survey baseline.
c. If the name of the survey control point includes stationing or numbers of any kind, the station name should not be assumed to be exact stationing on the survey baselines or profile lines. Coordinates shown on the Survey Control Sheets (DA Form 1959) will govern. Station naming often refers to historic project information and standard calculations must be performed based on coordinates in order to derive the specific relationship between the control point and the survey baseline.
d. Stake and flag all temporary bench marks or control points set within the work limits and clearly label the elevation of the point on the stake.
3.4 SURVEY LOGS
Prepare survey logs in spreadsheet form describing all survey progress and activity for pre- and post-placement condition surveys and for before- and after-dredging surveys. The spreadsheet shall be an ongoing log describing all survey lines that have been started as well as completed. Submit survey logs daily to the District Survey Point of Contact and COR.
3.5 STAKING AND FLAGGING
3.5.1 Contractor Work Limit
Stake and flag, every 50 feet, the Contractor's landward work limit, subject to Government approval.
3.5.2 Construction Baseline
Stake and flag, every 100 feet, a survey baseline, located such that it provides easy reference by QA and QC personnel. The location of the survey baseline is subject to the approval of the COR. This survey baseline is shown on the contract drawings.
3.5.3 Groins and Outfalls
Stake and flag, the limits of existing groins, outfalls and other structures as directed by, and subject to the approval of the COR.
Section 01 71 23 Page 6
3.6 PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS
3.6.1 Pre-Placement Condition Surveys
The beachfill area conditions are dynamic in nature. Conditions existing during the preparation of this contract may not be an accurate representation of the beachfill area conditions existing at the commencement of beachfill operations. Consequently, the Contractor must obtain and submit pre-placement condition survey profiles, in accordance with Section 01 71 23 SURVEY REQUIREMENTS. Upon receipt of pre-placement condition surveys, the Government will issue revised drawings indicating adjusted beachfill locations, template, profiles and sections. Commence beachfill work after pre-placement surveys have been submitted and approved, and revised drawings have been issued for each work area.
3.6.2 Post-Placement Condition Surveys
Complete post-placement condition surveys and submit for Government review not later than 30 calendar days after acceptance of final beachfill.
Obtain post-placement condition survey profiles, as specified herein.
3.6.3 Completion Time Requirements
a. Commence beachfill operations no more than 21 calendar days after completion of pre-placement condition surveys, subject to the approval of these surveys. Prior to commencement of beachfill operations, allow the Government a maximum of 14 calendar days for review and approval of these surveys, and potential revisions to the contract drawings. Re-collect pre-placement condition surveys in the event beachfill operations are not started within the time specified above. The Government will consider Before-Beachfill Surveys as part of beachfill operations.
b. Complete and submit for Government review, post-placement condition surveys not later than 30 calendar days after acceptance of final beachfill.
Submit data in the formats specified herein. Include the photographic documentation of the surveys, as specified herein.
3.6.4 Locations of Survey Lines
Take pre-placement and post-placement condition surveys at the locations of the profiles shown on the drawings.
3.6.5 Description of Required Survey Lines
The survey profiles shall be long lines, and shall extend from the survey baseline to a depth of -30 feet NAVD88 or 2,500 feet seaward, whichever occurs first. The origin of the new profile lines shall be the survey baseline, as shown on sections on the contract drawings.
3.6.6 Intervals Required
Take elevations along the profiles at a maximum of 10 foot intervals, and take additional elevations at breaks in grade and as necessary to describe all hydrographic and topographic features.
3.6.7 Quality Control
Data from previous surveys will be provided to the Contractor in advance of the pre-placement surveys. Overlay the previous surveys with pre-placement
Section 01 71 23 Page 7 surveys as a quality control measure. If previous surveys are not available, this requirement will be waived.
3.7 PHOTOGRAPHIC DOCUMENTATION OF SURVEYS
a. During the completion of pre-placement condition surveys, take digital color photographs at each profile line to provide visual documentation of the beach. Take digital photographs from a point on the profile line located approximately halfway between the water line and the seaward toe of the existing dune. Take the photographs in three directions. Take the first photograph facing perpendicular to the profile line azimuth. The direction of the first photograph shall be defined by facing the ocean while standing on the profile line, then turning counterclockwise approximately 90 degrees (generally facing a northeasterly direction along the coast of New Jersey. Take the second parallel to the profile line azimuth and facing seaward. Take the third parallel to the profile line azimuth and facing landward. Document any obstructions along the profile line azimuth which preclude collection of data with additional digital photographs.
b. Submit digital files and a brief report documenting the surveys, weather conditions, beach conditions and field notes.
3.8 BEFORE- AND AFTER-BEACHFILL SURVEYS
3.8.1 Completion Time Requirements
a. See time requirements specified under Paragraph "PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS" for commencement of beachfill operations.
b. Complete after-beachfill surveys of a particular location no more than 14 calendar days after the commencement of the before-beachfill surveys.
(14-day max performance period)
c. Upon agreement between the COR, vessel operator, and SSHO, that the sea conditions are too rough to safely operate the hydrographic survey vessel to obtain the after-beachfill surveys, a time extension may be granted until the sea conditions improve.
3.8.2 Locations of Survey Lines
Take survey profiles at 100-foot intervals at the locations as listed in tables on the drawings. Submit locations of survey lines prior to any data collection.
3.8.3 Description of Required Survey Lines
Extend survey profiles 1,200 feet from the survey baseline or the seaward work limit, whichever is further seaward.
3.8.4 Intervals Required
Take elevations along the profiles at a maximum of 10 foot intervals, and take additional elevations at breaks in grade and as necessary to describe all hydrographic and topographic features.
Section 01 71 23 Page 8
3.9 BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA
3.9.1 Completion Time Requirements
Commence dredging operations in the borrow areas not less than 15 calendar days after completion of before-dredging borrow area surveys. Conduct after-dredging borrow area surveys not more than 10 calendar days after completion of dredging of the borrow areas. Submit Before- and After-dredging survey data of the borrow areas within 5 business days after completion of each survey performed.
3.9.2 Locations of Survey Lines
Take before- and after-dredging survey cross section lines of all borrow areas, including the areas that are not available for dredging, at maximum intervals of 200 feet. Extend lines to 200 feet outside the limits of the borrow areas. In addition, take before- and after-dredging survey quality control lines perpendicular to and through all of the cross section lines, at maximum intervals of 500 feet and extending 200 feet outside the limits of the borrow areas. Submit locations of survey lines prior to any data collection.
3.9.3 Intervals Required
Take elevations along the cross-section at maximum intervals of 25 feet, and take additional elevations at breaks in grade and as necessary to describe all hydrographic features.
3.10 DATA SUBMISSION
Provide all survey data via DoD SAFE or other ftp online file transfer service. Include project name, transmittal no., survey type ( e.g., before beachfill), station, and date in file names or a txt file. Prepare the CAD drawing files in AutoCAD Civil 3D Release 2019 format compatible with a Windows 10 operating system.
3.10.1 General
Submit survey data in each of the following formats:
3.10.1.1 Pre- and Post-Placement Condition Surveys:
a. Nine-column XYZ Format, as shown on the attached sheets.
b. BMAP Free Format: ASCII files using distances offset from the baseline
(X) and elevation (Z1), as shown on attached sheets.
c. Plotted and electronic profile drawings in AutoCAD for each profile survey taken. These profiles shall be overlaid on the contract drawing profiles for comparison purposes. The grid spacing shall be 5 feet in the vertical and 50 feet in the horizontal. Each drawn profile shall show the station that it was taken from. Submit electronic files in both AutoCAD and Portable Document Format (PDF).
3.10.1.2 Before- and After-Beachfill Surveys and Beachfill Template Data:
a. Nine-column XYZ Format, as shown on the attached sheets.
b. One ASCII file containing the following for all profile lines: date, Section 01 71 23 Page 9 profile ID, survey origin, and grid azimuth with respect to the horizontal reference coordinate system.
c. BMAP Free Format: ASCII files using distances offset from the baseline
(X) and elevation (Z1), as shown on attached sheets.
d. Plotted and electronic cross section drawings in AutoCAD for each cross section survey taken. Overlay these cross sections on the contract drawing cross sections and include the specified beachfill template for that location. Each drawn cross section shall show the station that it was taken from. The grid spacing shall be 5 feet in the vertical and 50 feet in the horizontal. Submit electronic files in AutoCAD, ESRI ArcGIS 10.x shapefile format (.shp), including all components and extensions, and PDF formats.
e. Plotted plan view drawings that show topographic and hydrographic survey data points with tick marks at each shot collected and color coded by survey type (hydro, wading, topo). Plotted cross section drawings that show topographic and hydrographic survey data that are color coded by survey type. Use the data in the Nine-column XYZ format to derive these drawings.
f. Compile all survey data previously submitted with each new before/after beachfill survey submittal.
3.10.1.3 Before- and After-Dredging Borrow Area Surveys:
a. Nine-column XYZ format: as shown on attached sheets. Include Before Dredging Data in a single file and After Dredging data in a single file.
b. Plotted and electronic drawings of the survey lines and 2-foot-interval contour lines representing the bathymetric surface with the limits of the borrow area delineated in AutoCAD. The contour surface shall be a TIN (Triangulated Irregular Network) surface that is elevation referenced within the drawing. Include surveys of the entire borrow area that extend beyond the borrow area perimeter as specified in paragraph above titled "BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA," sub-paragraph "Locations of Survey Lines," for both the before and after surveys. Submit electronic files in AutoCAD, ESRI ArcGIS 10.x shapefile format (.shp), including all components and extensions, and PDF formats.
3.11 DISCREPANCIES
In the event of any discrepancies that cannot be resolved by the District Office quality assurance review of the Contractor's data, the COR may request an additional survey be performed by the Philadelphia District Survey Section. The results of the Government survey will be considered in the final determination made by the Contracting Officer to resolve any conflicts.
3.12 METADATA SUBMISSION
a. Provide metadata file(s) for all geospatial data produced under this Contract that are compatible with ESRI ArcGIS applications. (Information on ESRI ArcGIS is available at the following link: http://www.esri.com.)
The metadata file(s) must comply with Federal Geographic Data Committee (FGDC) Content Standards for Digital Geospatial Metadata Version 2.0 or higher. If another metadata generation tool is used, the ".txt" or ".doc" file types will be sufficient, however the ".xml" alternative file type
Section 01 71 23 Page 10 would be preferred.
b. Geospatial data is defined as information that identifies the geographic location and characteristics of natural or constructed features and boundaries on the earth, which also includes aerial photography.
Geospatial data affected by these requirements are those generated for use in a: Geographic Information System (GIS); Land Information System (LIS);
remote Sensing or Image processing system; Computer-Aided Design and Drafting (CADD) system; Automated Mapping/Facilities Management (AM/FM) system and other computer systems that employ or reference data using either absolute, relative or assumed coordinates.
c. Provide digital FGDC compliant metadata file(s) for each deliverable product and data set outlined in these specifications.
d. Metadata standards can be found at http://www.fgdc.gov/metadata.
e. Submit metadata within 14 business days after completion of beachfill placement operations.
3.13 MEASUREMENT AND PAYMENT
3.13.1 Beachfill
No separate measurement or payment will be made for the work specified in this section and all costs in connection therewith shall be included in the respective costs of the Base Bid and Option Bid Items titled, "Beachfill".
Section 01 71 23 Page 11
SURVEY DATA FORMATS
a. Nine-column XYZ Format
One ASCII file containing all data points for all profiles and having a descriptive header at the top of the file followed by a record of nine comma delimited fields for each data point including the following information: Profile ID, Date, Time, Point Number, Easting (X), Northing (Y), Elevation (Z), survey type (TOPO, WADING, or HYDRO), and description (as appropriate). The following is a sample data file format:
(DESCRIPTIVE HEADER)
CAPE MAY POINT, NEW JERSEY
BEACH PROFILE DATA
July 2012
VERTICAL DATA REFERENCED TO NAVD88, U.S. SURVEY FOOT
HORIZONTAL DATA REFERENCED TO NAD83, NEW JERSEY MERCATOR - ZONE 2900, U.S.
SURVEY FOOT
DESCRIPTION LEGEND (SAMPLE):
STREET = STREET OR SHOULDER
ROAD_BED = GRASSY SHOULDER OR EDGE OF ROAD
PK_NAIL = ON STATION, RANGE 0.0, PK NAIL MARKER
SEAWALL = CONCRETE EXTENT
BASE_DUNE = WINDWARD/SEAWARD TOE OF DUNE
VEG_DUNE = VEGETATION AND/OR DUNE SLOPE
TOP_DUNE = CREST OF DUNE
THICK_VEG = MODERATE TO EXTREMELY DENSE VEGETATION
VEG_G = SPARSE TO MODERATE VEGETATION
FENCE = TYPICAL WIRE AND WOOD BEACH FENCE
G = SPARSE TO NIL VEGETATION, GRAVEL OR SAND
RIPRAP = EDGE TO EDGE, EXTENT OF ROCK
BERM = NOTICEABLE HIGH TIDE LIMIT
BEACH_FACE = BETWEEN BERM AND SWASH ZONE
SWASH_ZONE = WAVE BREAK AREA, TIDE DURING COLLECTION
DATA TYPE LEGEND
TOPO = RTK TOPOGRAPHIC DATA COLLECTION
WADING = WADING CONVENTIONAL LEVEL DATA COLLECTION
HYDRO= RTK ECHO SOUNDER COLLECTION (ELEVATION)
PROFILE ID, DATE, TIME (EST), POINT #, EASTING (X), NORTHING (Y), ELEVATION
(Z), TYPE, DESCRIPTION
(START OF DATA)
V020, 20040417, 1107, 10001, 385926.7, 40466.0, 10.9, TOPO, THICK_VEG
V020, 20040417, 1108, 10002, 385931.4, 40457.2, 10.8, TOPO, VEG_DUNE
V021, 20040417, 1037, 9801, 384943.2, 40330.6, -8.3, HYDRO, SOUNDING
V021, 20040417, 1038, 9802, 384946.7, 40320.6, -8.2, HYDRO, SOUNDING
Etc.
Section 01 71 23 Page 12
b. BMAP Free Format One ASCII file containing all data points for all profiles. For each profile, format includes:
1. One profile header line including three fields separated by a space:
(a)Profile ID;
(b) Date of data collection in "YYYY_MM_DD" format;
(c) Survey descriptor: "Preplacement"; "BD"; "AD"; or "Postplacement"
Note: Use Profile IDs listed in drawings for pre/post placement surveys;
Use station in "xxx+xx" format as Profile ID for BD/AD profile surveys
2. One line listing the integer number of points "N" in the profile
3. "N" lines including two fields separated by a space:
(a) distance from baseline (positive offshore, in ft);
(b) elevation (relative to NAVD 88, ft)
Note: Points shall be sorted such that distances from baseline are listed in ascending order; No two points may have the same distance from baseline (adjacent points shall be separated by distance of at least 0.1 ft)
The following is a sample data file format: OC003 2015_05_12 Preplacement 5
827.4 9.62 840.3 8.61 848.6 6.60 859.7 5.49 871.4 4.29 OC005 2015_05_12
Preplacement 6 635.0 7.48 640.3 8.75 649.3 7.33 657.2 6.94 663.8 6.51 671.9 6.36
-- End of Section --
Section 01 71 23 Page 13
This page was intentionally left blank for duplex printing.
NJV-997
NJV-998
NJV-999
NJV-1000
NJV-1001
NJV-1002
NJV-1003
NJV-1004
NJV-1005
18,000
20,000 18,000
8,0
6,0
4,0
22,000
24,000
30,000 32,000
24,000
2,0
0,0
0,0
6,0
0,0
20,000
8,0
2,0
22,000
0,0
28,000
30,000
2,0
28,000
4,0
NOTES:
1. THE BATHYMETRY DEPICTED IN BORROW AREA K1, K2, K3, KE1, KE2, AND KE3 REPRESENTS THE RESULTS OF
SURVEYS CONDUCTED IN DECEMBER 2021 AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL
CONDITIONS EXISTING AT THAT TIME.
2. HORIZONTAL REFERENCE - NAD 83, NEW JERSEY STATE PLANE, ZONE 2900, U.S. FOOT.
3. SOUNDINGS ARE EXPRESSED IN FEET & TENTHS AND REFER TO THE NORTH AMERICAN VERTICAL DATUM 1988
(NAVD88).
4. THE POSITIONS OF THE AIDS TO NAVIGATION ARE PROVIDED FOR INFORMATION ONLY, AND SHOULD NOT BE
USED FOR NAVIGATION
5. BORING LOGS AND SIEVE CURVES FOR THE VIBRACORES SHOWN ON THIS PLAN CAN BE FOUND IN THE
SPECIFICATIONS.
6. DETAILED DESCRIPTIONS OF THE SUBMERGED DEBRIS ARE PROVIDED ON PAGE 42 AND 43 OF THE "PHASE I UNDERWATER ARCHAEOLOGICAL INVESTIGATION OF FOUR BORROW AREAS FOR THE CAPE MAY CITY AND LOWER CAPE MAY MEADOWS PROJECTS ATLANTIC OCEAN CAPE MAY COUNTY, NEW JERSEY" BY: DOLAN RESEARCH, INC., DATED: JANUARY 2008. AREA K IS REFERRED TO AS SURVEY ZONE 4 IN THE REPORT. REFER
TO THE CONTRACT SPECIFICATIONS FOR A COMPLETE COPY OF THE REPORT.
7. GRAB SAMPLES WERE COLLECTED ON 10 AND 11 JULY 2018. SIEVE CURVES FOR THE GRAB SAMPLES SHOWN
ON THIS PLAN CAN BE FOUND IN THE SPECIFICATIONS.
8. DREDGING IN BORROW AREA KE2 IS NOT PERMITTED. THE STRUCTURAL INTEGRITY OF THE SHOAL IN KE2 SHALL BE MAINTAINED SO THAT POST-DREDGING CONDITIONS RESEMBLE PRE-DREDGING CONDITIONS.
9. THE CONTRACT DREDGE DEPTHS FROM AREAS KE1 AND KE3 ARE AS INDICATED IN THE BELOW TABLE. BASED ON THE REQUIREMENTS OF THE DECEMBER 2018 FEDERAL CONSISTENCY DETERMINATION AND SECTION 401 WATER QUALITY CERTIFICATION, TOTAL QUANTITY OF MATERIAL REMOVED FROM AREAS KE1 AND KE3 SHALL NOT EXCEED 268,000 CUBIC YARDS FOR THIS CYCLE (SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION
REGARDING RESTRICTIONS ON BORROW AREAS KE1 AND KE3).
10. THE CONTRACT DREDGE DEPTHS FROM AREAS K1, K2, AND K3 ARE AS INDICATED IN THE BELOW TABLE.
11. THE CONTRACTOR SHALL COMPLETE BEFORE AND AFTER DREDGING SURVEYS FOR BORROW AREAS K1, K2, K3, KE1, KE2, AND KE3 IN ACCORDANCE WITH SPECIFICATION SECTION 01 73 23.
BORROW AREA
CONTRACT DEPTH OF DREDGING ACTIVITIES
KE1
DEPTH IN FEET, NAVD88
-40.0
SUBMERGED DEBRIS
(SEE NOTE 6)
BORROW AREA K - EAST
N 21639 E 394695
N 25113 E 399113
N 23870 E 391563
N 26898 E 397098
4 - 7
4 - 2
4 - 1
CM1
CM2
CM3 CM7
CM6
CM5
CM4
CM8
CM9
CM10
CM13
CM14
CM12
CM11
CM15
CM16
CM20
CM19
CM18
CM17
CM21
CM22
CM23
CM27
CM26
CM25
CM28
CM29
CM30
CM24
GRAB SAMPLE LOCATION (TYP)
(SEE NOTE 7)
VIBRACORE BORING
LOCATION (TYP)
(SEE NOTE 5)
N 26050 E 394138
N 25493 E 394529
N 28939 E 399275
N 28604 E 401353
N 27613 E 402134
BORROW AREA KE3
BORROW AREA KE1
N 26604 E 397430
N 25883 E 398244
N 28657 E 401027
N 28354 E 401550
KE3 -40.0
BORROW AREA KE2
NOT AVAILABLE
(SEE NOTE 8)
K2 K1
K3 -40.0 -40.0
-40.0
BORROW AREA K3
BORROW AREA K1
BORROW AREA K2
N 23123 E 392612
N 22377 E 393660
N 25708 E 398442
N 26303 E 397769
D
2 3
C
4 5
A
B
1 2 3 4 5
®US Army Corps of Engineers
DISTRICT
D
AT
E
SO
LI
C
IT
AT
IO
N N
U M
BE
R
FI
LE
N
AM
E:
M
AR
K
D W
G . S
IZ
E:
C O
N
TR
AC
T
N U
M
BE
R
SHEET NUMBER
BY
D
ES
C
R
IP
TI
O
N
AC
TI
ON
"X
IS
SU
E/
SU
BM
IT
TA
L
D
AT
E:
U.
S.
A
RM
Y
CO
RP
S
OF
E
NG
IN
EE
RS
D
IS
TR
IC
T
D W
N B
Y:
R
EV
IE
W
ED
B
Y:
D
ES
B Y:
PL
O
T
SC
AL
E:
C
KD
B Y:
1:4
DA
N
GM
G
JH
M
JH
M
PH
IL
AD
EL
PH
IA
JH
M
JU
N
AD
DE
D
AD
DI
TI
ON
AL
C
OO
RD
IN
AT
ES
F
OR
B
OR
RO
W
A
RE
A K2
AM
a
-W
2B U2
3B
M
AY
C-
1 P
LA
N
- B
OR
RO
W A
RE
A
- C
AP
E
MA
Y.
dw g
BO
RR
OW
A
RE
A
- C
AP
E
MA
Y
CA
PE
M
AY
IN
LE
T
TO
LO
W
ER
T
OW
NS
HI
P
BE
AC
H
NO
UR
IS
HM
EN
T
CA
PE
M
AY
, N
EW
JE
RS
EY
CA
PE
M
AY
C
OU
NT
Y
C-401
PHILADELPHIA
1 BORROW AREA - CAPE MAY1 BORROW AREA - CAPE MAY
a a a a
| AMENDMENT DESCRIPTION |
| REQUESTS FOR INFORMATION AND RESPONSES |
| 01 71 23 SURVEY REQUIREMENTS |
| W912BU23B0011-AM0001-Dwgs.pdf |
| Sheets and Views |
| C-401 BORROW AREA - CAPE MAY |
| BORROW AREA - CAPE MAY |