W912BU-23-B-0001 P00001.pdf

PDF 580 KB Posted

Attached to
Welded Steel Barges
Solicitation number
W912BU-23-B-0001
Issued by

About this file

This amendment to a solicitation provides answers to requests for information received regarding solicitation number W912BU-23-B-0001 from the U.S. Army Corps of Engineers Philadelphia District for the fabrication and delivery of two welded steel barges. The barges will measure 120 feet in length, 30 feet in beam, with a depth of 7 feet at the centerline and 6 feet 9 inches at the side, and are intended to support the civil works mission of the St. Paul District. Welding specifications and construction details will be included in drawings provided to the selected bidder. Bids are due on January 10, 2023 and the contractor will be required to deliver the completed barges to the U.S. Army Engineer District in Fountain City, Wisconsin, along with liquidated damages and bonding requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to post answ ers to Requests for Information received to date. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 27-Dec-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU23B0001

X 9B. DATED (SEE ITEM 11)

02-Dec-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

27-Dec-2022

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION 100 SOUTH INDEPENDENCE M

2ND FLOOR

PHILADELPHIA PA 19106-3400

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU23B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

RFI 1

1. Request for Information #1

Do you have any specifications of the Rubber that will be required for the Towknee Pads

Answer:

Towknee Pads shall be provided as specified in Clause C410 of the contract and as shown on Contract Drawing 891-B410-01

2. I cannot find the Profile required for the Longy and Transverse stiffeners for Bin Top plate of the barge, I may have overlooked them I know the removable end plates transverse stiffeners are 4’’ x 4’’ x ¼’’ Answer:

The Cargo Bin structure shall be in accordance with drawing 891-B410-02. Please note that the stiffeners shall be 4”x4”x1/2” as per the contract drawing.

3. Tack welding can you advise if the tacks are one run or Two runs as the welding schedule states 3-inch tack welds ¼’’ bead I assume we will be welding in accordance with our welding procedures.

Answer:

Welding shall be accomplished as specified in Drawing 891-B305-02. Any weld that is not defined in the contract drawing shall be designed by the contractor and approved by ABS in accordance with Clause C305 of the contract.

4. Headlog / Transom the Double Rolled plate between main deck and Sloping Bottom plate do you have the bend centers do you also know the overall length of the plate and the angle of the Sloping plate we can work it out if we have the detail.

Answer:

In accordance with Clause J01 of the contract, all drawings will be provided to the selected bidder in electronic file form and construction details can be determined from those drawings at that time.

(End of Summary of Changes)

File details come from the government source that posted it. Updated .