W912BU22B0019 P00003.pdf
PDF 3 MB Posted
- Attached to
- 1100 HP Tow Boat Federal contract opportunity
- Solicitation number
- W912BU22B0019
About this file
This solicitation is for the procurement of a triple screw towboat to be constructed in accordance with provided specifications and drawings. Key details include the vessel dimensions of 65' length, 26' beam, 5'2" draft, and 8'6" depth with a minimum air draft of 35'1". The towboat will be ABS classed with a steel hull and powered by two main propulsion engines totaling 1100 horsepower. The electrical system will be powered by two generator sets. Bids including bid bonds are due by October 13, 2022. Payment and performance bonds will be required. The procuring agency is the U.S. Army Corps of Engineers Engineering District Philadelphia.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Unauditited Abstract 22B0019.pdf | ||
| W912BU22B0019 P00005.pdf | ||
| W912BU22B0019 P00004.pdf | ||
| Contract Drawings ALL 20SEP22.pdf | ||
| W912BU22B0019 P00002.pdf | ||
| W912BU22B0019 P00001.pdf | ||
| W912BU22B0019.pdf | ||
| Contract Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to:
1) Update sections C, E, and H.
2) Post the most recent contract draw ings
3) Answ er questions submitted to date.
4) Extend the solicitation closing date.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 185
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 27-Sep-2022
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912BU22B0019
X 9B. DATED (SEE ITEM 11)
29-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
27-Sep-2022
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU22B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 13-Oct-2022 02:00 PM to 11-Nov-2022 11:00 AM.
The following have been added by full text:
QUESTIONS AND ANSWERS
The following questions have been received about solicitation W912BU22B0019.
Question 1: There are multiple references in the spec to C805 for spares. There is no section C805. Please advise.
Question 2: The following drawings are called out on 881-B000-02 Drawing Index but have not been provided. Please advise.
881-B115-01 Weight Estimate 881-B780-01 General Alarm and Bilge Alarm Diagram
Question 3: The following drawings are referenced in the specification but are not listed on 881-B000-02 Drawing Index. These drawings have also not been provided. Please advise.
881-B677-02 Fixed Fire Extinguishing Calculation 881-B675-02 Firemain Calculations 881-B685-04 Machinery Space Heating and Ventilation Load Calculations 881-B730-02 Emergency Lighting 881-B765-03 Cellular Amp and Repeater 881-B770-01 Navigation Equipment Overview
Question 4: Spec section C612 states there are (4) steering rudders. 881-B612-01 shows (2). Please clarify.
Question 5: There are references in the spec to a capstan. There is no specific section for a capstan, and none shown on arrangement. Please clarify.
Response:
While attempting to resolve the questions above it became apparent the specification sections in the solicitation were not the final versions. Correct, final versions of specification sections C, E, and H are included in this Amendment. Additionally, a revised PDF “Contract Drawings” is also included in this Amendment. To repeat, the above questions have been resolved in revised versions of sections C, E, H and Contract Drawings. These sections should be reviewed prior to bid submission.
The following have been modified:
SECTION C
Section C – Description/Specification/Work Statement
C000 GENERAL
C001 PROJECT OVERVIEW
The Marine Design Center (MDC) of the U.S. Army Corps of Engineers (USACE) has issued this solicitation to retain contractor services to construct, test, and deliver a new self-propelled inland river and intracoastal towboat, conforming to commercial standards. The vessel is intended to serve the U.S. Army Corps of Engineers, Tulsa District in support of its missions.
The completed vessel will be ABS classed, and certified by the U.S. Coast Guard for Subchapter M.
C002 CONTRACT OVERVIEW
For this contract, the Contractor shall include, as a minimum, all costs to provide and deliver the following:
Using the contract and reference drawings provided in the procurement package, complete the design for production and fabrication of the towboat.
Fabricate one towboat in accordance with the specifications of this contract.
Test all towboat related equipment, systems, piping, and electrical systems.
Obtain ABS Class and U.S. Coast Guard Subchapter M Certificate of Inspection for the towboat.
Deliver the completed towboat to a designated location.
Final Acceptance Demonstrations at the Corps’ designated point of Final Acceptance of the completed towboat.
C003 DESIGN STANDARDS
The towboat shall be designed and constructed in accordance with the latest edition and interpretations of the rules, regulations, requirements and standards of the Legislation, Regulatory Agencies and technical organizations listed as follows or as stipulated in the respective specification clauses.
American Bureau of Shipping (ABS) “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
This may be referred to in this specification and Contract Drawings as the ABS River Rules.
American Bureau of Shipping (ABS) “Rules for Building and Classing Marine Vessels”:
Part 2 – Rules for Materials and Welding
American Bureau of Shipping (ABS) “Guide for Crew Habitability on Workboats”
Section 3 – Whole Body Vibration Section 4 – Noise Section 6 – Lighting
International Association of Classification Societies (IACS) No. 47 “Shipbuilding and Repair Quality
Standard”.
American Welding Society (AWS) “Guide for Steel Hull Welding”, AWS D3.5.
33 CFR, Subchapter E - USCG, Inland Navigation Rules.
40 CFR, Subchapter C, Part 89 – Protection of Environment: Control of Emissions from New and In-
Use Nonroad Compression Ignition Engines 40 CFR, Subchapter C, Part 94 – Protection of Environment: Control of Emissions from Marine
Compression Ignition Engines
46 CFR, Subchapter M – Towing Vessels USCG inspection and certification is required.
46 CFR, Subchapter C, Part 28, Subpart E – Stability (Intact)
170.170 Weather Criteria
170.173 Criterion for vessels of unusual proportion
46 CFR, Subchapter C, Part 28, Subpart E – Stability (Damaged)
USCG has no requirement for damage stability on an inland river towboat.
USACE applies a single compartment damage survival based on 46 CFR 28 MDC will confirm the subdivision and arrangement of the vessel to ensure damage stability can be satisfied.
46 CFR, Subchapter G, Part 67 – Documentation of Vessels Builder’s Certification and First Transfer of Title (U.S. Coast Guard Form CG-1261) Certificate of Documentation (COD) (U.S. Coast Guard Form CG-1270)
46 CFR, Subchapter G, Part 69 – Measurement of Vessels
46 CFR, Subchapter S, Part 170
46 CFR, Subchapter J - Electrical Engineering.
U.S. Coast Guard, Navigation Rules and Regulations, International and Inland, COMDTINST
M16672.2D
U.S. Maritime Administration Schedule for Pipes, Joints, Valves and Fittings.
U.S. Army Corps of Engineers, Publication No. EM 385-1-1, “Safety and Health Requirements
Manual.”
The National Shipbuilding Research Program (NSRP 0490), January 1998, “Industrial Standards for Hull Structural Penetration Design Criteria and Details.”
Institute of Electrical and Electronic Engineers Standards, Publication No. IEEE Standard 45-2002, “Recommended Practice for Electrical Installation on Shipboard.”
National Electric Code (NEC).
ISO 484, Shipbuilding – Ship screw propellers – Manufacturing tolerances
ISO 8861, Shipbuilding – Engine Room Ventilation in Diesel-Engined Ships
U.S. Public Health Service (USPHS), Publication No. 393 “Handbook on Sanitation of Vessel
Construction”.
Environmental Criteria (Temperature): the vessel shall be designed in accordance with ASHRAE temperature standards, which prescribe an ambient temperature range of 18 to 99-degrees F for Tulsa, OK and Fort Smith, AR. River temperature for machinery cooling shall be 85-degrees F, with 0-mph flow.
Environmental Criteria (River Current): The typical river currents in the area of operation are river flow from 0-mph up to 12-mph.
C004 CLASSIFICATION AND CERTIFICATION
A. ABS CLASSIFICATION
The Contractor shall be responsible obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for the certification and classing of the vessel as follows, except as stated in Contract Clause C040 Scope of Work, A. Contract Intent.
ABS classification for “Maltese Cross ✠A-1 Towing Vessel, River Service with Maltese Cross ✠
AMS”.
The vessel has been assigned the following ABS Eng. Project No.: XXXXXXX
The recommended ABS point of contact is Mr. Rich Delpizzo, who can be reached by phone, email or mail, at: (703) 519-9233, RDelpizzo@eagle.org, or 1321 Prince Street, Suite 200, Alexandria, VA 22314.
The Contractor shall be responsible for all costs associated with applications, plan submittals, and inspections required to obtain such certification\documentation. When steel construction commences, the Contractor shall coordinate with ABS to ensure the frequency of onsite inspections are not less than once every two weeks. See Contract Clause C040 Scope of Work, for details on Contract Drawings and the level of effort required by the Contractor.
If the Contractor intends to launch, test, operate or tow the vessel “out of class”, the Contractor must specifically advise ABS of such intent and incorporate any and all modifications required by that agency for such operation at no additional cost to the Government and at no additional contract time. Any such modifications which, in the opinion of the COR, affects the arrangements, operability, or suitability of the vessel shall be removed from the vessel by the Contractor at no additional cost or time and the vessel returned to new condition prior to Final Acceptance. See Contract Clause C040 Scope of Work for details regarding deviations to the contract design.
B. U.S. COAST GUARD (USCG)
The contractor shall be responsible for obtaining necessary regulatory body reviews and approvals, obtaining necessary inspections and surveys during construction and for obtaining the following:
U.S. Coast Guard Certificate of Inspection (COI) under 46 CFR Subchapter M – Towing Vessels.
Certificate of Measurement issued by the measuring organization, per 46 CFR, Part 69.
Delivered with a Builder’s Certification and First Transfer of Title (U.S. Coast Guard Form CG- 1261).
Delivered with a Certificate of Documentation (COD) (U.S. Coast Guard Form 1270).
The Government will allow ABS to review on behalf of the USCG, where authorized. Should the Contractor wish to pursue this path for regulatory review, they shall submit the necessary request to USCG and ABS.
The Contractor shall be responsible for delivering the vessel with a USCG Builder’s Certification and First Transfer Title and a USCG Certificate of Documentation (COD).
The Government shall be provided a copy of all correspondences between the Contractor and the USCG.
B. VESSEL DESIGN AND CLASSIFICATION REVIEW STATUS
The Government has developed the vessel’s design and drawings. All of the design drawings and analyses have been submitted to ABS for review and approval. The design work provided to ABS has been approved by ABS for compliance with the classification standard identified in this clause.
Contract Section J, Clause J01 provides a drawing index indicating the engineering drawings that have been developed by the Government, submitted to and approved by ABS, where necessary for ABS classification.
Contract Section H, Clause H13 has details on the remaining drawings required to be developed by the Contractor and submitted to the Government and/or ABS for review and approval.
See Contract Clause C040 Scope of Work, for details on Contract Drawings and the level of effort required by the Contractor.
Upon Contract award, the Government will furnish the successful bidder with electronic copies of all ABS reviewed and Eagle stamped drawings, review letters and other regulatory correspondence as applicable.
C. VESSEL OWNER AND ADDRESS
For the ABS certificate of classification, the owner shall be listed as “U.S. Army Corps of Engineers, Tulsa District”.
The owner’s address of record shall be listed as:
U.S. Army Corps of Engineers U.S. Army Engineer District, TULSA
460360 E 1137 RD
Salliasaw, OK 74955
D. ABS ENGINEERING MANAGER ACCESS & DISCLOSURE
The Marine Design Center (CEMDC) will be the “Owner’s Representative” on this project and all correspondence with ABS shall be made available to the COR. In order to facilitate the communication process and reduce the paperwork burden on all parties, the Contractor, and all sub-contractors, shall utilize the ABS Eagle Construct Engineering Manager Portal (02E) for all drawing submittals and correspondence. The Contractor and all sub-contractors shall make the necessary arrangements with ABS to ensure that the Marine Design Center is granted the following Oversight Permissions for this Contract:
View project and drawing status View comments View transmittals Download approved drawings and review letters E-Mail notification of approval E-Mail notification of transmittal Status Disclaimer
The Marine Design Center’s ID/WCN number is 615255 and the point of contact with respect to the ABS Coordination/Engineering Manager Portal (02E) is Mr. Tim Keyser, Timothy.J.Keyser@usace.army.mil, phone: (215) 656-6171.
The Contractor shall ensure that, as a part of its contract with ABS the Contractor authorizes ABS to disclose to and discuss with the Army Corps of Engineers any Rule or certification criteria issues, design assumptions and their impact on classification and certification, and any other technical considerations on which classification is to be based or which may affect future classification or certification of the vessel.
The Contractor shall authorize ABS to provide the Army Corps of Engineers at its request with a copy of all correspondence related to classification, statutory certification or other compliance verification for which ABS is responsible as it is promulgated and initially distributed. This is to include drawings and other engineering work requiring ABS approval as well as correspondence generated which relates to such approvals, including all such correspondence dealing with vendors.
In addition, the Contractor shall copy the Army Corps of Engineers with correspondence regarding classification, statutory certification and other compliance verification for which ABS is responsible. The Contractor shall also authorize ABS to establish and maintain contact with other certification, verification and compliance agents involved on the vessel being built.
Upon request by the COR, the Contractor shall request ABS to furnish the Government with the project comment list.
The list shall include open and closed technical and surveyor comments. The surveyor comments shall not only include comments generated during the drawing review process, but also comments generated by the ABS Surveyor during construction inspections. The comment list shall be sent directly from ABS to the COR via email as a .pdf file.
At the completion of the ABS review process, the Contractor shall download all ABS “Eagle Stamped” drawings and provide them to the Government in .pdf format.
C006 VESSEL IDENTIFICATION
The vessel to be acquired through this solicitation has been assigned the following name and Marine Design Center hull and project numbers:
MDC Hull Number MDC Project Number Vessel Name .................................................. To be determined ABS Engineers Project ID ..................................... XXXXXXX
The vessel name has not been selected at this time. For the purpose of initial documents and drawing preparation, the following title shall be used:
“M/V TULSA TOW”
Upon selection of the official name for the vessel by the Government, the Contractor shall incorporate the name into all “As-Built” documents. The MDC hull number shall be used in lieu of an “Official Number”.
C010 DEFINITIONS
The following definitions are applicable to phrases and acronyms used throughout this Contract:
ABS - American Bureau of Shipping.
KO - Contracting Officer - A person with the authority to enter into, administer and/or terminate contracts and make related determinations and findings.
COR - Contracting Officer’s Representative - A member of the contract management and quality assurance team authorized by the Contracting Officer to perform certain administrative and managerial duties.
GFE – Government Furnished Equipment - Equipment, materials or components furnished by the
Government to the Contractor for installation in the vessel.
MDC - Marine Design Center.
QC - Quality Control. Quality Control is a function of the Contractor. Quality Assurance (QA) is a function of the Government.
SNAME – Society of Naval Architects and Marine Engineers.
USACE - United States Army Corps of Engineers.
USCG – United States Coast Guard.
C025 CONTRACTOR QUALITY STANDARDS
A. GENERAL
The Contractor shall be responsible for the construction of a complete and functioning vessel.
Inspection by the Marine Design Center is for the purpose of verifying the proper function of the Contractor’s quality control measures and is not to be used as a substitute for control of quality by the Contractor.
Every effort shall be made during production planning to construct the vessel in an efficient sequence minimizing re-work and repair. Care shall be taken to assure the latest revisions of the Final Design plans are being used.
B. STRUCTURAL MATERIALS
Unless otherwise specified or noted on the Contract Drawings, all structural hull material shall be in accordance with the following specifications:
American Bureau of Shipping (ABS), “Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways”.
Welding Materials - ABS “Approved Welding Electrodes, Wire-Flux and Wire Gas Combination.”
Bolts, nuts and screws – ASTM A307-82, Specification for Carbon Steel Externally and Internally
Threaded Standard Fasteners.
C. STANDARD PARTS AND MATERIALS
All articles, fittings, equipment, machinery, supplies, and materials used in the construction and outfitting of the vessel shall be new, of the highest grade, free from defects and imperfections, and be the standard product of reputable manufacturers, to the maximum extent practicable. Any material not specified shall be the best of their kind for the purpose intended. All items shall be suitable for inland river workboat application and meet the latest requirements of standard specifications published by National Agencies. No salvaged materials shall be used in the works. Spare parts and service shall be readily obtainable.
D. WORKMANSHIP
All labor shall be especially skilled for each kind of work and under competent direction.
Where work of one trade joins, passes through, or is on other work, there shall be no discrepancy or misfit when completed. In engaging one kind of work with another, marring or damage of previously acceptable construction shall be cause for rejection. All parts of the vessel intended to join or bear upon other parts shall have complete and solid contact and shall fit together without excessive cold work during erection. All faying surfaces shall be painted and be clean and smooth before bolting up. Shims or liners shall not be used for the purpose of overcoming a bad fit.
All frames and longitudinal members, where applicable, shall be provided with limber holes and/or snipes of adequate size to allow water in bilges to flow to the lowest point of each compartment. Limber holes shall also be provided to allow for the passage of air in tanks. Limber holes shall be located at the plate edge.
Ends of outstanding flanges shall be cropped. Lighting holes may be punched or flame-cut and all edges shall have burrs removed.
All holes for machinery mounting bolts shall be drilled or punched; burning is not acceptable. Holes in members having sharp curvature shall be avoided.
All hull castings shall be machined or ground to bear solidly against the connecting structure.
E. WELDERS
All welding under this contract shall be done only by welders who have successfully passed qualification tests accepted by the American Bureau of Shipping or other regulatory agency acceptable to ABS. The Contractor shall bear the expense of conducting these tests and shall certify, by name to the Contracting Officer, welders who have successfully passed the prescribed tests and hold current, valid certifications.
The listed of certified welders shall be submitted during Phase I of the Contract. The list shall include the employee’s name, certification(s) and date(s) of the most recent tests for each certification(s). This list shall be named and numbered 881-C025-01 LIST OF CERTIFIED WELDERS.
The Contractor shall require any welder to repeat these tests when in the opinion of the COR, the work of the welder indicates a reasonable doubt of their proficiency. In such cases the welder shall be re-certified as above if they successfully passed the retest; otherwise, they shall be disqualified until they have successfully passed the retest.
The Contractor shall maintain records of the individual welder’s certification during the course of the Contract. The records shall be available for examination upon request of the Contracting Officer or their representative.
F. WELDING
All welding shall be in accordance with the current rules of the American Bureau of Shipping, except where stated otherwise. All welding equipment used on the work shall be of a modern type subject to close control. The electrodes used throughout the work shall be suitable for use with the parent metal at each weld, and be approved by ABS.
Welding procedures, as to direction, length, numbers and sequence of beads, shall be carefully planned to minimize lock-up stresses. Care shall be exercised to produce smooth even beads, especially on all exposed plating and fittings.
Beads shall be ground where directed by the Contracting Officer or their authorized representative.
The Contractor shall employ appropriate welding procedures and grounding connections to preclude the possibility of anodic erosion of the hull after launching.
A detailed description of all welding procedures being employed in the construction shall be available to the Contracting Officer or their authorized representative.
G. INSTALLATION
Materials and equipment shall be installed in accordance with the approved recommendations of the manufacturer, and in compliance of this specification and the Contract documents. The installation shall be accomplished by workmen especially skilled for each kind of work and under competent direction.
H. PLATE FAIRNESS
Steel plating shall be installed using proper welding procedures and sequences to insure fair, undistorted plating panels. The use of filler materials to surface unfair areas is not acceptable.
Maximum allowable plating distortion is depicted in the IACS. Guide No. 47. Distortion shall not exceed the amounts in this guide.
I. CONSTRUCTION STANDARDS
All material, machinery and equipment shall be new, of current manufacture and suitable for the marine service intended. Spare parts and service shall be readily obtainable.
All material, unless otherwise specified in this specification or in the drawings, shall be of commercial quality to ASTM, ANSI, or SAE specifications.
During construction and before delivery, the Contractor shall be responsible for protection of all material, equipment, etc., intended for the vessel.
The overweight tolerance of members shall be within the limits defined by the specifications of the American Society for Testing and Materials.
All materials shall be free of imperfections due to manufacturing processes and from defects which adversely affect appearance or serviceability.
All plating shall be neatly cut, fitted and welded. All sharp edges or projections which constitute a personnel hazard shall be removed or ground smooth. All notches shall have a radius to prevent stress concentrations.
Where aluminum must be attached to dissimilar metals or between dissimilar alloys of aluminum, fasteners shall be of stainless steel of an approved design with insulation as required to eliminate metal to metal contact.
All galvanizing shall be done after fabrication by the hot dip process, and the zinc shall be not less than 98% pure. In instances where some types of metals cannot be hot dip galvanized, zinc silicate coating may then be substituted.
C040 SCOPE OF WORK
A. CONTRACT INTENT
This specification, in conjunction with the Contract Drawings listed in Contract Section J, Clause J01, Contract & Reference Drawings, contain the requirements for the construction of an inland river towboat, and describe the essential features, functions, and arrangements of the design.
These specifications and Contract Drawings form a “Contract Design” for the subject vessel. The design package provides the Contractor with enough information to bid on the solicitation, and develop a final design for construction, and minimize uncertainly and risk.
The Contract Design package also includes ABS review and approval of drawings as described in Clause C004.B.
B. CONTRACT PHASES
After the Contract is awarded, the services to be provided by the Contractor shall be structured and managed by the Marine Design Center, in the two phases as follows:
Phase I ............................. Planning, Engineering & Scheduling
Phase II ................................ Construction, Testing & Delivery
During the Planning, Engineering and Scheduling Phase of the Contract, the Contractor shall prepare a “Final” Design of the vessel. The Final Design shall be based on this specification and the Contract Drawings listed in Contract Section J, Clause J01, Contract & Reference Drawings.
During the Construction, Testing and Delivery Phase of the Contract, the Contractor shall construct the vessel, prepare “As-Built” drawings of the vessel, and test and deliver the vessel.
Please refer to Contract Section H, Clause H02, Contract Submittals, of this Contract for an outline of the deliverables required in each phase of the Contract.
During all phases of this Contract, the Contractor is authorized to use the services of Subcontractors performing under their direction and supervision; however, the Contractor shall assume the full responsibility for the Subcontractors’ work.
C. DESIGN DEVELOPMENT
The contract drawings providing with the solicitation have been prepared in accordance with the ABS Rules as stated in contract Clause C004 and the performance specification of this solicitation. The drawings have been reviewed by ABS. For the purpose of bidding, the contractor shall assume the submitted drawings, as issued in this solicitation, are approved by ABS.
The contract drawings provide a contract level design assumed to be in accordance with ABS and suitable for bidding with confidence. The contract level design shall serve as the basis for the barge contractor to complete the final design, as well as to prepare his construction and production drawings. Such contractor engineering can include: secondary structure and foundations, electrical system designs, piping and cable routings, miscellaneous details, complete material list, purchase specifications, shop drawings, construction details, As-Built drawings, and other engineering and technical development necessary to support administration, operation, and production practices. For specific design and engineering drawings and calculations required by the contractor, see paragraph C040 (D) below and respective clauses throughout Section C.
The contractor shall not deviate from the contract level design without approval from the Contracting Officer
The arrangements, hull geometry, structure, mechanical systems, electrical systems, and capacities have been engineered to a contract level design that meets the performance and operational requirements of the U.S. Army Corps of Engineers.
Stability analyses have been performed to verify the location of all watertight bulkheads and compliance with the applicable standards in C003.
This package has been engineered to the degree shown based on commercially available equipment.
The level of development is intended to limit the Contractor’s uncertainty and risk. This package is not a detailed design and is not intended to be substituted as detailed design drawings and documents.
D. CONTRACTOR’S RESPONSIBILITY
The Contractor shall be required to complete a detailed design as described herein to satisfy the requirements of this Contract.
Should the Contractor find any issues with the engineering and design of this vessel as it relates to this solicitation and Contract Drawing package, the Contractor shall bring it to the attention of the COR for resolution. If necessary, an appropriate contract modification will be developed to address the issue.
The Contractor shall be required to perform engineering and design such as development of secondary structure and foundations, piping and cable routings, miscellaneous details, complete materials lists, purchase specifications, shop drawings, construction details, submittals to regulatory bodies, “As-Built” drawings, and other engineering and technical development necessary to support their administration, operation, and production practices.
The Contractor assumes complete responsibility for constructing the vessel to meet the intent and requirements of this Contract. Should the Contractor determine at any time that they are unable to fulfill those design responsibilities, they shall notify the COR immediately of the problem experienced and their proposed manner of correction.
E. DRAWINGS
1. Contract & Reference Drawings
Contract Drawings and Reference Drawings that are part of this solicitation are listed in Contract Section J, Clause J01, Contract & Reference Drawings. All Contract and Reference Drawings will be available to the successful bidder in CAD format.
Contract Drawings are provided with the specifications for bid purposes as well as to develop the final design.
All features of the Contract Drawings must be complied with. The Contract Drawings have been designed in accordance with ABS Rules as per Contract Clause C004 and the performance specification of this solicitation. These drawings have previously been submitted to ABS for review and approval. Where necessary, the Government has made revisions to the Contract Drawings in response to ABS technical comments. The drawing revisions provided in this package are either the revisions submitted to and approved by ABS, or they have been revised in response to a technical comment.
The Reference Drawings that are part of this solicitation are intended to provide general guidance to the Contractor. The exact details presented in the Reference Drawings may not reflect the specific needs of the vessel, but present the Contractor with a methodology to develop a specific system or design feature as identified in the specification. The Contractor shall not build from any Reference Drawing. It is the responsibility of the Contractor to use this written specification and the Contract Drawings to properly develop the engineering drawings and construct the vessel.
2. ABS Comments & Revisions
The Government has resolved the majority of the ABS technical review comments through correspondence with ABS or with revisions to the drawings submitted. If comments have been resolved through a drawing revision, the current revision of that drawing is a part of the Contract Drawing package. Due to the nature of some ABS review comments, it was not practical for the Government to resolve all of the comments with ABS. Some comments are related to final equipment selection or shipyard construction practices and therefore could not be addressed during the development of this package. The Contractor shall assume responsibility for closing these comments.
The Contract Drawing design package provided with this solicitation shall be bid assuming it is a complete ABS approved package. All open technical and surveyor comments will be made available to the Contractor at the pre-construction conference. At that time, the Government will initiate a modification to the Contract to transfer responsibility for ABS technical and surveyor comment resolution to the Contractor.
3. Drawings Required
Contract Section J, Clause J01 provides a complete list of Contract Drawings and Reference Drawings.
Contract Section H, Clause H13, Engineering and Drawings, contains a list with the minimum drawings required to be finalized and/or developed during the Planning, Engineering and Scheduling Phase of the Contract in order to complete the ABS design review package and the final design. The requirements for developing the final design drawings are delineated in Contract Section H, Clause H03, Design Requirement, with any specific requirements for structural, mechanical or electrical changes defined in their relevant Contract Clauses.
For clarification purposes, the list in Contract Clause H13 details the drawings by action groups. The action groups distinguish between separate categories based upon the engineering requirements to be completed by the Contractor. The following is a description/definition of these categories:
Drawings To Be Finalized: As part of the scope of work for this effort, the Contractor shall be required to finalize a certain number of Contract Drawings to achieve a Final Design as defined above. These drawings have been included as Contract Drawings. The scope and extent of the necessary finalization has been explained in detail in each WBS section and/or the corresponding ABS comment sheet.
Drawings To Be Developed: The Contractor shall also be required to develop a certain number of drawings to achieve a Final Design to conform to the requirements of this solicitation. These drawings have been identified on the drawing index but do not currently exist. These drawings shall be submitted to the Government and, if required for class, ABS for review and approval.
“As-Built” Drawings: The Contractor shall be required to provide a complete “As-Built” record of the vessel. The requirements for the “As-Built” drawings as further defined in Contract Clause H14.
The requirements for “As-Built” drawings of the completed vessel are defined in Section H, Clause H14, “As-Built” Drawings.
F. CONTRACT DESIGN PERFORMANCE RISK
For the purpose of developing a complete contract design package and obtaining ABS review and approval, commercially available parts and equipment were selected. The Government assumes the performance risk for the systems as they are shown on the Contract Drawings and described in this specification. In addition, all of the items shown on the Contract Drawings were a part of the ABS review.
The Contractor shall provide and install all of the systems as they are shown on the Contract Drawings. All major pieces of equipment have performance characteristics shown on the Contract Drawings or described in this specification. The Contractor shall submit a Material & Equipment Schedule (M&E) as required in Contract Clause H10.
If Contractor selects equipment that is not shown on the Contract Drawings or described in this specification, they shall be responsible for ensuring the overall system(s) performance is maintained, submitted cut sheets and details to the Government for review and approval; and if necessary re-engineering the system(s) and revising the drawings, and coordinating with ABS for class review and approval.
G. DEVIATIONS FROM THE CONTRACT DESIGN
Should the Contractor desire to deviate from this Specification and/or the Contract Drawings, they shall submit their request in writing to the COR. Each proposed deviation shall request shall be accompanied with a detailed analysis and comparison of the equipment, material or arrangement specified, and the equipment, material or arrangement proposed, including features, dimensions, performance characteristics, benefit to the Government, and compelling reason why the deviation should be made. The request shall include, but is not limited to:
Desired deviation Reason for the deviation Detailed analysis (as stated above) Impact on schedule Impact on cost
Impact on weight, draft, and trim.
Impact of regulatory review and classification Supporting documentation (i.e. cut sheets, engineering drawings, photos, etc)
In the absence of compelling reasons for making the deviation, the Contractor’s proposal may be denied.
The Government will review the request and render a decision within 14 days of receipt. If approved, the Contractor shall be responsible for any cascading effects on the design, drawings or scientific reports as determined by the Government. The Contractor shall be responsible for integrating the deviation into the design at no increase in contract cost or no extension of contract completion.
The Contractor bears ultimate responsibility for satisfactory performance of all systems/arrangements impacted or affected by approved deviations as well as the operation of the completed vessel, as affected by the deviation.
No work deviation shall commence without a written approval from the KO.
If a deviation is approved by the Government, it is the sole responsibility of the Contractor to coordinate with ABS and provide any additional engineering effort to meet the conditions of classifications and this specification.
The Contractor shall bear all costs associated with any requested and/or approved deviations, including engineering, estimating, administrative and overhead, regulatory review and approval, construction and test and trials.
C100 SCIENTIFIC
C105 HULL GEOMETRY
A. CONTRACT DRAWINGS
881-B105-01 HULL LINES AND OFFSETS
B. PRINCIPAL CHARACTERISTICS
The hull geometry is defined as shown on the above Contract Drawing. The vessel’s principal characteristics are as follows:
Length Overall (Molded) …................................................65’-0” Beam (Molded) …...............................................................26’-0” Hull Depth Headlog (Molded) …........................................9’-0” Hull Depth Amidships (Molded) …....................................8’6” Draft (Full Load)…..............................................................5’-6” Fixed Air Draft @ Design WL............................................35’-1” Total Propulsion Power @ Continuous Rating ….............. 1,100-BHP Maximum Fuel Capacity…………………............………..9,300-gallons
C115 WEIGHT ESTIMATE
A. CONTRACT DRAWING
881-C115-01 WEIGHT ESTIMATE
Based on the Contract Design package the Lightship Weight Characteristics are:
Displacement .............................. ............................................................130.47-LT Longitudinal Center of Gravity (LCG)….....................31.43’ Aft Headlog Transverse Center of Gravity (TCG)…........................0.12’ Starboard Vertical Center of Gravity (VCG)….............................9.90’ Above Base Line
With the vessel in the full load condition (98% fuel and operating fluids, 10% waste fluids, 5LT crew/effects, 10LT stores) and ballast (as necessary), the target full load draft is 8’-6” with minimal trim (by the stern) if any.
A copy of the 881-B115-01 WEIGHT ESTIMATE will be provided to the Contractor at the pre-construction conference.
B. WEIGHT & CENTER OF GRAVITY ESTIMATES & MONITORING
The Contractor shall implement a careful weight estimating and monitoring procedure.
During Phase I, the Contractor shall update the weight and center of gravities (CG) each month with details on the final equipment selected and purchased, and system/outfitting design developments. The weight estimate shall be submitted monthly as drawing 881-C115-01.
During Phase II, the Contractor shall continue to update the weight and CG estimate each month. The update shall reflect actual equipment location, quantity and location of piping and wiring runs, actual quantity and location of outfitting items, and any changes to the structural weight.
The Government will review the monthly weight estimate to ensure the anticipated draft, trim and stability conditions of the vessel are satisfactory. If weight growth that adversely impacts the vessel trim and stability is found, the Government will coordinate with the Contractor to determine the cause and develop remedial action.
C. INCLINING AND DEADWEIGHT SURVEY
Upon completion of all work and after the crane has been installed, with the vessel in the lightship condition and the davit in the stowed position, the Contractor shall conduct an inclining test and deadweight survey under the direction of the Government. The inclining test shall be carried out in accordance with ASTM F 1321.The Contractor shall be responsible for developing the inclining test procedure/plan, providing all certified inclining weights, pendulum setups, support equipment and personnel, directing the experiment, recording all data and completing the inclining test report. The Government will participate in the incline experiment as a witness.
The Contractor shall prepare an inclining test procedure/plan and submit it to the Government and ABS for review and approval. The plan shall be numbered 881-C115-02 and titled “INCLINE EXPERIMENT PLAN.” For the Government’s review, the plan shall be submitted at least 60 days prior to the scheduled inclining.
Based on the required ABS Statements of Fact, ABS will require engineering review and surveyor witness with the inclining experiment. The Contractor shall coordinate submittals and on-site surveyor representation with ABS to ensure the construction and testing schedules are maintained.
Following the completion of the inclining experiment, the Contractor shall complete the incline test report and determine the lightship displacement, centers of gravity and hydrostatic properties of the barge. The report, numbered 843-D115-03 and titled “INCLINE EXPERIMENT RESULTS”, shall be submitted to the Government and ABS for review and approval.
The Contractor shall be responsible for all costs associated with ABS reviews (including at least one iteration to reflect any ABS comments made) and all surveyor costs.
D. FINAL STABILITY
The Government will maintain responsibility for updating the damage, and intact stability with the results of the incline experiment. Within 14 days of receipt of ABS approved 881-D115-03 (INCLINE EXPERIMENT RESULT), the Government will update and issue the following to the Contractor:
843-D125-01 HYDROSTATICS
843-D130-01 TANK CAPACITY TABLES
843-D150-01 DAMAGE STABILITY CALCULATIONS
843-D155-01 INTACT STABILITY CALCULATIONS
The Contractor shall be responsible for submitting the above documents to ABS for review and approval, including all ABS costs.
The Contractor shall coordinate the schedule of submissions and testing with ABS to maintain the construction and testing schedules.
C125 HYDROSTATICS
881-B125-01 HYDROSTATIC CALCULATIONS
B. GENERAL
The Government does not require additional review for the Hydrostatic Calculations. Any approved changes to the hull form shall require the Contractor to prepare and submit new Hydrostatic Calculations.
The Government will prepare the “As-Built” Hydrostatic Calculations.
C130 TANK CAPACITIES
881-B130-01 TANK CAPACITY TABLES
881-B215-01 GENERAL ARRANGEMENTS
881-B320-01 INDEPENDENT TANKS
The tank capacities, rounded down in 5-gallon increments, as shown on the Contract Drawings are as follows:
Potable Water Tank .............................................. 1,300-gallons Fuel Oil Tank, Port............................................... 2,250-gallons Fuel Oil Tank, Starboard ...................................... 2,250-gallons Fuel Oil Tank, Aft-Center .................................... 4,800-gallons Lube Oil Tank ......................................................... 275-gallons Waste Oil Tank ....................................................... 275-gallons Oily Bilge Tank ....................................................... 200-gallons Sewage Tank .......................................................... 300 -gallons
Ballast Tank, Fwd-Center .................................... 1,460-gallons Ballast Tank, Fwd-Stbd ........................................ 1,200-gallons
Ballast Tank, Fwd-Port ........................................ 1,200-gallons Ballast Tank, Aft-Stbd ........................................ 1,980-gallons Ballast Tank, Aft-Port ......................................... 1,980-gallons
The Government does not require additional review for the Tank Capacity Tables
The Contractor shall provide all operational fluids for test and delivery, including but not limited to Potable Water, Fuel Oil, and Lube Oil. Upon delivery, the Government will pay for remaining fuel oil via a credit mod.
The Government will prepare the “As-Built” Tank Capacity Tables.
C145 TONNAGE MEASUREMENT
The Contractor shall develop the necessary drawings and shall obtain a Certificate of Measurement issued by the measuring organization (ABS), per 46 CFR, Part 69.
C150 DAMAGE STABILITY
The Government has completed damage stability calculations based on the contract hull form, weight and centers of gravity estimate. The results of the Government’s analysis showed that the below criteria are satisfied.
A copy of 881-B150-01 DAMAGE STABILITY ANALYSIS will be provided at the pre-construction conference.
B. CRITERIA
With any one compartment flooded, the following criteria were satisfied:
46 CFR 28.580 Unintentional Flooding
(f) Survival Conditions:
(1) The angle of equilibrium after flooding does not exceed 25-degrees
(2) Through an angle of 20-degrees beyond the angle of equilibrium after flooding, the following are met-
(i) The righting arm curve is positive;
(ii) The maximum righting arm is at least 4-inches;
(iii) Each submerged opening is capable of being made weathertight.
For the naval architecture analyses, the superstructure is not considered buoyant, and the downflooding locations are the hold deck ventilation louvers on the side of the deckhouse and the compartment/tank vents.
C. CALCULATIONS & REPORTS
The Contractor is not responsible for preparing a damage stability report. The Government will use the results of the inclining experiment to verify our calculations and prepare the “As-Built” Damage Stability Calculations.
C155 INTACT STABILITY
The Government has completed intact stability calculations based on the contract hull form, weight and centers of gravity estimate. The results of the Government’s analysis showed that the below criteria are satisfied.
A copy of 881-B155-01 INTACT STABILITY ANALYSIS will be provided at the pre-construction conference.
B. CRITERIA
The vessel shall be capable of meeting the following parameters in all loading conditions:
Sufficient propeller immersion to maintain full thrust.
No trim by bow for any condition.
The intact stability criterion for this vessel is:
46 CFR 170.170 – Weather Criteria (Required GM), protected waters;
46 CFR 170.173 – Criterion for Vessels of Unusual Proportion and Form:
(e)(2) For protected routes (e)(2)(i) Positive righting arm to at least 25-degrees of heel;
(e)(2)(ii) No downflooding point to at least 15-degrees of heel;
(e)(2)(iii) At least 10 foot-degrees of righting energy to the smallest of the following:
(A) Angle of maximum righting arm
(B) Angle of downflooding, or
(C) 40-degrees.
For the naval architecture analyses, the superstructure is not considered buoyant, and the downflooding locations are the hold deck ventilation louvers on the side of the deckhouse and the compartment/tank vents.
Although the main deck doors are weathertight, all are equipped with dogs to improve the seal and minimize the ingress of water should they become temporarily submerged. For this reason, the main deck doors are not being considered as downflooding points.
C. LOADING CONDITIONS
The following loading conditions shall be considered for all trim, intact and damage stability calculations.
a. Departure – No Ballasted Condition
i. Service Tanks (Fuel, Clean Oils, Water) at 95%
ii. Waste Tanks (Dirty Oils, Sewage, Oily Bilge) at 10%
b. Departure – Ballasted…
This is the start of the file's text. The full file is on GovTribe.