This amendment to a solicitation provides responses to questions about a maintenance dredging contract on the Delaware River and Wilmington Harbor in Pennsylvania. The U.S. Army Corps of Engineers, Philadelphia District will award a firm fixed-price contract for approximately $25 million to $100 million to remove around 3.3 million cubic yards of sediment from the Delaware River navigation channel between stations 0+000 and 515+000 and 650,000 cubic yards from the Wilmington Harbor and Christina River using hydraulic dredging methods. Dredged materials will be disposed at the Pedricktown, Killcohook, Artificial Island and/or Reedy Point disposal areas over a 150-day period of performance. Discharge locations and specific pipe routing must be coordinated with the Contracting Officer. The solicitation is available through the System for Award Management website.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Abstract-W912BU22B008-KO.pdf | ||
| W912BU22B0008-Specs-AM0001.pdf | ||
| W912BU22B0008-Dwgs-AM0001.pdf | ||
| W912BU22B0008-Specs.pdf | ||
| W912BU22B0008-Dwgs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU22B0008
X 9B. DATED (SEE ITEM 11)
12-Aug-2022
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
***************************BID OPENING DATE IS NOT EXTENDED*****************************
This amendment 0002 is issued to provide responses to RFI questions 03 to 06.
(See Continuation page)Please indicate receipt of this amendment on Standard Form 1442 (SOLI CI TATION, OFFER, AND AWAR D) as Amendment No. 0002 (RFI Questions) Failure to acknowledge all amendments may be cause for rejection of the bid.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07 Sep-2022
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: ZAQUETTE EVERETT
USACE, PHI WANAMAKER BUILDING 100 PENN
SQUARE EAST PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU22B0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Submitted Questions:
3. Contract Drawing Pages C-101 and C 401: Can the Contractor land subline at the up-river end of Pedricktown North Cell and run pipe around the North Cell to the contract designated inflow location in the South Cell per the attached drawing?
Answer: Discharge locations are as shown on the respective disposal area drawings. Earthwork construction is currently ongoing at Pedricktown North and Oldmans Disposal Areas. Specific pipe routing on Federal property will be coordinated after award with the Contracting Officer.
4. Section 35 20 23 page 4, para 1.4, states, that the order of work for the New Castle, Deepwater Point and Marcus Hook Ranges will be determined by the Contracting Officer when the Notice to Proceed is issued. Please consider removing this requirement to allow contractors to plan and sequence the work in the most schedule-efficient and cost-effective manner.
Answer: No change, bid as shown.
5. In our review of past projects in the contract area, New Castle range appears to be the only area with a design grade down to -46.0’; however, specifications state that the material to be removed under this contract is maintenance material which has shoaled since previous dredge cycles. Please confirm that all areas have been previously dredged to -46.0 + 1.0’ and that dredging under this contract is maintenance and not new work.
Answer: All work is maintenance dredging
6. Section 01 30 00, page4, para. I, states that the Contracting Officer reserves the right to issue additional work assignments in the Delaware River project channel, and that appropriate disposal sites will be made available. Please confirm that these new assignments would be eligible for an equitable adjustment in time and cost under FAR 52.243-4, should they create material changes to the existing scope of the current project.
Answer: Any new work assignments, if required, would be accomplished through bilateral modification
(End of Summary of Changes)