This document contains an amendment to a solicitation and related questions and answers for a federal contract opportunity. The U.S. Army Corps of Engineers, Philadelphia District, is seeking a contractor to conduct beach nourishment work along the Atlantic coast of New Jersey between the Cape May Inlet and Lower Township. The base requirement is for surveying, pumping and placing approximately 491,000 cubic yards of sand from an offshore borrow area into two beach locations. There are also options to place additional sand in increments of 100,000, 50,000 and 10,000 cubic yards. All work must be completed by March 1, 2022. The estimated value of the contract is between $10-25 million. The amendment provides clarification on questions received, including confirming survey data provided, the timing of a previous borrow area project, and expediting the review of optional work.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Cape May Borrow Post Con merged XYZ.pdf PDF
W912BU21B0005-Dwgs.pdf PDF
W912BU21B0005-Specs.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU21B0005

X 9B. DATED (SEE ITEM 11)

24-May-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

****************This Amendment is issued to provide Request For Information clarification*************

THE BID OPENING DATE IS NOT EXTENDED

Continued on next page

Please indicate receipt of this amendment on Standard Form 1442 (Solicitation, Offer, and Award) as Amendment 0002. Failure to acknowledge all amendments may be cause for rejection of your bid.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

4. 21 JUN 2021

CODE 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

X

W912BU21B0005

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES:

RFI Questions and Answers:

Question 1. Please provide the most recent beach survey xyz.

Answer: The XYZ data provided with the solicitation is the most recent data available.

Question 2. What month in 2019 was the borrow area survey collected? There was a beach nourishment project that same year using the same borrow area. Please clarify if this data was collected before or after that project.

Answer: The borrow area surveys shown in the solicitation (the most recent the Corps has available) are after dredge surveys conducted in September 2019.

Question 3. Under section 52.211-10 Commencement, Prosecution and Completion of Work, it states the Contracting Officer has the right to exercise any or all of the options within 21 days after approval of the Pre-Construction Surveys. We request that this would be changed to 10 days due to the overall project duration not being a significant amount of days. It is beneficial to the contractor and the Government to finalize the template of the beach early enough before commencing dredging operations so that the project can be completed in an efficient manner.

Answer: The Corps will expedite getting answers back to the awardee regarding the award of options as soon as properly formatted survey data is received. The Corps is not amenable to changing the specification from the stated 21 days.

Question 4. Please clarify the magnitude of the Cape May Beach Nourishment Project. Sam.gov states $10 to $20 million, Section SF 30 – Block 14 Continuation Page states more than $30 million, and Section 01 30 00, 1.5 Physical Data, states the magnitude is $10 to $25 million.

Answer: The correct magnitude for this project is between $10M and $25M.

(End of Summary of Changes)