Category 3 Crane Maint Support Services.pdf

PDF 179 KB Posted

Attached to
Class 3 crane maintenance/inspection in Bethesda MD
Solicitation number
W912BU20Q0007
Issued by

About this file

This combined synopsis and solicitation requests quotes for category 3 crane maintenance and inspection services at Naval Surface Warfare Center Carderock Division in Bethesda, Maryland. The contractor shall provide qualified personnel to perform annual inspections, load testing every four years and as needed, monthly inspections, and emergency repairs on 77 category 3 cranes in accordance with Navy facilities specifications. The contract period of performance is one year from January 1, 2020 through December 31, 2020. Quotes are due by January 20, 2020 and will be evaluated based on price, technical capability demonstrating experience maintaining cranes, and past performance ratings. This requirement has been set aside for small businesses and will result in a firm fixed price contract awarded by the Department of the Army Corps of Engineers Philadelphia District.

View the file

Other files

File Type Posted
Amendment 1.pdf PDF
NAVFAC P-307 June 2016 Weight Handling Program Management.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Scope

1.1 The contractor shall supply all personnel, equipment, materials, supplies, specialized equipment and labor to perform all annual inspections and maintenance to Category 3 Cranes located at Naval Surface Warfare Center- Carderock Division (NSWCCD). The Contractor shall supply all personnel, equipment, materials, specialized equipment and labor to perform load testing on all Category 3 Cranes located at NSWCCD. The contractor shall perform emergency repairs on all cranes located at NSWCCD.

1.2 Parking: The Contractor is permitted to off-load materials, supplies, and equipment throughout the base however the Contractor must not block the facility exit/entry locations and park in reserved or handicap spaces. Contractors’ vehicles must be marked on the outside with the company name or logo or both. Failure to comply will result in ticketing and/or loss of vehicle privileges.

1.3 Safety: Personal Protective Equipment such as Safety shoes, Hard Hat, safety glasses, etc.

shall be worn at all the times during the performance of duties. Proper access to the work area shall be maintained throughout the working period.

1.4 Non-personal services: The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2. Products: N/A

3. Performance Requirements

3.1 Crane Maintenance Support Technician with Crane Inspection Qualifications- The contractor shall provide competent personnel that are trained and qualified to inspect Category 3 Cranes in accordance with NAVFAC P-307 Section 7 and Appendix N and NAVFAC P-307 1.4. The contractor shall provide documentation during the life of the contract showing personnel obtained and maintained the required qualifications to perform work specified throughout this performance statement. The contractor shall produce documentation supporting these qualifications. The contractor shall be knowledgeable and experienced in crane inspections, weight testing, and maintenance of various types and sizes of cranes. Cranes are located in various buildings and structures throughout the base. The contractor must follow all Federal, State and Local regulations including but not limited to Fall Protection, Hearing Protection, Hand Protection, Foot Protection, Eye Protection and Other Personal Protective Equipment. The contracted personnel shall carry a Maryland Class “A” License or Equivalent. The contractor shall complete the duties listed in 3.1.1-3.1.5 on all category 3 cranes listed in attachment 1. The period of performance for this contract shall be 365 days or 1 year.

3.1.1 Annual Inspections- The contractor shall provide all of the tools, equipment, supplies, labor, and personnel to perform all annual inspections of the cranes located at NSWCCD. This includes 33 Bridge Cranes, 31 Monorail Cranes, 9 Jib Cranes, 3 Hoist Cranes, and 1 Gantry Crane. Inspections shall be performed annually and inspections must be performed no later than five (5) days prior to the anniversary of the previous inspection. No crane shall exceed its anniversary of the previous inspection. Inspections shall be performed in accordance with NAVFAC P-307 Appendix D. The contractor shall ensure the equipment remains in proper operating order, clean, and maintained all fluids and lubricants. The contractor shall properly document any deficiencies noted and monitor (as defined by OSHA 1926.1412 and NAVFAC P-307), repair or replace any components not meeting or exceeding the current standard. All Federal, State and Local laws and regulations shall be followed. Best industry practices shall be followed.

Replacement parts must meet or exceed current standards with P-307, Manufacturer recommended practices, best industry practices, and OSHA. All deficiencies shall be noted on a form equal to Figure 3-1 of NAVFAC P-307.

Standard: All Class 3 Cranes shall be inspected annually and kept in proper working order AQL: Cranes inspected to 100% compliance annually Deliverables: Contractor generated report identifying any deficiencies and repairs made within three (3) working days of completion

3.1.2 Weight/Load Testing- The contractor shall provide all of the tools, equipment, supplies, labor, and personnel to perform all required weight testing of the category 3 cranes located at NSWCCD. Weight testing shall be performed no later than five (5) days prior to the 4th anniversary of the previous load test (every 4 years) as defined in NAVFAC P-307 4.4.1. Weight testing shall be completed outside of the quadrennial schedule each time a repair is made that affects the crane’s load bearing capability. This is further defined in NAVFAC P-307 4.4.2.1 “When the adjustment, repair, disassembly, alteration, or replacement of a load bearing part, load controlling part, or operational safety device requires a load test for verification of satisfactory work performed, recertification is required. To determine if a load test is required, the component’s impact on holding strength shall be assessed. If holding strength could be affected by the work performed (i.e., failure to make the proper adjustment, repair, etc., could result in dropping or uncontrolled lowering of the load), then a selective inspection, load test, and recertification shall be performed. This includes rotate and travel components when the rotate or travel function may operate on an inclined plane, such as the rotate function on floating and barge-mounted cranes, and a trolley on a luffing boom. When load tests are performed, they shall include applicable portions of both the static and dynamic tests of appendix E. The extent of inspection and testing may be limited, where practical, to those parts and components of systems affected, but shall fully ensure that the adjustment, repair, disassembly, replacement, or alteration has been performed correctly, and that the crane operates properly.” If the Crane Shop Supervisor has reason to believe a category 3 crane requires a load test due to any lift, inspection, repair, or modification, they shall request in writing a load test. The contractor shall supply ten (10) load tests in addition to the quadrennial schedule per year. All load tests shall be performed in accordance with NAVFAC P-307 Appendix E.

Standard: The contractor shall provide Load Testing for each class 3 crane on a quadrennial schedule and 10 additional load tests per year.

AQL: All class 3 Cranes load tested 5 days prior to the 4th anniversary of the previous load test to 100% compliance AQL: 10 Load test Service tickets per year (in addition to quadrennial schedule) to 100% compliance Deliverables: Contractor Generated Report with previous, current and future load test dates and schedules

3.1.3 Monthly Inspections- The contractor shall perform monthly inspections on all category 3 cranes located at NSWC-Carderock. Monthly inspections shall include all required testing and review of the basic operating components of the crane. This includes but not limited to: pulleys, cables, brakes, hooks, hydraulic lines, power plants, and all safety features to ensure the equipment is ready for operational use. Repairs shall be performed within 5 working days (with regard to access) of identification to minimize impact on facility operations. Monthly inspections also include rigging gear. There is approximately 4,000 pieces of rigging gear, including straps, hooks, chains, carabiners, pulleys, block and tackles, and all other equipment requiring an annual or bi-annual inspection to maintain its certification in accordance with NAVFAC P-307 Table 14-1.

AQL: All class 3 Cranes are inspected within 30 days of previous inspection to 95% compliance and 100% compliance within 45 days.

Deliverables: Contractor generated report the first working day of each month to 95% compliance and 100% compliance by the fifth working day of each month.

3.1.4 Service Requests- The contractor shall respond to 20 service calls for repairs.

Service calls shall not exceed $2,500 individually. Service calls shall be submitted through the service desk and coordinated with the Crane Shop Supervisor. The contractor shall respond within 2 working days of notification and all deficiencies must be corrected and the crane returned to service within five (5) working days. The contractor shall provide all labor, personnel, equipment, supplies, transportation, and tools to place the crane back in operational service in compliance with all Federal, State and Local regulations. Service calls shall include all cranes, of all types and categories, on site at NSWCCD.

AQL: Respond to 20 Service calls for cranes annually to 100% compliance AQL: Respond to service calls within 2 working days to 95% compliance with 100% compliance within 5 working days and returned to working condition within 5 working days to 95% compliance and 100% compliance within 30 working days Deliverables: Contractor generated report documenting service ticket status for each service call

3.1.5 Documentation- The contractor shall perform proper documentation that meets the standards of NAVFAC P-307 for all procedures and inspections performed on all cranes.

This includes properly tagging equipment with its certification and expiration date, maintaining files of all crane certifications and readily producing files upon request of the crane shop supervisor. Documentation shall be professional and free of errors or mistakes. Documentation shall include technical writing, accurate accounts of services performed, and deemed acceptable by the crane shop supervisor.

AQL: Documentation is clear, concise, free of errors, and readily available to the crane shop supervisor to 90% compliance and corrected to 100% compliance within 24 hours of notification.

4. Location of Services

The Contractor shall perform these services at the following location:

Naval Surface Warfare Center- Carderock Division 9500 MacArthur Blvd West Bethesda, MD 20817

5. Period of Performance The Contractor shall provide these services for 365 calendar days or 1 year.

6. Points of Contact

The Contractor shall be in contact with the following individuals in performance of this contract. If the contractor has any performance questions during the duration of the contract, the contractor shall contact the below personnel.

Michael Dempsey NSWCCD Facilities Service Contract Admin Tech Specialist Michael.p.dempsey1@navy.mil 301-227-6417

7. Security Requirements: Contractor personnel working at NSWC Carderock Division must be fully identified. Contractor personnel must be cleared by Security. If not, they will not have access to the base. A list of all personnel working under this contract should be turned in immediately after award in order to allow sufficient time to process security information.

mailto:Michael.p.dempsey1@navy.mil

7.1 Contractors will provide the NSWC Security Office, the following information on all employees, staff, subcontractors personnel, etc., who will require access:

a. full name

b. date and place of birth

c. nationality (if non-U.S. Citizen, alien registration number)

7.2 If Contractor vehicles are required for use on Center, the following ID is required:

d. Make

e. Model

f. License

g. insurance information

7.3 Contract personnel are expected to perform most work during normal NSWC duty hours with some work being performed outside normal working hours. When work must be performed outside normal working hours, permission must be obtained from the Security Office through the PM.

7.4 Contractor personnel must confine themselves to the work sites specified in their contract. Visiting other areas is prohibited.

7.5 Alcoholic beverages, weapons, cameras, sound recorders, proscribed drugs and explosives are prohibited on NSWC property.

7.6 Use of Government property without prior written approval of the Contracting Officer is prohibited.

7.7 The NSAW Guard Force will arrange for special contractor parking if required.

Contractor personnel must not park in numbered spaces, areas reserved for car pools, or other prohibited areas. Posted speed limits and traffic restrictions must be observed at all times.

7.8 Accidents or problems of a security/safety nature must be reported to the NSAW Guard Force and the NSWC Safety Office immediately.

7.9 Contractor personnel working on station for less than five (5) days may be required to log in and out at the Visitor's Center each day and will not be issued an Extended Entry Contractor’s Badge.

7.10 Pursuant to federal regulations, all personnel and vehicles on NSAW property are subject to search by authorized personnel at any time.

7.11 All contractors’ personnel are required to display the NSWC issued identification badge on their person at all times while present at the laboratory. Access to NSAW property and NSWC buildings will not be allowed without this identification badge. The badge is to be displayed on the person outer clothing, above the waist and in full view.

Identification badges and vehicle passes issued to contractor personnel remain the property of the U.S. Government and must be surrendered upon completion of the Contractor at the termination of individual employment, and when requested by the

Government.

8. Smoking Restrictions: The bearing and use of lighted cigarettes, cigars, pipes, or any tobacco product is prohibited in the following areas.

a. All buildings including private offices, lobbies, and restrooms.

b. Stairways and ramps leading to building entries and exits.

c. Within 20 feet of building entries and exits.

d. Within 20 feet of heating, ventilation, and air conditioning intake ducts.

e. Hazardous areas containing flammable liquids, gases, vapors, and all other locations where there is a collection of readily ignitable combustible material.

9. Station Permits: Permits are required for, but not necessarily limited to, welding and burning.

Permits must be requested by the Contractor, and approved by the Government Representative and the Fire Department, on a daily basis. The base Fire Department Phone number is (301)227- 1333 for fire and other emergencies and (301)227-0000 for the NSAW Police.

10. Storm Protection: If a warning of gale force winds is issued, take precautions to minimize any danger to persons, and protect the work and any nearby Government property. Precautions shall include, but not be limited to, closing openings, removing loose materials, tools, and equipment from exposed locations, and removing or securing scaffolding and other temporary work. Close openings in the work if storms of lesser intensity pose a threat to the work or any nearby Government property.

11. Asbestos and Lead Material: If material is encountered which may contain asbestos and or lead and must be disturbed, do not touch the material. Should the discovery of such suspected material affect the Contractor's planned work schedule, the Contractor shall redirect the work crew to other portions of the unaffected work and modify the schedule at no additional cost to the Government. The Contracting Officer, PM, and the COR shall be notified immediately, in writing, regarding the discovery of the suspected material and of any adverse impact the Contractor may expect to incur due to this situation. Within 14 calendar days, the Contracting Officer or the Project Manager will perform laboratory tests to determine if there is asbestos or lead. If asbestos or lead is not a danger, the Contracting Officer will direct the Contractor to proceed in the identified area without change.

12. Safety Requirements: In order to provide control for protection of the life and health of employees, and other persons; avoid work interruptions in the performance of this contract; the Contractor shall comply with all pertinent provisions of the 29 CFR 1910 General, and with any additional measures the Contracting Officer may determine to be reasonably necessary. Copies of this manual may be obtained from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C., 20402. Additionally, it is the Contractor's responsibility to familiarize himself and comply with the Corps of Engineers Manual, EM 385-1-1, entitled "General Safety Requirements", and incorporate those general and additional safety requirements into daily working procedures that will provide safe working conditions during performance of this Contract. Copies of this manual may also be obtained from the Superintendent of Documents.

12.1 Safety Plan: Submit in writing a safety plan for preventing accidents and meet in conference with the PM and the COR to discuss and develop mutual understandings relative to the overall safety program, pursuant to the Contract Clause entitled "Accident

Prevention." The safety plan shall include provisions to deal with hazardous materials, pursuant to the Contract Clause entitled "Hazardous Material Identification and Material Safety Data." With respect to hazardous materials, the plan will consist of:

a. An index of hazardous materials to be introduced to the site.

b. Plan for protecting personnel and property during the transport, storage, and use of the materials.

c. Procedures for spill response and disposal.

d. Material Safety Data Sheets (MSDS) for materials listed in the index of the plan and not required in the technical section of the specification.

12.2 Lockout Or Tagout Procedure: The Contractor shall perform this work in accordance with 29 CFR 1910.147, The Control Of Hazardous Energy and the following general requirements.

12.3 Preparation: Make a survey to locate and identify all isolating devices to be certain which switches, valves, or other energy isolating devices apply to the equipment to be locked or tagged out. More than one energy source such as electrical, mechanical, or others may be involved.

12.3 Sequence Of Lockout/Tagout Procedure:

12.3.1 Notify all affected personnel that a lockout/tagout system is going to be used and the reason therefore. The authorized personnel shall know the type and magnitude of energy that the machine or equipment uses and shall understand the hazards thereof. If the machine or equipment is operating, shut it down by the normal stopping procedure such as depressing stop button, open toggle switch, etc.

12.3.2 Operate the switch, valve, or other energy isolating devices so that the equipment is isolated from its energy source. Stored energy such as in charged capacitors, springs, elevated machine members, rotating flywheels, hydraulic systems and other pressurized air, gas, steam, or water systems etc. must be dissipated or restrained by methods such as repositioning, blocking, or bleeding down the stored energy.

12.3.3 Lockout and/or tagout the energy isolating devices with assigned individual locks, tags, or additional safety measures as may be required.

12.3.4 After ensuring that no personnel are exposed, and as a check on having disconnected the energy sources, operate the push button or other normal operating controls to make certain the equipment will not operate. CAUTION:

Make sure the operating controls are returned to the “NEUTRAL” or “OFF” position after the test.

12.3.5 The equipment is now locked out or tagged out.

12.4 Restoring Machines Or Equipment To Normal Production Operations:

12.4.1 After the servicing and/or maintenance is complete and equipment is ready for normal production operations, check the area around the machines or equipment to ensure that no one is exposed.

12.4.2 After all tools have been removed from the machine or equipment, guards have been reinstalled, and personnel are in the clear, remove all lockout and tagout devices.

Operate the energy isolating devices to restore energy to the machine or equipment.

12.5 Procedure Involving More Than One Person: In the preceding steps, if more than one individual is required to lockout or tagout equipment, each shall place his/her own personal lockout or tagout device on the energy isolating devices. When an energy isolating device cannot accept multiple locks or tags, a multiple lockout or tagout hasp shall be used. If a single lock is used to lockout the machine or equipment, the single key shall be placed in a lockout box or cabinet which allows the use of multiple locks to secure it. Each employee shall then use his/her own lock to secure the box or cabinet.

As each person no longer needs to maintain his/her lockout protection, only that person shall remove his/her lock from the box or cabinet.

13. ENVIRONMENTAL PROTECTION REQUIREMENTS: Provide and maintain, during the life of the contract, environmental protection. Plan for and provide environmental protective measures to control pollution that develops during normal construction practice. Plan for and provide environmental protective measures required to correct conditions that develop during the construction of permanent or temporary environmental features associated with the project.

Comply with Federal, state, and local regulations pertaining to the environment, including but not limited to, water, air, soil, and noise pollution.

13.1 Preserve the natural resources within the project boundaries and outside the limits of permanent work. Restore to an equivalent or an improved condition upon completion of work. Confine construction activities to within the limits of the work indicated or specified.

13.2 Prevent oily or other hazardous substances from entering the ground, drainage areas, storm drainage system, or local bodies of water.

13.3 Pickup solid wastes daily and place in covered containers which are regularly removed by the Contractor from Government property. Do not prepare or cook food on the project site. Prevent contamination of the site or other areas when handling and disposing of wastes. At project completion, leave the areas clean.

13.4 Handle generated hazardous waste in accordance with 40 CFR 262. Dispose of hazardous waste in accordance with Federal, State, and local regulations including 40 CFR 263 and 40 CFR 264. Take precautions to prevent spills of oils and hazardous material. In the event of a spill, immediately notify the PM, COR, USACE Safety Office/ USACE Environmental, and initiate containment operations utilizing personnel properly trained and protected for such situations.

13.5 Keep dust down at all times, including during nonworking periods. Sprinkle or treat, with dust suppressants, the soil at the site, and other areas disturbed by operations. Dry power brooming will not be permitted. Instead use vacuuming, wet mopping, wet sweeping, or wet power brooming. Only wet cutting will be permitted for cutting concrete, and bituminous concrete.

13.5 Make the maximum use of low-noise emission products, as certified by the EPA.

Blasting or the use of explosives is prohibited.

14. TRANSPORTATION ON STATION: No employee of the Contractor shall be allowed to operate a privately owned vehicle on Station other than for ingress and egress. All private vehicles shall be parked in the designated areas and remain until the end of the work shift at which time they shall be driven directly to the gate for exit from the station. Any desired transportation of personnel, supplies or equipment on station by the Contractor shall be accomplished by the use of one (1) registered vehicle furnished by the Contractor and operated by an assigned driver appointed by and responsible to his "Supervisor”.

15. AVAILABILITY OF UTILITY SERVICES: The Government will furnish water, electric lights, and power in the quantity not to exceed the amount necessary for the normal prosecution of the work, at the nearest available outlet. The Contractor shall make all piping and wiring connections thereto and shall extend the services to the site of the work. On completion of the work, all such temporary connections shall be removed by the Contractor and any removed or damaged portions of the Government services at the points of connection shall be repaired or replaced.

15.1 Other Utilities: The Contractor shall make arrangements to obtain all utilities not furnished by the Government, at his/her own expense.

15.2 The Government will not provide refuse facilities. The Contractor will be required to dispose of all garbage and other waste materials generated by his work at a licensed off-site landfill.

16. All work is subject to inspection by a designated Government Representative and/or the COR during performance of specified work, and upon completion of the job. The Government will perform the pre-final inspection to verify that the work is complete and the facility ready to be occupied. A Government punch list will be developed as a result of this inspection. All items in the punch list shall be corrected in timely manner and shall be approved by the Government and /or COR.

17. The work will be under the general direction of an COR, an NSWC Project Manager - Code 1021, or another officer or representative of the Government, designated as appropriate, in either block 4 of Standard Form 252, block 24 of Standard Form 33, block 6 of Standard Form 26, or block 6 or 7 of DD Form 1155. Except in connection with the Disputes Clause of this Contract, this designated person has complete charge of, and exercises full supervision over work so far as it affects the interests of the Government.

17.1 For the purposes of the disputes clause, the "Contracting Officer" is the Chief, Contracts Branch, Army Corp of Engineers, Philadelphia, or his representative warranted for this purpose. Any claim submitted under the Disputes Clause shall be submitted to the Contracting Officer in care of the person designated, as appropriate, in either block 4 of Standard Form 252, block 24 of Standard Form 33, block 6 of Standard Form 26, or block 6 or 7 of DD Form 1155 as the representative of the Contracting Officer.

17.2 The provisions of this paragraph or provisions elsewhere in this Contract regarding supervision, approval, or direction by the Contracting Officer or the designated person shall not relieve the Contractor of responsibility for accomplishing the work, with regard to sufficiency or time of performance, except as otherwise provided.

18. ORAL MODIFICATION: No oral statement of any person other than the Contracting Officer, or his representative, as provided in the clause in the Contract entitled "Changes", shall in any manner of degree modify or otherwise affect the terms of this Contract.

19. WORK SCHEDULE: All work shall be performed to minimize disruption to building occupants. Electrical labeling and various other electrical repairs shall be performed before 0630 or after 1700 on weekdays, or on weekends. Interruptions to electrical service shall also be limited to before 0630 or after 1700 on weekdays, or on weekends. It is recommended that the majority of the work be performed during normal working hours, starting 0630 Monday.

Incidental work may be completed during normal working hours.

***END OF SPECIFICATION***

Cat 3 Crane Inventory

Number Location Crane ID Crane Type Year Installed Capacity

1 1 C0001 Bridge 1940/2001 6000

2 9 C0002 Bridge 2006 10000

3 9 C0004 Bridge 2005 19900

4 3 C0005 Monorail 1940 6000

5 3 C0006 Monorail Unknown 8000

6 3 C0008 Monorail Unknown 2000

7 3 C0009 Monorail Unknown 3000

8 4E C0013 Monorail 2007 6000

9 4E C0014 Monorail 2007 6000

10 4E C0015 Monorail 2007 6000

11 4E C0016 Monorail 2007 6000

12 4E C0017 Monorail 2007 6000

13 4E C0018 Monorail 2018 6000

14 4E C0019 Bridge 2014 10000

15 4E C0020 Bridge 2014 10000

16 4W C0027 Monorail Unknown 2000

17 4W C0028 Monorail Unknown 2000

18 1 C0030 Hoist Unknown 4000

19 4W C0034 Bridge Unknown 10000

20 4E C0040 Bridge 1975 500

21 3 C0041 Jib 2009 1000

22 7 C0048 Monorail 2009 4000

23 9 C0050 Hoist 1984 2000

24 18 C0061 Monorail 2006 10000

25 18 C0062 Bridge Unknown 19900

26 18 C0063 Monorail Unknown 4000

27 18 C0065 Monorail 2010 2000

28 18 C0066 Monorail 2010 2000

29 19 A Bay C0067 Jib Unknown 4000

30 19 C0069 Jib 2008 4000

31 19 C0071 Jib 2008 4000

32 19 C0075 Monorail Unknown 6000

33 19 C Bay C0076 Jib Unknown 4000

34 21 C0089 Monorail Unknown 1000

35 21 C0090 Monorail Unknown 1000

36 4E C0097 Hoist Unknown 4000

37 4E C0101 Monorail 2018 2000

38 4W C0102 Jib Unknown 4000

39 4E C0104 Hoist 1996 6000

40 19 B Bay C0107 Bridge 1965 40000

41 19 B Bay C0107A Bridge 1965 20000

42 4E C0110 Bridge Unknown 19900

43 4W C0113 Monorail Unknown 6000

44 3 C0123 Monorail Unknown 4000

45 4E C0124 Monorail Unknown 1000

46 125 C0125 Bridge 2015 10000

47 9 C0127 Jib 2014 1000

48 9 C0128 Bridge 1994 19900

49 9 C0129 Bridge 1994 19900

50 60 C0130 Bridge 1996 4000

51 60 C0131 Bridge 1996 4000

52 60 C0132 Bridge 1996 10000

53 60 C0133 Bridge 1996 4000

54 60 C0134 Bridge 1996 10000

55 60 C0135 Bridge 1996 10000

56 60 C0136 Bridge 1996 4000

57 60 C0137 Bridge 1996 4000

58 60 C0138 Bridge 1996 4000

59 60 C0139 Bridge 1996 4000

60 60 C0143 Bridge 1996 4000

61 60 C0144 Bridge 1996 4000

62 60 C0145 Monorail 1996 4000

63 60 C0146 Monorail 1996 4000

64 60 C0147 Monorail 1996 4000

65 60 C0148 Monorail 1996 4000

66 60 C0157 Bridge 1996 4000

67 18 C0160 Bridge 1996 4000

68 61 C0162 Monorail 1998 4000

69 18 C0164 Bridge 2000 4000

70 106 C0165 Jib 2000 1000

71 68 C0167 Bridge 2000 4000

72 18 C0168 Bridge 2006 4000

73 43 C0169 Bridge 2017 19900

74 104 None Bridge Unknown 20000

75 104 None Monorail Unknown 20000

76 104 None Monorail Unknown 20000

77 104 None Gantry Unknown 20000

File details come from the government source that posted it. Updated .