T20W163-850-002_H.R._SPIES_Docking_Diagram.pdf

PDF 416 KB Posted

Attached to
0049SHIP OVERHAUL S/V HR SPIES
Solicitation number
W912BU-18-R-0049
Issued by

About this file

Drawings

View the file

Other files

File Type Posted
Amendedsolicitation-18-R-004.docx DOCX document
T20W163-101-016.pdf PDF
A.8.3._Draft_Solicitation_and_Review_Comments-18R-0049signed.pdf PDF
T20W163-101-014.pdf PDF
T20W163-101-002.pdf PDF
Rudder_Construction_CT_Dwg.pdf PDF
T20W163-101-015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Profile View

Baseline

14'-0"

26'-0"

35'-0"

42'-0"

1'-6"

11'-2"

10'-6"

No Blocking in this area No Blocking in this area

Blocking BlockingFoil between hulls

Blocking

24'-7"

52'-2"

31'-6"

6'-6"

Min block height of 28"

3' -2

Longitudinal Center of gravity in lightship condition Mass 92000 lb

DescriptionRev Date Checked

Init.

RLFIssued for Reference30 Nov 16

PROJECT:

TITLE:

STATUS:

APPROVAL TEKNICRAFT:

PLOT SIZE:SCALE: REV: DRAWING No:

USACE REF No.:

Rev.Rev.

Docking Diagram USACE REF No.:

TBD

Hull Number:

TD20-46AA

PO Box 160, Beachlands Auckland, New Zealand

Tel: +64 9 536 5070 design@teknicraft.com www.teknicraft.com

1"=6'

NDW

File details come from the government source that posted it.