Responses to Requests for Information (RFIs)
Q.1 Section SC-15 Watch Service Requirements: “The contractor Shall provide a 24 hour watch service to respond to any emergencies/alarms on vessel while in contractor’s possession.”
a. General Ship Repair has 2 working shifts, working hours from 0700 to 0030 week days. We have a burglar and fire alarms system monitored by ADT 24 hours a day as well as watch cameras providing coverage of the whole yard. These measures were acceptable for the Hayward. Will this satisfy the watch service requirement?
A. Burglar, fire alarm systems and watch cameras monitored by ADT will satisfy this requirement.
Q.2 Section TP 1.24 Gas-Freeing Compartments:
If GSR is directed to open additional compartments under this section, a competent person check meets the OSHA, ABS and USCG requirements to provide “Safe for Entry”. Would this satisfy the COR requirements as well?
A. A competent person check meets this requirement
Q.3 1.30 Galley/Mess Deck Replacement
a. Please provide drawings of required galley configuration and cabinet fabrication details.
b. Please provide drawings / pictures of current galley configuration for reference.
A. Drawing will be added to FBO
Q.4 TP 1.32 Galley Exhaust Vent
a. Please provide details (make, model, specs etc) for the Galley range hood.
b. Please provide pictures of existing vent hood for reference.
A. Drawing will be added to FBO
Q.5 1.33 Fabricate two new Rudders
a. Please provide Drawing 351-H400-0001 – Rudder & Rudder Stock Details
A. Drawing will be added to FBO
Q.6 TP 2.05 Sea Valves
a. There are not any sea chest valves listed here.
A. TP 2.05 Sea Valves are listed in the scope of work
Q.7 TP 2.09 Replace Port and Stbd Main Engine Exhaust Piping
a. Please provide Drawings SD-6, SD-6A, 91-200-57, 91-300-P-6, 91-500-M-2 A. Drawing will be added to FBO
Q.8 TP 2.12 Propeller Shafts
a. Please provide Drawing 351-M200-001 – Shafting
A. Drawing will be added to FBO
Q.9 TP 2.21 Renewal of Deck Vents
a. Please provide Drawing 351-M520-0002
A. Drawing will be added to FBO