AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
THIS AMENDMENT ANSWERS RFIs AND MODIFIES THE SPECIFICATIONS.
RFIs ARE DUE NO LATER THAN 17 SEPTEMBER 2018 BY 1:00 PM EST
BID OPENING DATE IS CHANGED FROM 17 SEPTEMBER 2018 TO 21 SEPTEMBER 2018 AT 11:00 AM EST
Please indicate receipt of this amendment on the Standard Form 1442 (Solicitation, Offer, and Aw ard) as Amendment 0001. Failure to acknow ledge all amendments may be cause for rejection of the bid.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU18B0015
X 9B. DATED (SEE ITEM 11)
17-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2018
CODE
CONTR DIV-CONTRACTS BR
USACE, PHILA DISTRICT
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
This page was intentionally left blank for duplex printing.
Amendment No. 0001
IFB W912BU-18-B-0015
14. DESCRIPTION OF AMENDMENT (continued)
a. REQUESTS FOR INFORMATION (RFI) WITH RESPONSES: RFI’s with responses, annotated Amendment No. 0001, are attached to this amendment.
b. SECTION 00 10 00 – SOLICITATION:
(1) The required response date/time has changed from 17-Sep-2018 12:00 AM to 21-Sep-2018 10:00 AM.
(2) Please delete page 3 of 175 and page 4 of 175.
(3) Bidding Schedule: Please delete the Bidding Schedule in its entirety and substitute the revised Bidding Schedule, annotated Amendment No.
0001, attached hereto
c. SECTION 00 70 00 - CONDITIONS OF THE CONTRACT: The following have been modified: 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 110 calendar days after NTP. The time stated for completion shall include final cleanup of the premises.
The Contracting Officer has the right to exercise Option 1 within 60 calendar days. The contract will be extended by 20 days if Option 1 is awarded.
(End of clause)
d. SECTION 00 73 46 - WAGE RATES: Please delete pages 00 73 46-22 through 00 73 46-31 in their entirety and substitute revised pages 00 73 46-22 through 00 73 46-31, annotated Amendment No. 0001, attached hereto.
e. TECHNICAL SPECIFICATIONS:
(1) SECTION 01 30 00 – ADMINISTRATIVE REQUIREMENTS: Please delete this section in its entirety and substitute revised Section 01 30 00, annotated Amendment No. 0001, attached hereto.
(2) SECTION 01 33 00 – SUBMITTAL PROCEDURES: Please delete pages 01 33 00- 15 through 01 33 00-18 in their entirety and substitute revised pages 01 33 00-15 through 01 33 00-18, annotated Amendment No. 0001, attached hereto.
(3) SECTION 01 35 26 - GOVERNMENTAL SAFETY REQUIREMENTS: Please delete page 01 35 26-30 in its entirety and substitute revised page 01 35 26-30, annotated Amendment No. 0001, attached hereto.
(4) SECTION 35 20 23 – DREDGING: Please delete this section in its entirety and substitute revised Section 35 20 23, annotated Amendment No. 0001, attached hereto.
f. APPENDICES:
(1) TABLE OF CONTENTS: Please delete the Appendices Table of Contents in its entirety and substitute the revised Appendices Table of Contents, annotated Amendment No. 0001, attached hereto.
14. DESCRIPTION OF AMENDMENT (continued)
(2) APPENDIX B-46 – PIPE CROSSING REPORTS: Please insert the following new Appendix B-46, in its entirety, annotated Amendment No. 0001, attached hereto.
g. CONTRACT DRAWINGS:
(1) Please delete the following drawings in their entirety:
C-103 C-104 C-301
(2) Please delete the following drawings in their entirety and substitute the revised drawings of the same numbers, with the latest revision date of 14 September 2018, attached hereto:
G-001 C-105 C-001 C-106 C-101 C-302
h. Please indicate receipt of this amendment on Standard Form 1442 (SOLICITATION, OFFER, AND AWARD) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the Bidder.
Request For Information Page 1
Request For Information Page 2
00 10 00-3
BIDDING SCHEDULE
(To be attached to SF 1442)
Item Estimated Unit Estimated No. Description Quantity Unit Price Amount
BASE BID:
1. Mobilization & Demobilization 1 JOB L.S. $___________
2. Dredging – Maintenance Material from Marcus Hook Range and New Castle Range 1,350,000 CY $_______ $___________
3. Interim Mobilization &
Demobilization between Marcus Hook and New Castle Ranges 1 JOB L.S. $___________
TOTAL ESTIMATED BASE BID AMOUNT $______________
OPTION 1:
4. Interim Mobilization &
Demobilization to Marcus Hook Anchorage 1 JOB L.S. $___________
5. Dredging - New Work Material from Marcus Hook Anchorage 298,000 CY $_______ $___________
TOTAL ESTIMATED OPTION 1 AMOUNT $______________
TOTAL ESTIMATED BASE BID AND OPTION 1 AMOUNT $_________________
NOTE: Bidders must bid on all items.
This page was intentionally left blank for duplex printing.
General Decision Number: NJ180062 09/07/2018 NJ62
Superseded General Decision Number: NJ20170062
State: New Jersey
Construction Type: Heavy
County: Salem County in New Jersey.
HEAVY CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 02/09/2018 2 06/01/2018 3 07/13/2018 4 08/31/2018 5 09/07/2018
ASBE0042-003 06/26/2017
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR (Includes the application of all insulating materials, protective coverings, coatings and finishings to all types of mechanical systems; also, the
Amendment No. 0001
Section 00 73 46 Page 22 application of firestopping material to openings and penetrations in walls, floors, ceilings and curtain walls; also, all lead abatement).......................$ 32.16 24.42
CARP0006-009 11/01/2017
Rates Fringes
CARPENTER (Scaffold Builder).....$ 47.92 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0006-013 11/01/2017
Rates Fringes
CARPENTER (Including Form Work)............................$ 47.92 57%
The first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
CARP0454-009 05/01/2016
Rates Fringes
PILEDRIVERMAN....................$ 43.95 31.32
PAID HOLIDAYS:
New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day; provided that the worker works any of the three days in the five-day work week preceding the holiday and the first work day after the holiday.
CARP0715-007 05/01/2018
Rates Fringes
Millwright.....................$ 48.80 58%+0.20
Work of erection and dismantling of elevators and towers, such as concrete conveyors and temporary material
Amendment No. 0001
Section 00 73 46 Page 23 elevators, scaffolding or other structures to be used as scaffolding inside or outside of buildings: the first sixty feet at the regular rate, 10% per hour additional for each additional fifty feet thereafter.
ELEC0351-013 10/02/2017
Rates Fringes
Electricians:
Cable splicer on lead cable.$ 46.51 72.54% + .65 Electrician and cable splicer.....................$ 46.55 77.03%+.65
ENGI0825-021 07/01/2018
Rates Fringes
Power equipment operators:
GROUP 1.....................$ 51.77 30.45
GROUP 2.....................$ 50.18 30.45
GROUP 3.....................$ 48.27 30.45
GROUP 4.....................$ 46.64 30.45
GROUP 5.....................$ 44.93 30.45
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous material, and when personal protective equipment is required for respiratory, skin and eye protection: 20% per hour additional.
PAID HOLIDAYS:
New Year's Day, Washington's Birthday observed, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided
1) that the worker works three of the preceding five work days before the holiday; or, the work day before the holiday and the work day after the holiday; and, 2) that the worker works the work day before and the work day after the holiday.
DEFINITION OF GROUPS:
GROUP 1:
Backhoe, Including Backhoe Track; Boom; Concrete Paving Machine; Crane (all types, including overhead and straddle
Amendment No. 0001
Section 00 73 46 Page 24 traveling type); Drill (down-the-hole drill, rotary drill, self-propelled hydraulic drill, self-powered drill);
Elevating Grader; Excavator; Front End Loader (5 cu. yd.
and over); Piledriver (length of boom, including length of leads, shall determine premium rate applicable)
GROUP 2:
Backhoe Loader Combo; Concrete Pumper; Grader/Blade (Finish);
Hoist; Hydraulic Crane, 10 Tons and under; Front End Loader (2 cu. yd. but less than 5 cu. yd.); Scraper; Side Boom
GROUP 3:
Asphalt Spreader; Bulldozer; Compressor(2 or 3) (in Battery) (within 100 ft.); Crusher; Forklift; Front End Loader (1
cu. yd. and over but less than 2 cu. yd.); Lull; Mechanic;
Paver, Asphalt; Roller, Blacktop; Tractor;
GROUP 4:
Broom; Compressor (Single); Farm Tractor; Front End Loader (under 1 cu. yd.); Roller, Grade; Pump
GROUP 5:
Oiler
IRON0399-007 07/01/2015
Rates Fringes
IRONWORKER (Structural, Reinforcing and Ornamental)......$ 44.60 27.25
* LABO0172-009 09/01/2018
Rates Fringes
Laborers:
Common or General Laborer;
Landscape Laborer, Power Tool Operator...............$ 40.00 29.80 Pipelayer...................$ 40.70 29.80
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is required to wear Level A, B or C personal protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where the worker is not required to wear Level A, B, Amendment No. 0001
Section 00 73 46 Page 25 or C personal protection: $1.00 per hour additional.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day, Thanksgiving Day and Christmas Day; provided that the worker works three days for the same employer within a period of ten working days consisting of five working days before and five working days after the day upon which the holiday falls or is observed.
LABO0222-013 07/01/2012
Rates Fringes
LABORER
MASON TENDER:
Cement/Concrete.............$ 29.35 23.07
PAIN0711-023 05/01/2017
Rates Fringes
Painters:
Work on bridges (Major Bridges Designed for Commercial Navigation)......$ 54.13 27.12
PAIN0711-024 05/01/2017
Rates Fringes
Painters:
New Construction Brush and roller...........$ 40.19 22.72 Repaint work, on projects on which no major alterations occur.
Brush and roller...........$ 29.05 18.91
PLAS0592-035 05/01/2018
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 38.45 36.46
PLUM0322-010 05/01/2018
Amendment No. 0001
Section 00 73 46 Page 26
Rates Fringes
PIPEFITTER.......................$ 46.17 40.34
TEAM0676-005 05/01/2017
Rates Fringes
Truck drivers:
Dump Truck Drivers; Pickup Truck.......................$ 34.20 25.485 Off the Road Truck;
Flatbed Truck...............$ 34.55 25.485
Hazardous waste removal work:
Work on a state or federally designated hazardous waste site, where the worker is in direct contact with hazardous materials, and when personal protective equipment is required for respiratory, skin and eye protection: $3.00 per hour additional.
Work on a state or federally designated hazardous waste site, where personal protection A, B, C or D is NOT required:
$1.00 per hour additional.
SHIFT WORK:
An owner mandated irregular shift staring any time other than between 6:00 am and 8:00 am to receive $1.00 per hour, for each hour worked, in addition to the regular rate of pay.
PAID HOLIDAYS:
New Year's Day, President's Day, Memorial Day, Independence Day, Labor Day, Presidential Election Day, Veteran's Day (or the day after Thanksgiving, at the option of the contractor), Thanksgiving Day, the afternoon of the day before Christmas (Dec. 24) provided that the worker works in the morning, and Christmas Day, provided that the worker works or is available for work on at least two days in the week in which the holiday occurs.
BEREAVEMENT PAY:
In case of a death in the worker's immediate famiy (mother, father, wife, husband, children, brother, sister, current mother-in-law, current father-in-law, grandparents), the worker shall be allowed leave not to exceed three (3) days straight-time pay, provided that he or she shall receive no pay unless the day of death and the burial day falls on a regular work day, and not on days off, holidays, vacation, Saturdays or Sundays.
Amendment No. 0001
Section 00 73 46 Page 27
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
Amendment No. 0001
Section 00 73 46 Page 28
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
Amendment No. 0001
Section 00 73 46 Page 29
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an
Amendment No. 0001
Section 00 73 46 Page 30 interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Amendment No. 0001
Section 00 73 46 Page 31
SECTION 01 30 00
ADMINISTRATIVE REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2014) Safety and Health Requirements Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 88 Pilot Rules
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Notice To Mariners
Movement Of Navigation Aids
Evidence Of Insurance
Placing Submerged Pipelines Across The Channel
Utility Company Correspondence
1.3 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The notice to proceed (NTP) for this project is anticipated to be issued on 11 October 2018. In addition to FAR 52.211-10 of Section 00 70 00 CONTRACT
CLAUSES:
a. Complete base bid work for use not later than 110 calendar days after the date of NTP.
b. Commence dredging under this contract within 10 calendar days after receipt of NTP.
c. The Contracting Officer has the right to exercise Option 1 within 60 calendar days after the date the Contractor receives the notice to proceed for the Base Bid work. If awarded, the Contract will be extended by 20 calendar days if Option 1 is awarded.
Section 01 30 00 Page 1
1.4 LIQUIDATED DAMAGES - CONSTRUCTION (SEPT 2000)
The liquidated damages amount for FAR 52.211-12 in Section 00 70 00 CONTRACT CLAUSES is $2,000.00 per day.
1.5 SUPERVISION
1.5.1 Minimum Communication Requirements
Have at least one qualified superintendent, or competent alternate, capable of reading, writing, and conversing fluently in the English language, on the job-site at all times during the performance of contract work. In addition, if a Quality Control (QC) representative is required on the contract, then that individual must also have fluent English communication skills.
1.5.2 Superintendent Qualifications
The project superintendent must have a minimum of 10 years experience in construction with at least 5 of those years as a superintendent on projects similar in size and complexity. The individual must be familiar with the requirements of EM 385-1-1 and have experience in the areas of hazard identification and safety compliance. The individual must be capable of interpreting a critical path schedule and construction drawings. The qualification requirements for the alternate superintendent are the same as for the project superintendent. The Contracting Officer may request proof of the superintendent's qualifications at any point in the project if the performance of the superintendent is in question.
1.5.2.1 Duties
The project superintendent is primarily responsible for managing and coordinating day-to-day production and schedule adherence on the project.
The superintendent is required to attend partnering meetings, and quality control meetings. The superintendent or qualified alternative must be on-site at all times during the performance of this contract until the work is completed and accepted.
1.5.3 Non-Compliance Actions
The Project Superintendent is subject to removal by the Contracting Officer for non-compliance with requirements specified in the contract and for failure to manage the project to insure timely completion. Furthermore, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to such stop orders is acceptable as the subject of claim for extension of time for excess costs or damages by the Contractor.
1.6 PRECONSTRUCTION CONFERENCE
After award of the contract but prior to commencement of any work at the site, meet with the Contracting Officer to discuss and develop a mutual understanding relative to the administration of the value engineering and safety program, preparation of the schedule of prices or earned value report, shop drawings, and other submittals, scheduling programming, prosecution of the work, and clear expectations of the "Interim DD Form 1354" Submittal. Major subcontractors who will engage in the work must also attend.
Section 01 30 00 Page 2
1.7 U.S. COAST GUARD COORDINATION MEETING
Prior to any work, conduct coordination meeting with U.S. Coast Guard and USACE to facilitate safe marine traffic scheme for navigation.
1.8 PHYSICAL DATA (APR 1984)
Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. (FAR 52.236-4)
a. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by surveys. Samples of material to be dredged and dated as shown were obtained by using harpoon samplers.
b. Tide Data. Tide tables and tidal current tables for the Delaware River may be obtained from the National Ocean Service, Distribution Division, 6501 Lafayette Avenue, Riverdale, MD 20840. The channel depths specified herein are referenced to mean lower low water. The mean range of tides in the Delaware River opposite the mouth of the Christina River is 5.6 feet.
The average currents in the Christina River are 0.2 knots on flood and 0.8 knots on ebb.
c. Weather Conditions. The site of the work varies from sheltered to exposed conditions. It is believed that work can be performed during all seasons of the year except during winter months when ice conditions may interfere with dredging operations, subject to the seasonal time restrictions specified in Section 35 20 23 DREDGING.
d. Channel Traffic. Traffic in the work area consists of ocean going and coastwise vessels, tugs and barges, and pleasure craft. Passing vessels may interfere with dredging operations.
e. Conditions of Channel. The channel was previously dredged to varying depths. The following records are available for inspection by prospective bidders in the Office of the District Engineer, U.S. Army Engineer District, Wanamaker Building, 100 Penn Square East, Philadelphia, PA 19107-3390:
(1) Soundings after dredging, most recent dredging.
(2) Examinations and soundings before dredging, most recent dredging.
(3) Examinations and soundings (before and after dredging) for 1982 to the present for all dredging locations.
(4) Records of sampling, most recent investigation.
(5) NADP Form 27, Report of Hopper Dredge Operation (most recent dredging).
(6) Marcus Hook and New Castle Ranges, and Wilmington Harbor: The Government has in the past experienced significant shoaling during dredging. The Contractor is cautioned to evaluate for himself the effect of bottom changes between before-dredging surveys and the completion of the work assignment. The records of after-dredging
Section 01 30 00 Page 3 surveys for contracts are available for inspection.
f. Obstruction of Channel. The Government will not undertake to keep the channel free from vessels or other obstructions, except to the extent of such regulations if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act approved 8 August 1917. The Contractor is required to conduct the work in such a manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the channel as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. The Contractor shall request the U.S. Coast Guard to issue a Notice to Mariners for each work assignment advising navigation interests that the Contractor's dredging plant will be operating in the work assignment waterway. The Contractor shall submit each such request to the U.S. Coast Guard, MSO/Group Philadelphia, 1 Washington Avenue, Philadelphia, PA, 19106 for Delaware River work assignments. The Contractor shall furnish a copy of each request to the Contracting Officer not less than five days prior to the start of dredging. Each request shall contain the approximate time required for completion of dredging. The Contractor shall also notify the U.S. Coast Guard prior to the movement of his dredge plant from one acceptance section to another on the opposite side of the channel. Upon completion of dredging in a work assignment area, the Contractor shall promptly remove his plant, including ranges, buoys, piles and other marks placed by him under the contract in navigable waters and on shore.
g. Navigation Aids. Do not relocate or move any aids to navigation that have been established by the U.S. Coast Guard. If it becomes necessary to have any aid to navigation moved in order to complete dredging operations under this contract, notify the Fifth Coast Guard District (dpw) at least 45 days prior to the desired date for movement of the aid. To request a relocation, contact Waterways Management Section, Assistant Section Chief/NJ, DE, PA: LTJG Hannah Cronin at (757)398-6516; e-mail cgd5waterways@uscg.mil or FAX (757)398-6303 at least 45 days before the desired date for movement of the aid. When making a request by telephone, speak to the designated points of contact. The leaving of voicemail messages will not be acceptable. The Fifth CG District (dpw) will coordinate all temporary relocations or discontinuances. A copy of each request to the USCG for Movement of Navigation Aids (including records of telephone conversations) shall be furnished to the Contracting Officer.
h. Location. The potential work assignment areas are at various locations in the Delaware River between Stations 117+000 and 237+000 and Wilmington Harbor, Christina River. The Contracting Officer reserves the right to issue additional work assignments in the Delaware River project channel.
Should additional work assignments be issued, the Government will make available appropriate disposal area locations.
i. Laying of Submerged Pipelines and Obstruction of Channel. All discharge pipelines crossing the navigation channel shall be submerged. Should it become necessary in the performance of this contract to use a submerged pipeline, the Contractor shall notify the Contracting Officer in advance of the schedule for placement of the pipeline. If the submerged line is to be placed across a navigable channel, the Contractor shall submit a request for approval, at least 3 working days (Sundays and holidays excluded) prior to the desired closure date, to the U.S. Coast Guard, MSO/Group Philadelphia, 1 Washington Avenue Philadelphia, PA 19147. A copy of each request to the USCG for placing submerged pipelines across the channel
Section 01 30 00 Page 4 shall be furnished to the Contracting Officer. This request shall contain the following information:
(1) Location (Channel Centerline Stationing) and depth (over the top ofthe pipeline) at which the submerged line will be placed;
(2) The desired length of time the channel is to be closed;
(3) The date and hour placement or removal will commence;
(4) The date and hour of anticipated completion; and
(5) The name and telephone number of the person to be contacted for information and response to any emergency condition.
The Coast Guard has indicated that the requirements of navigation may make it necessary to establish times other than those requested. Coordinate plans with the Coast Guard sufficiently in advance of the planned closing to prevent delay to the dredging operations and comply with the Coast Guard requirements. The minimum depth to the top of any submerged pipe in the Delaware River shall not be less than that shown as the required dredging depth.
j. Bridge and Utility Line Crossings (Delaware River):
(1) Bridges: The following bridges cross the Delaware River between Delaware Bay and Philadelphia, PA. The vertical clearances presented are above Mean High Water.
HORIZONTAL VERTICAL MILES
LOCATION TYPE CLEARANCE CLEARANCE ABOVE MOUTH
Del. Memorial Twin Bridges Fixed Hwy. 2000 ft. 175 ft. 68.9 Pigeon Point, Delaware
Commodore Barry Fixed Hwy. 1644 ft. 180 ft. 81.4 Bridge, Chester, PA
Walt Whitman Bridge Fixed Hwy. 1930 ft. 139 ft. 96.8 Packer Avenue, Philadelphia, PA
Benjamin Franklin Fixed Hwy. 1686 ft. 129 ft. 100.2 Bridge, Race Street, Philadelphia, PA
Penn Central RR Co. Vert. Lift 500 ft. 49 ft.(down) 104.6 135 ft. (up)
(2) The location and elevation of oil, gas, telephone and power lines crossing the river are shown in the following table:
LOCATION DESCRIPTION ELEVATION
Just north of Pea Patch Aerial power cables Min. Height 223 ft Island between Red Lion (Delmarva Power & above MHW across Creek, DE and Killcohook Light Co.) navigation channel National Wildlife Refuge
Section 01 30 00 Page 5
New Castle, Del. across 2 Submarine telephone Min. depth 59 ft.
Deepwater Range to cables (AT & T) below MLW Penns Beach, NJ across channel
Pigeon Pt., Del. to 8 Submarine power cables 50 ft. below Deepwater Pt., NJ (Del. Power & Light Co.) MLW on natural bottom
Claymont, Del. across 20 inch submarine gas Min. depth 60 ft.
Marcus Hook Range pipeline (Columbia below MLW to Logan Twp., NJ Gas Transmission Corp.) across channel
Lower end of Marcus Hook 1-8 inch, 3-6 inch, and Min. depth 60 ft.
Anchorage, between New 3-4 inch submarine pipe below MLW Castle Co., DE & Logan Twp. lines (Sunolin Chemical Gloucester, Co., NJ Co.)
Lower end of Marcus Hook l-l6 inch submarine pipe Min. depth 60 ft.
Anchorage, between New line (Transcontinental below MLW Castle Co., DE & Logan Twp. Gas Pipeline Co.)
Gloucester, Co., NJ
Just south of Del. State 2-30 inch submarine oil Min. depth 57 ft.
line across Marcus Hook pipelines (Colonial below MLW Range and Anchorage Pipeline Co.) across channel between Claymont, Del. and anchorage and Logan Twp., NJ
Just north of Del. State 12 inch Submarine gas 65 ft. below line at Marcus Hook, PA to pipeline (Transconti- MLW across a point 1-1/2 miles down- nental Gas Pipeline channel and stream from mouth of Corp.) present anchorage Raccoon Creek, Logan Twp., Gloucester Co., NJ
Near upstream end of 2-20 inch,1-6 inch sub- Min. depth 52.6 Marcus Hook Range, marine gas pipelines ft. below MLW between Chester, PA (Transcontinental across channel and Logan Twp., Pipeline Corp.) and anchorage Gloucester Co., NJ
Near upstream end of Aerial power cables Min. height 210 Marcus Hook Range, (Phila. Elec. Co. ft. above MHW between Chester, PA & Atlantic City and Logan Twp., Elec. Co.)
Gloucester Co., NJ
Near upstream end of Submarine power On bed of river Marcus Hook Range, cables (Phila. Elec.
between Chester, PA Co. & Atlantic City and Logan Twp., Elect. Co.) 2 cables Gloucester Co., NJ between PA shore & westerly tower and 2 cables between NJ shore & easterly tower
Approximately 50 ft. 1-8 inch, 1-10 inch, Min. depth 56 ft.
below Tinicum Range 1-12 inch, submarine below MLW Front Light between pipelines (Sacony
Section 01 30 00 Page 6
Paulsboro, NJ and Vacuum Oil Co.)
Tinicum Twp., Del. Co., PA
Between Hog Island, 1-10 inch, submarine Min. depth 58 ft.
Delaware Co., PA & West petroleum pipeline below MLW Deptford, NJ (Colonial Pipeline Co.)
Opposite International 1-24 inch, submarine 60 ft. below MLW Airport, Phila., PA pipeline (Laurel across channel across Mifflin Range Pipeline Co.) and anchorage Sta. 65+550
Opposite International 1-8 inch, 1-12 inch, 55 ft. below MLW Airport, Phila., PA, submarine petroleum across channel and across Mifflin Range pipe lines anchorage Sta. 64+750 (Sinclair Pipe Line Co. & Gulf Oil Corps.)
1600 ft. downstream 2-10 inch, submarine 60 ft. below MLW Walt Whitman gas pipe lines across channel Bridge (Transcontinental and anchorage Gas Pipe Line Corp.)
Foot of Arch St. Phila., 12 submarine telephone In single trench, PA, to foot of Penn St., cables, 3 submarine 50 ft. below MLW Camden, NJ pipelines (Bell between U.S. Govt.
Telephone Co. of PA) pier-head lines
Just north of Ben Franklin Submerged fiber optics Min. depth 10 ft Bridge from Weeks cable (Lightnet Corp.) below authorized Marine Inc. property in Federal project Camden, NJ to Pier 25 in depths Phila. PA
(3) Take all necessary precautions to prevent damage to these utilities. The Contractor shall cause timely notice of the dredging to be given to the owners and, when in the opinion of the Contractor such action is necessary, he shall request that the said owner or owners mark the pipelines or move the cables so as to avoid interference with the dredging operations. Requests made by the Contractor shall be within 30 days following his receipt of the Notice to Proceed.
(4) The above information may not be complete and it is the Contractor's responsibility to investigate all utility crossings.
Reports from Utility companies for pipelines in Option 1 area of work, are included in the Appendices, and are furnished for information only. Before beginning the work the Contractor shall contact all utility companies to verify the location of all underground utilities.
Submit copies of all Utility Company correspondence.
k. Bridge to Bridge Radio Telephone Equipment. In order that radio telephone communication may be made with passing vessels, all dredges engaged in work under the contract shall be equipped with and operate bridge-to-bridge radio telephone equipment. The radio telephone equipment shall operate on VHF Channel 13 (156.65 MHZ) with low power output having a communication range of approximately ten miles. The frequency has been approved by the Federal Communication Commission.
l. Disposal Areas: The disposal areas available for this contract, as
Section 01 30 00 Page 7 shown on the Contract Drawings, are: Pedricktown North Disposal Area and Killcohook Area #1, subject to the following:
(1) Either or both of the disposal areas designated above may be utilized for material dredged under the Base Bid.
(2) Utilize Pedricktown North Disposal Area for Option 1.
(3) Extend the discharge end of the dredge pipe 40 feet past the interior crest of the containment dike. Support the extension with timber cribbing, a compacted earthen embankment, or other means approved by the Contracting Officer's Representative.
(4) Extend outfall pipes located at the Pedricktown North Disposal Area 500 feet beyond the Mean Low Water line into the Delaware River.
m. The most recent maintenance dredging of this project was completed under Contract No. W912BU-17-C-0044 by Great Lakes Dredge and Dock Company.
Actual dredging work commenced in October 2017 and was completed in December 2017. Dredging between stations 117+000 to 237+500 was completed to a required depth of 45 feet MLLW plus 1 foot allowable overdepth.
n. "Abstract of Bottom Samples" are included as APPENDIX B-40 of this contract.
o. Historic vibracore data is presented in APPENDIX B-43 for new work dredging to be performed under Option 1 at Marcus Hook Anchorage.
p. Survey Controls. Survey control description sheets are included in
APPENDIX A-30.
q. Magnitude of the Contract Work. The estimated value of the contract is between $10,000,000 and $25,000,000.
1.9 LAYOUT OF WORK (DEC 1996)
The Contractor shall lay out its work from Government-provided channel coordinates and survey control points, furnished as part of each work assignment. The Contractor shall furnish, at its own expense, such stakes, templates, platforms, equipment, range markers and labor as may be required in laying out any part of the work, from the channel coordinates and surveying benchmarks furnished by the Government and shall be responsible for all measurements in connection therewith. If any Government control is found disturbed or destroyed, this must be communicated to the Philadelphia District Surveys Branch through the COR before any control is re-established. The Contractor shall be responsible for executing the work to such lines and grades as may be established or indicated by the Contracting Officer. The Contractor shall have real time differential GPS positioning in accordance with the Corps surveying manual, EM 1110-2-1003, for class 1 survey requirements for dredge positioning. The Contractor shall provide real time positioning on a computer screen during dredging, and have the capability of playback in 15 minute intervals. The position must be recorded on disk every 15 minutes and submitted to the Contracting Officer on a daily basis. (CENAP)
Section 01 30 00 Page 8
1.10 CONTRACTOR SUPPLY AND USE OF ELECTRONIC SOFTWARE FOR PROCESSING WAGE
RATE REQUIREMENTS STATUTE CERTIFIED LABOR PAYROLLS (APRIL 2011)
a. The contractor is encouraged to use a commercially-available electronic system to process and submit certified payrolls electronically to the Government. The requirements for preparing, processing and providing certified labor payrolls are established by the Wage Rate Requirements statute.
b. If the contractor elects to use an electronic payroll processing system, then the contractor shall be responsible for obtaining and providing for all access, licenses, and other services required to provide for receipt, processing, certifying, electronically transmitting to the Government, and storing weekly payrolls and other data required for the contractor to comply with the Wage Rate Requirements statute. When the contractor uses an electronic payroll system, the electronic payroll service shall be used by the contractor to prepare, process, and maintain the relevant payrolls and basic records during all work under this construction contract and the electronic payroll service shall be capable of preserving these payrolls and related basic records for the required 3 years after contract completion. If the contractor chooses to use an electronic payroll system, then the contractor shall obtain and provide electronic system access to the Government, as required to comply with the Wage Rate Requirements over the duration of this construction contract. The access shall include electronic review access by the Government contract administration office to the electronic payroll processing system used by the contractor.
c. The contractor's provision and use of an electronic payroll processing system shall meet the following basic functional criteria:
(1) commercially available;
(2) compliant with appropriate Wage Rate Requirements statute payroll provisions in the Federal Acquisition Regulation (FAR);
(3) able to accommodate the required numbers of employees and subcontractors planned to be employed under the contract
(4) capable of producing an Excel spreadsheet-compatible electronic output of weekly payroll records for export in an Excel spreadsheet to be imported into the contractor's Quality Control System (QCS) version of Resident Management System (RMS), that in turn shall export payroll data to the Government's RMS;
(5) demonstrated security of data and data entry rights;
(6) ability to produce contractor-certified electronic versions of weekly payroll data;
(7) ability to identify erroneous entries and track the date/time of all versions of the certified Wage Rate Requirements statute payrolls submitted to the government over the life of the contract;
(8) capable of generating a durable record copy, that is, a CD or DVD and PDF file record of data from the system database at end of the contract closeout. This durable record copy of data from the electronic payroll processing system shall be provided to the Government during contract closeout.
Section 01 30 00 Page 9
d. All contractor-incurred costs related to the contractor's provision and use of an electronic payroll processing service shall be included in the contractor's price for the overall work under the contract. The costs for compliance with the Wage Rate Requirements statute by using electronic payroll processing services shall not be a separately bid or reimbursed item under this contract. (UAI 5152.222-9000)
1.11 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE (MAR 1995)
a. This clause does not apply to terminations. See UAI 5152.249-9000, Basis for Settlement of Proposals, and Federal Acquisition Regulation (FAR) part 49.
b. Allowable costs for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a contractor or subcontractor at any tier shall be based on actual cost data for each piece of equipment or groups of similar serial and series for which the Government can determine both ownership and operating costs from the contractor's accounting records. When both ownership and operating costs cannot be determined for any piece of equipment or groups of similar serial or series equipment from the contractor's accounting records, costs for that equipment shall be based upon the applicable provisions of Engineer Pamphlet (EP) 1110-1-8, Construction Equipment Ownership and Operating Expense Schedule, Region [I][II]. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the contracting officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retroactive pricing, the schedule in effect at the time the work was performed shall apply.
c. Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36. Rates for equipment rented from an organization under common control, lease-purchase arrangements, and sale-leaseback arrangements, will be determined using the schedule, except that actual rates will be used for equipment leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees.
d. When actual equipment costs are proposed and the total amount of the pricing action exceeds the simplified acquisition threshold (SAT), the contracting officer shall request the contractor to submit either certified cost or pricing data, or partial/limited data, as appropriate. The data shall be submitted on Standard Form 1411, Contract Pricing Proposal Cover Sheet. (UAI 5152.231-9000)
1.12 DAMAGE TO WORK
The responsibility for damage to any part of the permanent work shall be as set forth in the clause of the contract entitled "Permits and Responsibilities". However, if, in the judgement of the Contracting Officer, any part of the permanent work performed by the Contractor is damaged by flood or hurricane, which damage is not due to the failure of the Contractor to take reasonable precautions or to exercise sound engineering and construction practices in the conduct of the work, the Contractor shall make the repairs as ordered by the Contracting Officer and full compensation for such repairs will be made at the applicable contract unit or lump sum prices as fixed and established in the contract. If, in
Section 01 30 00 Page 10 the opinion of the Contracting Officer, there are no contract unit or lump sum prices applicable to any part of such work,…