PTFL06-2005B1907-_DRAWINGS_Update-6-14-18.pdf

PDF 14 MB Posted

Attached to
Repair HVAC System Bldg. 1907 JBMDL
Solicitation number
W912BU-18-B-0011
Issued by

About this file

Project Drawings to accompany W912BU-18-B-0011 Invitation for Bids

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CT

NJ

ATLANTIC OCEAN

MD

DE

NYPA

NJ

NY

SITE

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

MAIN GATE

SECONDARY ENTRANCE

GATE #1 PASSENGER

VEHICLES AND LIGHT

TRUCKS ONLY

X

X

X

X

X

X

X X

X

X

X

X

X

X

X X

X

X

X

X X

X X

X X

XXXXXXX

XX

XXXX

X X

X X

X X

X X

X X

X

XX

X X

X X

X

X X

X

X

X

X X

X X

X

X

X

X

X

X X X

X

X

X X

X X X

X

X

X

X X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

XX

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

XX

X

X

X

X X

X

XXX

X

X

X

X

X

XX

X

X

X

X

X

XX

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

BROIDY R

OAD

FL

A

G

BUILDING 1907EAST ARN

O

LD

AVE.

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X X

X

X

X

X

X

XX

X

X

X

X

X

X X

X X

X

X

X

X

X X X

X

X

X

X

X

X

XX

X

X

X

X X

X

X

X

X

X

X

X

X X

X

X

X

X X

X X

X X

XXXXXXX

XX

XXXX

X X

X X

X X

X X

X X

X

XX

X X

X X

X

X

X X

X

X X X

X

X

X X

X X X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X X

X

XXX

X

BROIDY R

OAD

XX

X

X

X

X

X

X

X

X X

X

X

XX

X

XX

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

XBROIDY R

OAD

TEXAS AVE.

50 54

A

09 01

16 07

TEXAS AVE.45

SAYLORS POND ROAD

03 04

PLAZA

B.

B

AL

L

ST.

HOW

ARD

BUTT

S

LEXINGTON AVE.

McGUIRE GATE #8

McGUIRE AFB HAUL ROUTE

CHECKPOINT #9

7-

13 12

18 17 16

P-

49 31

A

3433 5217

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

G-000

C O

VE

R

S H

EE

T

G -0

0 0

PROJECT INDEX

GENERAL

ARCHITECTURAL

MECHANICAL

4 AD101 DEMOLITION FIRST FLOOR PLAN

5 AD102 DEMOLITION SECOND FLOOR PLAN

6 AD103 DEMOLITION THIRD FLOOR PLAN

7 AD104 DEMOLITION FOURTH FLOOR PLAN

8 AD105 DEMOLITION 3 & 4 MEZZANINE

9 AD106 DEMOLITION BUILDING 1908

10 AD111 DEMOLITION REFLECTED CEILING PLAN- FIRST FLOOR

11 AD112 DEMOLITION REFLECTED CEILING PLAN- SECOND FLOOR

12 AD113 DEMOLITION REFLECTED CEILING PLAN- THIRD FLOOR

13 AD114 DEMOLITION REFLECTED CEILING PLAN- FOURTH FLOOR

14 AD115 DEMOLITION REFLECTED CEILING PLAN- 3 & 4 MEZZANINE

15 AD116 DEMOLITION REFLECTED CEILING PLAN- BUILDING 1908

16 A-101 ARCHITECTURAL FIRST FLOOR PLAN

17 A-102 ARCHITECTURAL SECOND FLOOR PLAN

18 A-103 ARCHITECTURAL THIRD FLOOR PLAN

19 A-104 ARCHITECTURAL FOURTH FLOOR PLAN

20 A-111 REFLECTED CEILING PLAN- FIRST FLOOR

21 A-112 REFLECTED CEILING PLAN- SECOND FLOOR

22 A-113 REFLECTED CEILING PLAN- THIRD FLOOR

23 A-114 REFLECTED CEILING PLAN- FOURTH FLOOR

24 A-115 REFLECTED CEILING PLANS 3 & 4 MEZZANINE

25 A-116 REFLECTED CEILING PLAN- BUILDING 1908

26 A-501 MISCELLANEOUS DETAILS

1 G-000 COVER SHEET

2 G-001 GENERAL NOTES

3 G-101 PARTIAL SITE PLAN- TEMPORARY MODULAR UNIT LOCATION

ARCHITECT

GOVERNMENT SERVICES INTEGRATED PROCESS TEAM

1801 McCORMICK DRIVE

SUITE 160

LARGO, MD 20774

(301) 794-8797

(301) 794-4454 FAX

MECHANICAL AND ELECTRICAL ENGINEER

O'BRIEN AND GERE

18 LINK DRIVE, PO BOX 5231

BINGHAMTON, NY 13902-5231

(607) 232-5300

(607) 723-3915 FAX

DESIGN OF PTFL 06-2005

REPAIR HVAC BLDG 1907 AT McGUIRE

NEW JERSEY

FINAL SUBMISSION SET

APRIL 28, 2016

JOINT BASE McGUIRE-DIX-LAKEHURST

COST ESTIMATOR

HANSCOMB CONSULTING, INC.

1212 NEW YORK AVENUE, NW

SUITE 825

WASHINGTON, DC 20005

(202) 347-3040

(703) 683-4707 FAX

LOCATION MAP JB MDL MCGUIRE AREA BASE MAP

PLAN

NORTH

PLAN

NORTH

ELECTRICAL

64 E-001 SYMBOLS AND ABBREVIATIONS

65 E-002 PARTIAL SITE PLAN- TEMPORARY MODULAR UNIT POWER

66 E-003 PARTIAL SITE PLAN- TEMPORARY MODULAR UNIT

COMMUNICATIONS

67 E-101 FIRST FLOOR DEMOLITION PLAN

68 E-102 SECOND FLOOR DEMOLITION PLAN

69 E-103 THIRD FLOOR DEMOLITION PLAN

70 E-104 FOURTH FLOOR DEMOLITION PLAN

71 E-105 THIRD AND FOURTH FLOOR MEZZANINE DEMOLITION PLANS

72 E-106 B1908 FIRST FLOOR DEMOLITION PLAN

73 E-107 UTILITY/ COMM PARTIAL PLANS

74 E-108 FIRST FLOOR INSTALLATION PLAN

75 E-109 SECOND FLOOR INSTALLATION PLAN

76 E-110 THIRD FLOOR INSTALLATION PLAN

77 E-111 FOURTH FLOOR INSTALLATION PLAN

78 E-112 B1908 FIRST FLOOR AND MEZZANINE INSTALLATION PLAN

79 E-113 PARTIAL ONE-LINE DIAGRAMS

80 E-114 DIAGRAMS AND DETAILS

81 E-115 SCHEDULES

82 E-116 PANEL SCHEDULES

83 E-117 PANEL SCHEDULES

27 M-001 SYMBOLS AND ABBREVIATIONS

28 M-101 B1907 FIRST FLOOR DUCT DEMOLITION PLAN

29 M-102 B1907 FIRST FLOOR PIPING DEMOLITION PLAN

30 M-103 B1907 FIRST FLOOR MECHANICAL RM. DUCT DEMOLITION PLANS

31 M-104 B1907 FIRST FLOOR MECHANICAL RM. PIPING DEMOLITION PLANS

32 M-105 B1907 SECOND FLOOR DUCT DEMOLITION PLAN

33 M-106 B1907 THIRD FLOOR DUCT DEMOLITION PLAN

34 M-107 B1907 THIRD FLOOR MECHANICAL RM. DUCT DEMOLITION PLANS

35 M-108 B1907 THIRD FLOOR MECHANICAL RM. PIPING DEMOLITION PLANS

36 M-109 B1907 FOURTH FLOOR DUCT DEMOLITION PLAN

37 M-110 B1907 THIRD AND FOURTH FLOOR MEZZANINE DEMOLITION

PLANS

38 M-111 B1908 FIRST FLOOR PIPING DEMOLITION PLAN

39 M-112 B1907 FIRST FLOOR DUCTWORK INSTALLATION PLAN

40 M-113 B1907 FIRST FLOOR MECHANICAL RM. INSTALLATION PLANS

41 M-114 B1907 SECOND FLOOR DUCTWORK INSTALLATION PLAN

42 M-115 B1907 THIRD FLOOR DUCTWORK INSTALLATION PLAN

43 M-116 B1907 THIRD FLOOR MECHANICAL RM. INSTALLATION PLAN

44 M-117 B1907 FOURTH FLOOR DUCTWORK INSTALLATION PLAN

45 M-118 B1907 THIRD AND FOURTH FLOOR MEZZANINE INSTALLATION

PLANS

46 M-119 B1908 FIRST FLOOR PIPING INSTALLATION PLAN

47 M-120 B1908 MEZZANINE AREA PIPING INSTALLATION PLAN

48 M-121 B1907 FIRST FLOOR PIPING INSTALLATION PLAN

49 M-122 B1907 SECOND FLOOR PIPING INSTALLATION PLAN

50 M-123 B1907 THIRD FLOOR PIPING INSTALLATION PLAN

51 M-124 B1907 FOURTH FLOOR PIPING INSTALLATION PLAN

52 M-125 TEMPERATURE CONTROL SCHEMATIC

53 M-126 DDC SYSTEM DIAGRAMS

54 M-127 SEQUENCE OF OPERATION

55 M-128 DETAILS

56 M-129 DETAILS

57 M-130 DETAILS

58 M-131 DETAILS

59 M-132 AHU DETAILS

60 M-133 SCHEDULES

61 M-134 SCHEDULES- VAV BOX

62 M-135 SCHEDULES- VAV BOX

63 M-136 SCHEDULES & SEQUENCE OF OPERATIONS

ACCESSORY (IES)

ABOVE FINISHED FLOOR

ACOUSTICAL CEILING TILE

ADJACENT

ARCHITECTURAL

BETWEEN

CENTERLINE

CEILING

CONCRETE MASONRY UNIT

COLUMN

CONCRETE

CONTINUOUS

COORDINATE

DETAIL

DIMENSION

DRAWING

EACH

ELECTRICAL

ELEVATION

EQUAL

EXISTING

EXTERIOR

FLOOR

GYPSUM WALL BOARD

HANDICAPPED

HOLLOW METAL

INSULATE (D) (ION)

MAXIMUM

MECHANICAL

MINIMUM

METAL

NOT IN CONTRACT

NOT TO SCALE

ON CENTER

OPPOSITE HAND

OPEN TO STRUCTURE

PAIR

PAINT

PAINTED

PARTITION

REFERENCE

REQUIRED

REVISION

SQUARE FEET

SIMILAR

SPECIFICATION

(SPECIFIED)

SQUARE

STANDARD

TO BE DETERMINED

THICK (NESS)

TOP OF SLAB

TYPICAL

UNLESS OTHERWISE

NOTED

VERIFY IN FIELD

WITH

WITHOUT

WITHIN

WOOD

WOOD BLOCKING

ACC

AFF

ACT

ADJ

ARCH

B / T

CL

CLG

CMU

COL

CONC

CONT

COORD

DET

DIM

DWG

EA

ELEC

ELEV

EQ

EXIST

EXT

FL

GWB OR

GYP

HC

HM

INSUL

MAX

MECH

MIN

MTL

NIC

NTS

OC

OH

OPEN

PR

PT

PTD

PTN

REF

REQ

REV

SF

SIM

SPEC

SQ

STD

TBD

THK

TOS

TYP

U.O.N.

W / W / O W / I

WD

WDBLKG

VIF

AMERICANS WITH

DISABILITY ACT

ADA

MOUNTEDMTD

ARCHITECTURAL BARRIERS

ACT

ABA

TRANSITION STRIPTS

HARDWAREHDWR

STEELSTL

PRESSURE TREATEDP/T

OCCUPANCYOCC

CARPETCPT

CLEARCLR

INTERIORINT

CORNER GUARDCG

BASIS OF DESIGNBOD

PLASTIC LAMINATEPLAM

FIBER-REINFORCED PLASTICFRP

GOVERNMENTG

ARCHITECT/ ENGINEERAE

CONTRACTING OFFICER'S

REPRESENTATIVE

COR

CONTRACTING OFFICERCO

1DETAIL

SHEET NUMBER

WHERE DRAWN

NUMBER INDICATES

DETAIL

PROJECT AREA OF

WORK

ROOM

ROOM/ SPACE

DESIGNATION

SWING DOOR-

EXISTING TO REMAIN

DOUBLE DOOR-

EXISTING TO REMAIN

SECURED AREA

SWING DOOR- NEW

1i

DOOR TAG,

REFER TO SHEET A-501

PARTITION TAG

NEW PARTITION,

REFER TO SHEET A-501

EXISTING PARTITION /

WALL TO REMAIN

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

G-001

G

EN

ER

AL

N O

TE

S

G -0

0 1

ARCHITECTURAL GENERAL NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

THE FOLLOWING GENERAL NOTES APPLY TO ALL

ARCHITECTURAL DRAWINGS.

INFORMATION CONTAINED IN THESE DRAWINGS ARE

BASED ON EXISTING CONSTRUCTION DRAWINGS OF THE

BUILDING, VISUAL INSPECTIONS, AND FIELD

MEASUREMENTS.

FIELD VERIFY ALL DIMENSIONS AND EXISTING

CONDITIONS, INCLUDING COLUMN ENCLOSURES AND

PERIMETER SOFFIT DETAILS.

FOR GENERAL NOTES AND SYMBOLS APPLICABLE ONLY

TO THE DRAWINGS OF DISCIPLINES OTHER THAN

ARCHITECTURE, REFER TO THE SPECIFIC DRAWING OF

THAT DISCIPLINE. SEE PROJECT INDEX ON SHEET G-

001.

THE ARCHITECTURAL DRAWINGS ARE A PART OF THE

LARGER SET WHICH, WHEN COMPLETE, CONSISTS OF

ALL DRAWINGS LISTED BY THE PROJECT INDEX. THE

WORK DESCRIBED BY THE DRAWINGS IN ONE DISCIPLINE

MAY BE AFFECTED BY THE WORK DESCRIBED BY

ANOTHER DISCIPLINE AND MAY REQUIRE REFERENCE

TO DRAWINGS OF ANOTHER DISCIPLINE. PARTIAL SETS

OF DRAWINGS ARE INCOMPLETE AND SHALL NOT BE

DISTRIBUTED AND UTILIZED BY THE CONTRACTOR. IT IS

THE CONTRACTOR'S RESPONSIBILITY TO REVIEW AND

COORDINATE THE WORK OF ALL SUBCONTRACTORS,

TRADES, AND SUPPLIERS WITH THE REQUIREMENTS OF

THE CONTRACT BEFORE COMMENCING CONSTRUCTION

AND TO ASSURE THAT ALL PARTIES ARE AWARE OF ALL

REQUIREMENTS, REGARDLESS OF WHERE THE

REQUIREMENTS OCCUR IN THE CONTRACT DOCUMENTS,

WHICH MIGHT AFFECT THE WORK OF THAT PARTY.

THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING

THE WORK OF ALL SUBCONTRACTORS, TRADES, AND

SUPPLIERS. THE CONTRACTOR SHALL ENDEAVOR TO

IDENTIFY AND NOTIFY THE CONTRACTING OFFICER OF

ANY CONFLICTS BETWEEN THE WORK OF DIFFERENT

PARTIES AT THE EARLIEST POSSIBLE DATE SO AS TO

ALLOW REASONABLE AND ADEQUATE TIME FOR THE

CONFLICT TO BE RESOLVED WITHOUT DELAYING THE

WORK. ALL DEVIATIONS FROM THAT WHICH IS

REQUIRED BY THE CONTRACT DOCUMENTS MUST BE

APPROVED IN ADVANCE BY THE CONTRACTING OFFICER.

THE ARCHITECTURAL DRAWINGS ESTABLISH AND

COORDINATE THE FINISHED APPEARANCE AND EXACT

LOCATION OF ALL EXPOSED ELEMENTS OF THE WORK,

INCLUDING THAT WORK WHICH IS ILLUSTRATED

PRIMARILY ON DRAWINGS OF OTHER DISCIPLINES.

LOCATIONS SHOWN ON OTHERS ARE SCHEMATIC,

UNLESS OTHERWISE NOTED ON ARCHITECTUAL

DRAWINGS. THE ARCHITECTURAL DRAWINGS TAKE

PRECEDENCE FOR THE FINISHED APPEARANCE AND

EXACT LOCATION OF ALL PARTS OF THE WORK.

EXCEPTION: DIMENSIONED LOCATIONS SHOWN ON

DRAWINGS OF OTHER DISCIPLINES SHALL GOVERN

ONLY WHERE:

1. SPECIFICALLY AND INDIVIDUALLY INDICATED BY

SYMBOL, KEYED NOTE, OR NOTATION ON

ARCHITECTURAL DRAWINGS.

2. OCCURRING WITHIN A ROOM OR OTHER IDENTIFIED

SPACE FOR WHICH THE ARCHITECTURAL SHEET OR

SCHEDULE NOTES INDICATE THAT DIMENSIONS

PROVIDED ELSEWHERE SHALL GOVERN.

THE ARCHITECTURAL FLOOR PLANS, SECTIONS, AND

ELEVATIONS SHOW THE EXACT LOCATION OF MANY,

BUT NOT ALL, EXPOSED PARTS OF THE WORK.

DIMENSIONING CONVENTIONS

1.

2.

3.

EXCEPT WHERE DIRECTED TO PLACE ITEMS OF THE WORK AT THE

"APPROPRIATE LOCATION SHOWN", DO NOT SCALE DRAWINGS FOR

DIMENSIONAL INFORMATION.

ALL ELEMENTS OF THE DRAWINGS MAY NOT BE DRAWN TO EXACT SCALE.

ALL DIMENSIONS REQUIRED ARE SHOWN (OR MAY BE DERIVED FROM

THOSE SHOWN OR NOTED) ON THE FLOOR PLANS, DETAIL PLANS,

ELEVATIONS, SECTIONS, SCHEDULES, CONFIGURATION DETAILS, AND

SPECIFICATIONS. SEE THE NOTES BELOW AND THE SYMBOLS ON THIS

SHEET FOR DIMENSIONING CONVENTIONS USED FOR THIS PROJECT.

EXCEPT WHERE SPECIFICALLY NOTED TO THE CONTRARY, ALL

DIMENSIONS SHOWN ON THE ARCHITECTURAL DRAWINGS CONFORM TO

THE FOLLOWING CONVENTIONS:

A.

B.

C.

DIMENSIONS UTILIZING THE CENTERLINE SYMBOL ARE MEASURED TO:

-STRUCTURAL OR DIMENSIONAL GRID LINES.

-CENTERLINE OF CONCRETE OR CONC. MASONRY UNITS (EXCLUSIVE

OF FURRING OR APPLIED FINISHES HAVING THICKNESS). REFER TO

ARCHITECTURAL PLANS AND SECTIONS, THE STRUCTURAL DRAWINGS,

OR PARTITION SCHEDULE TO DETERMINE THE THICKNESS OF EACH

PARTITION TYPE.

-CENTERLINE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES WHICH MAY BE ADDED TO SUCH WALLS) AT PARTITIONS

FRAMED WITH METAL STUDS. REFER TO PARTITION SCHEDULE TO

DETERMINE THICKNESS OF EACH PARTITION TYPE.

-CENTERLINE OF DOOR, WINDOW, OR LOUVER OPENING.

-CENTERLINE OF EQUIPMENT OR FURNISHING.

-CENTERLINE OF OTHER FEATURES AS INDICATED.

REFER TO THIS SHEET FOR SYMBOL USED TO INDICATE CENTERLINE

DIMENSION.

DIMENSIONS UTILIZING THE "FACE OF" SYMBOL ARE MEASURED TO:

-FACE OF CONCRETE OR CONC. MASONRY UNIT WALL (EXCLUSIVE OF

APPLIED FINISHES HAVING THICKNESS OR FURRING WHICH MAY BE

ADDED TO THE FACE OF SUCH WALLS).

-FACE OF PARTITION ASSEMBLY (EXCLUSIVE OF ANY APPLIED

FINISHES WHICH MAY BE ADDED TO SUCH WALLS) AS DEFINED BY THE

PARTITION SCHEDULE. UNLESS NOTED AS A "FACE OF FINISH" OR

CLEAR DIMENSION (SEE NOTE E BELOW), DIMENSIONS ARE NOT

MEASURED TO THE FACE OF APPLIED FINISH. REFER TO THE FINISH

SCHEDULE TO DETERMINE THICKNESS OF EACH PARTITION TYPE.

-DIMENSION OF WORK POINT AS INDICATED OR RELATED ARCH DETAIL

PLAN, SECTION, ELEVATION, LAYOUT OR CONFIGURATION DETAIL, OR

CONSTRUCTION DETAIL.

90.00°

B

COLUMN LINES

DIMENSION SYMBOLS

DIMENSION TO:

-GRIDLINE

-COLUMNLINE

DIMENSION TO:

-CENTERLINE OF ASSEMBLY

-CENTERLINE OF OPENING

-CENTERLINE OF EQUIPMENT

-CENTERLINE OF FURNISHING

DIMENSION TO:

-FACE OF PARTITION ASSEMBLY

-EDGE OF DOOR OPENING

-FACE OF ASSEMBLY

-FACE OF WORKPOINT INDICATED

ON DETAILS

ABBREVIATIONS

DEFINITIONS

THE TERM "REFERENCE" ELEVATION OR DIMENSIONS REFERS

TO A NOMINAL WORK POINT. THE ACTUAL ELEVATION MAY

VARY FROM THE REFERENCE POINT. REFER TO APPLICABLE

DETAILS TO DETERMINE THE RELATIONSHIP BETWEEN THE

ACTUAL ELEVATION OR DIMENSION AND THE STATED

REFERENCE POINT.

"FINISH FLOOR" ELEVATIONS ARE MEASURED AT THE TOP OF

CONCRETE FLOOR SLAB, UNLESS OTHERWISE NOTED.

APPLIED FINISHES SUCH AS CARPET MAY ACTUALLY RAISE

THE ACTUAL FINISHED SURFACE ABOVE THE REFERENCE

ELEVATION PROVIDED FOR THE FINISH FLOOR.

CEILING HEIGHT DIMENSIONS ARE MEASURED TO FINISH

SURFACES, UNLESS OTHERWISE NOTED.

THE WORD "PROVIDE" REFERS TO CONTRACTOR TO SUPPLY

AND INSTALL.

THE WORD "PATCH" REFERS TO FILLING IN HOLES AND

DAMAGED SURFACES EXPOSED TO THE FINISHED WORK.

PATCHED AREA SHALL BE FLUSH WITH ADJACENT EXISTING

SURFACE AND SHALL MATCH AS CLOSELY AS POSSIBLE AS

TO TEXTURE AND FINISH.

ARCHITECTURAL SYMBOLS

GENERAL CONSTRUCTION NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

THIS PROJECT CONSISTS OF REPLACING THE HVAC

SYSTEM IN BUILDING 1907.

SCOPE OF WORK SHALL INCLUDE ALL LABOR,

MATERIALS, TOOLS, EQUIPMENT, TRANSPORTATION,

HOISTING, RIGGING, ETC., AS INDICATED ON THE

DRAWINGS AND HEREIN SPECIFIED FOR A COMPLETE

INSTALLATION.

CONTRACTOR SHALL FIELD MEASURE AND VERIFY ALL

DIMENSIONS PRIOR TO COMMENCING WORK.

IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR

TO STUDY ALL DRAWINGS AND DETAILS SO THAT ALL

ALTERATIONS AND INSTALLATION OF NEW WORK CAN

BE FULLY COORDINATED. THE CONTRACTOR SHALL

VISIT THE SITE TO SATISFY HIMSELF THAT ALL

PROVISIONS HAVE BEEN MADE FOR ALL ASPECTS OF

THIS PROJECT. IF DISCREPANCIES EXIST BETWEEN

DRAWINGS AND/OR SITE CONDITIONS, THE

CONTRACTOR SHALL NOTIFY THE COR PRIOR TO

COMMENCING WORK.

IT IS NOT INTENDED THAT THE DRAWINGS SHALL SHOW

EVERY DIMENSION, CONNECTION, AND DETAIL BUT THE

CONTRACTOR SHALL FURNISH AND INSTALL ALL WORK

AS MAY BE NECESSARY TO COMPLETE THE PROJECT IN

ACCORDANCE WITH THE BEST TRADE PRACTICE, AND

TO THE SATISFACTION OF THE COR.

SITE INSPECTION AND VISITATION. THE CONTRACTOR

SHALL VISIT THE SITE AND INSPECT EXISTING

CONDITIONS, SERVICES, CONDUIT, SPATIAL

CONSIDERATIONS AND ALL OTHER PERTINENT

CONDITIONS TO FULLY FAMILIARIZE HIMSELF WITH

CONDITIONS TO BE ENCOUNTERED IN THE

PERFORMANCE OF THIS WORK. FAILURE TO DO SO

SHALL NOT RELIEVE THE CONTRACTOR OF

RESPONSIBILITY FOR FULL COMPLETION OF THE WORK

IN ACCORDANCE WITH THE DRAWINGS AND

SPECIFICATIONS. VERIFY EXISTING CONDITIONS WHICH

WILL BE UTILIZED FOR TRANSITIONS AND CONNECTIONS

TO THE NEW WORK. IF DISCREPANCIES EXIST BETWEEN

THE CONTRACT DRAWINGS AND THE ACTUAL EXISTING

CONDITIONS, THE CONTRACTOR SHALL NOTIFY THE COR

PRIOR TO STARTING WORK.

CONTRACTOR SHALL COORDINATE ALL REQUIREMENTS

OF THE CONTRACT DOCUMENTS AND PROVIDE SHOP

DRAWINGS AND SUBMITTALS. SUMMARIZED IN THE

MATERIALS APPROVAL SUBMITTAL.

HOURS OF OPERATION: 0600 - 1700 MONDAY THROUGH

FRIDAY EXCEPT FOR GOVERNMENT HOLIDAYS.

SATURDAY WORK IS POSSIBLE WITH PRIOR APPROVAL

AND COORDINATION WITH CO.

BUILDING SHALL REMAIN OPERATIONAL DURING

CONSTRUCTION. CONTRACTOR SHALL SECURE WORK

AREA AND PROTECT ALL FINISHES, FURNITURE, AND

EQUIPMENT TO REMAIN INSIDE AND OUT OF WORK

AREA AND GOVERNMENT ASSETS. THE GOVERNMENT

REQUIRES THE CONTINUOUS OPERATION OF ALL

ELECTRICAL AND COMMUNICATION DISTRIBUTION

SYSTEMS. ANY INTERRUPTION OF SAME WILL REQUIRE

THE GOVERNMENT'S PERMISSION AND SHALL BE

SCHEDULED WITH THE COR AT MUTUALLY AGREEABLE

PERIODS OF TIME AND AT THE END OF EACH SUCH

PERIOD, SERVICE SHALL BE RESTORED TO THE FULL

EXTENT. ALL PREMIUM TIME CHARGES REQUIRED FOR

SUCH AN INTERRUPTION OF SERVICES SHALL BE

INCLUDED IN THE CONTRACT.

CONTRACTOR SHALL LEAVE WORK AREA CLEAN AND

ORDERLY AT THE END OF EACH DAY.

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK

AREAS.

THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE

TO ASSURE THAT ALL WORK BY THE SUBCONTRACTORS

IS INSTALLED AND COMPLETED IN ACCORDANCE WITH

THE DRAWINGS AND SPECIFICATIONS AND THAT ALL

WORK IS 100% COMPLETE AT THE TIME OF BENEFICIAL

OCCUPANCY.

GOVERNMENT ESCORT IS REQUIRED FOR WORK

PERFORMED IN THE SECURED AREAS LOCATED ON THE

SECOND AND THIRD FLOORS.

D.

E.

REFER TO THIS SHEET FOR SYMBOL USED TO INDICATE 'FACE OF"

DIMENSION.

WHERE "FACE OF FINISH" OR "CLEAR" DIMENSIONS ARE SPECIFICALLY

NOTED, THE DIMENSION MEASURED TO:

-FINISH FACES AT THE MOST NARROW OR CONSTRUCTED POINTS OF

SECTION WHERE DIMENSION IS SHOWN, WHEN THE DIMENSION OCCURS

ACROSS AN OPEN SPACE. THIS CASE, A "FACE OF FINISH" DIMENSION IS

EQUIVALENT TO A "CLEAR" DIMENSION.

-FINISH FACES AT THE WIDEST OR MOST EXPANSIVE POINTS OF SECTION

WHERE THE DIMENSION IS SHOWN WHEN THE DIMENSION OCCURS

ACROSS AN OBJECT OR GROUP OF OBJECTS.

ALL WORK SHALL BE IN ACCORDANCE WITH NATIONAL,

STATE, AND LOCAL CODES AND ORDINANCES. THE

FOLLOWING CODES AND STANDARDS ARE USED IN THE

DESIGN OF THIS PROJECT:

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), NFPA

101 – CODE FOR LIFE SAFETY

UNIFORM CONSTRUCTION CODE (UCC), STATE OF NEW

JERSEY

INTERNATIONAL BUILDING CODE (IBC)

ARCHITECTURAL BARRIERS ACT (ABA) AND AMERICANS

WITH DISABILITY ACT (ADA)

APPLICABLE UNIFIED FACILITIES CRITERIA (UFC) INCLUDING:

o UFC 1-200-01 – DESIGN: GENERAL BUILDING

REQUIREMENTS

o UFC 3-101-01 – ARCHITECTURE o UFC 4-610-01 – ADMINISTRATIVE FACILITIES

JB MDL MCGUIRE ARCHITECTURAL COMPATIBILITY PLAN

BUILDING 1907 IS A CONCRETE FRAMED STRUCTURE WITH A

CONCRETE MASONRY UNIT (CMU) AND STUCCO VENEER

EXTERIOR. THERE ARE NO EXTERIOR WINDOWS AND ONLY

SMALL LOUVERS PENETATE THE FOURTH FLOOR. BUILT IN

THE 1960s, THIS BUILDING IS CONSIDERED HISTORIC. THIS

PROJECT WILL NOT MODIFY THE EXTERIOR.

THE BUILDING SERVES AS ADMINISTRATIVE SPACE FOR

COMMAND GROUP HEADQUARTERS.

THIS PROJECT WILL NOT AFFECT EXISTING LIFE SAFETY OR

ACCESSIBILITY. ALL EXISTING WALL RATINGS ARE TO BE

MAINTAINED. ANY NEW PENETRATIONS OF EXISTING WALLS

SHALL BE PROTECTED IN ACCORDANCE WITH UL

REQUIREMENTS, ANY EXISTING UNPROTECTED

PENETRATIONS SHALL BE SIMILARLY PROTECTED BY THE

CONTRACTOR.

FLOORS ARE POURED IN PLACE CONCRETE ON METAL DECK

AND PENETRATIONS REQUIRE A 2 HOUR RATED FIRE

SEPARATION.

BUILDING CODES AND REGULATIONS

T T

TSW

BUILDING 1908BUILDING 1907

BUILDING 1907A

BUILDING 1909

E A S T A

R N O

LD

A V E N U E

EAST FOURTH STREET

loading dock area signage

PARKING AREA

PARKING AREA

PARKING AREA

PROJECT SCOPE OF WORK LIMITED SCOPE OF WORK,

SEE PLANS

W

SAN

W

SAN

W

W

W

W

W

W W

W

SAN

SAN

SAN

SAN

SAN

SAN

W option: temporary modular unit site

NOTE:

SCHEMATIC MODULAR UNIT LAYOUT SHOWN.

AVOID DISTURBING ALL EXISTING TREE CANOPIES.

PROTECT ALL EXISTING TREES.

ST

ST

ST

ST

ST

RAMP

STAIRS

STAIRS

STAIRS

RAMP

RAMP

RAMP

RAMP

THE CONTRACTOR SHALL PROVIDE ALL FURNITURE,

FIXTURES AND EQUIPMENT (FF&E) FOR 150

WORKSTATIONS APPROPRIATE TO OPEN SPACE WORK

AREAS AND/OR PRIVATE AND SEMI-PRIVATE OFFICES.

PROVIDE DESIGN AND SELECTION OF FF&E FOR REVIEW

AND APPROVAL BY GOVERNMENT PRIOR TO EXECUTION

OF CONTRACT. EACH WORKSTATION SHALL BE FURNISHED

WITH 1 BUSINESS DESK, 1 CHAIR, 1 FILE CABINET, AND 1

TASK LIGHT. ADDITIONALLY, PROVIDE 2 GUEST CHAIRS

FOR EACH PRIVATE OFFICE.

THE CONTRACTOR SHALL PREPARE THE SITE FOR THE

MODULAR UNITS TO ALLOW FOR POSITIVE DRAINAGE.

SCHEMATIC WATER AND SANITARY UTILITY LINES ARE

IDENTIFIED ON THE PLAN. THE CONTRACTOR SHALL

COORDINATE WITH JD MDL FOR UTILITY REQUIREMENTS,

SCHEDULING, AND CONNECTION LOCATIONS. THE

CONTRACTOR SHALL PROVIDE SUITABLE SIZED UTILITIES

(COMM, ELECTRIC INCLUDING TRANSFORMER, SEWER, AND

WATER) AND ALL ACCESSORIES TO THE MODULAR

ADMINISTRATIVE SPACES.

REFER TO ELECTRICAL CONTRACT DRAWINGS FOR

ELECTRICAL AND COMMUNICATIONS UTILITY

CONNECTIONS AND REQUIREMENTS.

PROVIDE SMOKE ALARMS, PULL STATIONS, AND FIRE

EXTINQUISHERS AT EGRESS EXITS. FIRE ALARM IS NOT

CONNECTED TO DISPATCH CENTER. PROVIDE A SIGN AT

ALL PULL STATIONS THAT READS "LOCAL ALARM ONLY.

DIAL 9-1-1 FOR ALL EMERGENCIES."

THE CONTRACTOR SHALL INSTALL FULLY FUNCTIONING

AND FULLY FURNISHED THE MODULAR UNITS 30 DAYS

PRIOR TO THE START OF CONSTRUCTION TO ALLOW FOR

MOVE IN. THE CONTRACTOR SHALL LEAVE IN PLACE THE

FULLY FUNCTIONING AND FULLY FURNISHED MODULAR

UNITS FOR 30 DAYS AFTER FINAL ACCEPTANCE OF THE

HVAC REPLACEMENT IN BUILDING 1907 TO ALLOW TIME

FOR GOVERNMENT RELOCATION. THE CONTRACTOR IS

RESPONSIBLE FOR MAINTAINING THE SITE OF THE

MODULAR UNITS AND ALL UTILITY CONNECTIONS FOR THE

PERIOD OF CONSTRUCTION PLUS 60 DAYS. THE

GOVERNMENT SHALL PROVIDE INTERIOR CLEANING AND

TRASH REMOVAL DURING THE PERIOD OF CONSTRUCTION

PLUS 60 DAYS.

THE CONTRACTOR SHALL REMOVE ALL MODULAR UNITS,

FURNITURE, FURNISHINGS AND EQUIPMENT, DISCONNECT

ALL UTILITIES, AND RESTORE THE SITE TO THE EXISTING

CONDITION PRIOR TO FINAL ACCEPTANCE OF ALL WORK.

THE CONTRACTOR SHALL PROVIDE A CERTIFICATE OF

INSURANCE FOR THE MODULAR UNITS, CONTRACTOR

PROVIDED FURNITURE, FIXTURES AND EQUIPMENT WITHIN

10 DAYS OF AWARD. THE GOVERNMENT SHALL INSURE

GOVERNMENT PROPERTY LOCATED WITHIN THE MODULAR

UNITS.

THE CONTRACTOR SHALL SUBMIT FOR GOVERNMENT

APPROVAL SHOP DRAWINGS FOR THE MODULAR UNITS,

LAYOUT, SITE WORK, UTILITY CONNECTIONS, AND

SYSTEMS. THE CONTRACTOR SHALL SUBMIT FOR

GOVERNMENT APPROVAL SUBMITTALS/CUTSHEETS FOR

THE MODULAR UNITS AND ALL FF&E.

2.

3.

4.

THE CONTRACTOR SHALL PROVIDE FULLY FUNCTIONAL,

TURN-KEY ADMINISTRATIVE SWING SPACE VIA MODULAR

UNITS. THE MODULAR UNITS SHALL BE LAID TO SUPPORT

ONE ADMINISTRATIVE AREA FOR THE DISPLACEMENT OF

150 PERSONNEL MEETING THE 120 ALLOWABLE NET

SQUARE FOOT PER PERSON PER AFMAN 32-1084 FACILITY

REQUIREMENTS. THE MODULAR ADMINISTRATIVE SPACE

SHALL BE FULLY FURNISHED TO SUPPORT

ADMINISTRATIVE FUNCTIONS INCLUDING OPEN WORK

AREAS, PRIVATE OFFICES AND COPY/PRINT AREAS.

CONFERENCE ROOMS AND FILE STORAGE ARE NOT

REQUIRED. PRIVATE OFFICES SHALL BE PROVIDED IN THE

NUMBER AS THE EXISTING BUILDING. MALE AND FEMALE

RESTROOMS SHALL BE PROVIDED IN ACCORDANCE WITH

UFC 3-420-01 PLUMBING SYSTEMS. SEPARATE

COMM/DATA ROOMS SHALL BE PROVIDED. PRIVATE

OFFICES AND THE MODULAR UNITS SHALL BE LOCKABLE.

REQUIRED SQUARE FOOTAGE:

150 PERSONS x 120 SF/PERSON = 18,000 NSF 18,000 NSF x 1.3 NET/GROSS = 23,400 GSF

THE BASIS OF DESIGN USED FOR THE SCHEMATIC

MODULAR UNIT LAYOUT SHOWN IS MODSPACE OFFICE

COMPLEX BY MODULAR SPACE CORPORATION. EACH

MODULAR UNIT IS 12' X 60'.

MODULAR UNITS SHALL BE FULLY ACCESSIBLE IN

ACCORDANCE WITH ABA REQUIREMENTS. MODULAR

UNITS SHALL MEET ALL LIFE SAFETY AND CODE

REQUIREMENTS. CONTRACTOR IS RESPONSIBLE TO

PROVIDE RAMP AND STAIRS TO ACCESS EACH MODULAR

GROUPS. PROVIDE RAMP AND STAIRS AT EACH END.

MODULAR UNITS SHALL BE THERMALLY INSULATED.

PROVIDE WINDOWS AND INTERIOR TEMPERATURE

CONTROL WITH HVAC UNITS.

5 THE INTENT IS TO COMBINE THE MODULES TO FORM AN OPEN

SPACE ADMINISTRATIVE SPACE SIMILAR AS SHOWN

TEMPORARY MODULAR

UNIT SITE

DOMESTIC WATER LINE

SANITARY LINE

W

SAN

STORM DRAINAGE LINE

ST

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

G-101

PA

R

TI

AL

S

IT

E

PL

AN

- T

EM

P O

R

AR

Y M

O D

U

LA

R U

N

IT

L O

C

AT

IO

N

G -1

0 1

1" = 30'-0"1 SITE PLAN 30'0 15' 60'

SCALE:1"=30'

PLAN

NORTH

MODULAR UNIT OPTION AND SITE PLAN NOTES

SITE PLAN SYMBOLS

UP

UP

1 2 3 4 5 6

A

B

C

D

E

F

MECH

U14

OPEN OFFICE

SECURE

OFFICE

115C

OFFICE

115B

CONFERENCE

ROOM

PROJECTION

STOR

OFFICE

108A

OFFICE

OFFICE

OFFICE

OPEN OFFICE

108B

OFFICE

UTILITY /

COMM

NA

OFFICE

115 A

STOR

OPEN OFFICE

OFFICE

OFFICE

100A

OFFICE

OFFICE

NA

MEN

U12

WOMEN

U13

COMM ROOM

U14A

MECH

U14B

OFFICE

103B

OFFICE

103C

OPEN OFFICE

STOR

U16ENTRANCE

LOBBY

U16A OFFICE

MECH

U17

OFFICE

U18

MECH

U17A

OFFICE

OFFICE

OPEN OFFICE

OFFICE

WAITING

ROOM

103J

OFFICE

103F

OFFICE

103E

ELEVATOR

STAIR

STAIR

EXISTING

EXTERIOR

LOADING AREA

BUILDING 1907A

(NOT IN CONTRACT)

ELEVATOR

ELEV

MACHINE

ROOM

1−104

ELEVATOR

LOBBY

1−100

TOILET

1−101

CORRIDOR

U17B

BLDG 1908

BLDG 1907

BLDG 1907A

D1 DEMOLISH ALL UNUSED CONCRETE EQUIPMENT PADS.

FLOOR SURFACE SHALL BE LEVEL, SMOOTH, AND

CONSISTENT.

SEAL ALL UNUSED FLOOR AND WALL PENETRATIONS.

CUT OPENING IN EXISTING PARTITION FOR NEW DOOR

AND FRAME. COORDINATE WITH ARCHITECTURAL

RENOVATION PLANS.

D2

SHADED REGION DESIGNATE AREAS OF

KNOWN ASBESTOS LOCATIONS PER A

ENVIRONMENTAL REPORT BY OTHERS. REFER

TO ENVIRONMENTAL REPORT ATTACHED TO

SPECIFICATION SECTION 02080 FOR SPECIFIC

LOCATIONS AND ASBESTOS TO BE ABATED.

THE INTENT OF THIS PROJECT IS TO ABATE

THE ASBESTOS LOCATED ON MECHANCIAL

EQUIPMENT AND ABOVE THE CEILING ONLY.

D3

A

B

C

D

E

F

G

H

IT IS THE INTENT OF THE DEMOLITION TO REMOVE

EXISTING CONSTRUCTION WHICH CONFLICTS WITH THE

INTENT OF NEW CONSTRUCTION. EVERY DEMOLITION

CONDITION MAY NOT BE COVERED IN THESE DOCUMENTS.

CONTRACTOR SHALL PERFORM DEMOLITION REQUIRED

FOR THE INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL

PROJECT AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM

OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO

BE DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS

REQUIRED.

WHERE ACCESS IS REQUIRED TO CONCEALED

ELEMENTS, CONTRACTOR SHALL RESTORE AFFECTED

AREA TO ORIGINAL CONDITIONS.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD101

D

EM

O

LI

TI

O

N F

IR

ST

F

LO

O R

P

LA

N

AD

1 0

1/8" = 1'-0"1 FIRST FLOOR - BUILDING 1907 DEMOLITION

MATCHLINE A-A

MATCHLINE A-A

SEE 1/AD106

FLOOR PLAN DEMOLITION NOTES

D1

D1 D1

D1

DEMOLITION KEY NOTES

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

REMOVE ALL

CONTROLS AND

EQUIPMENT FROM

ROOM. CAP ALL

UTILITIES.

DN

UP

BLDG 1908

BLDG 1907

BLDG 1907A

1 2 3 4 5 6

A

B

C

D

E

F

OPEN OFFICE

OFFICE

OFFICE

203A

OPEN OFFICE

OPEN OFFICE

OFFICE

200A

ELEV

MEN

U21

WOMEN

U22

OFFICE

NA

CL

OPEN OFFICE

OFFICE

NA

OPEN OFFICE

OPEN OFFICE

218A

OPEN OFFICE

OPEN OFFICE

218F

OFFICE

218C

OFFICE

218D

OFFICE

NA

OPEN AREA /

RECEPTION

OFFICE

225P

STOR

NA

OFFICE

225H

OFFICE

225C

OFFICE

225B

OFFICE

225A

OFFICE

225F

OFFICE

225G

OFFICE

OPEN AREA /

RECEPTION

225Q

OFFICE

NA

OFFICE

NA

STOR

226A

CONFERENCE

OPEN OFFICE

OFFICE

209E

OFFICE

209F

OFFICE

209A

OFFICE

209D

OFFICE

209B

OPEN OFFICE

STORAGE

210C

OFFICE

OPEN OFFICE

OFFICE

213A

OFFICE

OFFICE

209C

OPEN OFFICE

225M

OFFICE

206A

OFFICE

OFFICE

OFFICE

219A

OPEN OFFICE

OPEN OFFICE

OFFICE

204C

OFFICE

204B

OPEN OFFICE

CORRIDOR

2−103

ELEVATOR

LOBBY

2−100

ELEVATORTOILET

2−101

STAIR

STAIR

D1 DEMOLISH ALL UNUSED CONCRETE EQUIPMENT PADS.

FLOOR SURFACE SHALL BE LEVEL, SMOOTH, AND

CONSISTENT.

SEAL ALL UNUSED FLOOR AND WALL PENETRATIONS.

CUT OPENING IN EXISTING PARTITION FOR NEW DOOR

AND FRAME. COORDINATE WITH ARCHITECTURAL

RENOVATION PLANS.

D2

SHADED REGION DESIGNATE AREAS OF

KNOWN ASBESTOS LOCATIONS PER A

ENVIRONMENTAL REPORT BY OTHERS. REFER

TO ENVIRONMENTAL REPORT ATTACHED TO

SPECIFICATION SECTION 02080 FOR SPECIFIC

LOCATIONS AND ASBESTOS TO BE ABATED.

THE INTENT OF THIS PROJECT IS TO ABATE

THE ASBESTOS LOCATED ON MECHANCIAL

EQUIPMENT AND ABOVE THE CEILING ONLY.

D3

A

B

C

D

E

F

G

H

IT IS THE INTENT OF THE DEMOLITION TO REMOVE

EXISTING CONSTRUCTION WHICH CONFLICTS WITH THE

INTENT OF NEW CONSTRUCTION. EVERY DEMOLITION

CONDITION MAY NOT BE COVERED IN THESE DOCUMENTS.

CONTRACTOR SHALL PERFORM DEMOLITION REQUIRED

FOR THE INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL

PROJECT AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM

OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO

BE DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS

REQUIRED.

WHERE ACCESS IS REQUIRED TO CONCEALED

ELEMENTS, CONTRACTOR SHALL RESTORE AFFECTED

AREA TO ORIGINAL CONDITIONS.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD102

D

EM

O

LI

T I O

N S

EC

O

N D

F

LO

O R

P L A

N

AD

1 0

MATCHLINE A-A

SEE 2/AD106

FLOOR PLAN DEMOLITION NOTES

DEMOLITION KEY NOTES

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

1/8" = 1'-0"1 SECOND FLOOR - BUILDING 1907 DEMOLITION

MATCHLINE A-A

D2

D2

D2

D2

D2

D2

D2

D2

D2

DNUP

UP

OFFICE

OPEN OFFICE

MENS TOILET

U30

JC

U31

OFFICE

OFFICE

304A

OPEN OFFICE

OFFICE

307A

OFFICE

OFFICE

OFFICE

310A

OFFICE

OFFICE OPEN AREA

COPY

311A

OFFICE

OFFICE

CLOSET

OPEN OFFICE

ROOM

ROOM

316B

ROOM

316A

ROOM

315A

CONFERENCE

CONFERENCE

SUPPORT

U36A

JC

317A

MENS TOILET

U37

WOMENS

TOILET

U36B

TRAINING

OFFICES

OFFICE

320B

OPEN OFFICE

CLOSET

319C

CLOSET

319D

BREAK ROOM

MECH AREA

U38A

MECH AREA

U34

MECH AREA

U33

MECH AREA

U32

CONFERENCE

300L

OPEN OFFICE

VEST

300D

CONFERENCE

300A

OFFICE

300H

OFFICE

304B

STAIR

ELEVATOR

U23

STAIR

1 2 3 4 5 6

A

B

C

D

E

F

STAIRS TO

3RD FL MEZZ

ELEVATOR

LOBBY

3−100

ELEVATORTOILET

3−101

CORRIDOR

3−103

MECH

U38N

MECH

U38

BLDG 1908

BLDG 1907

BLDG 1907A

D1 DEMOLISH ALL UNUSED CONCRETE EQUIPMENT PADS.

FLOOR SURFACE SHALL BE LEVEL, SMOOTH, AND

CONSISTENT.

SEAL ALL UNUSED FLOOR AND WALL PENETRATIONS.

CUT OPENING IN EXISTING PARTITION FOR NEW DOOR

AND FRAME. COORDINATE WITH ARCHITECTURAL

RENOVATION PLANS.

D2

SHADED REGION DESIGNATE AREAS OF

KNOWN ASBESTOS LOCATIONS PER A

ENVIRONMENTAL REPORT BY OTHERS. REFER

TO ENVIRONMENTAL REPORT ATTACHED TO

SPECIFICATION SECTION 02080 FOR SPECIFIC

LOCATIONS AND ASBESTOS TO BE ABATED.

THE INTENT OF THIS PROJECT IS TO ABATE

THE ASBESTOS LOCATED ON MECHANCIAL

EQUIPMENT AND ABOVE THE CEILING ONLY.

D3

A

B

C

D

E

F

G

H

IT IS THE INTENT OF THE DEMOLITION TO REMOVE

EXISTING CONSTRUCTION WHICH CONFLICTS WITH THE

INTENT OF NEW CONSTRUCTION. EVERY DEMOLITION

CONDITION MAY NOT BE COVERED IN THESE DOCUMENTS.

CONTRACTOR SHALL PERFORM DEMOLITION REQUIRED

FOR THE INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL

PROJECT AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM

OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO

BE DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS

REQUIRED.

WHERE ACCESS IS REQUIRED TO CONCEALED

ELEMENTS, CONTRACTOR SHALL RESTORE AFFECTED

AREA TO ORIGINAL CONDITIONS.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD103

D

EM

O

LI

TI

O

N T

H

IR

D F

LO

O

R P

LA

N

AD

1 0

1/8" = 1'-0"1 THIRD FLOOR- BUILDING 1907 DEMOLITION

FLOOR PLAN DEMOLITION NOTES

DEMOLITION KEY NOTES

D1

D1

D1

D1

D1

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

D3

D3

D3

DN

DN

DN

UP

DN

UP

BLDG 1908

BLDG 1907

BLDG 1907A

ROOM

ROOM

OFFICE

401A

ROOM

401C

OFFICE

401B

ROOM

401D

OPEN OFFICE

JC

U41A

MENS TOILET

U41

STORAGE

400A

CONFERENCE

STORAGE

400B

STORAGE

417D

STORAGE

417C

OFFICE

417B

OFFICE

OFFICE

415D

OFFICE

415F

OFFICE

415C

OFFICE

415B

OPEN OFFICE

415A

ROOM

409A

ROOM

ROOM

409B

OPEN AREA

OFFICE

419D

OFFICE

414C

ROOM

414E

TRAINING

414A

BREAK ROOM

414B

MENS TOILET

U43

WOMENS

TOILET

U44

JC

407E

OPEN

OFFICES

OPEN

OFFICES

ROOM 4

OPEN OFFICE

OFFICE

408C

OFFICE

408B

RECEPTION

406A

EXEC OPEN

415E

OPEN OFFICE

OPEN AREA

OFFICE

OFFICE

1 2 3 4 5 6

A

B

C

D

E

F

STAIR

ELEVATOR

STAIR

OFFICE

406B OPEN AREA

ELEVATOR

LOBBY

4−100

ELEVATORTOILET

4−101

CORRIDOR

4−103

TRAINING

415G

A

B

C

D

E

F

G

H

IT IS THE INTENT OF THE DEMOLITION TO REMOVE

EXISTING CONSTRUCTION WHICH CONFLICTS WITH THE

INTENT OF NEW CONSTRUCTION. EVERY DEMOLITION

CONDITION MAY NOT BE COVERED IN THESE DOCUMENTS.

CONTRACTOR SHALL PERFORM DEMOLITION REQUIRED

FOR THE INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL

PROJECT AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM

OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO

BE DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS

REQUIRED.

WHERE ACCESS IS REQUIRED TO CONCEALED

ELEMENTS, CONTRACTOR SHALL RESTORE AFFECTED

AREA TO ORIGINAL CONDITIONS.

D1 DEMOLISH ALL UNUSED CONCRETE EQUIPMENT PADS.

FLOOR SURFACE SHALL BE LEVEL, SMOOTH, AND

CONSISTENT.

SEAL ALL UNUSED FLOOR AND WALL PENETRATIONS.

CUT OPENING IN EXISTING PARTITION FOR NEW DOOR

AND FRAME. COORDINATE WITH ARCHITECTURAL

RENOVATION PLANS.

D2

SHADED REGION DESIGNATE AREAS OF

KNOWN ASBESTOS LOCATIONS PER A

ENVIRONMENTAL REPORT BY OTHERS. REFER

TO ENVIRONMENTAL REPORT ATTACHED TO

SPECIFICATION SECTION 02080 FOR SPECIFIC

LOCATIONS AND ASBESTOS TO BE ABATED.

THE INTENT OF THIS PROJECT IS TO ABATE

THE ASBESTOS LOCATED ON MECHANCIAL

EQUIPMENT AND ABOVE THE CEILING ONLY.

D3

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD104

D

EM

O

LI

T I O

N F

O U

R T H

F

LO

O R

P L A

N

AD

1 0

FLOOR PLAN DEMOLITION NOTES

DEMOLITION KEY NOTES

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1' 1/8" = 1'-0"1 FOURTH FLOOR- BUILDING 1907 DEMOLITION

D2

D2

D2

D2

D2

D2

F

U

V

W

X

Y

Z

51 52 53 54 55 56

JANITOR

STORAGE

STORAGE

FIRE PUMP

EQUIPMENT

ROOM

BREAK ROOM

ELECTRIC

ROOM

BUILDING

1907A

(NOT IN

CONTRACT)

BLDG 1908

BLDG 1907

BLDG 1907A

D1 DEMOLISH ALL UNUSED CONCRETE EQUIPMENT PADS.

FLOOR SURFACE SHALL BE LEVEL, SMOOTH, AND

CONSISTENT.

SEAL ALL UNUSED FLOOR AND WALL PENETRATIONS.

CUT OPENING IN EXISTING PARTITION FOR NEW DOOR

AND FRAME. COORDINATE WITH ARCHITECTURAL

RENOVATION PLANS.

D2

SHADED REGION DESIGNATE AREAS OF

KNOWN ASBESTOS LOCATIONS PER A

ENVIRONMENTAL REPORT BY OTHERS. REFER

TO ENVIRONMENTAL REPORT ATTACHED TO

SPECIFICATION SECTION 02080 FOR SPECIFIC

LOCATIONS AND ASBESTOS TO BE ABATED.

THE INTENT OF THIS PROJECT IS TO ABATE

THE ASBESTOS LOCATED ON MECHANCIAL

EQUIPMENT AND ABOVE THE CEILING ONLY.

D3

A

B

C

D

E

F

G

H

IT IS THE INTENT OF THE DEMOLITION TO REMOVE

EXISTING CONSTRUCTION WHICH CONFLICTS WITH THE

INTENT OF NEW CONSTRUCTION. EVERY DEMOLITION

CONDITION MAY NOT BE COVERED IN THESE DOCUMENTS.

CONTRACTOR SHALL PERFORM DEMOLITION REQUIRED

FOR THE INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL

PROJECT AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM

OTHER DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO

BE DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS

REQUIRED.

WHERE ACCESS IS REQUIRED TO CONCEALED

ELEMENTS, CONTRACTOR SHALL RESTORE AFFECTED

AREA TO ORIGINAL CONDITIONS.

51 52 53 54 55 56

FAN ROOM

LOCKER

ROOM

TOILET ROOM

BOILER

CONTROL

ROOM

CONSTRUCTION

OFFICE

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD106

D

EM

O

LI

TI

O

N B

U I L

D

IN

G

AD

1 0

1/8" = 1'-0"1 FIRST FLOOR - BUILDING 1908 DEMOLITION

MATCHLINE A-A

MATCHLINE A-A

FLOOR PLAN DEMOLITION NOTES

DEMOLITION KEY NOTES

D1

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

1/8" = 1'-0"2 SECOND FLOOR - BUILDING 1908 DEMOLITION

MATCHLINE A-A

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SDSD

SD

SD

SD

OS

SD

A

B

C

D

E

F

G

H

I

J

K

IT IS THE INTENT OF THE DEMOLITION TO REMOVE EXISTING

CONSTRUCTION WHICH CONFLICTS WITH THE INTENT OF

NEW CONSTRUCTION. EVERY DEMOLITION CONDITION MAY

NOT BE COVERED IN THESE DOCUMENTS. CONTRACTOR

SHALL PERFORM DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL PROJECT

AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM OTHER

DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EXPOSED STRUCTURE NOT INDICATED FOR CLARITY.

EXISTING CEILING MOUNTED A/V, SECURITY, FIRE

PROTECTION, AND MECHANICAL, ELECTRICAL, AND

PLUMBING EQUIPMENT SHOWN. CONTRACTOR TO

COORDINATE ANY VARIANCE.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO BE

DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS REQUIRED.

CEILING DEMOLITION SHOWN AS REQUIRED FOR HVAC

REPLACEMENT.

WHERE ACCESS IS REQUIRED TO CONCEALED ELEMENTS,

CONTRACTOR SHALL RESTORE AFFECTED AREA TO

ORIGINAL CONDITIONS.

1 2 3 4 5 6

A

B

C

D

E

F

OPEN OFFICE

OFFICE

NA

OFFICE

MEN

U12

WOMEN

U13

OPEN OFFICE

STOR

UTILITY /

COMM

NA

OFFICE

115 A

SECURE

OFFICE

115C

OFFICE

115B

OFFICE

OFFICE

OFFICE

100A

OFFICE

ELEVATOR

MECH

U17A

MECH

U18B

OFFICE

U18

MECH

U17

OFFICE

STOR

U16

ENTRANCE

LOBBY

U16A

OFFICE

103C

OPEN OFFICE

WAITING

ROOM

103J

CONFERENCE

ROOM

OFFICE

103E

OFFICE

103F

OFFICE

103B

MECH

U14B

COMM ROOM

U14A

MECH

U14

PROJECTION

STOR

OFFICE

108A OFFICE

OFFICE

OFFICE

OFFICE

OPEN OFFICE

OFFICE

OFFICE

OPEN OFFICE

108B

STAIR

STAIR

EXISTING

EXTERIOR

LOADING AREA

BUILDING 1907A

(NOT IN CONTRACT)

BLDG 1908

BLDG 1907

BLDG 1907A

AREAS/ CEILINGS NOT HATCHED OR DESIGNATED ARE

EXISTING TO REMAIN U.N.O.

DEMOLISH SUSPENDED 2'-0"x2'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

DEMOLISH SUSPENDED 2'-0"x4'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

GYPSUM WALL BOARD CEILING ON

SUPPORT SYSTEM TO REMAIN. REMOVE

AND REINSTALL AS REQUIRED TO

DISSASSEMBE EXISTING DUCTWORK AND

ASSEMBLE NEW DUCTWORK.

EXPOSED CEILING/ OPEN TO STRUCTURE

TO REMAIN.

LIGHT FIXTURES

DEMOLISH MECHANICAL SUPPLY/ RETURN

AND DUCTWORK. COORDINATE WITH

MECHANICAL DRAWINGS.

SMOKE DETECTOR

CEILING MOUNTED EXIT SIGN

FIRE SPRINKLER HEAD

DISCONNECT, REMOVE, AND REINSTALL OR PROVIDE

TEMPORARY SUPPORT FOR ALL ELECTRICAL DEVICES AND

LIGHT FIXTURES AS REQUIRED TO DISASSEMBLE EXISTING

DUCTWORK AND ASSEMBLE NEW DUCTWORK.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD111

D

EM

O

LI

TI

O

N R

EF

L E

C

TE

D C

EI

LI

N G

P

LA

N

FI

R

S T F

LO

O

R

AD

1 1

CEILING DEMOLITION NOTES

CEILING DEMOLITION PLAN SYMBOLS

1/8" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN DEMOLITION

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

MATCHLINE B-B

MATCHLINE B-B

SEE 1/AD116

SDSD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

SD

SD SD

SD

SD

SD

SD

SD

A

B

C

D

E

F

G

H

I

J

K

IT IS THE INTENT OF THE DEMOLITION TO REMOVE EXISTING

CONSTRUCTION WHICH CONFLICTS WITH THE INTENT OF

NEW CONSTRUCTION. EVERY DEMOLITION CONDITION MAY

NOT BE COVERED IN THESE DOCUMENTS. CONTRACTOR

SHALL PERFORM DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL PROJECT

AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM OTHER

DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EXPOSED STRUCTURE NOT INDICATED FOR CLARITY.

EXISTING CEILING MOUNTED A/V, SECURITY, FIRE

PROTECTION, AND MECHANICAL, ELECTRICAL, AND

PLUMBING EQUIPMENT SHOWN. CONTRACTOR TO

COORDINATE ANY VARIANCE.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO BE

DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS REQUIRED.

CEILING DEMOLITION SHOWN AS REQUIRED FOR HVAC

REPLACEMENT.

WHERE ACCESS IS REQUIRED TO CONCEALED ELEMENTS,

CONTRACTOR SHALL RESTORE AFFECTED AREA TO

ORIGINAL CONDITIONS.

1 2 3 4 5 6

A

B

C

D

E

F dumbwaiter

OFFICE

OFFICE

203A

OPEN OFFICE

OPEN OFFICE

OPEN OFFICE

OFFICE

200A

ELEV

MEN

U21

WOMEN

U22

OFFICE

NA

OFFICE

NA

OPEN OFFICE

OPEN OFFICE

218A

OPEN OFFICE

OFFICE

218C

OFFICE

218D

OPEN OFFICE

225M

OPEN OFFICE

218F

OFFICE

NA

OPEN AREA /

RECEPTION

225Q

OFFICE

NA

OFFICE

NA

STOR

226A

CONFERENCE

OPEN AREA /

RECEPTION

OFFICE

225A

OFFICE

225B

OFFICE

225H

OFFICE

225C

STOR

NA

OFFICE

225P

OFFICE

225G

OFFICE

225F

OFFICE

OFFICE

219A

OPEN OFFICE

OFFICE

OFFICE

OFFICE

206A

OPEN OFFICE

OFFICE

209F

OFFICE

209E

OFFICE

209D

OFFICE

209A

OFFICE

209B

OFFICE

209C

OPEN OFFICE

STORAGE

210C

OFFICE

OFFICE

OFFICE

213A

OPEN OFFICE

OPEN OFFICE

OFFICE

204C

OFFICE

204B

OPEN OFFICE

CL

OPEN OFFICE

STAIR

STAIR

BLDG 1908

BLDG 1907

BLDG 1907A

AREAS/ CEILINGS NOT HATCHED OR DESIGNATED ARE

EXISTING TO REMAIN U.N.O.

DEMOLISH SUSPENDED 2'-0"x2'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

DEMOLISH SUSPENDED 2'-0"x4'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

GYPSUM WALL BOARD CEILING ON

SUPPORT SYSTEM TO REMAIN. REMOVE

AND REINSTALL AS REQUIRED TO

DISSASSEMBE EXISTING DUCTWORK AND

ASSEMBLE NEW DUCTWORK.

EXPOSED CEILING/ OPEN TO STRUCTURE

TO REMAIN.

LIGHT FIXTURES

DEMOLISH MECHANICAL SUPPLY/ RETURN

AND DUCTWORK. COORDINATE WITH

MECHANICAL DRAWINGS.

SMOKE DETECTOR

CEILING MOUNTED EXIT SIGN

FIRE SPRINKLER HEAD

DISCONNECT, REMOVE, AND REINSTALL OR PROVIDE

TEMPORARY SUPPORT FOR ALL ELECTRICAL DEVICES AND

LIGHT FIXTURES AS REQUIRED TO DISASSEMBLE EXISTING

DUCTWORK AND ASSEMBLE NEW DUCTWORK.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD112

D

EM

O

LI

TI

O

N R

EF

L E

C

TE

D C

EI

LI

N G

P

LA

N

SE

C

O N

D F

L O O

R

AD

1 1

CEILING DEMOLITION NOTES

1/8" = 1'-0"1 SECOND FLOOR REFLECTED CEILING PLAN DEMOLITION

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

CEILING DEMOLITION PLAN SYMBOLS

MATCHLINE C-C

MATCHLINE C-C

SEE 2/AD116

SD SD

SD

SD

SD

SD

SD SD

SD SD SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

A

B

C

D

E

F

G

H

I

J

K

IT IS THE INTENT OF THE DEMOLITION TO REMOVE EXISTING

CONSTRUCTION WHICH CONFLICTS WITH THE INTENT OF

NEW CONSTRUCTION. EVERY DEMOLITION CONDITION MAY

NOT BE COVERED IN THESE DOCUMENTS. CONTRACTOR

SHALL PERFORM DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL PROJECT

AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM OTHER

DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EXPOSED STRUCTURE NOT INDICATED FOR CLARITY.

EXISTING CEILING MOUNTED A/V, SECURITY, FIRE

PROTECTION, AND MECHANICAL, ELECTRICAL, AND

PLUMBING EQUIPMENT SHOWN. CONTRACTOR TO

COORDINATE ANY VARIANCE.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO BE

DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS REQUIRED.

CEILING DEMOLITION SHOWN AS REQUIRED FOR HVAC

REPLACEMENT.

WHERE ACCESS IS REQUIRED TO CONCEALED ELEMENTS,

CONTRACTOR SHALL RESTORE AFFECTED AREA TO

ORIGINAL CONDITIONS.

1 2 3 4 5 6

A

B

C

D

E

F projector projector

STAIR

MECH AREA

U32

MECH AREA

U33

MECH AREA

U34

MECH AREA

U38A

ELEVATOR

U23

OPEN OFFICE

CONFERENCE

300A

OFFICE

300H

OFFICE

304B

CONFERENCE

300L

MENS TOILET

U30

OPEN OFFICE

OFFICE

304A

OFFICE

VEST

300D

OFFICE

320B

OFFICES

CLOSET

319C

CLOSET

319D

BREAK ROOM

MENS TOILET

U37

WOMENS

TOILET

U36B

CONFERENCE

CONFERENCE

SUPPORT

U36A

JC

317A

STAIR

ROOM

ROOM

316B

ROOM

316A

ROOM

315A

OPEN OFFICE

OFFICE

OPEN AREA

COPY

311A

OFFICE

CLOSET

OFFICE

OFFICE

OFFICE

310A

OFFICE

OFFICE

307A

OPEN OFFICE

OFFICE

STAIRS TO

3RD FL MEZZ

MECH

U38N

MECH

U38

TRAINING

OPEN OFFICE

BLDG 1908

BLDG 1907

BLDG 1907A

AREAS/ CEILINGS NOT HATCHED OR DESIGNATED ARE

EXISTING TO REMAIN U.N.O.

DEMOLISH SUSPENDED 2'-0"x2'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

DEMOLISH SUSPENDED 2'-0"x4'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

GYPSUM WALL BOARD CEILING ON

SUPPORT SYSTEM TO REMAIN. REMOVE

AND REINSTALL AS REQUIRED TO

DISSASSEMBE EXISTING DUCTWORK AND

ASSEMBLE NEW DUCTWORK.

EXPOSED CEILING/ OPEN TO STRUCTURE

TO REMAIN.

LIGHT FIXTURES

DEMOLISH MECHANICAL SUPPLY/ RETURN

AND DUCTWORK. COORDINATE WITH

MECHANICAL DRAWINGS.

SMOKE DETECTOR

CEILING MOUNTED EXIT SIGN

FIRE SPRINKLER HEAD

DISCONNECT, REMOVE, AND REINSTALL OR PROVIDE

TEMPORARY SUPPORT FOR ALL ELECTRICAL DEVICES AND

LIGHT FIXTURES AS REQUIRED TO DISASSEMBLE EXISTING

DUCTWORK AND ASSEMBLE NEW DUCTWORK.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n D at e

JO

IN

T

BA

SE

M cG U

IR

E-

D

IX

-L

AK

EH

U

R

ST

M cG

U

IR

E, N

EW

J

ER

SE

Y

AI

R

M O

BI

LI

TY

C

O M

M

AN

D D

EP

AR

TM

EN

T O

F

TH

E

AI

R F

O R

C E

Fi le

N am e:

Dwg. No.

A

HGE FDCB

/2

/1

K O

T L

R

EP

AI

R

H

VA

C B

LD

G

AT

M C

G U

IR

E

JO

IN

T

BA

SE

M

C G

U

IR

E- D

IX

-L

AK

EH

U R

ST

7T H

C

IV

IL

E

N G

IN

EE

R S

Q U

AD

R

O N

06-2005 a w

AD113

D

EM

O

LI

TI

O

N R

EF

L E

C

TE

D C

EI

LI

N G

P

LA

N

TH

IR

D F

LO

O

R

AD

1 1

CEILING DEMOLITION NOTES

1/8" = 1'-0"1 THIRD FLOOR REFLECTED CEILING PLAN DEMOLITION

PLAN

NORTH

8'0 4' 16'

SCALE:1/8"=1'

CEILING DEMOLITION PLAN SYMBOLS

SD

SD

SD SD

SD

SD

SD

SDSDSD

SD

SD

SD

SD

SD

SDSD

SD

SD

SD

SD

SD

SD

SDSD

SDSDSD

SD

SD SDSD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

SD

A

B

C

D

E

F

G

H

I

J

K

IT IS THE INTENT OF THE DEMOLITION TO REMOVE EXISTING

CONSTRUCTION WHICH CONFLICTS WITH THE INTENT OF

NEW CONSTRUCTION. EVERY DEMOLITION CONDITION MAY

NOT BE COVERED IN THESE DOCUMENTS. CONTRACTOR

SHALL PERFORM DEMOLITION REQUIRED FOR THE

INSTALLATION OF NEW WORK.

SEE SPECIFICATIONS FOR ADDITIONAL GENERAL PROJECT

AND DEMOLITION NOTES.

SEE G-001 FOR LEGEND AND GENERAL NOTES.

COORDINATE WITH AND REFER TO DRAWINGS FROM OTHER

DISCIPLINES FOR ADDITIONAL SCOPE OF WORK.

ROOM NUMBERING BASED ON BUILDING SIGNAGE.

CONTRACTOR TO VERIFY ROOM IDENTIFICATION BASED

UPON ACTUAL SITE CONDITIONS.

INTERIOR WALL FINISHES SHALL REMAIN AND BE

PROTECTED THROUGHOUT DEMOLITION.

EXPOSED STRUCTURE NOT INDICATED FOR CLARITY.

EXISTING CEILING MOUNTED A/V, SECURITY, FIRE

PROTECTION, AND MECHANICAL, ELECTRICAL, AND

PLUMBING EQUIPMENT SHOWN. CONTRACTOR TO

COORDINATE ANY VARIANCE.

EQUIPMENT, SYSTEMS, AND DEVICES NOT INDICATED TO BE

DEMOLISHED SHALL REMAIN. PROVIDE TEMPORARY

SUPPORT AND PROTECTION FROM DAMAGE AS REQUIRED.

CEILING DEMOLITION SHOWN AS REQUIRED FOR HVAC

REPLACEMENT.

WHERE ACCESS IS REQUIRED TO CONCEALED ELEMENTS,

CONTRACTOR SHALL RESTORE AFFECTED AREA TO

ORIGINAL CONDITIONS.

1 2 3 4 5 6

A

B

C

D

E

F

CIRCULAR EXHAUST

OPEN OFFICE

OPEN AREA

OFFICE

OFFICE

STAIR OFFICE

419D

OFFICE

414C

OPEN AREA

ROOM

414E

TRAINING

414A

BREAK ROOM

414B

OPEN OFFICE

415A

OFFICE

415B

OFFICE

415C

ROOM

409A

ROOM

ROOM

409B

MENS TOILET

U43

WOMENS

TOILET

U44

OPEN

OFFICES

OPEN

OFFICES

ROOM 4

STAIR

ROOM

ROOM

401C

OFFICE

401A

ROOM

OFFICE

401B

ROOM

401D

OPEN OFFICE

MENS TOILET

U41

JC

U41A

STORAGE

400A

CONFERENCE

STORAGE

400B

ELEVATOR

STORAGE

417D

STORAGE

417C

OFFICE

417B

OFFICE

OFFICE

415D

EXEC OPEN

415E

OFFICE

415F

RECEPTION

406A

OFFICE

408C OFFICE

408B

OPEN OFFICE

OPEN AREA

CIRCULAR EXHAUST

CIRCULAR EXHAUST

TRAINING

415G

JC

407E

BLDG 1908

BLDG 1907

BLDG 1907A

AREAS/ CEILINGS NOT HATCHED OR DESIGNATED ARE

EXISTING TO REMAIN U.N.O.

DEMOLISH SUSPENDED 2'-0"x2'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

DEMOLISH SUSPENDED 2'-0"x4'-0"

ACOUSTICAL CEILING TILE AND CEILING

GRID.

GYPSUM WALL BOARD CEILING ON

SUPPORT SYSTEM TO REMAIN. REMOVE

AND REINSTALL AS REQUIRED TO

DISSASSEMBE EXISTING DUCTWORK AND

ASSEMBLE NEW DUCTWORK.

EXPOSED CEILING/ OPEN TO STRUCTURE

TO REMAIN.

LIGHT FIXTURES

DEMOLISH MECHANICAL SUPPLY/ RETURN

AND DUCTWORK. COORDINATE WITH

MECHANICAL DRAWINGS.

SMOKE DETECTOR

CEILING MOUNTED EXIT SIGN

FIRE SPRINKLER HEAD

DISCONNECT, REMOVE, AND REINSTALL OR PROVIDE

TEMPORARY SUPPORT FOR ALL ELECTRICAL DEVICES AND

LIGHT FIXTURES AS REQUIRED TO DISASSEMBLE EXISTING

DUCTWORK AND ASSEMBLE NEW DUCTWORK.

OMILIB CT Y

O

R M

AI NAM

D

/2

8/

K O

T L

A R C H D

PT

FL

6-

PR

O

JE

C

T N

U M

BE

R

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

Sheet of

PTFL

D es cr ip tio n

Ap pr ov ed

Sy m bo l

Ap pr ov ed

D at e

D at e:

Pl ot

S ca le

D w n by

P lo t D at e:

D es ig ne d by

C hk b y:

D ra w in g N um be r:

Sy m bo l D es cr ip tio n…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.