W912BU-16-P-0005_0001_SF30.pdf
PDF 22 KB Posted
- Solicitation number
- W912BU-16-T-0005
About this file
SF30 Amendment to the Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912BU-16--T-0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W25PHS51620539
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this modification is to answ er questions posed by vendors, change specific language concerning the publications initially required, and extend the offer due date to November 30th 2015 at 1400 (2:00 PM) EST. All other terms and conditions remain the same.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 19-Nov-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-T-0005
X 9B. DATED (SEE ITEM 11)
02-Nov-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
19-Nov-2015
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-T-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
The following items are applicable to this modification:
AMENDMENT 0001
The purpose of this modification is to answer questions posed by vendors, change specific language concerning the publications initially required, and extend the offer due date to November 30th 2015 at 1400 (2:00 PM) EST. All other terms and conditions remain the same.
Language Change Cylinder Heads
Remove the following sentences.
Statement of Work
Paragraph 1 “Spares Designation: MD-09-05-22”:
It is the contractor’s responsibility to obtain the publications from FM/ALCO to assure they are using the most current information for the job.
Paragraph 6: The contractor is to obtain most current publication copies directly from ALCO to insure latest revisions and changes are utilized.
Replace with: “It is the contractor’s responsibility to re-build the parts to the latest revision of the manufacturer’s specifications."
Questions
Question 1: Does the Combined Synopsis/Solicitation under solicitation number W912BU-16- T-0005 contain requirements similar to a current contract? If so, please provide the current contract number.
Answer 1: No, this is a new requirement
Question 2: The SOW directs the contractor to bear the burden of obtaining the ALCO publications from FM/ALCO. The contractor is challenged in meeting this requirement due to FM/ALCO refusal to make available in obtaining the referenced publications. ALCO representative stated that they will make available the OEM’s latest version of the repair manuals referenced in the solicitation to the Engine Owners “ONLY”.
W912BU-16-T-0005
Answer 2: USACE is not responsible for nor are we liable for “making” FM/ALCO provide the repair manuals referenced in the solicitation. FM/ALCO has the right, since they are the owners of the patents/copyright to these materials, to make them available to FM/ALCO authorized agent/distributor/rebuild firms or others IAW their company policies. However, this does not preclude any vendor from entering a private agreement with AF/ALCO to obtain these manuals.
Additionally the sentences that initially required the contractors to obtain these publications has been removed and replaced with: “It is the contractor’s responsibility to re-build the parts to the latest revision of the manufacturer’s specifications."
Question 3: Please provide ALCO specifications MI-11020G, DRP-12200N and DRP-12400H.
Answer 3: “It is the contractor’s responsibility to re-build the parts to the original manufacturer’s specifications."
Question 4: Please provide model and serial numbers for the referenced ALCO Engine referenced in the solicitation.
Answer 4: Engine numbers are: 251C for 12 cyl - 8848, 8850, 8849, 8851, 8852, 8853, and 8854. 251B for 16 cyl - 8855, 8856, 8857. Engine 8852 is 12 cyl, but the engine block was replaced with a 251F.
Question 5: In the solicitation it states, "Contractor shall offer with his proposal a warranty ... in accordance with the contract clauses. ... The warranty shall be set up for the number of operational hours rather than days." Please advise how many hours are required to comply with this requirement.
Answer 5: 250 operating hours
All other terms and conditions remain unchanged.
File details come from the government source that posted it. Updated .