Amendment_0001.docx
DOCX document 25 KB Posted
- Solicitation number
- W912BU-16-T-0001
About this file
Amend 0001 Q A Requirement Notes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Hugo_Gate_Photos_and_Dwgs.pdf | ||
| Amendment_0002.docx | DOCX document | |
| Hugo_SOW_Amendment_0001.doc | DOC document | |
| Price_Schedule_Amendment_0001.docx | DOCX document | |
| Price_Schedule.docx | DOCX document | |
| Clauses.docx | DOCX document | |
| Hugo_SOW_Attachments.pdf | ||
| Hugo_SOW.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912BU-16-T-0001
QUESTION AND ANSWERS
AMENDMENT 0001
Question #1 - Has a contractor performed similar work to this for the government in the past? If available, please provide the incumbent contract number.
Answer #1 – USACE has performed work similar to this solicitation. Three (3) recent requirements similar to the Hugo solicitation are as follows:
1) W912BU-15-P-0091 at Howard Hanson Dam
2) W912BU-15-P-0062 at Hannibal L/D
3) W912BU-15-P-0048 at Hildebrand L/D and Opekiska L/D
Question #2 Can you please describe the floating bulkhead inspection? Is confined space required? If so who will act as attendant for entry? What is rescue plan? The rope access L3 could provide this service but it would have to be specifically called out in the solicitation and that cost would be included in the bulkhead portion of the pricing.
Answer #2 – Per amendment 0001, the bulkhead portion of this requirement has been descoped.
Question #3 The pricing schedule is difficult to understand, may I suggest the following:
| 1. | LIN 001: Bulkhead NDT (1 day) |
| 2. | LIN 002: Bulkhead NDT Option (1 day) |
| 3. | LIN 003: Gates Rope Access and NDT (3 days) |
| 4. | LIN 004: Gates Rope Access and NDT Option (1 day) |
Answer #3 – USACE has amended the CLIN structure for this requirement. However, per amendment 0001, the bulkhead portion of this requirement has been descoped.
Question #4 Are schematics or engineering drawings indicating the inspection locations on the floating bulkhead available?
Answer #4 – No. Per amendment 0001, the bulkhead portion of this requirement has been descoped.
Notes:
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) on each copy of the offer submitted or by separate letter or telegram which includes a reference to the solicitation and amendment number.
FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR QUOTE.
File details come from the government source that posted it. Updated .