W912BU-16-B-0015-0003.pdf

PDF 95 KB Posted

Attached to
Procurement of One Welded Steel Deck Barge for Louisville District
Solicitation number
W912BU-16-B-0015
Issued by

About this file

W912BU-16-B-0015-0003

View the file

Other files

File Type Posted
16B0015_SF1409_(signed).pdf PDF
16B0015_Section_B_Combined.pdf PDF
16B0015-0004_Amendment.pdf PDF
Amendment_03.zip ZIP file
16B0015-0002_Amendment.pdf PDF
16B0015-0001_Amendment.pdf PDF
Drawings.zip ZIP file
16B0015_Solicitation.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the due date, revise the SOW, revise draw ings, and answ er questions from bidders (see Block 14 Continuation Page for details).

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jun-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-B-0015

X 9B. DATED (SEE ITEM 11)

13-May-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jun-2016

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912BU-16-B-0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The purpose of this amendment is to:

1. Extend the due date from 22 June 2016 to 29 June 2016, the due time remains the same.

2. Revise the following section of the Scope of Work:

C115.D C410 C415.C C637.D C685 C690.C E05.F.4

3. Revise the following drawings:

788-B245-01 Machinery Arrangement 788-B552-01 Spud Wells 788-B630-01 Fuel Oil System 788-B645-01 Raw Water System 788-B660-01 Bilge System 788-B667-01 Sewage System 788-B685-01 HVAC System 788-B690-01 Compressed Air System 788-B720-01 AC Electrical System One-Line 788-B730-01 Lighting & Receptacle Plan

4. Answer questions from Bidders

All other terms and conditions remains the same.

Bidder must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended).

FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN

REJECTION OF YOUR PROPOSAL.

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 22-Jun-2016 02:00 PM to 29-Jun-2016 02:00 PM.

C115.D

D. INCLINING AND DEADWEIGHT SURVEY

Upon completion of all work and after the cranes have been installed, with the vessel in the lightship condition and the cranes in the stowed position, the Contractor shall conduct an inclining test and deadweight survey under the direction of the Government. The inclining test shall be carried out in accordance with ASTM F 1321-92 (2008) and contract section E05. The Contractor shall be responsible for providing all inclining weights, pendulum setups, support equipment and personnel.

The Government will provide the inclining test procedure, direct the inclining experiment, record all data, complete the inclining test report, and revise the intact and lifting stability.

The timeline shall be as follows:

-Within 6 months after NTP for Phase II, the Government coordinates with the Contractor regarding the type and amount of required incline weight -After notice from the Contractor, the Government provides inclining test procedure within 15 calendar days -Contractor submits inclining test procedure to ABS -Contractor receives ABS approval for inclining test procedure -Contractor conducts inclining test under direction of the Government, witnessed by ABS -Government provides inclining test report and revised intact and lifting stability within 7 days after completion of inclining -Contractor submits inclining test report and revised intact and lifting stability to ABS

The Contractor shall be responsible for all costs associated with ABS reviews (including at least one iteration to reflect any ABS comments made) and all surveyor costs.

Note, after inclining, load handling tests (CRANE TESTS) shall not commence until Contractor receives ABS approval to do so. ABS surveyor attendance shall be required for all load handling tests.

C410 FENDERING DETAILS

A. CONTRACT DRAWINGS

788-B410-01 FENDERING DETAILS

B. GENERAL

A fendering system shall be provided and installed as shown on the Contract Drawings. The Government does not require additional review for the Fendering Details.

C. FENDERING

Fendering shall be provided along each side of the barge in accordance with the Contract Drawings.

D. GRATING

1 ¼” galvanized metal grating shall be provided on the port side attached to the landing as shown on the Contract Drawing. The grating shall have removable sections in way of the three runner retaining pin assemblies.

Grating shall be installed in accordance with the manufacturer’s recommendations. Galvanized steel clip fasteners shall be provided by the manufacturer of the grating and shall be attached to the support structure with recessed stainless steel hex head bolts and stainless steel locknuts with nylon inserts.

C415.C

C. DOORS

All doors shall be equipped with lever style handles inside and outside, a minimum of three hinges (except as noted), door stops, and a positive means to secure them in both the open (except CO2 protected spaces) and closed positions. All door jams shall be bolted in place to facilitate removal and prevent wrapping during installation. All hardware shall be stainless steel. All door heights shall be as shown on the Contract Drawings. All doors shall be stainless steel with a mill finish with no visible burns, grinding, or welding marks. Doors shall not be painted.

All exterior doors shall be fitted with suitable locks. All locks shall be lever type and suitable for marine service. Two keys shall be furnished for each door lock. The locks shall be keyed alike so that the same key can open all doors.

C637.D

D. WASTE OIL TANK AND PUMP OUT

The Contractor shall provide an independent tank to collect waste oil (See C130 and C320). The tank shall be fitted with a liquid level sight gauge similar to an ABS approved KENCO Model 9900 (w/ Shield Option H) series level gauge with integral valves, suitable for waste oil service. The liquid level gauges shall have all stainless steel construction and each gauge shall be calibrated to show ¼ tank level, the ½ tank level, and the ¾ tank level.

An alarm shall be installed at the tank level alarm panels to report a high tank levels in the waste oil tank.

A warning shall sound at a tank capacity of 90% and a high alarm at a capacity of 95%. The alarms shall be audible and visual and shall be recorded at alarm panels.

The waste oil tank shall be fitted with a 1-1/2-inch connection for the waste oil supply header and a 1-1/2-inch pump-out connection terminating 18-inches above the main deck outside of the deckhouse and clear of the deck storage area. A 1-inch nominal pipe drain with pipe plug shall be fitted at the lowest point possible for the waste oil tank. The line shall be used for tank cleaning purposes.

For subsequent disposal of the waste oil to a shore reception facility, the system shall have a 1½-inch tank pump out connection located on the main deck. The pump shall be provided with local start-stop controls and pump-run indicating light at the pump, remote start-stop controls and pump indicating light in the generator room, and weather-tight start-stop controls and a pump run-indicating light at the deck pump out station. The pump-out line shall be fitted with a bronze threaded cap. The cap shall be attached to the pipe with a lanyard, and the cap shall be properly labeled “WASTE OIL”.

The tank pump-out line and vent shall terminate in a permanent spill containment enclosure on the main deck. The containment shall be weather-tight, vented, have a hinged closure and be located on the main deck.

C685 HVAC

A. CONTRACT DRAWINGS

788-B685-01 HVAC SYSTEM

B. DESCRIPTION OF WORK

The HVAC and machinery ventilation systems shall be provided and installed on the vessel as shown on the Contract Drawings. The Government does not require additional review for these systems.

The Contract Drawings show a schematic of the complete HVAC system. The Contractor shall provide and install all components, ducting, fans, and vents necessary to form a complete HVAC system. The vessel shall be outfitted with heating, air conditioning, and ventilation in the various spaces, as shown on the Contract Drawings or described in this specification.

C. GENERAL REQUIREMENTS

Ventilation air for non air-conditioned spaces shall be introduced into and exhausted from each space, so as to promote effective distribution throughout the space, while providing the required numbers of air changes or cfm for ambient temperature control and/or required air quality. Supply and exhaust terminals shall be separated to the maximum extent feasible. Intakes shall be ducted to distribute the supply air evenly throughout the space and introduce the air low, near the floor level. Exhausts shall be located high in the space and away from the intake supply openings.

D. AIR-CONDITIONING - CONTROL HOUSE

The contractor shall provide and install a Coleman SeaMach 48203 series, with Heating, or similar in the control house as shown on the contract drawing. The air conditioning unit shall be rated for 350 cfm and 1900 Watts, a minimum 13,500 BTU/HR Cooling and 5,600 heating capacity, the thermostat shall be wall mounted in the control house.

E. HEATING SYSTEM

The non air-conditioned spaces shall be heated with bulkhead mounted, thermostatically controlled, Dayton 2YU58 3KW Unit Heater or similar, as indicated below:

Space Quantity Rating

● Generator Room (2) 3 kW

● Crew Support Room (1) 3 kW

● Head & Shower Rm* (1) 3 kW

● Machine Shop (1) 3 kW

● Auxiliary Machinery (2) 3 kW

● C02 Locker (1) 3 kW

*The head & shower/changing room shall be provided with a combination exhaust fan, light, and heater unit similar to Broan QTX100HL.

All units shall have On/Off switches at the heater.

F. VENTILATION SYSTEM – NON AIR-CONDITIONED SPACES

The contractor shall provide ventilation equipment as shown on the Contract drawings.

The fans shall be marine duct axial type, similar to Hartzell, and shall have two-speed controllers.

All ventilation fans shall have local On/Off switches in the compartments/spaces they serve in addition to remote switches located in a watertight enclosure near the CO2 locker.

G. VENTILATION SYSTEM – LOUVERS & DAMPERS

All ventilation intake and discharge openings shall have stainless steel, slide out insect screens and shall be provided with backdraft dampers for closure of the openings when the fans are not running.

The Contractor shall furnish and install supply and exhaust louvers for the generator room and auxiliary machine room as shown on the Contract Drawings. The louvers shall be similar to Greenheck Model ESD-635, with stainless steel insect screens.

H. DUCTING

The Contractor shall furnish and install ventilation ducting to distribute the forced ventilation from the supply fans throughout as shown on the contract drawing. Ventilation and air distribution ducts shall be constructed of galvanized steel with SMACNA G90 coating, suitably supported and stiffened as necessary, and shall be at least 24-gauge. Ducts over 12-inches in diameter (or the equivalent rectangular duct size) shall be at least 22-gauge. All ducts in machinery spaces shall be at least 1/16-inch thick. Ducts, including deck cowls, in the weather and at locations subject to mechanical damage shall be at least 1/8-inch thick.

I. FIXED FIRE EXTINGUISHING SYSTEM INTERCONNECTION

Fans and ventilation dampers in spaces protected by fixed fire extinguishing systems (CO2) shall be interlocked with the CO2 system to provide automatic shutdown when the CO2 system is activated.

For all other spaces, fans and ventilation dampers shall be automatically shut down upon activation of the fire detection system in that space.

E05.F.4

4. INCLINING TEST

In accordance with Clause C115.D, a stability test on the vessel shall be performed by the Contractor to determine the basic stability parameters. The inclining experiment shall accurately determine the As-Built lightship weight and the coordinates of the center of gravity for the completed vessel in three directions.

The inclining experiment shall be conducted in accordance with ASTM F 1321-92 (2008) with the spuds in the upper stowed position. The Government will identify the requirements, incline weights, pendulum lengths, etc., to the Contractor. The Government will prepare the inclining test procedure. The Government will direct the incline procedure, record the data, complete the inclining test report, and revise the intact and lifting stability.

The Contractor shall coordinate with the regulatory bodies, including submitting the test procedure, test report, and revised intact and lifting stability, and scheduling the experiment with the necessary witnesses.

The Contractor shall be responsible for providing all inclining weights, pendulum setup, support equipment and personnel. The Contractor shall erect a minimum of 3 pendulums for the inclining experiment.

After the inclining test, several (no load) crane movements shall be performed (crane operated by the crane manufacturer) for each crane (maintenance crane and wicket lifter crane), as follows:

• With no load on the hook, the crane shall swing to 90 degrees (starboard side), and next to 270 degrees, (port side). The crane rigging radius shall not change. Pendulum readings shall be taken after each movement, as well as the vessel draft readings at the four corners of the barge. This will be used to assess the heeling moment due to the crane’s own weight and CG. The change in LCG shall be ignored during the experiment.

• With the crane at 90 degrees over the starboard side, and next with the crane at 270 degrees over the port side, the crane boom angle shall be changed to cause the boom point to move transversely a known distance.

Pendulum and draft readings shall be taken at each position. The initial and final boom angle shall be recorded. The change in the rigging radius shall be calculated. The heeling moment divided by the change in the rigging radius shall equal the boom point dead load by experiment. The change in VCG shall be ignored during the experiment.

Note, after inclining, load handling tests (CRANE TESTS) shall not commence until Contractor receives ABS approval to do so. ABS surveyor attendance shall be required for all load handling tests.

C690.C

C. AIR COMPRESSOR/RECEIVER

The Contractor shall provide one air compressor/receiver unit. The compressor/receiver unit, which shall be located in the auxiliary machinery space, shall be a reciprocating unit similar to a Quincy QR-25 model F350 with a 120-gallon receiver and rated for 33 ACFM @ 135-175-psi and 860 RPM. The compressor motor shall be rated for 10HP, 3 phase, 480 V, 60Hz at 1750 RPM. The compressor/receiver unit shall be equipped with a safety relief and shut-off valves and an aftercooler.

The compressor and motor shall be mounted on vibration isolators with a design transmissibility of 20% or less, and shall be furnished with an inlet air filter, load-less starting and pressure switch for automatic operation.

Each compressor discharge line shall be flexibly connected to the air supply system.

The compressor shall be started automatically by a low-pressure sensor switch, and the supply line from the receiver shall have a pressure gauge with a pressure regulator. Local Start/Stop controls and run-indicating lights shall be provided at the air compressor.

One horizontal air receiver, 120-gallon capacity, rated at not less than 300-psig, shall be provided and installed.

The receiver shall be:

Constructed and certified in accordance with the ASME Code for Unfired Pressure Vessels. The receiver shall be stamped and an ASME Certificate of Inspection shall be furnished with the receiver.

The design, fabrication, and testing of the air receiver shall be in accordance with the ABS Rules (which also requires survey at the plant of manufacture for fabrication and testing). Each receiver shall be certified and stamped by ABS.

Supplied with an automatic condensate drain valve to allow for the removal of accumulated oil and water. The valve shall empty into a drain pan located beneath the receiver.

Provided with a pressure gauge and relief valve.

(End of Summary of Changes)

QUESTIONS AND ANSWERS

(Questions that may be of general interest of all Bidders/Government and that are not readily answered by the proceeding changes will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Bidders for information purposes only.)

1. Are the wicket lifter crane diesel engine and maintenance crane diesel engine to be provided by the shipyard?

ANSWER: No. The diesel engines for each crane shall not be provided by the shipyard. They will be provided by the Government as GFE with the cranes. Drawing 788-B245-01 Machinery Arrangement has been revised to clarify by removing them from the equipment list.

2. What is the air draft for the vessel?

ANSWER: Because the crane procurement has not yet been awarded, the exact height of the crane is not yet known. The air draft with the crane currently shown on the contract drawings is approximately 39’-2”. For bidding purposes the contractor shall assume an air draft up to 10’ greater, or 49’-2”.

3. We feel that hydraulic powered winches would be the best fit for this application.

ANSWER: The Government does not intend to change the solicitation requirements for electrically powered winches.

4. In section C456 please confirm that the use of the term “drum brake” is to identify the brake on the winch drum as opposed to requiring the brake to be an actual “drum” type brake.

ANSWER: Correct. The use of the term “drum brake” in section C456 is not intended to specify the type of brake it is only intended to refer to the brake that is on the winch drum.

5. The specification calls for a drum brake with controllable application force, disc brakes are not recommended for this application.

ANSWER: The solicitation does not specify which type of brake; it is the responsibility of the contractor to choose a brake type for this application that is meets the solicitation requirements.

6. What is the design criteria for brake thermal capacity?

ANSWER: The thermal capacity of the brakes shall be rated for a minimum of 15 minutes at full application of the brake (150% of the full load motor torque) and rated line speed.

7. At high speeds, 2 seconds is far too great a time to allow a winch to come to a full stop. A more common and practical approach is to use normal failsafe (spring applied – hydraulic released) static parking brakes. In a hydraulically powered winch system, dynamic braking would be done using the hydraulic motors and hydraulic counterbalance valves. This system provides excellent speed and load control in addition to providing high thermal capacity. The cooling medium is the hydraulic fluid itself which would be cooled by the hydraulic power unit heat exchanger.

ANSWER: The specification requires the use of spring applied-hydraulically released drum brakes, spring applied-hydraulically released motor brakes, and dynamic braking through the motors and motor VFDs. The Government does not intend to change the solicitation requirements with respect to braking or the requirement for electrically powered winches.

8. Solicitation Section C456 (D)(Operational Modes)(c) requires lever control for actuation of the drum brake for constant tension mode. Is the lever control manual or automatically engaged in overspeed conditions?

ANSWER: The Solicitation requires the motor control constant tension function to be controllable up to 50% of full rated line tension, allowing automatic haul in and pay out at up to twice the maximum rated winch haul in and pay out speed. The lever control is required to allow for supplemental drum brake actuation as needed to prevent overspeed haul out on the winch, from loads exceeding the constant tension dynamic brake capacity (i.e. 50% of full rated line tension). In other words, the winches shall provide constant tension functionality automatically up to 50% of full rated line tension, with the ability to manually apply the drum brake for loads exceeding the constant tension dynamic braking capacity.

9. C415.C states “The finish of all exterior doors shall be polished stainless, they are not intended to be painted”…… Please clarify the level of polished finish.

ANSWER: Section C415.C has been revised to state all doors shall be stainless steel with a mill finish with no visible burns, grinding, or welding marks. Doors shall not be painted.

10. The ABS rules for steel barges dictate that external doors require a minimum of .250” thickness, however your drawing 788-B415-01 states the doors are to have minimum 16 gauge. Please clarify.

ANSWER: The barge shall be designed and constructed in accordance with ABS Rules for Building and Classing Steel Vessels for Service on Rivers and Intracoastal Waterways, not Steel Barge Rules. The Contractor should bid as per the drawing, which is currently under ABS review. If a change is required by ABS, it will be handled under a modification to the contract.