16B0002-0002.pdf
PDF 22 KB Posted
- Attached to
- GELBERMAN Dry Docking 2016 Federal contract opportunity
- Solicitation number
- W912BU-16-B-0002
About this file
Please sign and attach to your proposal.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912BU-07-G-0006_0011.pdf | ||
| W912BU-16-B-0002_SF1409signed.pdf | ||
| ENG_FORM_93_-_Pay_Estimate_-_Sample.pdf | ||
| 16-B-0002_Amend_0001.pdf | ||
| Drawings_3.zip | ZIP file | |
| W912BU-16-B-0002_-_Gelberman.pdf | ||
| Drawings_1.zip | ZIP file | |
| Drawings_2.zip | ZIP file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The amendment hereby answ ers questions presented to the Government.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Feb-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-16-B-0002
X 9B. DATED (SEE ITEM 11)
21-Jan-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Feb-2016
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
POC: JUSTIN CHUNG
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912BU-16-B-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to answer questions presented to the Government.
Questions that may be of general interest of all Bidders/Government will appear below. These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information purposes only.
Anwers To Questions The Government received the following question concerning the solicitation and provides the following answer to this question:
Question #1: Section J – “List of Attachments” of the solicitation lists ENG Form 93 – Pay Estimate as an attached document. The solicitation as issued, did not contain this document. Please post this document.
Answer #1: This document is posted as part of this amendment.
Question #2: How far is the vessel capable of traveling for proposed repairs?
Answer #2: Section C – “Descriptions and Specifications”, subsection SW-5 – “Distance Restriction From Caven Point Terminal” of the solicitation details the travel restriction on the vessel. The restriction is sixteen (16) hours at an average vessel sailing speed of 10 knots, approximately 160 NM.
Question #3: In Section C – “Descriptions and Specifications”, subsection TP 1.14 - “Compartment #6 Deck Hatches” of the solicitation, should the hatch and frame be steel or aluminum? Additionally should the hatch and frame be painted, or left with a primer finish?
Answer #3: The hatch and frame shall be steel, to be welded to the current steel structure. The hatch and frame shall be painted in accordance with Section C – “Descriptions and Specifications”, subsection TP 1.04 - “Exterior Cleaning and Painting”, subsection d. - “Paints”, and subsection TP 1.05 - “Interior Cleaning and Painting”, subsection 4. – “Compartment #6” of the solicitation.
Question #4: Is a licensed marine chemist required to be present to maintain gas-free certification for the duration of work, or can a shipyard competent person be sufficient for maintaining the gas-free certification?
Answer #4: Per CFR 29 CFR 1915.14 “Hot Work”, once gas-free certification has been issued the certificate shall be posted in the immediate vicinity of the affected operations. If the gas-free conditions are violated, the contractor shall bear the full expense of gas-freeing the space and provide an updated marine chemist’s gas-free certificate.
Question #5: Where are the solicitation documents, deadlines, scope of work, and other documents available?
Answer #5: All documentation, deadlines and procedures can be found at “https://www.fbo.gov” searching for Keyword / Solicitation # W912BU-16-B-0002.
Question #6 Which countries are eligible to bid on this solicitation?
W912BU-16-B-0002
Answer #6: Section H – Special Contract Requirements of the solicitation states “In compliance with U.S.C.
7309 and 7310 and DFAR 225.7013, Restrictions on Construction or Repair of Vessels in Foreign Shipyards, the work performed under this contract shall not be performed in a foreign shipyard.”
(End of Summary of Changes)
File details come from the government source that posted it. Updated .