US ARMY ENGINEER DISTRICT, PHILADELPHIA
MEGAN MCMULLEN
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This is amendment 0001. The purpose of this amendment is to modify FAR clause 52.212-2 and provide answ ers to RFI's. Offeror must acknow ledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the follow ing methods: in the space provided on the SF 33, or by signing the block 15 below .
FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY RESULT IN REJECTION OF YOUR PROPOSAL.
RFP Revised Due Date: 1400 EST, 03 November 2015.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Oct-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-15-R-0050
X 9B. DATED (SEE ITEM 11)
14-Sep-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Oct-2015
CODE
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
W912BU 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912BU
FACILITY CODECODE
EMAIL:TEL:
W912BU-15-R-0050
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
W912BU-15-R-0050, Amendment 0001:
The purpose of this amendment is to modify FAR clause 52.212-2 and to address requests for information.
Offeror must acknowledge receipt of this amendment by the date specified in the solicitation (or as amended) by one of the following methods: in the space provided on the SF 33, or by signing the block 15 below.
FAILURE TO ACKNOWLEDGE AMENDMENTS BY THE DATE AND TIME SPECIFIED MAY
RESULT IN REJECTION OF YOUR PROPOSAL.
RFP Revised Due Date: 1400 EST, 03 November 2015.
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 16-Oct-2015 02:00 PM to 03-Nov-2015 02:00 PM.
The depository location has changed from Electronic Copies Only to 6th USACE, NAP DISTRICT.
The number of offeror copies required has increased by 2 from 1 to 3.
SECTION I - CONTRACT CLAUSES
The following have been modified:
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
1. TECHNICAL CAPABILITIES:
a. Sub-factor: Experience Elements:
Facility: Experience, at the designated facility, building at least two aluminum catamarans, 50 feet or longer, in the last five years
Design: Experience designing two foil assisted catamarans, 50 feet or longer, in the last five years.
b. Sub-factor: Product Elements:
Length: 53 – 57 feet LOA w/o Transom Beam: 22-24 feet Speed: 30 – 34kts @90% power
2. PAST PERFORMANCE
i. Review of past performance on contracts identified in the offer. Review of questionnaire
ii. Information obtained from references provided in the offer, and other appropriate sources.
iii. Review of offeror provided information relevant to problems encountered on the contracts identified in the offer.
3. PRICE:
i. Lowest Price Technically Acceptable.
Proposals will be rated as acceptable/ unacceptable. The definition of acceptability/unacceptability is as follows:
Rating Description:
Acceptable: Quote clearly meets the minimum requirements of the solicitation.
Unacceptable: Quote does not clearly meet the minimum requirements of the solicitation.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
(End of Summary of Changes)
The Government has received several questions concerning the solicitation and provides the following answers to these questions (Questions that may be of general interest of all offerors/Government and that are not readily answered by the proceeding changes will appear below.
These questions may have been paraphrased or altered to represent several questions regarding the same subject and/or clarify and simplify the question(s). Questions and answers are issued to the Offerors for information only.
1. The best quality marine high load slide systems use hardcote anodized 6061 T6 alloy. This is a tested off the shelf solution. Would this be acceptable?
Answer: Hardcote anodized 6061 T6 alloy is not acceptable.
2. Item 6, can you confirm that all aluminum plate and stiffeners in the hull is to be 5083 H116 for maximum strength and not 5052?
No specific metal requirement is laid out in the spec other than the fact that all plate in the hull shall be 5000 series aluminum.
3. Item 10, can you confirm that all forward facing windows require the linear wipers and be electrically heated, or is it meant to be the windshields by way of the pilot station?
All forward facing windows on the same level as the pilot station shall have linear wipers and be electrically heated. There is no such requirement for forward facing windows on a different level.
4. Item 10, can you confirm that all cabin windows, including rear bulkhead and sides are to have tinted mylar shades?
Confirmed
5. Item 16-a,IN solicitation ending NO 0050 you require light weight single piece foam anti fatigue matting for flooring. By single piece do you mean a rolled type flooring that might have 1 or 2 seams in it? The widest flooring we know of is 12’ wide. Please advise.
Seams are acceptable and expected, though they should be minimized. The intent of the spec is to prevent "tiled" anti fatigue matting.
6. Item 16-a, In solicitation ending No 0051, you require a poured epoxy type floor. You also specify Corian counter tops whereas 0050 are to be laminate tops. Can you please confirm these tow boats are to be built differently with different outfit items? One would think that standardized fitout would be an advantage to the USACE for maintenance and repair.
Confirmed. These boats are for separate customers in different areas of the country and are two totally independent packages.
7. Item 18, you state that the lower tier of rubrails is to ‘run around the hull’ the full length of the hull. Would a partial length of the hull from the transom be acceptable? We are concerned that the low height of the fendering will cause undue spray in the forward sections.
This is acceptable.
8. Item 22, you do not state that fuel tanks are to be removable, can you confirm if this is required?
Fuel tanks shall not be removable.
9. Item 40, This item states that the survey desks are to be mounted facing fore and aft with outboard ends against the house sides. This conflicts with your sketch. Can you reconfirm the survey desk arrangement. Also in Item 11 it states desks are to be L shaped or angled.
Please note that the requirements are different for each boat. For 0050, there is a conflict between the spec and the sketch. The spec shall govern.
10. Item 41, we do not see that an A-frame winch is specified, can you please confirm.
No A frame winch is required.
11. Item 41&45, Can you confirm if the builder is to include the supply and installation of this survey equipment or will this be supplied and installed by the USACE and/or require an expert to install the survey equipment at the shipyard? Can you also confirm if this is all the survey equipment required for these vessels?
No survey equipment is to be supplied nor installed under this solicitation, however all provisions for such installations shall be made.
12. Item 34C and 15C, You specify a requirement for outside experts for the silencer design and control system. We have not had a response from either of these sources and Mr. Sullivan’s email bounces back. Can you please provide an alternate email for Mr. Sullivan and one for Mr.
Ockerman?
The government has verified that the specified phone number for Dr. Sullivan is correct however, the correct e-mail address is scs.joe1@comcast.net.
The government has verified that the provided phone number is correct for Ockerman Automation.
13. Item 3, The minimum requirements for freeboard in the tunnel are specified at 5.5 feet at the bow and 1.8 feet at the transom, do these dimensions mean from the wave striker under the tunnel or to the mean height of the tunnel?
A11 - The freeboard is from the waterline to the deck edge at both bow and stern.
14. Delivery, will you consider a later delivery for one of these solicitations, as to build two vessels of this complexity in 480 days for small businesses may be difficult for a small business.
The two solicitations are independent and the performance periods are not related therefore they remain at 480 days.
15. Section L 4.0.1, requires that the bidder provide details on ‘at least two aluminum vessels 50 feet or longer’ built during past five years. Our company has built approximately 12-15 vessels of similar or greater complexity over the past five years. However under minimum requirements P 63 paragraph 3 you state at the facility in the past five years. Our company has moved to a new facility in the past two years. Does facility really mean the company, can we amend the wording to state the company.
For the purpose of the minimum requirements under section 4.0.1 and the requirement “built at the facility in the past five years”, the relocation of organizational assets within the same geographic area satisfies the requirement.
16. Evaluation, We would like to clarify that 52.212-2, (a) 1-a conflicts with Section L, 4.0.
Clause 52.212-2 (a) 1-a has been amended to meet the same requirement stated in Section L 4.0.