About this file

Amend No. 1 - Spec

View the file

Other files

File Type Posted
JandA.pdf PDF
AmendNo.0005 DWGS.pdf PDF
AmendNo.0005 SPECS.pdf PDF
Brig-OC_Amend0004.pdf PDF
Brig-OC_Amend0003_Spec.pdf PDF
Brig-OC_Amend0003_Dwgs.pdf PDF
Brig-OC_Amend0002_Specs.pdf PDF
Brig-OC_Amend0002_Dwgs.pdf PDF
Brig-OC_Amend0001_Dwgs.pdf PDF
100 -BrigOC-Specs.pdf PDF
100 -BrigOC-Dwgs.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PAGE INTENTIONALLY LEFT BLANK

Amendment No. 0001 Invitation for Bids

W912BU-12-B-0012

14. DESCRIPTION OF AMENDMENT (continued)

a. GENERAL NOTE - The following specification sections have been amended. Some pages have been provided that contain no changes in order to enable double-sided printing, or to provide information that has moved as a result of changes that were made on other sheets. All pages have been annotated with “Amendment No. 0001” in the header. All revisions are shown in bold italics.

b. SPECIFICATIONS - Please delete the following specification sections or pages in their entirety and substitute new sections or pages of the same title and number attached hereto, unless otherwise described.

(1) BIDDING SCHEDULE, Pages 00010-2 and -3

(2) SECTION 01 11 00 – SUMMARY OF WORK

(3) SECTION 01 71 23 – SURVEY REQUIREMENTS, Pages 7 and 8

(4) SECTION 35 31 00 - BEACHFILL, Pages 1 through 4

c. CONTRACT DRAWINGS - Please delete previously issued drawing sheets C0-001 and CO-104, originally dated 30 July 2012 and substitute revised drawing sheets of the same numbers, with a revision date of 17 August 2012, attached hereto.

d. Please indicate receipt of this amendment on Standard Form 30 (AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT) as Amendment No. 0001. Failure to acknowledge all amendments may be cause for rejection of the offer.

00010-2

BIDDING SCHEDULE

(To be attached to SF 1442)

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

BASE BID

1. Mobilization and Demobilization 1 JOB LS $____________

BRIGANTINE ISLAND:

2. Beachfill 350,000 CY $________ $____________

3. Reconstructed Standard Pedestrian Dune Crossover 2,050 SF $________ $____________

4. Sand Fence 2,100 LF $________ $____________

5. Split Rail Fence 870 LF $________ $____________

6. Dune Grass Planting 6,225 SY $________ $____________

OCEAN CITY:

7. Beachfill 1,000,000 CY $________ $____________

TOTAL ESTIMATED BASE BID AMOUNT $_________________

OPTIONS

BRIGANTINE:

8. Option 1 - Beachfill 25,000 CY $________ $____________

9. Option 2 - Beachfill 50,000 CY $________ $____________

10. Option 3 - Beachfill 75,000 CY $________ $____________

OCEAN CITY:

11. Option 4 - Beachfill 200,000 CY $________ $____________

12. Option 5 - Beachfill 200,000 CY $________ $____________

13. Option 6 - Beachfill 200,000 CY $________ $____________

(Continued on next page)

00010-3

Item Estimated Unit Estimated No. Description Quantity Unit Price Amount

14. Option 7 – Outfall Repair, Station 50+25 (2nd Street)

14a. Replace Timber Piles 10 EA $________ $____________

14b. Replace Top & Bottom Timbers 20 EA $________ $____________

14c. Replace Side Timbers 44 EA $________ $____________

TOTAL ESTIMATED OPTION 7 AMOUNT $_____________

15. Option 8 – Outfall Repair, Station 61+25 (4th Street)

15a. Replace 24-Inch Outfall Pipe 270 LF $________ $____________

15b. Replace Timber Piles 32 EA $________ $____________

15c. Replace Top & Bottom Timbers 64 EA $________ $____________

15d. Replace Side Timbers 64 EA $________ $____________

TOTAL ESTIMATED OPTION 8 AMOUNT $_____________

16. Option 9 – Outfall Repair, Station 85+00 (8th Street)

16a. Replace 24-Inch Outfall Pipe 180 LF $________ $____________

16b. Replace Timber Piles 22 EA $________ $____________

16c. Replace Top & Bottom Timbers 44 EA $________ $____________

16d. Replace Side Timbers 44 EA $________ $____________

TOTAL ESTIMATED OPTION 9 AMOUNT $_____________

17. Option 10 – Outfall Repair, Station 87+50 (Moorlyn Terrace)

17a. Repair 12-Inch Outfall Pipe 1 JOB LS $____________

18. Option 11 – Outfall Repair, Station 91+00 (9th Street)

18a. Replace Timber Piles 6 EA $________ $____________

18b. Replace Top & Bottom Timbers 12 EA $________ $____________

18c. Replace Side Timbers 12 EA $________ $____________

TOTAL ESTIMATED OPTION 11 AMOUNT $_____________

19. Option 12 – Outfall Repair, Station 98+00 (10th Street)

19a. Replace 24-Inch Outfall Pipe 126 LF $________ $____________

19b. Replace Timber Piles 16 EA $________ $____________

SECTION 01 11 00

SUMMARY OF WORK

PART 1 GENERAL

1.1 SCOPE OF SECTION

This section presents a general description of the work to be accomplished under this contract on Brigantine Island, between Absecon Inlet and Brigantine Inlet located in Atlantic County, New Jersey, and the work to be accomplished under this contract at Great Egg Harbor Inlet and Peck Beach located in Ocean City, New Jersey.

1.2 DESCRIPTION OF WORK

1.2.1 Base Bid

The contract work consists of a Base Bid to place, along the Atlantic Ocean coastline, approximately 350,000 cubic yards of beachfill in the northern portion of Brigantine Island between 14th Street South and 1,000 feet north of 14th Street North, and approximately 1,000,000 cubic yards of beachfill between the groin at Seaview Road and 14th Street in Ocean City. With respect to Ocean City, present surveys currently indicate that beachill will only be placed in these areas. However, due to the dynamic nature of the shoreline, beachfill may be needed anywhere within the Federal project limits at the time of actual construction, namely from the groin at Seaview Road to 36th Street.

In addition to beachfill, the Base Bid work for both Brigantine Island and Ocean City will include providing and installing groin hazard signs.

In addition to beachfill, the Base Bid work for Brigantine Island includes: the re-construction of pedestrian crossovers; planting dune grass; structure monitoring; and providing sand and split rail fence.

1.2.2 Options

The contract work may also consist of three separate options (Options 1, 2 and 3) to place an additional 25,000, 50,000 and/or 75,000 cubic yards of beachfill on Brigantine Island, and three separate options (Options 4, 5 and 6) to place an additional 200,000 cubic yards of beachfill per option in the Ocean City project area, depending on which, if any, options are awarded. Pre-placement condition surveys, as specified in Section 01 71 23 SURVEY REQUIREMENTS, will determine the exact location and quantity of beachfill material required within the limits indicated, and will be a determining factor in the award of Options for additional quantities of beachfill. Where Options for additional beachfill are awarded, the additional beachfill material shall be placed immediately after the initial Base Bid quantity has been placed in the area(s) to be covered by the awarded Option. The intent is to complete the beachfill template in a given Base-plus-Option area, before proceeding with work further along the construction baseline for a particular project site.

In addition to beachfill, the contract work for Ocean City may include one or more options for stormwater outfall work (Options 7 through 13), consisting of replacing various lengths of 12-inch and 24-inch ductile iron pipe and replacement of damaged or missing pile bents, top and bottom pipe support timbers, and side timber bracing for 12-inch, 18-inch, and 24-inch

Section 01 11 00 Page 1 outfall pipes. If awarded, this work shall be coordinated with City of Ocean City officials.

1.2.3 Common Work

All beachfill work---Base Bid and Option, Brigantine and Ocean City---will include the requirements for structure monitoring as specified in the contract package.

1.2.4 Borrow Areas

The borrow area that will be available for the Brigantine Island beachfill material is located northeast of the project location adjacent to the northern tip of Brigantine Island in the Brigantine Inlet. See the contract drawings for the exact location. All material for beachfill work performed under this contract for Brigantine Island shall be obtained from this borrow area. Beachfill material from any other source, including trucking from upland sources, will not be considered under this contract.

The borrow area for beachfill material for Ocean City is located approximately 5,000 feet offshore, north east of the project location, east of the Great Egg Harbor Inlet. See the contract drawings for the exact location. All material for beachfill work performed under this contract for Ocean City shall be obtained from this borrow area. Beachfill material from any other source, including trucking from upland sources, will not be considered under this contract.

1.3 CONTRACTOR ACCESS

Access to the work sites is available by land and water. Access to the Brigantine beach for land based equipment is at 15th Street North. Access to the Ocean City beach for land based equipment is at Morningside Avenue.

Any materials required to establish or stabilize an access point for vehicle use shall be approved by the COR and provided and removed by the Contractor. Any additional parking that the Contractor requires, outside the work limits, shall be coordinated directly with the appropriate local officials. Access to the approved borrow areas is by water only.

Document the original conditions of access areas and routes by taking detailed photographs of those areas prior to starting work. See Section 01 32 33 CONSTRUCTION PHOTOGRAPHY for additional requirements.

Any damage to the roads due to truck traffic or other Contractor operations shall be repaired, subject to the Contracting Officer's approval, at no additional cost to the Government.

1.4 WORK HOURS

The Contractor may work 24 hours per day, 7 days per week, to complete the contract work. However, the Contractor shall be required to comply with local codes regarding noise at all times during the contract period. The Contractor shall be required to equip his land-based equipment with noise suppression equipment if so directed by the COR. All crossover, fencing, signage, planting, stormwater outfall work and timber cribbing work shall be performed during daylight hours.

1.5 RESTRICTIONS ON WORK

The Contractor shall begin dredging and beachfill operations in the

Section 01 11 00 Page 2

Brigantine Island site. All required dredging operations for Brigantine Island (to include Base and any related Options) shall be completed for the Brigantine site prior to commencing dredging operations for the Ocean City work site.

See specification Section 00800 SPECIAL CLAUSES, and Section 01 57 20 ENVIRONMENTAL PROTECTION for additional performance time and environmental restrictions associated with this project.

It is the responsibility of the Contractor to determine all upfront scheduling needed to ensure there are no dredging delays.

1.6 EXISTING WORK

In addition to "FAR 52.236-9, Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements":

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.

b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer.

1.7 EXISTING UTILITIES

The existing utility locations shown on the drawings are approximate and not complete. The Contractor is responsible for field verifying all existing utility locations, including those not shown on the drawings. For marking underground utility lines, call for free markouts a minimum of 3 work days before you dig at 800-272-1000.

PART 2 PRODUCTS (Not Applicable)

PART 3 EXECUTION (Not Applicable)

-- End of Section --

Section 01 11 00 Page 3 groins, outfalls and other structures as directed by, and subject to the approval of, the COR.

3.5 PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS

3.5.1 General

The beachfill area conditions are dynamic in nature. Conditions existing during the preparation of this contract may not be an accurate representation of the beachfill area conditions existing at the commencement of beachfill operations. Consequently, the Contractor shall obtain pre-placement condition survey cross sections.

3.5.2 Completion Time Requirements

The pre-placement condition surveys shall be completed and submitted for Government review as specified in the SUBMITTALS paragraph in PART 1 above, and as specified in Section 00800 SPECIAL CLAUSES, Clause SC-1, "COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK." Post-placement condition surveys shall be completed and submitted for Government review not later than 30 calendar days after acceptance of final beachfill.

3.5.3 Locations of Survey Lines

The pre-placement and post-placement condition surveys shall be taken at the locations of the individual cross sections shown in the tables on the contract drawings.

3.5.4 Description of Required Survey Lines

The survey cross sections shall be long lines, and shall extend from the survey baseline to a minimum of 5,000 feet seaward.

3.5.5 Intervals Required

Elevations along the cross-sections shall be taken at a maximum of 10 foot intervals, with additional elevations taken at breaks in grade and as necessary to describe all hydrographic and topographic features.

3.5.6 Quality Control

Data from previous surveys will be provided to the Contractor in advance of the pre-placement surveys. The Contractor shall overlay the previous surveys with pre-placement surveys as a quality control measure.

3.5.7 Photographic Documentation of Surveys

During the completion of pre-placement condition surveys, digital color photographs shall be taken at each profile line to provide visual documentation of the beach. The digital photographs shall be taken from a point on the profile line located approximately halfway between the water line and the survey baseline. The photographs shall be taken in three directions. The first photograph shall be taken facing perpendicular to the profile line azimuth. The direction of the first photograph shall be defined by facing the ocean while standing on the profile line, then turning counterclockwise approximately 90 degrees (generally facing a northerly or easterly direction along the coast of New Jersey). The second shall be taken parallel to the profile line azimuth and facing seaward.

The third shall be taken parallel to the profile line azimuth and facing

Section 01 71 23 Page 7 landward. Any obstructions along the profile line azimuth which preclude collection of data shall be documented with additional digital photographs. Digital files and a set of hardcopy images shall be provided to the Government in a brief report documenting the surveys, weather conditions, beach conditions and field notes.

3.6 BEFORE- AND AFTER-BEACHFILL SURVEYS

3.6.1 Completion Time Requirements

a. Before-beachfill surveys of a location shall commence no less than 14 calendar days after the submittal of the pre-placement condition survey cross sections. (14 day minimum waiting period)

b. After-beachfill surveys of that location shall be completed no more than 10 calendar days afterthe commencement of the before-beachfill surveys of that location. (10 day maximum performance period)

c. In addition, the Contractor shall not commenct the after-beachfill surveys sooner than 24 hours after the final placement of beachfill in a particular location. (24-hour minimum waiting period)

d. Time extensions will not be granted due to equipment failure or any weather-related impacts to the repair of such equipment.

3.6.2 Locations of Survey Lines

The survey cross sections shall be taken at 100-foot intervals. Survey lines for quantity surveys shall be perpendicular to the seaward edge of berm referenced to the survey baseline.

3.6.3 Description of Required Survey Lines

The survey cross sections shall extend 1,200 feet seaward from the survey baseline.

3.6.4 Intervals Required

Elevations along the cross-sections shall be taken at a maximum of 10 foot intervals, with additional elevations taken at breaks in grade and as necessary to describe all hydrographic and topographic features.

3.7 BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA

3.7.1 Completion Time Requirements

Before-dredging surveys of the borrow area shall be conducted a minimum of 15 calendar days prior to dredging the borrow area. After-dredging surveys of the borrow area shall be conducted within 10 calendar days of completion of dredging of the borrow area.

3.7.2 Locations of Survey Lines

3.7.2.1 Brigantine

Before- and after-dredging surveys of the borrow area for Brigantine Island shall consist of cross-sections taken at a maximum of 200-foot intervals, starting 200 feet west of and parallel to the western limit of the borrow

Section 01 71 23 Page 8

SECTION 35 31 00

BEACHFILL

PART 1 GENERAL

1.1 SCOPE OF SECTION

The work covered by this section consists of furnishing all labor, materials, plant and equipment and performing all operations required for dredging the beachfill material from the borrow areas and placing the material on the beach within the limits shown on the contract drawings.

1.2 REFERENCES

The following publications form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM D 422 (1963; R 2007) Particle-Size Analysis of Soils

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;

Changes 4-6 2011; Change 7 2012) Safety and Health Requirements Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

33 CFR 156 (2011) Navigation and Navigable Waters, Oil and Hazardous Material Transfer Operations

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Borrow Areas; G COR.

The Contractor shall provide maps of the borrow areas, to scale, with stationing and range information. These maps will be used by the Government to identify the location of dredging on a daily basis.

Debris Prevention Plan; G,COR.

The Contractor shall devise a means and a monitoring program/method to ensure that debris (boulders, cobbles, clay balls, and other debris) is not deposited upon the beach and

Section 35 31 00 Page 1 buried by beachfill material.

Work Plan; G,COR.

For each project site, the Contractor shall submit to the Contracting Officer for approval prior to the start of work its detailed plan for removing the material from the borrow area and placing it in the areas shown on the contract drawings. The plan shall show the pipeline layout, details of ramps over the pipeline, safety fence locations, personnel to be used to patrol closed beach area, and signage, and shall include the surveying procedures, methods, and equipment for topographic, wading and hydrographic surveys, as specified in Section 01 71 23 SURVEY REQUIREMENTS. Additionally, the plan shall address the safe working wave height limits for daily work procedures.

Pumpout Plan; G,COR.

If a hopper dredge is used for the contract work, the Contractor shall submit to the Contracting Officer, for approval prior to the start of work, its plan for pumpout of excavated material from the dredge to the beachfill area. The plan shall include the description, dimensions, and location of the proposed mooring facility. The plan shall include detailed descriptions of the personnel, materials, equipment and methods proposed to be utilized to complete this task.

Accident Prevention Plan; G,DO.

The Contractor shall submit to the Contracting Officer for approval prior to the start of work its plan for accident prevention. The plan shall comply with all provisions of Contract Clause: ACCIDENT PREVENTION and Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, and shall include the protection and safety of the Contractor's personnel, as well as the general public using the adjacent beach areas. The plan shall show details of any barricades, warning signs, and equipment the Contractor intends to use in the implementation of the accident prevention plan.

Grade Stake Recovery Plan; G,COR.

Contractor shall submit a plan describing his procedures that will be used to ensure that all grade stakes placed on the beach during construction are subsequently removed.

SD-06 Test Reports

Test Reports; G,COR.

Copies of all laboratory and field test reports shall be submitted to the Contracting Officer within one week after completion of each test.

SD-07 Certificates

Daily Report of Operations; G,COR

The Contractor shall prepare, maintain, and submit daily for approval, Daily Report of Operations forms, and shall furnish

Section 35 31 00 Page 2 signed copies thereof with the Quality Control Reports required in SECTION 01 45 00 CONTRACTOR QUALITY CONTROL (CQC), to the Contracting Officer. Daily Report of Operations forms shall be completed in the RMS system and submitted daily to the COR.

Samples of the types of Daily Report of Operations forms to be used are attached at the end of this section. Submittals for the Daily Report of Operations are available to the public.

Fuel Usage.

The Contractor shall furnish the Contracting Officer reports, to be received on or before the last day of each month, listing the totals of fuels consumed by the dredging plant and supporting vessels. The reports shall separately list the quantities of each type of fuel used. The reports shall cover the period from the 25th of the preceding month to the 25th of the current month.

Request to Adjust Template; G,DO

Submit documentation describing why the specified foreshore slope cannot be achieved in an area, and requesting permission to adjust the construction template, as specified herein. Documentation shall include the location, by project site and range of survey baseline stations, for which the request is being made.

1.4 SITE CONDITIONS

1.4.1 General

There are numerous obstructions in the project areas---including, but not limited to: existing bulkheads, dunes, stairs, groins (which are visible and hidden) and piles in the Brigantine area; existing a pier, dunes, groins (which are visible and hidden), some stone revetment, piles and a short stretch of boardwalk in the Ocean City area---which may effect placement of the beachfill. Bidders are expected to examine the site of the work in accordance with Contract Clause: SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK to determine the conditions affecting their operations. The entire work site is designated as a hard hat area in accordance with EM 385-1-1. Throughout the dredging operations the Contractor shall maintain close coordination with the U.S. Coast Guard.

1.4.2 Access and Limits of Work

Access to either of the beachfill sites is available only at the locations shown on the contract drawings. The Contractor shall note the limits of work shown on the contract drawings. The Contractor shall restrict all of the contract work and his equipment to within those indicated limits of work. In the areas of Brigantine Island where the promenade is located within the Contractor's limit of work, the Contractor will not be permitted to stage equipment on the promenade. In the areas where the boardwalk in Ocean City is located within the Contractor's work limit, the Contractor will not be permitted to stage equipment on the boardwalk. The staging area is located as shown on the contract drawings and shall be used for storing material and temporary construction facilities.

Section 35 31 00 Page 3

1.5 BORROW MATERIAL

1.5.1 Location of Borrow Material for Brigantine Island

The location of the approved borrow area for Brigantine Island and the limits to which removal of material is permitted are shown on the contract drawings. The borrow area to be used for the beachfill is adjacent to Brigantine Island within Brigantine Inlet. Unless specifically directed by the Contracting Officer, no payment will be made for material removed below the maximum allowable depth or from outside the approved borrow area limits, as indicated on the contract drawings.

1.5.2 Location of Borrow Material for Ocean City

The location of the approved borrow area for Ocean City and the limits to which removal of material is permitted are shown on the drawings. The borrow area to be used for the beachfill is located approximately 5,000 feet offshore, on the ebb shoal of the Great Egg Harbor Inlet. Unless specifically directed by the Contracting Officer, no payment will be made for material removed below the maximum allowable depth or from outside the borrow area limits, as indicated on the contract drawings. If during the progress of the work it is determined that the borrow area does not contain a sufficient quantity of material for completion of the project, the Contracting Officer may adjust the maximum allowable depth of the borrow area. If this adjustment results in the Contractor pumping material of undesirable quality, the Contractor shall move to another location within the specified limits of the borrow area.

1.5.3 Character of Borrow Material for Brigantine Island

The character of the material in the borrow area for Brigantine Island is believed to be as indicated by the results of Government-conducted sampling. Vibrational core logs for this area are included in Section 00850 of these contract specifications. Associated sieve curves are included in Section 00855. The locations of the vibrational core holes in the borrow area are shown on the drawings. The information depicted on the vibrational core logs represents the results of subsurface explorations made on the dates indicated and can only be considered the conditions existing at that time.

1.5.4 Character of Borrow Material for Ocean City

The character of the material to be used for beachfill for Ocean City is believed to be as indicated by the results of Government-conducted sampling. Vibrational core logs for this area are included in Section 00852 of these contract specifications. Associated sieve curves are included in Section 00857. The locations of the vibrational core holes within and around the borrow area are shown on the drawings. The information depicted on the vibrational core logs represents the results of subsurface explorations made on the dates indicated and can only be considered the conditions existing at that time.

1.5.5 Maximum Allowable Depth for Removal

The maximum allowable depths for removal of material from the borrow areas are as indicated on the borrow area drawings. To cover the inaccuracies of the dredging process, the Contractor may remove material in the borrow area to a depth of not more than 1 foot below the maximum allowable depth.

Section 35 31 00 Page 4

STANDARD FORM 30
AMENDMENT DESCRIPTION
BIDDING SCHEDULE
01 11 00 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SCOPE OF SECTION
1.2 DESCRIPTION OF WORK
1.2.1 Base Bid
1.2.2 Options
1.2.3 Common Work
1.2.4 Borrow Areas
1.3 CONTRACTOR ACCESS
1.4 WORK HOURS
1.5 RESTRICTIONS ON WORK
1.6 EXISTING WORK
1.7 EXISTING UTILITIES
PART 2 PRODUCTS Not Applicable
PART 3 EXECUTION Not Applicable
01 71 23 - SURVEY REQUIREMENTS
PART 3 EXECUTION
3.4 STAKING AND FLAGGING
3.4.4 Groins and Outfalls
3.5 PRE-PLACEMENT AND POST-PLACEMENT CONDITION SURVEYS
3.5.1 General
3.5.2 Completion Time Requirements
3.5.3 Locations of Survey Lines
3.5.4 Description of Required Survey Lines
3.5.5 Intervals Required
3.5.6 Quality Control
3.5.7 Photographic Documentation of Surveys
3.6 BEFORE- AND AFTER-BEACHFILL SURVEYS
3.6.1 Completion Time Requirements
3.6.2 Locations of Survey Lines
3.6.3 Description of Required Survey Lines
3.6.4 Intervals Required
3.7 BEFORE- AND AFTER-DREDGING SURVEYS OF THE BORROW AREA
3.7.1 Completion Time Requirements
3.7.2 Locations of Survey Lines
3.7.2.1 Brigantine
35 31 00 - BEACHFILL
PART 1 GENERAL
1.1 SCOPE OF SECTION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 SITE CONDITIONS
1.4.1 General
1.4.2 Access and Limits of Work
1.5 BORROW MATERIAL
1.5.1 Location of Borrow Material for Brigantine Island
1.5.2 Location of Borrow Material for Ocean City
1.5.3 Character of Borrow Material for Brigantine Island
1.5.4 Character of Borrow Material for Ocean City
1.5.5 Maximum Allowable Depth for Removal
kmn0y97ti: Amendment No. 0001