RFI Example.xls
XLS spreadsheet 24 KB Posted
- Attached to
- Building 3, Bay 3, New HVAC and Renovations
- Solicitation number
- W912BU-12-B-0007
About this file
RFI Example
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SiteVisitList.pdf | ||
| 12B0007-SPECS-AM2.PDF | ||
| 12B0007-DWGS-AM2.PDF | ||
| AMENDMENT 0001.pdf | ||
| 12B0007-SPECS-VOL1.PDF | ||
| 12B0007-DWGS.PDF | ||
| 12B0007-SPECS-VOL2.PDF |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| FORMAT FOR SUBMITTING REQUESTS FOR INFORMATION | ||||
| IFB W912BU-12-B-0007 | ||||
| NEW HVAC AND RENOVATIONS, BUILDING 3, BAY 3 | ||||
| TOBYHANNA ARMY DEPOT | ||||
| Sample Questions | ||||
| Spec Sect/ | ||||
| RFI# | Discipline | Drawing | Description | |
| 1 | Mechanical | 15 22 00 | Para. 2.5.1 specifies 4-inch pipe, however Dwg P2.01 shows | |
| piping is 8-inch in size. | <--Note: Entire comment on one line please. | |||
| 2 | Architectural | A5.1.2 | Unable to locate the specifications for the Grab Bars shown in the Toilet rooms. |
File details come from the government source that posted it. Updated .