11-T-0019.pdf
PDF 395 KB Posted
- Solicitation number
- W912BU-11-T-0019
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lot I Map B.jpg | JPG image | |
| Lot II Map B.jpg | JPG image | |
| Lot I Map A.jpg | JPG image | |
| Lot II Map D.jpg | JPG image | |
| Lot II Map A.jpg | JPG image | |
| Lot III Map A.jpg | JPG image | |
| Lot I Map C.jpg | JPG image | |
| Lot II Map C.jpg | JPG image | |
| Lot III Map B.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY ENGINEER DISTRICT, PHILADELPHIA
CONTRACTING DIVISION
WANAMAKER BUILDING
100 PENN SQUARE EAST
PHILADELPHIA PA 19107-3390
UNDER DPAS (15 CFR 700)
11. DELIVERY FOR FOB
RFQ
SEE SCHEDULE
14. METHOD OF SOLICITATION
IFB RFP
CODE
SEE ADDENDUM
BLOCK IS MARKED
DESTINATION UNLESS
12. DISCOUNT TERMS
(No Collect Calls)
$7Million
13b. RATING
13a. THIS CONTRACT IS A RATED ORDER
X
CODE
W912BU-11-T-0019 21-Jan-2011
b. TELEPHONE NUMBER
215-656-6923
8. OFFER DUE DATE/LOCAL TIME
11:00 AM 11 Feb 2011
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV 3/2005)
Prescribed by GSA
FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER) 31c. DATE SIGNED
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
22. UNIT 23. UNIT PRICE 24. AMOUNT21. QUANTITY
CODE 10. THIS ACQUISITION IS
UNRESTRICTED
FAX: NAICS:
TEL:
CODE 18a. PAYMENT WILL BE MADE BYOFFEROR
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TEL.
W912BU
SIZE STD:
9. ISSUED BY
FACILITY
CODE
17a.CONTRACTOR/
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LINDA M DOBBS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES
SEE SCHEDULE
561730
TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS
SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS
SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED HEREIN.
SB
HUBZONE SB
SET ASIDE: 100 % FOR
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W25PHS10079547
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
TEL: EMAIL:
0 COPIES
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
.OFFER DATED YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
8(A)
SVC-DISABLED VET-OWNED SB
EMERGING SB
X X
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W912BU-11-T-0019
Section SF 1449 - CONTINUATION SHEET
SPECIAL INSTRUCTIONS
The following items are required before an award can be made:
CENTRAL CONTRACTOR’S REGISTRATION: All contractors are required to register in the Central Contractor’s Registration (CCR) Database before an award can be made. Contractor’s can obtain information on registration and annual confirmation requirements by calling 1-888-227-2423 or via the Internet at www.ccr.gov See DFARS Clause 52.204-7004 “Required Central Contractor Registration” in the solicitation document.
VETS 100 REPORT – You must be in compliance with the VETS 100 reporting requirement to receive a Federal contract of $25,000.00 or more. The Department of Labor has made available several reporting options as follows:
1. Direct entry of information on VETS 100 website at:
http://www.vets100.com/
2. Submission of an electronic file on a diskette; and
3. Submission of the VETS 100 Report in hard copy form U.S. Department of Labor Veterans Employment and Training Service VETS 100 Report Office 6101 Stevenson Avenue Alexandria, VA 22304-3540
INFORMATION ONLY – The Health & Safety Requirement Manual (EM 385-1-1) can be downloaded from the following web site:
http://www.usace.army.mil/CESO/Pages/EM385-1-1.aspx
SPECIAL NOTES TO OFFERORS
1) TERM OF CONTRACT - The contract will start on or about 1 April 2011 and end 31 March 2012 (Work Period of Performance is 1 April 2011 through 15 November 2011) for the Base Year and will contain 4 one-year option periods.
2) In the event the government elects to exercise the options, the period of performance will be:
Option Year 1, from 1 April 2012 through 31 March 2013 (Work Period of Performance is 1 April 2012 to 15 November 2012);
Option Year 2, from 1 April 2013 through 31 March 2014 (Work Period of Performance is 1 April 2013 to 15 November 2013);
Option Year 3, from 1 April 2014 through 31 March 2015 (Work Period of Performance is 1 April 2014 to 15 November 2014);
Option Year 4, from 1 April 2015 through 31 March 2016 (Work Period of Performance is 1 April 2015 to 15 November 2015).
http://www.vets100.com/�
SITE VISIT
Prospective bidders MUST inspect the site prior to bid submission. Contact the Park Manager or Chief Ranger at Blue Marsh Lake (610) 376-6337 between 8:00 a.m. and 3:30 p.m. to coordinate inspection. Site visits are scheduled to be held on Thursday, January 27, 2011 and Thursday, February 3, 2011 at 10:00 A.M. Meet the representative at the Conference Center, Blue Marsh Lake.
NOTE
PROJECT NO: 107556
All work shall be performed in accordance with the attached Service Contract Act (SCA) Wage Determination Number 05-2447 Rev (11).
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 16 Each
BASE YEAR
FFP
LOT I - Contractor shall mow and trim the Dry Brooks Day Use Area for the period 1 April 2011 through 31 March 2012 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2011 through 15 November 2011.
FOB: Destination
MILSTRIP: W25PHS10079547
PURCHASE REQUEST NUMBER: W25PHS10079547
NET AMT
0002 14 Each
BASE YEAR
FFP
LOT II - Contractor shall mow and trim the Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp, and Church Road Access for the period 1 April 2011 through 31 March 2012 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2011 through 15 November 2011.
FOB: Destination
0003 10 Each
BASE YEAR
FFP
LOT III - Contractor shall mow and trim levees and tributary dams, Bernville Protective Works for the period 1 April 2011 through 31 March 2012 in accordance with the attached Scope of Work.
Work Period of Performance is 15 April 2011 through 15 November 2011.
FOB: Destination
TOTAL OF BASE YEAR (Line Items 0001 to 0003) $____________________
0004 16 Each
OPTION OPTION YEAR 1
FFP
LOT I - Contractor shall mow and trim the Dry Brooks Day Use Area for the period 1 April 2012 through 31 March 2013 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2012 through 15 November 2012.
FOB: Destination
0005 14 Each
OPTION OPTION YEAR 1
FFP
LOT II - Contractor shall mow and trim the Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp, and Church Road Access for the period 1 April 2012 through 31 March 2013 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2012 through 15 November 2012.
0006 10 Each
OPTION OPTION YEAR 1
FFP
LOT III - Contractor shall mow and trim levees and tributary dams, Bernville Protective Works for the period 1 April 2012 through 31 March 2013 in accordance with the attached Scope of Work.
Work Period of Performance is 15 April 2012 through 15 November 2012.
TOTAL OF OPTION YEAR 1 (Line Items 0004 to 0006) $_________________
0007 16 Each
OPTION OPTION YEAR 2
FFP
LOT I - Contractor shall mow and trim the Dry Brooks Day Use Area for the period 1 April 2013 through 31 March 2014 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2013 through 15 November 2013.
0008 14 Each
OPTION OPTION YEAR 2
FFP
LOT II - Contractor shall mow and trim the Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp, and Church Road Access for the period 1 April 2013 through 31 March 2014 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2013 through 15 November 2013.
0009 10 Each
OPTION OPTION YEAR 2
FFP
LOT III - Contractor shall mow and trim levees and tributary dams, Bernville Protective Works for the period 1 April 2013 through 31 March 2014 in accordance with the attached Scope of Work.
Work Period of Performance is 15 April 2013 through 15 November 2013.
TOTAL OF OPTION YEAR 2 (Line Items 0007 to 0009) $_________________
0010 16 Each
OPTION OPTION YEAR 3
FFP
LOT I - Contractor shall mow and trim the Dry Brooks Day Use Area for the period 1 April 2014 through 31 March 2015 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2014 through 15 November 2014.
0011 14 Each
OPTION OPTION YEAR 3
FFP
LOT II - Contractor shall mow and trim the Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp, and Church Road Access for the period 1 April 2014 through 31 March 2015 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2014 through 15 November 2014.
0012 10 Each
OPTION OPTION YEAR 3
FFP
LOT III - Contractor shall mow and trim levees and tributary dams, Bernville Protective Works for the period 1 April 2014 through 31 March 2015 in accordance with the attached Scope of Work.
Work Period of Performance is 15 April 2014 through 15 November 2014.
TOTAL OF OPTION YEAR 3 (Line Items 0010 to 0012) $_________________
0013 16 Each
OPTION OPTION YEAR 4
FFP
LOT I - Contractor shall mow and trim the Dry Brooks Day Use Area for the period 1 April 2015 through 31 March 2016 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2015 through 15 November 2015.
0014 14 Each
OPTION OPTION YEAR 4
FFP
LOT II - Contractor shall mow and trim the Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp, and Church Road Access for the period 1 April 2015 through 31 March 2016 in accordance with the attached Scope of Work.
Work Period of Performance is 1 April 2015 through 15 November 2015.
0015 10 Each
OPTION OPTION YEAR 4
FFP
LOT III - Contractor shall mow and trim levees and tributary dams, Bernville Protective Works for the period 1 April 2015 through 31 March 2016 in accordance with the attached Scope of Work.
Work Period of Performance is 15 April 2015 through 15 November 2015.
TOTAL OF OPTION YEAR 4 (Line Items 0013 to 0015) $_________________
GRAND TOTAL OF CONTRACT (BASE PLUS 4 OPTION YEARS)
LINE ITEMS 0001 THROUGH 0015
LOT I
Day Use Area
C-1 The contractor shall provide all labor, material and equipment necessary and perform all work to comply with requirements for maintenance of grassed areas at Blue Marsh Lake as shown on attached drawings Lot I maps A, B, and C and as described herein.
C-2 GENERAL LAWN MAINTENANCE REQUIREMENTS.
2.1 Policing of Debris and Trash -- The contractor shall police all of the mowing areas to insure that they are as free from litter, rocks, trash and other debris as possible prior to mowing.
2.2 Mowing and Trimming -- The contractor is required to mow and trim within the designated mow lines and around all structures and buildings in the Dry Brooks Day Use Area, to the heights specified in Section 3, Special Requirements by Area, and as noted in this section. All grass will be mowed to a height of two (2) inches to four (4) inches. Growth on road and parking lot shoulders shall be trimmed to no more than one (1) inch height.
All mowing and trimming shall be accomplished in such a manner as not to damage any trees, shrubbery, ornamental plantings, Government property, or to endanger or annoy any visitors in the area. Conflicts between the contractor and the public shall be brought to the attention of the Park Manager, or his representative. No tractor mowing shall be performed within six (6) to twelve (12) inches of trees and shrubs. The contractor shall arrange his work schedule so that visitors are not unduly disturbed in accordance with directives by the Park Manager or his representative. No mowing shall be accomplished on Saturdays, Sundays or Federal Holidays or commence prior to 6:00 a.m. and continue beyond 7:00 p.m. No grass trimmings are to be left on sidewalks, paved roads, or parking lots. If "weed-eater" type trimmers are used, care will be exercised so as not to damage trees, tables, or property. Wire string may not be used with "weed-eaters". Each mowing and trimming shall be performed in one continual operation until completed, not to exceed two (2) continuous days from the start of mowing operations, excepting inclement weather. Each mowing and trimming will be accomplished only after advance coordination by the contractor's supervisor with the Park Manager or his designated representative. Mowing shall commence within one (1) to three (3) days of the date agreed upon by the Park Manager, or his designated representative. Mowing will not be permitted when ground is so wet that the mowing operations cause wheel rutting. Tables will be returned to their locations after mowing the grass that is under them. No table shall be moved by machinery (unless approved by the Park Manager) and shall not be pulled/pushed so as to cause turf damage.
There are steep slopes associated with some of these areas and the Contractor should make a visual inspection of the areas to get an idea if special equipment is needed or for any other considerations. The contractor is required to trim or weed-eat around all trees, refuse containers, signs, charcoal grills, ash pits, volleyball posts, buildings, along walks, fences, walls, rock gutters, storm culverts, catch basins, manholes and pipeline markers, stone road shoulders, parking lot shoulders, and where grass areas meet rip rapped banks. Growth on road and parking lot shoulders shall be trimmed to no more than one (1) inch height. The contractor may control growth around all trees and the aforementioned areas to be trimmed, at their expense, with chemical growth inhibitors, providing the chemical does not damage any man-made or natural features. Any chemical used shall be approved first by the Contracting Officer's Representative.
The contractor must be a Pennsylvania certified pesticide applicator and follow all appropriate procedures. The spray used by the contractor must utilize a marker dye and spray can extend no more than six (6) inches from the object being sprayed. Material Data Safety Sheet must be provided to the park manager for all chemicals prior to their application. Contractor will also fill out government supplied Pesticide Tracking Forms
C-3 SPECIAL REQUIREMENTS BY AREA.
3.1 Dry Brooks Day Use Area -- At the entrance, start approximately one hundred twenty
(120) feet from entrance gates to either side where pin oak trees are located and the slopes along Palisades Drive. Follow existing mow lines towards the first set of guide rails. No grass will be mowed on either side of the guide rail, shoulders will be maintained. At the South end of the guide rails continue along the designated mowing area. At the turnaround embankment no mowing is required along the outside edge. Continue to follow the designated mow line maintaining a two (2) inch to four (4) inch height throughout the Dry Brooks Day Use Area.
Mow and trim around the Sewage Pumping Station, and within the established mow line around the building. Weed-eat, or hand trim, along the trail and steps from Comfort Station "B" to the area just west of the boat beach below "F" parking. Keep trail width at five (5) feet.
All growth occurring on the shoreline erosion control mattresses, and where the grass areas meet water's edge, the stone shoulders, rock gutter channels, rock catch basins, and rock outfalls, and any growth occurring on the road and parking areas stone shoulders, should be weed trimmed to no more than one (1) inch height.
No mowing at the beach towel area, and below Parking Area "F" to include the boat beach area and bathhouse/concession building shall be performed after 9:00 a.m.
C-4 EQUIPMENT AND SAFETY
4.1 Equipment -- The contractor shall have available sufficient equipment, manpower and other resources to perform mowing and trimming. All equipment shall be in good operating condition; and will be inspected by a representative of the Contracting Officer prior to award of the contract. The selectee must demonstrate to the satisfaction of the Contracting Officer or his representative that:
a. Contractor has adequate equipment to meet the requirements of this solicitation.
b. Contractor has the capability of obtaining adequate equipment within such time as will not delay commencement of the work and will present the equipment for inspection before work commences.
c. Tractors/mowers shall be equipped with turf-type flotation tires, or approved equal.
d. All cutting equipment will be kept sharp so as not to cause grass blade splitting. Use of sickle bars and flail mowers is prohibited.
4.2 Safety -- All equipment must conform to the requirements of the Corps of Engineers Safety Manual, EM 385-1-1, including but not limited to:
a. Tractors/mowers shall be equipped with seat belts and roll bars.
b. Rotary-type mowers shall be equipped with protective devices to prevent discharged material from flying or causing injury.
c. Protective eye and ear protection shall be worn while operating weed eaters and tractors.
d. Personnel shall, as a minimum, wear safety toed boots while working on the site.
e. The contractor shall posses a Pennsylvania Certified Pesticide Applicators License in the appropriate category for any spray work he or she chooses to perform, and shall receive authorization from the Park Manager, or his representative, for any intended spray work.
Material Safety Data Sheets shall be submitted for any substance the contractor utilizes in his spray operations. Contractor will also fill out government supplied Pesticide Tracking Forms.
C-5 DAMAGE TO GOVERNMENT PROPERTY -- The contractor shall be responsible for restoring any Government facilities or structures damaged (including trees, shrubs and flowers) as a result of his operation.
C-6 ACREAGE AND NUMBER OF CUTTINGS -- It is estimated that between fourteen
(14) and sixteen (16) cuttings will be required during the term of the contract. The first cutting will be performed between 1 April 2011 and 15 April 2011. Each cutting thereafter will be coor-dinated with the Park Manager or his designated representative as needed through 15 November 2011 Approximate acreages for the areas to be serviced are:
AREA APPROXIMATE ACREAGE
Dry Brooks Day Use Area 40.53 Acres (2 - 4 inch)
C-7 QUALITY ASSURANCE REQUIREMENTS -- The contractor shall contact the Park Manager, or his designated representative, to inspect the work to assure all requirements have been met. Such an inspection will be required before the contractor departs the work site, and before payment requests are processed.
C-8 COORDINATION OF WORK - The Contractor shall meet with the Park Manager or his designated representative at least twice a month as arranged by the Park Manager, to coordinate work schedules in compliance with the contract. Any schedule changes, inspections or deficiencies shall be discussed at this time.
LOT II
All other Recreation Areas, Dry Brooks Boat Ramp, Stilling Basin, State Hill Boat Ramp & Church Road Access
C-1 The contractor shall provide all labor, material and equipment necessary and perform all work to comply with requirements for maintenance of grassed areas at Blue Marsh Lake as shown on attached drawings Lot II maps A, B, C, and D and as described herein.
C-2 GENERAL LAWN MAINTENANCE REQUIREMENTS.
2.1 Policing of Debris and Trash -- The contractor shall police all of the mowing areas to insure that they are as free from litter, rocks, trash and other debris as possible prior to mowing.
2.2 Mowing and Trimming -- The contractor is required to mow and trim within the designated mow lines and around all structures and buildings in State Hill Launch, Dry Brooks Launch, portions of the Stilling Basin, around the Sewage Lift Station and Stilling Basin Road shoulders, to the heights specified in Section 3, Special Requirements by Area, and as noted in this section. All grass will be mowed to a height of two (2) inch to four (4) inches. Growth on road and parking lot shoulders shall be trimmed to no more than one (1) inch height.
All mowing and trimming shall be accomplished in such a manner as not to damage any trees, shrubbery, ornamental plantings, Government property, or to endanger or annoy any visitors in the area. Conflicts between the contractor and the public shall be brought to the attention of the Park Manager, or his representative. No tractor mowing shall be performed within six (6) to twelve (12) inches of trees and shrubs. The contractor shall arrange his work schedule so that visitors are not unduly disturbed in accordance with directives by the Park Manager or his representative. No mowing shall be accomplished on Saturdays, Sundays or Federal Holidays or commence prior to 6:00 a.m. and continue beyond 7:00 p.m. No grass trimmings are to be left on sidewalks, paved roads, or parking lots. If "weed-eater" type trimmers are used, care will be exercised so as not to damage trees, tables, or property. Wire string may not be used with "weed-eaters". Each mowing and trimming shall be performed in one continual operation until completed, not to exceed two (2) continuous days from the start of mowing operations, excepting inclement weather. Each mowing and trimming will be accomplished only after advance coordination by the contractor's supervisor with the Park Manager or his designated representative. Mowing shall commence within one (1) to three (3) days of the date agreed upon by the Park Manager, or his designated representative. Mowing will not be permitted when ground is so wet that the mowing operations cause wheel rutting. Tables will be returned to their locations after mowing the grass that is under them. No table shall be moved by machinery (unless approved by the Park Manager) and shall not be pulled/pushed so as to cause turf damage.
There are steep slopes associated with some of these areas and the Contractor should make a visual inspection of the areas to get an idea if special equipment is needed or for any other considerations. The contractor is required to trim or weed-eat around all trees, refuse containers, signs, charcoal grills, ash pits, buildings, along walks, fences, walls, rock gutters, storm culverts, catch basins, manholes and pipeline markers, stone road shoulders, parking lot shoulders, and where grass areas meet rip rapped banks. Growth on road and parking lot shoulders shall be trimmed to no more than one (1) inch height. The contractor may control growth around all trees and the aforementioned areas to be trimmed, at their expense, with chemical growth inhibitors, providing the chemical does not damage any man-made or natural features. Any chemical used shall be approved first by the Contracting Officer's Representative.
The contractor must be a Pennsylvania certified pesticide applicator and follow all appropriate procedures. The spray used by the contractor must utilize a marker dye and spray may extend no more than six (6) inches from the object being sprayed. Material Data Safety Sheet must be provided to the park manager for all chemicals prior to their application. Contractor will also fill out government supplied Pesticide Tracking Forms.
C-3 SPECIAL REQUIREMENTS BY AREA.
3.1 Dry Brooks Boat Launch Area -- All mowing in this area shall follow the designated mow line, to include grass islands in the parking area and fee area turnaround, and shall be two
(2) inch to four (4) inch height. All growth occurring where the grass areas meet the riprap, stone shoulders, rock gutter channels, rock catch basins, and rock outfalls, and any growth on the road and parking areas stone shoulders should be weed-trimmed to no more than one (1) inch height.
3.2 Stilling Basin - Maintain a mow line of ten (10) feet from the edge of the road, on both sides, starting at the intersection with Palisades Drive for a distance of three hundred and fifty
(350) feet, area of traffic meter. Mow around the Sewage Lift Station and trail entrance near the intersection with Palisades Drive, following the existing mow line. Mow a ten (10) foot swath around the gravel parking lot, entrance and exit lanes, and trim around wooden guide rails. From the area of the traffic meter down to the Stilling Basin parking lot the road shoulders will be weed-trimmed to no more than one (1) inch height. Mow the area between the access road and the rock gutter along the lane approaching the auxiliary lot. Mow existing open grass areas along the stream bank and between the picnic sites, around auxiliary lot and Stilling Basin Road. Also, mow around the weir pond, and the slopes beyond the macadam parking area to the weir pond, stream, riprap, and both sides of the concrete wing walls. Trim around trees rock gutters, wing walls, tables, ash pits, and where grass areas meet water's edge in this area. All mowing in this area shall be two (2) inch to four (4) inch height.
3.3 State Hill Launch Area -- Follow the designated mow line, two (2) inch to four (4) inch height, throughout the entire area to include the traffic island at the fee booth turnaround island, and parking area islands, the bank and outfall channel along Brownsville Road, from the entrance south to the property line, shall be trimmed each mowing. The contractor should use precautions to protect workers from traffic along this road. All growth occurring where the grass areas meet the riprap, stone shoulders, curbs, rock gutter channels, rock catch basins, and rock outfalls, and any growth on the road and parking area stone shoulders, should be weed-trimmed to no more than one (1) inch height. Mow and trim behind the comfort station in the picnic grove, two (2) inch to four (4) inch height to include the access area for the trail. Also mow the grass island and area around the auxiliary parking lot, as well as around the walkway to the main lot, two (2) inch to four (4) inch height.
3.4 Church Road Access Area - Mow within the existing mowing limits, the flat area north of the parking lot, and the slopes down to the lake's edge. Trim around the guard rail fence posts, trees, picnic tables, portable toilet enclosure, and water's edge. Mowing height should be two (2) inch to four (4) inch.
C-4 EQUIPMENT AND SAFETY
4.1 Equipment -- The contractor shall have available sufficient equipment, manpower and other resources to perform mowing and trimming. All equipment shall be in good operating condition; and will be inspected by a representative of the Contracting Officer prior to award of the contract. The low bidder must demonstrate to the satisfaction of the Contracting Officer or his representative that:
a. Contractor has adequate equipment to meet the requirements of this solicitation.
b. Contractor has the capability of obtaining adequate equipment within such time as will not delay commencement of the work and will present the equipment for inspection before work commences.
c. Tractors/mowers shall be equipped with turf-type flotation tires, or approved equal.
d. All cutting equipment will be kept sharp so as not to cause grass blade splitting. Use of sickle bars and flail mowers is prohibited.
4.2 Safety -- All equipment must conform to the requirements of the Corps of Engineers Safety Manual, EM 385-1-1, including but not limited to:
a. Tractors/mowers shall be equipped with seat belts and roll bars.
b. Rotary-type mowers shall be equipped with protective devices to prevent discharged material from flying or causing injury.
c. Protective eye and ear protection shall be worn while operating weed eaters and tractors.
d. Personnel shall, as a minimum, wear safety toed boots while working on the site.
e. The contractor shall posses a Pennsylvania Certified Pesticide Applicators License in the appropriate category for any spray work he or she chooses to perform, and shall receive authorization from the Park Manager, or his representative, for any intended spray work.
Material Safety Data Sheets shall be submitted for any substance the contractor utilizes in his spray operations. Contractor will also fill out government supplied Pesticide Tracking Forms.
C-5 DAMAGE TO GOVERNMENT PROPERTY -- The contractor shall be responsible for restoring any Government facilities or structures damaged (including trees, shrubs and flowers) as a result of his operation.
C-6 ACREAGE AND NUMBER OF CUTTINGS -- It is estimated that between twelve
(12) and fourteen (14) cuttings will be required during the term of the contract. The first cutting will be performed between 1 April 2011 and 15 April 2011. Each cutting thereafter will be coor-dinated with the Park Manager or his designated representative as needed through 15 November 2011 Approximate acreages for the areas to be serviced are:
AREA APPROXIMATE ACREAGE
Dry Brooks Launch 3.91 Acres (2 - 4 inch)
State Hill Launch 9.13 Acres (2 - 4 inch)
Stilling Basin 2.15 Acres (2 - 4 inch)
Church Road Access 2.13 Acres (2 - 4 inch)
C-7 QUALITY ASSURANCE REQUIREMENTS -- The contractor shall contact the Park Manager, or his designated representative, to inspect the work to assure all requirements have been met. Such an inspection will be required before the contractor departs the work site, and before payment requests are processed.
C-8 COORDINATION OF WORK -- The Contractor shall meet with the Park Manager or his designated representative at least twice a month as arranged by the Park Manager, to
LOT III
BERNVILLE PROTECTIVE WORKS
C-1 The contractor shall provide all labor, material, and equipment necessary, and perform all work to comply with requirements for maintenance of grass areas and application of weed killer at the Bernville Protective Works for those areas as shown on Drawings Lot III maps A & B.
C-2 LAWN MAINTENANCE REQUIREMENTS FOR BERNVILLE PROTECTIVE
WORKS.
2-1 Mowing and Trimming -- The contractor is required to mow and trim grass to two (2) inch to four (4) inch heights. All mowing shall be accomplished in such a manner as not to damage any trees, shrubbery, ornamental plantings, or other Government property. Trimming is required around buildings, Fire Water Tank, and other structures and along road edges as further described herein under Section 2.2. Each mowing and trimming will be accomplished only after advance coordination by the contractor's representative with the Park Manager, or his designated representative. Mowing will not be permitted when the ground is so wet that wheel rutting and damage to levee slopes results from operations. No mowing shall be accomplished on Sundays and Federal Holidays or commence prior to 7:00 a.m. and continue beyond 8:00 p.m. Mowing shall commence within one (1) to two (2) days of the date agreed upon by the Park Manager, or his designated representative.
2.2 Special Trimming Requirements -- If "weed-eater" type trimmers are used, care will be exercised so as not to damage trees and shrubbery. Weed trimming shall be accomplished as noted on Drawings Lot III maps A & B, and in accordance with the following instructions:
Around trees planted east of the pumping station, around the pumping station and fences, around guardrail posts and under the guardrail going into the pumping station; around the transformer box and utility pole next to the transformer. Weed trimming shall be accomplished where the top of levee slopes meet stone road edges (main levee, Tributary Dams 1 and 2). Also, around the gate lifts and utility pole on top of main levee. Weed trim around air relief valve to fire hydrant, around trees behind and on side of gas station, around catch basin west of gas station. Weed trim around gate lift on levee next to Bernville Elementary School, around trees bordering the main-tenance road (inside gate) and leading to top of levee at Tributary Dam No. 1. Weed trim, or mow, slopes flanking culvert at the lower end of Tributary Dam No. 2. Also, weed trim around the concrete intake structures at Tributary Dams 1 and 2. Weed trimmers may not be equipped with wire string.
2.3 Length of Cutting -- Each mowing and trimming shall be performed in one continual operation until completed, not to exceed two (2) continuous days from the start of mowing opera-tions, excepting inclement weather.
2.4 Acreage and Number of Cuttings -- There are approximately 26.41 acres to be mowed.
It is estimated that ten (10) cuttings will be required during the term of this contract. The first cutting will be performed between 15 April 2011 and 30 April 2011. Each cutting thereafter will be coordinated with the Park Manager as needed through 15 November 2011. A portion of the ponding area may be too wet to mow on some occasions during the course of the contract, particularly in May and June. The Park Manager or his designated representative shall be notified at such times.
2.5 Policing of Debris and Trash -- The contractor will police all of the mowing areas to insure that they are free from litter, trash and other debris as possible prior to mowing.
C-3 EQUIPMENT AND SAFETY
3.1 Equipment -- The contractor shall have available sufficient equipment, manpower and other resources to perform mowing and trimming. All equipment shall be in good operating condition; and will be inspected by a representative of the Contracting Officer prior to award of the contract. The low bidder must demonstrate to the satisfaction of the Contracting Officer or his representative that:
a. Contractor has adequate equipment to meet the requirements of this solicitation.
b. Contractor has the capability of obtaining adequate equipment within such time as will not delay commencement of the work and will present the equipment for inspection before work commences.
c. Tractors/mowers shall be equipped with turf-type flotation tires, or approved equal.
d. All cutting equipment will be kept sharp so as not to cause grass blade splitting. Use of sickle bars and flail mowers is prohibited.
3.2 Safety -- All equipment must conform to the requirements of the Corps of Engineers Safety Manual, EM 385-1-1, including but not limited to:
a. Tractors/mowers shall be equipped with seat belts and roll bars.
b. Rotary-type mowers shall be equipped with protective devices to prevent discharged material from flying or causing injury.
c. Protective eye and ear protection shall be worn while operating weed eaters and tractors.
d. Personnel shall, as a minimum, wear safety toed boots while working on the site.
e. The contractor shall posses a Pennsylvania Certified Pesticide Applicators License in the appropriate category for any spray work he or she chooses to perform, and shall receive authorization from the Park Manager, or his representative, for any intended spray work.
Material Safety Data Sheets shall be submitted for any substance the contractor utilizes in his spray operations. Contractor will also fill out government supplied Pesticide Tracking Forms.
f. The steepness of levee slopes requires special consideration as to the type of equipment, weight of equipment, and center of gravity in order to accomplish the mowing in a safe manner while not causing wheel-rutting and erosion. Levee mowing will be closely monitored and inspected for damage for which the contractor will be held responsible.
C-4 DAMAGE TO GOVERNMENT PROPERTY -- The contractor shall be responsible for restoring any Government facilities or structures damaged (including trees, shrubs and flowers) as a result of his operation
C-5 QUALITY ASSURANCE REQUIREMENTS -- The contractor shall contact the Park Manager, or his designated representative, to inspect the work to assure all requirements have been met. Such an inspection will be required before the contractor departs the work site, and before payment requests are processed.
C-6 COORDINATION OF WORK -- The Contractor shall meet with the Park Manager or his designated representative at least twice a month as arranged by the Park Manager, to
EVALUATION FACTORS FOR AWARD
Proposals will be evaluated on the basis of two criteria, TECHNICAL and PRICE. Techncial factors, when combined, are more important than price; however, price remains a significant factor. Technical factors are of equal importance. Each technical proposal shall be evaluated on the basis of the factors cited below:
(1) Managerial/Organizational Capability – will consist of the following components:
Offerors must demonstrate their ability to respond quickly to Park Managers’ concerns and inquiries, along with their ability to communicate with Park Manager on a regular basis throughout the term of the contract.
Offerors must demonstrate that adequate supervision, staff, and employee resources will be allocated to satisfactorily perform required services.
Offerors must present accident prevention plans for completion of lawn maintenance requirements for Lots I and II of the contract.
(2) Past Performance - Will consist of the following components:
Offerors are required to provide past performance information for lawn mowing and maintenance of public parks or recreation areas that were awarded within the past 3 years (i.e. contract numbers with dollar amount, length of contract, POC and telephone number). The evaluation regarding past performance may not be limited to references furnished.
Offerors are required to provide past performance information for general lawn mowing and maintenance services that were awarded within the past 3 years (i.e.
contract numbers with dollar amount, length of contract, POC and telephone number). The evaluation regarding past performance may not be limited to references furnished.
(3) Equipment Capabilities
• Offerors must state the degree of their equipment capabilities to perform lawn maintenance services to meet contract requirements for Lots I and II.
(4) Price
SECTION J SCA - WAGE RATES
WD 05-2447 (Rev.-11) was first posted on www.wdol.gov on 11/16/2010
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2447 Shirley F. Ebbesen Division of | Revision No.: 11 Director Wage Determinations| Date Of Revision: 11/10/2010 State: Pennsylvania
Area: Pennsylvania Counties of Berks, Cumberland, Dauphin, Juniata, Lancaster, Lebanon, Mifflin, Montour, Northumberland, Perry, Snyder, Union **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 14.81 01012 - Accounting Clerk II 16.64 01013 - Accounting Clerk III 18.60 01020 - Administrative Assistant 21.90 01040 - Court Reporter 22.23 01051 - Data Entry Operator I 12.14 01052 - Data Entry Operator II 13.24 01060 - Dispatcher, Motor Vehicle 18.09 01070 - Document Preparation Clerk 13.74 01090 - Duplicating Machine Operator 13.91 01111 - General Clerk I 11.55 01112 - General Clerk II 12.62 01113 - General Clerk III 14.16 01120 - Housing Referral Assistant 19.71 01141 - Messenger Courier 11.60 01191 - Order Clerk I 12.19 01192 - Order Clerk II 14.87 01261 - Personnel Assistant (Employment) I 16.27 01262 - Personnel Assistant (Employment) II 18.20 01263 - Personnel Assistant (Employment) III 20.29 01270 - Production Control Clerk 19.92 01280 - Receptionist 12.17 01290 - Rental Clerk 12.94 01300 - Scheduler, Maintenance 15.61 01311 - Secretary I 15.61 01312 - Secretary II 17.68 01313 - Secretary III 19.71 01320 - Service Order Dispatcher 16.83 01410 - Supply Technician 21.90 01420 - Survey Worker 14.90 01531 - Travel Clerk I 12.01 01532 - Travel Clerk II 12.88 01533 - Travel Clerk III 13.80 01611 - Word Processor I 14.25 01612 - Word Processor II 15.84 01613 - Word Processor III 17.68 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 19.95 05010 - Automotive Electrician 18.12 05040 - Automotive Glass Installer 17.37 05070 - Automotive Worker 17.37 05110 - Mobile Equipment Servicer 15.88 05130 - Motor Equipment Metal Mechanic 18.68 05160 - Motor Equipment Metal Worker 17.37 05190 - Motor Vehicle Mechanic 18.68 05220 - Motor Vehicle Mechanic Helper 15.12 05250 - Motor Vehicle Upholstery Worker 16.62 05280 - Motor Vehicle Wrecker 17.37 05310 - Painter, Automotive 18.12 05340 - Radiator Repair Specialist 17.37 05370 - Tire Repairer 14.53
05400 - Transmission Repair Specialist 18.68 07000 - Food Preparation And Service Occupations 07010 - Baker 12.53 07041 - Cook I 11.49 07042 - Cook II 12.85 07070 - Dishwasher 8.54 07130 - Food Service Worker 9.61 07210 - Meat Cutter 15.48 07260 - Waiter/Waitress 8.87 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 18.88 09040 - Furniture Handler 14.47 09080 - Furniture Refinisher 18.88 09090 - Furniture Refinisher Helper 15.75 09110 - Furniture Repairer, Minor 17.31 09130 - Upholsterer 19.54 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 11.05 11060 - Elevator Operator 11.05 11090 - Gardener 14.73 11122 - Housekeeping Aide 12.29 11150 - Janitor 12.29 11210 - Laborer, Grounds Maintenance 12.18 11240 - Maid or Houseman 9.52 11260 - Pruner 11.32 11270 - Tractor Operator 13.89 11330 - Trail Maintenance Worker 12.18 11360 - Window Cleaner 12.61 12000 - Health Occupations 12010 - Ambulance Driver 13.73 12011 - Breath Alcohol Technician 17.37 12012 - Certified Occupational Therapist Assistant 21.31 12015 - Certified Physical Therapist Assistant 20.19 12020 - Dental Assistant 15.04 12025 - Dental Hygienist 27.49 12030 - EKG Technician 22.45 12035 - Electroneurodiagnostic Technologist 22.45 12040 - Emergency Medical Technician 13.73 12071 - Licensed Practical Nurse I 15.53 12072 - Licensed Practical Nurse II 17.37 12073 - Licensed Practical Nurse III 19.38 12100 - Medical Assistant 13.30 12130 - Medical Laboratory Technician 15.26 12160 - Medical Record Clerk 13.99 12190 - Medical Record Technician 14.00 12195 - Medical Transcriptionist 14.74 12210 - Nuclear Medicine Technologist 29.16 12221 - Nursing Assistant I 10.02 12222 - Nursing Assistant II 11.26 12223 - Nursing Assistant III 12.29 12224 - Nursing Assistant IV 13.79 12235 - Optical Dispenser 18.11 12236 - Optical Technician 15.63 12250 - Pharmacy Technician 13.18 12280 - Phlebotomist 13.79 12305 - Radiologic Technologist 24.57 12311 - Registered Nurse I 22.75 12312 - Registered Nurse II 27.84 12313 - Registered Nurse II, Specialist 27.84 12314 - Registered Nurse III 33.68 12315 - Registered Nurse III, Anesthetist 33.68 12316 - Registered Nurse IV 40.36 12317 - Scheduler (Drug and Alcohol Testing) 20.76 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 19.05 13012 - Exhibits Specialist II 23.61 13013 - Exhibits Specialist III 28.89 13041 - Illustrator I 18.66 13042 - Illustrator II 23.13 13043 - Illustrator III 28.30 13047 - Librarian 25.61 13050 - Library Aide/Clerk 10.60 13054 - Library Information Technology Systems 23.13 Administrator
13058 - Library Technician 14.66 13061 - Media Specialist I 16.68 13062 - Media Specialist II 18.66 13063 - Media Specialist III 20.82 13071 - Photographer I 17.17 13072 - Photographer II 19.67 13073 - Photographer III 23.69 13074 - Photographer IV 28.98 13075 - Photographer V 35.06 13110 - Video Teleconference Technician 19.28 14000 - Information Technology Occupations 14041 - Computer Operator I 16.25 14042 - Computer Operator II 18.18 14043 - Computer Operator III 20.28 14044 - Computer Operator IV 22.53 14045 - Computer Operator V 24.94 14071 - Computer Programmer I 21.66 14072 - Computer Programmer II (see 1) 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 16.25 14160 - Personal Computer Support Technician 22.53 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 28.57 15020 - Aircrew Training Devices Instructor (Rated) 34.57 15030 - Air Crew Training Devices Instructor (Pilot) 41.43 15050 - Computer Based Training Specialist / Instructor 28.57 15060 - Educational Technologist 27.95 15070 - Flight Instructor (Pilot) 41.43 15080 - Graphic Artist 20.05 15090 - Technical Instructor 23.54 15095 - Technical Instructor/Course Developer 28.80 15110 - Test Proctor 19.00 15120 - Tutor 19.90 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 9.39 16030 - Counter Attendant 9.39 16040 - Dry Cleaner 12.07 16070 - Finisher, Flatwork, Machine 9.39 16090 - Presser, Hand 9.39 16110 - Presser, Machine, Drycleaning 9.39 16130 - Presser, Machine, Shirts 9.39 16160 - Presser, Machine, Wearing Apparel, Laundry 9.39 16190 - Sewing Machine Operator 12.84 16220 - Tailor 13.56 16250 - Washer, Machine 10.27 19000 - Machine Tool Operation And Repair Occupations 19010 - Machine-Tool Operator (Tool Room) 18.47 19040 - Tool And Die Maker 21.57 21000 - Materials Handling And Packing Occupations 21020 - Forklift Operator 15.01 21030 - Material Coordinator 20.74 21040 - Material Expediter 20.74 21050 - Material Handling Laborer 15.53 21071 - Order Filler 11.42 21080 - Production Line Worker (Food Processing) 15.01 21110 - Shipping Packer 13.40 21130 - Shipping/Receiving Clerk 13.40 21140 - Store Worker I 12.78 21150 - Stock Clerk 15.99 21210 - Tools And Parts Attendant 15.01 21410 - Warehouse Specialist 15.01 23000 - Mechanics And Maintenance And Repair Occupations 23010 - Aerospace Structural Welder 23.48 23021 - Aircraft Mechanic I 22.26 23022 - Aircraft Mechanic II 23.48 23023 - Aircraft Mechanic III 24.38 23040 - Aircraft Mechanic Helper 18.02 23050 - Aircraft, Painter 21.21 23060 - Aircraft Servicer 19.81 23080 - Aircraft Worker 20.71
23110 - Appliance Mechanic 21.05 23120 - Bicycle Repairer 14.53 23125 - Cable Splicer 28.34 23130 - Carpenter, Maintenance 19.67 23140 - Carpet Layer 17.11 23160 - Electrician, Maintenance 23.72 23181 - Electronics Technician Maintenance I 20.65 23182 - Electronics Technician Maintenance II 22.01 23183 - Electronics Technician Maintenance III 26.64 23260 - Fabric Worker 18.94 23290 - Fire Alarm System Mechanic 21.92 23310 - Fire Extinguisher Repairer 17.88 23311 - Fuel Distribution System Mechanic 23.48 23312 - Fuel Distribution System Operator 19.02 23370 - General Maintenance Worker 17.30 23380 - Ground Support Equipment Mechanic 22.26 23381 - Ground Support Equipment Servicer 19.81 23382 - Ground Support Equipment Worker 20.71 23391 - Gunsmith I 17.88 23392 - Gunsmith II 19.99 23393 - Gunsmith III 22.07 23410 - Heating, Ventilation And Air-Conditioning 19.52 Mechanic 23411 - Heating, Ventilation And Air Contditioning 21.24 Mechanic (Research Facility) 23430 - Heavy Equipment Mechanic 22.88 23440 - Heavy Equipment Operator 21.41 23460 - Instrument Mechanic 21.92 23465 - Laboratory/Shelter Mechanic 21.05 23470 - Laborer 14.89 23510 - Locksmith 18.32 23530 - Machinery Maintenance Mechanic 20.20 23550 - Machinist, Maintenance 20.59 23580 - Maintenance Trades Helper 14.97 23591 - Metrology Technician I 21.92 23592 - Metrology Technician II 22.95 23593 - Metrology Technician III 24.00 23640 - Millwright 24.50 23710 - Office Appliance Repairer 21.44 23760 - Painter, Maintenance 20.88 23790 - Pipefitter, Maintenance 23.41 23810 - Plumber, Maintenance 22.03 23820 - Pneudraulic Systems Mechanic 22.07 23850 - Rigger 22.07 23870 - Scale Mechanic 19.99 23890 - Sheet-Metal Worker, Maintenance 22.36 23910 - Small Engine Mechanic 18.10 23931 - Telecommunications Mechanic I 26.92 23932 - Telecommunications Mechanic II 27.98 23950 - Telephone Lineman 23.48 23960 - Welder, Combination, Maintenance 19.46 23965 - Well Driller 22.07 23970 - Woodcraft Worker 22.07 23980 - Woodworker 16.54 24000 - Personal Needs Occupations 24570 - Child Care Attendant 11.43 24580 - Child Care Center Clerk 16.23 24610 - Chore Aide 11.03 24620 - Family Readiness And Support Services 17.23 Coordinator 24630 - Homemaker 16.73 25000 - Plant And System Operations Occupations 25010 - Boiler Tender 22.00 25040 - Sewage Plant Operator 19.78 25070 - Stationary Engineer 22.00 25190 - Ventilation Equipment Tender 16.76 25210 - Water Treatment Plant Operator 19.78 27000 - Protective Service Occupations 27004 - Alarm Monitor 16.47 27007 - Baggage Inspector 12.52 27008 - Corrections Officer 22.18 27010 - Court Security Officer 22.18 27030 - Detection Dog Handler 16.29 27040 - Detention Officer 22.18
27070 - Firefighter 20.45 27101 - Guard I 12.52 27102 - Guard II 16.29 27131 - Police Officer I 26.75 27132 - Police Officer II 29.73 28000 - Recreation Occupations 28041 - Carnival Equipment Operator 10.50 28042 - Carnival Equipment Repairer 11.56 28043 - Carnival Equpment Worker 8.96 28210 - Gate Attendant/Gate Tender 14.00 28310 - Lifeguard 11.03 28350 - Park Attendant (Aide) 15.57 28510 - Recreation Aide/Health Facility Attendant 11.37 28515 - Recreation Specialist 13.83 28630 - Sports Official 11.65 28690 - Swimming Pool Operator 18.30 29000 - Stevedoring/Longshoremen Occupational Services 29010 -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .