Amendment Three(3).pdf

PDF 23 KB Posted

Attached to
Shipyard Repair - Tug GELBERMAN
Solicitation number
W912BU-11-R-0018
Issued by

About this file

Amendment Three(3)

View the file

Other files

File Type Posted
Amendment Two(2).pdf PDF
Amendment One(1).pdf PDF
Solicitation 11-R-0018.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US ARMY ENGINEER DISTRICT, PHILADELPHIA

POC ROBERT W. HUTCHEON

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W25PHS10390320A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment Three(3)

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 01-Mar-2011

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912BU-11-R-0018

X 9B. DATED (SEE ITEM 11)

16-Feb-2011

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

01-Mar-2011

CODE

US ARMY ENGINEER DISTRICT, PHILADELPHIA

CONTRACTING DIVISION

WANAMAKER BUILDING

100 PENN SQUARE EAST

PHILADELPHIA PA 19107-3390

W912BU 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE W912BU

FACILITY CODECODE

EMAIL:TEL:

W912BU-11-R-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

TP 2.09 is changed to the following:

AMENDMENT THREE(3)

CLIN 0011 TP 2.09 Propeller Shafts

When directed by the COR, the contractor shall remove and replace the port and/or starboard propeller shafts with Government furnished spares. Any removed shafts are the property of the Government. Following shaft removal and prior to reinstallation, the Contractor shall furnish a condition found report to the COR to document the condition of the existing shafting. The report shall also document any input and directed repair action by USCG and ABS and shall be signed by the Contractor, USCG, and ABS representatives.

During reinstallation, the Contractor shall hone and blue-fit test the propellers to the shafts to produce a minimum of 80% contact between the propeller inner bore and the propeller shaft. Shafts are 25'L x 5-1/2"D plus sleeve diameters of 6-1/2”. The Contractor shall remove the rudders and propellers prior to removing the shafts.

Reinstallation of existing propellers shall be subject to the same requirements and shall be paid for under TP2.08 “Propellers”, above, as if new propellers had been directed installed. Bidders shall quote a unit price per shaft replaced under this item. For bid comparison purposes it will be assumed that two (2) propeller shafts will be replaced. If directed by the COR, the Contractor shall provide alignment services under TP 2.19 during the reinstallation of the propeller shafts. All alignment services performed under TP 2.19 shall be paid for only under

TP 2.19.

Additionally, the Contractor shall furnish a condition found report to the COR to document the condition of two (2) spare propeller shafts which will be delivered to the shipyard by the GELBERMAN. The report shall also document any input and directed repair action by USCG and ABS and shall be signed by the Contractor, USCG, and ABS representatives.

Repair and/or reconditioning of the existing or spare propeller shafts is not required by TP 2.09 and will be separately addressed under a formal contract modification.

(End of Summary of Changes)